CIVIL AND STRUCTURAL REFURBISHMENT WORKS OF SUNGAI KOTA MINI HYDRO PROJECT Rate (RM)

Items
1 a) b) c) d) Piling Works

Description

Unit

Supply, handle & pitch 200mm x 200mm initial/head pile 6.00m long. Supply, handle & pitch 200mm x 200mm extension pile 6.00m long. Drive to set 200mm x 200mm pile. Butt weld connection 0.60m girth between edges of and including mild steel extension head, base cap plates, bars etc and including coated heavily with bituminous compound for jointing 200mm x 200mm R.C piles.

M M M

No.

e) Cut off and dump away surplus length of 200mm x 200mm precast concrete pile and strip off pile head, bend back reinforcement for connection as specified. f) Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works complete with report. No.

tonne

2 a) b)

Excavator Clearing and grubbing within the Site of all trees, bushes, etc. Cut down and clear away from site, trees exceeding 300mm and not exceeding 600mm girth measured at 1.00m above ground level including grubbing up roots and filling up holes with approved earth. Supply, lay and compact hardcore of approved aggregates. 50mm Thick blinding on top of hardcore. Concretor (Including supply and delivery of materials) Lean concrete (Grade 15) in 50mm thick blinding. Reinforced concrete (Grade 25) in sub-structural works such as pile caps, pad footings, column stumps, and the like. Reinforced concrete (Grade 30) in sub-structural works such as pile caps, pad footings, column stumps, and the like. Reinforced concrete (Grade 30) in super-structural works such as columns, stiffeners, walls, and the like. m2 m3 Ha

No.

c)
d) 3) a) b)

m3 m3

c)

m3

d)

m3

Struct/1

CIVIL AND STRUCTURAL REFURBISHMENT WORKS OF SUNGAI KOTA MINI HYDRO PROJECT SUMMARY OF TENDER
Items
1 2

Description
Preliminaries and Generally Civil and Structural Works Total Tender Sum

Total

S/2

2.164 2.526 1.404 1.08 3.848 2.656 1.733 1.747 2.303 2.887 2.612 2.929 3.301 4.143 5.53 7.34 6.291 9.775 7.993 0.495 7.292 9.143 6.667 4.462 4.704 6.235 5.263 3.451 3.463 3.98 2.899 2.888 1.628 1.079 3.997382

120

8.8

111.2 113 2 226 1356 2712

169.5

Road side drain Steel rc lean concrete formwork excavation 2.88 705.6 93.1 122.5 1274 245 18 345 13.1 38 10 #### #### 1605 #### 2450 #### 397

Interceptor Steel rc lean concrete formwork excavation

1.88

282 35.25 75 350 150

18 345 13.1 38 10

5076 #### 983 #### 1500 #### 135

Interceptor Steel rc lean concrete formwork excavation

1.6

380.8 52 0 445.06 238

18 345 13.1 38 10

6854 #### 0 #### 2380 #### 180

8 1400 11200

0.2 1781 356.2 2137.2

8.94 1400 12516

1781

#REF! 36000 #REF! 70000 14 2200 30800 #REF! #REF!

592.65 3.008 3.007 3.007 3.007 3.006 3.006 3.006 3.005 3.005 5.226 3.706 3.491 2.085 2.145 2.129 2.077 1.646 1.596 1.622 1.859 1.829 2.78 2.035 1.678 0.923 0.862 0.878 0.93 1.36 1.41 1.384 1.146 1.176 2.446 1.671 1.813 1.33325

f c pt sav as hp mkn bb

1693 240 612 150 170 110 60 180 71 100 580

2625

2887.5

Toe drain length

0.315 0.016

28800 2244.417 33666.25 5262 1.057988 15.86982 33682.12 0.002066 333366