C & V ENGINEERING PTE LTD

Project Consultant Engineers GST. Reg. No. 198202518K Maxwell House, # 09-04/05. 20, Maxwell Road, Singapore 069113 Tel: 62260828 Fax: 62225645 Email : cveng0904@gmail.com Website : www.cvconslt.com
SS ISO 9001:2008 Certificate No : FS 500171

Our ref: ER420-130623-5014-CV-ULT - Method Statement for Bakau Piling to 1500mm RC Box Drain Your ref: 12605-LTA/1306/s/C072/L

23 June 2013 Officer-in-Charge Land Transport Authority 1 Hampshire Road Singapore 219428 Attn: Ms Tan Ai Ping Dear Sirs, CONTRACT NO. : ER420QP PROJECT TITLE: QUALIFIED PERSON (SUPERVISION) SERVICES FOR CONTRACT ER420 NEW ROAD LINK BETWEEN UPPER CHANGI ROAD AND UPPER CHANGI ROAD EAST

Re: - Method Statement for Bakau Piling to 1500mm RC Box Drain

1. We refer to the Contractors' submission (Ref: 12605-LTA/1306/s/C072/L Dated 11th June 2013. 2. The Above submission is accepted with comments.

Thank you Yours faithfully,

Cheng Kim Hua QP(Supervision), ER420QP

Cc:

Mr. Ho Tuck Kai ( S.O. Rep) Mr. Pat Sio Poh (Project Officer) Mr. Wong Keng Wah (Project Supervisor)

Annex A Comment Codes Review Form 1 = Minor Importance 2 = Moderate Importance 3 = Major Importance DOCUMENT REVIEW Document No. Subject: Review Department Date: QP(Supervision) Comments Code 23rd June 2013
Method Statement for Bakau Piling to 1500mm RC Box Drain

NO. Document/Drawing No. 1 General

1. Please follow LTA Materials & Workmanship Specs: 5.6.2~ 5.6.2.9 Bakau Piling (Indigenous Timber Piles). 5.6.2.1 Pile Materials Bakau Piles shall be good , sound, straight piles, with fresh unjured bark and of reasonably uniform size. 5.6.2.2 Pile Lengths Bakau Piles supplied shall be in lengths of 3m, 5 or 6m as required. Measurement shall be from the squared-off head to the pointed end, with the under-sized end cut off. 5.6.2.3 Pile Diameter The Pile diameter shall not be less than 75mm at the largest end, measured within 150mm from its end. Such measurements shall not be over knobs and protuberances. 5.6.2.4 Examination of Pile Delivered AlL Bakau Piles shall be inspected and accepted by the Engineer before being used. bakau piles that have been rejected shall be removed from the site immediately. 5.6.2.5 Protection of Pile Heads The Head of the pile shall be protected with a simple steel or cast iron ring during driving. After completion of such driving, the head shall be properly squared and cut off to the required level. 5.6.2.9 Pile Replacement All incorrectly driven piles and piles damaged during driving shall be compensated to the acceptance of the Engineer.
2

2. Secure properly the metal Dolly to be used a) Weld the Metal Dolly to the Excavator Bucket b) Install additional lifting Straps to secure the Metal Dolly c) Safety Officer /or Safety Supervisor to inform very well to all Workers and Machine Operator the RISKS in doing BAKAU Piling Works. Always remind to all to work SAFELY. d) Standing Supervision is required for Safety Supervisor and Site Engineer / Supervisor during BAKAU Piling works.
Overall Acceptance Status Please cross (x) one box 1. Accepted 2. Accepted with comments 3. Noted with comments 3. Rejected

The above comments do not relieve the contractor of his contractual obligations. The submission is Accepted

__________________ Cheng Kim Hua QP (Supervision) for ER420QP