AARVI ENGINEERING & CONSULTANTS PVT. LTD.

155,1 Floor, Shah & Nahar Industrial Estate (A1),Sitaram Jadhav Marg Lower Parel-West, Mumbai,400013, Maharashtra, India, Client : M/s.Yashdeep chemical India Pvt Ltd. Doc. No. : AECPL-111-xxxx-xx-R0 Project No. : AECPL-111 Project : Specility Chemicals Equipment Name: 2 HP Blower Qty : 04 No. Process conditions: 1.0 Name of fluid Air + vapors I 40 / - / II Operating temp.(normal/ min./ max.) C Molecular weight 29 III Solid contents Nil IV Size of solids (average/ max.) * V mm Nature of solids * VI 3 Capacity (normal/ min./ max.) 1500/1200/1800 VII m /hr Differential pressure 180 VIII mmWC Suction pressure Atm IX bar g Zone Gas group IIA/ IIB X Design data: 2.0 Design temperature (min./ max.) - / 50 I C Design pressure * II bar g 3.0 Performance and construction data: Impeller size I mm Efficiency *% II Shut-off head * III m */*/* IV Power (bid/ end of curve/ max impeller) kW Type of sealing * V Sound level * VI dB Motor: 4.0 Item number * I Make Crompton II Model number * III Type * IV Class FLP/ TEFC zone 1, Grp.II A/B, T4 V Efficiency class Eff 1 VI Motor power 2 VII HP RPM 2900* VIII Mounting * XI Bearing: X Type * a Make SKF b Lubrication * c Motor to blade connection Direct coupled/ with belt drive 5.0 Weight: 6.0 Weight of pump with base plate and motor * a kg 7.0 I II III IV V VI Material Specification: Equipment parts Casing Impeller Hub Shaft Shaft sleeve Base plate
st

MOC Fibre Glass-Reinforced Plastic Polypropylene * EN8* SS410* MS Fabricated

Remark Page 1 of 7

AARVI ENGINEERING & CONSULTANTS PVT. LTD. 155,1 Floor, Shah & Nahar Industrial Estate (A1),Sitaram Jadhav Marg Lower Parel-West, Mumbai,400013, Maharashtra, India, Client : M/s.Yashdeep chemical India Pvt Ltd. Doc. No. : AECPL-111-xxxx-xx-R0 Project No. : AECPL-111 Project : Specility Chemicals Equipment Name: 2 HP Blower Qty : 04 No. Process conditions: Nut-bolts CS VII List of documents/ drawing: Filled-in datasheet/ specification. Foundation plan with static and dynamic load. General arrangement/ Dimensional outline drawing with sections and connections. List of commissioning spares. List of spares and consumables for 2 yrs of normal operation. Operation and maintainance manuals. Fabrication drawing* Electrical wiring diagram* P&I diagram* Detail of utility consumption* List of bought-outs and makes* Connected load details* Operating panel details and drawings* Performance curves*
st

1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0

Number of hard copies and soft copies: Stage for document submission S. No. Name of document Proposal Review/ Approval Final 2 H/C 3 H/C + S/C 4 H/C + S/C 1.0 Filled-in datasheet/specificaton 2 H/C + S/C 3 H/C + S/C 4 H/C + S/C 2.0 G.A./ Dimensional drawing Foundation plan 2 H/C + S/C 3 H/C + S/C 4 H/C + S/C 3.0 Performance curves 2 H/C 3 H/C + S/C 4 H/C + S/C 4.0 2 H/C 3 H/C + S/C 4 H/C + S/C 5.0 Quality, Inspction & testing plan Other documents 2 H/C 3 H/C + S/C 4 H/C + S/C 6.0 Note: 1.0 2.0 3.0 0 REV

Abbreviations: H/C: hard copy, S/C: soft copy * indicates vendor to specify/ confirm. ** indicates client to specify/ confirm. Issued for approval DESCRIPTION 22.08.13 DATE SGJ PRPD PBS CHKD VDS APPD

Page 2 of 7

AARVI ENGINEERING & CONSULTANTS PVT. LTD.


155,1 Floor, Shah & Nahar Industrial Estate (A1),Sitaram Jadhav Marg
st

Lower Parel-West, Mumbai,400013, Maharashtra, India,


Client : Bostik India Pvt. Ltd. Doc. No. : AECPL-108-2010-79-R0 Project No. : AECPL-108 Ref. P&ID: AECPL-108-2004-02-R0 Project : ADHESIVE MANUFACTURING UNIT Sheet : 02 of 03 Equipment Name : PE1K1 vent blower Tag No. : PE1C2 Qty : 04 No. 10.0 Material Specification: Equipment parts MOC Remark 10.1 Housing ASTM A106 Gr.WCB 10.2 Blades ASTM A106 Gr.WCB 10.3 Hub * 10.4 Shaft EN8* 10.5 Shaft sleeve SS410* 10.6 Base plate MS Fabricated 10.7 Nut-bolts CS Notes: 1.0 * indicates vendor to specify/ confirm. 2.0 ** indicates client to specify/ confirm.

AARVI ENGINEERING & CONSULTANTS PVT. LTD.


155,1 Floor, Shah & Nahar Industrial Estate (A1),Sitaram Jadhav Marg
st

Lower Parel-West, Mumbai,400013, Maharashtra, India,


Client : Project No. : Project : Document Name : Bostik India Pvt. Ltd. AECPL-108 ADHESIVE MANUFACTURING UNIT PE1K1 vent blower Tag No. : Doc. No. : AECPL-108-2010-79-R0 Ref. P&ID: AECPL-108-2004-02-R0 Sheet : 03 of 03 PE1C2 Qty :

1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0

List of documents/ drawing: Filled-in datasheet/ specification. Foundation plan with static and dynamic load. General arrangement/ Dimensional outline drawing with sections and connections. Bar chart indicating various activities of fabrication. List of commissioning spares. List of spares and consumables for 2 yrs of normal operation. Operation and maintainance manuals. Quality, inspection and testing plans with schedule. Fabrication drawing* Electrical wiring diagram* P&I diagram* Detail of utility consumption* List of bought-outs and makes* Connected load details* Operating panel details and drawings* Performance curves* Number of hard copies and soft copies:

S. No. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Note:

Name of document Filled-in datasheet/specificaton G.A./ Dimensional drawing Foundation plan Performance curves Manufacturing schedule Quality, Inspction & testing plan Other documents

Proposal 2 H/C 2 H/C + S/C 2 H/C + S/C 2 H/C 2 H/C 2 H/C 2 H/C

Stage for document submission Review/ Approval 3 H/C + S/C 3 H/C + S/C 3 H/C + S/C 3 H/C + S/C 3 H/C + S/C 3 H/C + S/C 3 H/C + S/C

Final 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C

* This documents are to be submitted wherever applicable. * abbreviations: H/C: hard copy, S/C: soft copy

TS PVT. LTD.

am Jadhav Marg ra, India,

08-2010-79-R0 08-2004-02-R0 04 No.

ission Final 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C 4 H/C + S/C

You might also like