SAIC NUMBER
DATE APPROVED
QR NUMBER
SAIC-L-2118
WBS / BI / JO NUMBER
25-May-05
MECH.
CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
EQPT CODE
SYSTEM ID.
PLANT NO.
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
The culvert length or bridge width does exceed 20 times the clearance between the top of the highest pipeline in a culvert and the ceiling of the culvert, or from the top of a pipeline to the bottom of the bridge beams. Box culverts are not used in areas where moving sand can bury the pipeline unless the pipeline is coated in accordance with SAES-H-002. The minimum spacing between any two pipes when pipelines cross under roads or railroads through box culverts shall be twice the diameter of the larger pipe. The minimum spacing between any pipe and the overhead or side portion of the culvert structure shall be 1.5 pipe diameters, but in no case less than 1 meter. Transition from pipeline spacing within corridors and that stipulated at box culverts shall be made within the road or railroad right-of-way.
SAES-L-460 Para. 6.3 SAES-L-460 Para. 6.4 SAES-B-064 Para. 10.12 SAES-B-064 Para. 10.12 SAES-B-064 Para. 10.13
A2
A3
A4
A5
REMARKS:
REFERENCE DOCUMENTS: 1. SAES-L-460, Pipeline Crossings Under Roads and Railroads, (30 September, 2003) 2. SAES-B-064, Onshore and Nearshore Pipeline Safety, (30 January, 2002)
Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Y = YES
N = NO F = FAILED
Page 1 of 1