You are on page 1of 1

EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-150 1 June 2013 31 May 2013 8.00-17.00


21.00 22.00 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 C Cloudy (C), 14.00 C 15.00 C 16.00 C 17.00 C 18.00

Working Date Working Time


19.00 20.00

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Install Stair Trim Cooler 03E006A Install Fire Proof Structure 03D020 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 800HT 24" Fit-up and welding Pipe 66" 304H Chipping Fireproof Reactor 03R001 Fit-up and welding Hopper Fit-up and welding Pipe 36" 800HT Area 03A 03B 03B 03B 03B 03B 03B Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Joint Joint Set Set Joint Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 1 2 No. 4 5 6 No. 1 2 3 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Fit-up and welding Pipe 36" 800HT Preparation Fit-Up Pipe 66" 304H Area Shop Shop Shop Unit Set Joint Joint Q'ty 1 2 1 No. 1 2 3 Activities (Tomorrow) Fit-up and welding Hopper Fit-up and welding Pipe 36" 800HT Preparation Fit-Up Pipe 66" 304H Area Shop Shop Shop Unit Set Joint Joint Q'ty 1 2 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 42 21 12 2 10 5 6 3 3 7 14 2 80 88 336 168 96 16 80 40 48 24 24 56 112 16 10 11 42 21 12 2 10 5 6 3 3 7 14 2 167 80 88 336 168 96 16 80 40 48 24 24 56 112 16 1,336 Description 2 2 2 4 1 Indirect 1 1 4 2 8 8 32 16 8 16 16 16 32 1 1 4 2 1 2 2 2 4 8 8 32 16 8 16 16 16 32 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description 3 3 7 4 2 5 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 39 21 8 2 80 88 312 168 64 16 40 24 24 56 32 16 10 11 39 21 8 2 5 3 3 7 4 2 134 Unit ea ea ea 1 80 88 312 168 64 16 40 24 24 56 32 16 1,072 Q'ty 2 2 2 4 Indirect 1 1 3 2 1 1 8 8 24 16 8 8 16 16 16 32 1 1 3 2 1 1 2 2 2 4 8 8 24 16 8 8 16 16 16 32

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /