Responsibility
Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar Rahul Shrivastav/Rakesh ingole/Tej kumar
2 3 4
Reliability of power for FES Auxiliary and Rahul Shrivastav/Rakesh ingole/Tej kumar Compressure- New Transformer to be
provided to minimize the overloading of existing 2 MVA FES Aux. Transformer.
Reliability of power for Water Complex pump House of SMS-3 - One No.
additional Transformer to be provided.In case one Transformer will failure on water complex area on that time the additional transformer is capable to bear the laod.
Sl
1 2 3
DP Kushwaha
2 MVA Transformer for MLSM aux. Loads DP Kushwaha 33 KV Second source for MLSM Second source & New Panel Installation for SMS-II compressors DP Kushwaha DP Kushwaha DP Kushwaha DP Kushwaha
Separation of Parshada line from MLSM 5 power Interconnection between oxygen Plant Unit-1,2 and 3 6.6 KV switch boards
Sl
Responsibility
Conversion of Open Switchyard of RUBM VAR Yard into Indoor & New Power Hub DP Kushwaha for upgoing expension projects Conversion of outdoor yard into Indoor DP Kushwaha DP Kushwaha DP Kushwaha
Spare furnace duty breaker for LRF -1 HT 3 Room Combi caster EMS transformer HT cable 4 replacement/ repairing
Sl
CABLE TAGGING, HEALTH ANALYSIS, IMPROVEMENT,FIRE COATING AND ALTERNATE CABLE LAYING
CABLE TAGGING, HEALTH ANALYSIS, IMPROVEMENT,FIRE COATING AND ALTERNATE CABLE LAYING 2
Sl
5 6 7
Sl
Responsibility
Sl
Sl
MR.VINOD AHIRWAR ( ALL CABLE GANTRY PAINTING WORK TG & INHOUSE CABLE INSPECTION & FIRE AREA):,MR.P.SREENAT COATING TO BE PROVEDED. 1 H (BOILER AREA) ALL TRANSFORMERS PAINTING TO BE MR.VINOD AHIRWAR & DONE Mr.P.SREENATH AIR COOLED AC SYSTEM TO BE PROVIDED MR.VINOD AHIRWAR & Mr.P.SREENATH MR.VINOD AHIRWAR & Mr.P.SREENATH
4 TEMPERATURE MONITORING
Sl
ALL CABLE GANTRY INSPECTION & 1 DUST CELEANINI TO BE DONE 2 ALL GANTRY PAINTING TO BE DONE
ALL TYPE OF HT CABLE TO BE 3 MAINTAIN IN CENTRILISED PLACE HT CABLE GANTRY APPROACH TO BE 4 MADE
ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE ASHOK KUMAR , AK BANCHHORE
Sl
Sl
Remark
Target Date
Done at Platemill. Pending in other plant. Pending , 11kv source not availble Pending. Will be executed in Yr 2013-14 Pending . Spare cable laid from Platemill in case of emergency. Pending Interconnection between 1 & 2 done. With unit -3 pending. Pending
Remark
Pending Pending. Panel ordered. Cable laid. Room making pending. Pending Pending
Target Date
Plant-3 Remark
HT CABLE(11KV,6.6KV) TO HOUSELOAD POWER USERS (DRI-II, SMS-II,COKE OVEN BF-II) HEALTH STATUS ANALYSIS AND IMPROVEMENT.
Target Date
HT CABLE(6.6KV) TO GRID POWER USERS (BF-II,COKE OVEN,SINTER PLANT,LIME KILN) HEALTH STATUS ANALYSIS AND IMPROVEMENT. CABLE GANTRY STRUCTURE COLLAPSED NEAR BOILER CONTROL ROOM, (6.6KV CABLES LAID FOR BF-II,COKE OVEN LIME KILN, SINTER PLANT,POWER PLANT-BOILER) SHUTDOWN REQUIRED
Target Date
30-3-2013
Due to SMS dust & fumes which contasin conducting particle & deposits on insulators & bushing,we are taking preventive measure to wash it on monthly basis. Pneumatic operated SF-6 CB for 220KV network which are consisting compressor units in continuous operation needs overhauling New earthing Four nos of Power Transformers will be done Diagnostic test being done on critical Transformers As part of predictive maintenance SVC Cooling tower has been erectedfor reliable performance
13-Mar
30-3-2013
Remark
Target Date
In order to reduce the inventory the firing card willSep-13 be changed to digital one Aug-13 We have planned to change 2nd harmonic cap cans with new one for reducing its neutral unbalance as well as better protection which enhance its performance and reliability On critical bays it is required for better performance
Required for better communication & remote monitoring of yard equipments In order to maintain temp of control room pannels.it is required In order to increase run ability of furnace two different power source will be provided Electromagnetic relay will be
Plant-1 Remark
Preventive action
Target Date
Pro-active action
Preventive action
Help is bing taken by CMC New earthing 48 nos of Power Transformers will be done
Plant-2 Remark
ALL CABLE GANTRY HEALTHINESS TO BE MAINTAIN ALL POWER & DISTRIBUTION TRANSFORMER HEALTHNESS TO BE MAINTAIN SOME ELECTRICAL CONTROL ROOM WHERE HEAT & DUST PROBLEM IS MAZOR TEMPERATURE MONITORING OF ALL HT/LT BREAKERS & CABLE JOINTS
Target Date
MAINTENANCE Remark
Target Date
ALL CABLE GANTRY MAINTENANCE ALL HT CABLE GANTRYPAINTING HT CABLE YARD MADE WHERE IT IS REQUIRED