Short term Action Plan


Cable Joint failure of LRF- Tempreture
monitoring and Trafoil clamp has been 1 provided throughtout the cable. Carbon hose pipe puncture of LRF- New Carbon hose pipe changed of higher capacity .The pressure range is 14 kg and 2 working pressure is 4 kg. Ritter Breaker Tulip contact failureCopper flexible has been provided in placed of tulip contact.Previously we found that the upper and lower contact of same 3 breaker was burnt. Power Reliability for Caster at SMS-3House load has to provided. 4

EPS ( IRON) Responsibility


Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar

Rahul Shrivastav/Rakesh ingole/Tej kumar

Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar

Cable failure of Combi Caster: Temperature monitoring of all joints 5 started.

Sl
1

Long term Action Plan


We dont have skilled & qualified Electricians -Expert Electrician required
who can perform the job in HT system. Transformer Monitoring system to be provided in all critical Transformer of EPS IRON zone. Ventilation system to be provideed for HT panel.

Responsibility
Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar

2 3 4

Reliability of power for FES Auxiliary and Rahul Shrivastav/Rakesh ingole/Tej kumar Compressure- New Transformer to be
provided to minimize the overloading of existing 2 MVA FES Aux. Transformer.

Reliability of power for Water Complex pump House of SMS-3 - One No.
additional Transformer to be provided.In case one Transformer will failure on water complex area on that time the additional transformer is capable to bear the laod.

Rahul Shrivastav/Rakesh ingole/Tej kumar

Sl

Short term Action Plan

EPS (Steel) Responsibility

1 2 3

Rat / insect control in all HT Installations

DP Kushwaha

2 MVA Transformer for MLSM aux. Loads DP Kushwaha 33 KV Second source for MLSM Second source & New Panel Installation for SMS-II compressors DP Kushwaha DP Kushwaha DP Kushwaha DP Kushwaha

Separation of Parshada line from MLSM 5 power Interconnection between oxygen Plant Unit-1,2 and 3 6.6 KV switch boards

Annul Maintenance opportunity for 6.6kv DP Kushwaha 7 Switchboad

Sl

Long term Action Plan

Responsibility

Conversion of Open Switchyard of RUBM VAR Yard into Indoor & New Power Hub DP Kushwaha for upgoing expension projects Conversion of outdoor yard into Indoor DP Kushwaha DP Kushwaha DP Kushwaha

2 switchboard for Oxygen Plant

Spare furnace duty breaker for LRF -1 HT 3 Room Combi caster EMS transformer HT cable 4 replacement/ repairing

Sl

Short term Action Plan

Power Plant-3 Responsibility

CABLE TAGGING, HEALTH ANALYSIS, IMPROVEMENT,FIRE COATING AND ALTERNATE CABLE LAYING

MR.VIJAY MISHRA ( TG AREA:J.SONI, BOILER AREA:MANISH TIWARI)

CABLE TAGGING, HEALTH ANALYSIS, IMPROVEMENT,FIRE COATING AND ALTERNATE CABLE LAYING 2

MR.VIJAY MISHRA ( TG AREA:J.SONI, BOILER AREA:MANISH TIWARI)

CABLE GANTRY STUCTURE REPAIRING

MR.VIJAY MISHRA ( BOILER AREA:MANISH TIWARI)

Sl

Short term Action Plan


1 Hot Line Maintenance,tightness checking of all conductor joints,clamps,connectors & replacement if found damaged. 2 Hot Line washing of insulators& bushings

MRSS-1 & 2 Responsibility


Pankaj Gurg,Ravish Ranjan,M.V.Sudhakar Pankaj Gurg,Ravish Ranjan,M.V.Sudhakar

Overhauling of SF-6 COMPRESSOR

Earthing of Power Transformers Comprehensive test of Transformers

5 6 7

Thermography Cooling Tower erection

Sl

Long term Action Plan


1 LEU to GDU conversion 2 Conversion of Out door to Indoor 33kv yard

Responsibility

3 Capacitor replacement of SVC Yard 4 To install gas insulated CT

5 CCTV for 220KV Yard

6 P&V System for 220KV control room

7 Alternate source for EAF-3 8 Pritection system enhancement

Sl

Short term Action Plan


Preventive maintenance of all equipments 1 done as per schedule Thermovision of HT panels, cable termination and cable joints should be 2 checked regularly. Condition of cable vaults and condition of cables in gantry/ cable trench should be 3 checked regularly. Vibration and condition monitoring of
4 critical drives should be checked regulary Earthing of Power Transformers 5

Power Plant-1 Responsibility

Sl

Short term Action Plan

Power Plant-2 Responsibility

MR.VINOD AHIRWAR ( ALL CABLE GANTRY PAINTING WORK TG & INHOUSE CABLE INSPECTION & FIRE AREA):,MR.P.SREENAT COATING TO BE PROVEDED. 1 H (BOILER AREA) ALL TRANSFORMERS PAINTING TO BE MR.VINOD AHIRWAR & DONE Mr.P.SREENATH AIR COOLED AC SYSTEM TO BE PROVIDED MR.VINOD AHIRWAR & Mr.P.SREENATH MR.VINOD AHIRWAR & Mr.P.SREENATH

4 TEMPERATURE MONITORING

Sl

EPS CABLE MAINTENANCE Short term Action Plan Responsibility

ALL CABLE GANTRY INSPECTION & 1 DUST CELEANINI TO BE DONE 2 ALL GANTRY PAINTING TO BE DONE

ALL TYPE OF HT CABLE TO BE 3 MAINTAIN IN CENTRILISED PLACE HT CABLE GANTRY APPROACH TO BE 4 MADE

ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE

Sl

EPS GENARAL ELECT Short term Action Plan Responsibility

Sl

Power Plant-2 (2X25) Short term Action Plan Responsibility

IRON) Remark Target Date

Remark

Target Date

(Steel) Remark Target Date

Done at Platemill. Pending in other plant. Pending , 11kv source not availble Pending. Will be executed in Yr 2013-14 Pending . Spare cable laid from Platemill in case of emergency. Pending Interconnection between 1 & 2 done. With unit -3 pending. Pending

Remark
Pending Pending. Panel ordered. Cable laid. Room making pending. Pending Pending

Target Date

Plant-3 Remark
HT CABLE(11KV,6.6KV) TO HOUSELOAD POWER USERS (DRI-II, SMS-II,COKE OVEN BF-II) HEALTH STATUS ANALYSIS AND IMPROVEMENT.

Target Date

HT CABLE(6.6KV) TO GRID POWER USERS (BF-II,COKE OVEN,SINTER PLANT,LIME KILN) HEALTH STATUS ANALYSIS AND IMPROVEMENT. CABLE GANTRY STRUCTURE COLLAPSED NEAR BOILER CONTROL ROOM, (6.6KV CABLES LAID FOR BF-II,COKE OVEN LIME KILN, SINTER PLANT,POWER PLANT-BOILER) SHUTDOWN REQUIRED

S-1 & 2 Remark


To ensure healthiness of switichgear

Target Date
30-3-2013

Due to SMS dust & fumes which contasin conducting particle & deposits on insulators & bushing,we are taking preventive measure to wash it on monthly basis. Pneumatic operated SF-6 CB for 220KV network which are consisting compressor units in continuous operation needs overhauling New earthing Four nos of Power Transformers will be done Diagnostic test being done on critical Transformers As part of predictive maintenance SVC Cooling tower has been erectedfor reliable performance

13-Mar

30-3-2013

Remark

Target Date

In order to reduce the inventory the firing card willSep-13 be changed to digital one Aug-13 We have planned to change 2nd harmonic cap cans with new one for reducing its neutral unbalance as well as better protection which enhance its performance and reliability On critical bays it is required for better performance

Required for better communication & remote monitoring of yard equipments In order to maintain temp of control room pannels.it is required In order to increase run ability of furnace two different power source will be provided Electromagnetic relay will be

Plant-1 Remark
Preventive action

Target Date

Pro-active action

Preventive action

Help is bing taken by CMC New earthing 48 nos of Power Transformers will be done

Plant-2 Remark
ALL CABLE GANTRY HEALTHINESS TO BE MAINTAIN ALL POWER & DISTRIBUTION TRANSFORMER HEALTHNESS TO BE MAINTAIN SOME ELECTRICAL CONTROL ROOM WHERE HEAT & DUST PROBLEM IS MAZOR TEMPERATURE MONITORING OF ALL HT/LT BREAKERS & CABLE JOINTS

Target Date

MAINTENANCE Remark

Target Date

ALL CABLE GANTRY MAINTENANCE ALL HT CABLE GANTRYPAINTING HT CABLE YARD MADE WHERE IT IS REQUIRED

6 MONTH 1 YEAR REGULAR AS & WHEN

ARAL ELECT Remark Target Date