INCLINATION ANGLE The inclination angle of a well at any point is the angle the wellbore forms between its axis and the vertical, see Figure 11.11. MEASURED DEPTH Measured depth (MD) is the distance measured along the well path from one reference point to the survey point. Measured depth is also known as Along Hole Depth and is measured with the pipe tally or by a wireline. True vertical depth (TVD) is the vertical distance measured from a reference point to the survey point. TVD is usually referenced to the rotary table, but may also be referenced to mean sea level. Northing: Horizontal distance between one survey point and the RKB, measured to the North. A distance to the South is generally d denoted t d as being b i negative. ti Easting: Horizontal distance between one survey point and the , measured to the East. A distance to the West is generally g y RKB, denoted as being negative.
A 84
W C 1852
Dt
Dn
De
HorizontalDeparture:
Dt = De + Dn
2
1
De Azimuthofthewell ( )= tan Dn
Circular Functions
Circular Functions
Radius of curvature
Radius of curvature
Whats Best?
ManualDesign:Build&HoldTrajectory(JProfile)
ManualDesign:Build&HoldTrajectory(JProfile)
To carry out the geometric planning for a Type I well, Figure 11.13, the following information is required: Surface Co Co-ordinates ordinates Target Co-ordinates TVD of target TVD to KOP Build Build-up up rate
Base Equations
Using the detailed trigonometry shown in Figure 11.13, the maximum inclination angle max for type I trajectory can be calculated for two cases:
Base Equations
Base Equations
Problem:Build&HoldTrajectory(JProfile)
Following data is given for a directional offshore well ll drilled d ill d as J-profile: J fil Origin (O): 0 Kick-off point (K) = 1000 Build Rate ( (BUR) ) = 2.50/ /100 Target data True vertical depth (V3) = 9500 Northings (Dn) = +3507 E Eastings i (De) = -1752 1752
Find the following: 1.Horizontal Departure (D2) 2.Azimuth of the well ( ) 3 Final inclination of the well ( ) 3.Final 4.End of build at TVD (V2) 5.End of build at departure (D1) 6.Measured depth at end of build (OE) 7 Total measured depth at the target (OT) 7.Total
O v1 K C
R
v2 B E v3
T D1 D2