Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------
Features
Usage Probability
Material requirements planning (MRP) plans the alternative items according to usage probability.
If you use the usage probability to determine the withdrawal posting (strategy 1), the quantities are
proposed according to the usage probability. You can change the proposed quantities.
It is possible to plan too much for alternative items, because you can enter usage probabilities
that add up to more than 100%.
Priority
The priority of an item within an alternative item group determines the sequence in which material
components are reserved in the production order.
Strategy
The strategy is only relevant to the withdrawal posting in the production order. The strategy is ignored
in MRP.
You use the strategy to determine how the items within an alternative item group are selected for the
withdrawal posting. Use the same strategy for all alternative items in an alternative item group.
The following strategies for withdrawal postings are supported:
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------Strategy 2 (100 % Availability):-
Strategy: Example
If you use this strategy, the availability checks uses, ATP logic according to the priorities you define.
100% Availability
Gross requirements: 100 pieces
Calculating issue quantity for 100% availability
Material
A
B
C
Percentage usage
probability
20
30
50
Priority
1
2
3
Planned
requirement qty
20
30
50
ATP
qty
30
150
180
Issue
quantity
0
100
0
The required quantity of the first material in order of priority that covers 100% of requirements is
reserved (material B).
The system sets the usage probability of the reserved material to 100%. The quantity and usage
probability of the other alternative items (materials A and C) are set to 0.
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------Demonstration:In the Bill of Material all the alternatives have 10 as the required quantity for 1 base quantity
For component 40000555 priority 1 is given, strategy 2 is given and usage probability is 30%
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------For component 40000666 priority 2 is given, strategy 2 is given and usage probability is 40%
For component 40000777 priority 3 is given, strategy 2 is given and usage probability is 30%
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------While the stock of materials is as follows
40000555
7 quantity
40000666
12 quantity
40000777
14 quantity
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------Planned order is created and is converted to production order.
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------In the component overview of the production order only item 40000666 shows requirement 10 and
other two materials having zero requirements as item 40000666 is having higher priority than
4000777 and can satisfy with the quantity available
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------Only material 40000666 is issued
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
-------------------------------------------------------------------------------------------------------------------------------------Strategy 1 Manual Maintenance/by usage probability: - In this strategy all or more items can be
chosen with the usage percentage.
Strategy 1
Material
Usage Probability
40000555
30%
40000666
40%
40000777
30%
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------
https://sites.google.com/site/sapppdocs/
Alternative Item Group in BOM
--------------------------------------------------------------------------------------------------------------------------------------