Professional Documents
Culture Documents
21/07/10 Date
Pasqualato Prepared by
Ditommaso Checked by
Chiorrini Approved by
Company Document ID
00250600BBQB09623
Job N. Contractor Document ID
2506-ZA-E-09623
Vendor logo and business name Contract N. Vendor Document ID Order N. Scale n.a.
Location ONSHORE
Sheet of Sheets 1 of 31
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 2 / 31
e & p division
00
REVISION HISTORY
Rev. CD-FE 00
Date 21/07/2010
Nr. of sheets 32
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 3 / 31
e & p division
00
INDEX
3 4
GENERAL .............................................................................................................................................................4 1.1 Scope and Objective........................................................................................................................................4 1.2 Terms and definitions ......................................................................................................................................4 QUALITY CONTROL PLANNING........................................................................................................................5 2.1 Information Related to this Document .............................................................................................................5 2.2 Issuing of QCP and ITP(s)...............................................................................................................................5 2.3 Construction Contractor responsibility.............................................................................................................6 2.4 Local Regulations ............................................................................................................................................6 APPLICABLE DOCUMENTATION ......................................................................................................................6 3.1 Specifications Codes and Standards ..............................................................................................................6 SITE QUALITY ACTIVITIES.................................................................................................................................6 4.1 Site welding activities.......................................................................................................................................6 4.2 Inspection on welding resources .....................................................................................................................7 4.3 Welding inspection checklists........................................................................................................................10 ATTACHMENTS .................................................................................................................................................13 5.1 ITP (s) ............................................................................................................................................................13 5.2 Forms List ......................................................................................................................................................13
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 4 / 31
e & p division 1
1.1 1.1.1 1.1.2
00
GENERAL
Scope and Objective This specification defines the quality control requirements for Construction Contractor for the execution of welding of Piping / Tank /Vessel / Structural Steel related works to be performed during construction of logistic support base. This document is additional to specification n 2506-ZA-E-09610 already delivered to Construction Contractor and with all other applicable contractual documentation. Terms and definitions PROJECT COMPANY ZUBAYR OIL FIELD DEVELOPMENT PROJECT Eni S.p.A. Exploration & Production Division
1.2
1.2.1
The following terms and definitions are applicable to this document: Construction Contractor(s) Company TPI Organisation(s), including its sub-contractors to whom any part of the Works has been subcontracted by Client; Is the party, which requests contract activities/service and pays for them Third Party Inspection: any organization, authority, person or persons, to which Construction Contractor has subcontracted the execution of inspection and or laboratory testing related activities. Means the facilities constituting the Project, including all the construction services, materials and equipment to be provided by Client to satisfy its obligations pursuant to the Contract undertaken with the Client. Quality Management System: part of the organizations management system that focuses on achievement of results, in relation to the quality objectives, to satisfy the needs, expectations and requirements of Client and of any other interested parties, as appropriate. Quality Control Specification: Company specification for quality control requirements. Quality Control Plan: Construction Contractor plan contain all quality control requirements. This plan complements and compiles all applicable ITP(s). Inspection and Test Plan: Construction Contractor plan of inspection and tests required by engineering and vendors documents or elsewhere specified. ITP(s) shall provide references to applicable procedures, acceptance criteria, documentation, quality records and inspection attendance to be performed, in chronological order, from initial inspection, throughout final inspections and mechanical completion. ITP(s) and relevant forms shall be issued as QCP enclosures. Inspection report Form, attached to the ITP. They shall be used during checks and inspections /tests and signed by the involved parties, as per relevant QC code. Request for Inspection: Written notification to be issued by Construction Contractor in order to allow all parties involved to perform their inspection and test witness as planned in the applicable ITP; Quality Assurance: Part of quality management focused on providing confidence that quality requirements will be fulfilled;
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Works
QMS
QCS QCP
ITP
MDT
RFI
QA
Sheet of Sheets 5 / 31
e & p division
QC NCR Non Conformity Special Process
00
Quality Control: Part of quality management focused on fulfilling quality requirements; Non Conformity Report: Document recording a non-fulfilment of a requirement; The non-fulfilment of specified requirements; A process, the results of which are highly dependent on the control of the process or the skill of the operator and in which the specified quality cannot be readily determined by inspection or test on the product; Comparison of a measurement and test equipment with a reference standard or with another one provided with better tolerance in order to detect or to measure possible inaccuracies and to document or eliminate them.
Calibration
1.2.2
Any other terms related to quality and not listed above shall conform to section 3 Term and Definition of ISO 9000:2005 Quality Management System Fundamentals and vocabulary.
2
2.1 2.1.1 2.1.2
2.
2.2 2.2.1
Issuing of QCP and ITP(s) Construction Contractor shall endorse and reissue this document Quality Control Specification (QCS) as Quality Control Plan (QCP), improving the enclosed ITPs in accordance to the scope of work, project requirements and completing the information requested on clause 3.1 and the ITPs columns Reference document & Acceptance Criteria Construction Contractor will number the QCP in accordance to the project numbering system provided by Company. If during Works Construction Contractor will need additional ITP/ ITP phase for further test and checks with the relevant QC Codes, the same shall be numbered adding an alphanumeric suffix to the preceding available QC Code. New QC Codes shall be submitted and approved by Company. Construction Contractor during the execution of the Works shall revise and update, as and when required, the QCP(s) and relevant ITP(s) to incorporate any other pertinent requirements set forth in engineering specifications, standards, design codes, recommended practices, safety design, referred hereafter or included elsewhere in the contractual and vendors documents. Before starting of Works, the QCP containing the ITPs applicable for the project items and works, shall be submitted by the Construction Contractor for Company review and approval.
2.2.2
2.2.3
2.2.4
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 6 / 31
00
2.3.5 2.3.6
3
3.1 3.1.1 3.1.2 3.1.3
APPLICABLE DOCUMENTATION
Specifications Codes and Standards Contractual Specification: Project Specifications: TO BE UPDATE BY EPC CONTRACTOR Codes and Standards: Applicable Codes and Standards are those referred in the above specification and in engineering documentation. API 650 for TANK AWS D1.1 for Steel structures ASME B31.3 ASME V ASME IX ASME II Part C
4
4.1 4.1.1
Sheet of Sheets 7 / 31
e & p division
TABLE 1
00
Welding documents control (Welding summary list/Weld map / WPS / WPQR / Work Instructions) PWHT procedure control Welding personnel Inspection, testing and examination personnel Welding and allied process equipment Welding consumables Materials (base metals and consumables) identification and traceability Welding execution Post weld heat treatment execution Welding related inspection and testing Quality records
4.2 4.2.1
Inspection on welding resources Construction Contractor will provide resources such as: working facilities, welding equipment tools, consumables, weather protection and any other special equipments suitable to the specific work to be performed. Welding resources and welding activities are outlined in Table 2 TABLE 2
Tools Equipment (2) Construction Contractor action (1)
Reference
Welding quality control - Check on that warehouse shall be dry, clean and protected by weather condition. - Check on different working areas for storage, working tools, welding consumables, working and welding activities according to parent material (carbon steel, stainless steel, nonferrous material, etc). - Check on identification of non destructive examination area. - Check on identification of scrap area.
Working facilities
Visual inspection
Visual inspection
Visual inspection
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 8 / 31
e & p division
Tools Equipment (2) Reference Construction Contractor action (1)
00
Welding quality control - Check on the availability of welding machine, cables, amperometer, voltmeter, etc. - Check on calibration of all parameters that can affect production quality - Check on certificates - Check on availability, efficiency and cleaning of purging and trailing gas system - Check on cylinder identification/marking - Check on efficiency, calibration and cleaning of gas flow meter, gas hoses, etc. - Check on certificates - Check on availability of cutting tools, cutting torch and similar. - Calking tool efficiency - Test efficiency - Check on availability of yokes, jigs, pipe couplers, connecting spacers, etc - Check on presence of different area in warehouse for fit-up equipment in terms of: pipe base metal chemical composition, etc. - Check on certificates - Check on identification and marking
Project specification
Visual inspection
Visual inspection
- Check on that Welding consumables warehouse is dry, clean and protected by weather condition. - Check on presence of different area in warehouse for consumables in terms of: storage, conditioning and scrap; type, size and classification. - Check on batch/lot certificates - Check on filler metal marking - Check on implementation of manufacturer recommendations for storage, drying, reconditioning and handling
- Check on the availability of ovens. - Check on certificates, marking - Test temperature calibration - Check on availability of brushing, grinding tools, etc. - Check on presence of different area in warehouse for tools in terms of: type / material - Check on identification and marking
Visual inspection
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 9 / 31
e & p division
Tools Equipment (2) Reference Construction Contractor action (1)
00
Welding quality control - Check on availability of proper protection for the part to be welded and for welders/ operators function of weather conditions and welding process/ consumables - Check on availability of gauges, calliper, magnifier lens, mirror, borescopes, artificial lighting, etc. - Check on certificates and calibration - Test efficiency - Check on availability of X-ray machines, -ray sources, radiographic film, intensifying screens, wire IQI, hole IQI, densitometer, etc. - Check on certificates and calibration - Test efficiency - Check on availability of pulse-echo instrument, TOFD, probes, couplant, calibration blocks, etc - Check on certificates and calibration - Test efficiency - Check on the availability and efficiency of penetrant, emulsifiers, solvents and cleaning agents, etc. - Check on certificates - Test efficiency - Check on availability of electromagnet or similar, magnetic particles, lighting equipment. - Check on certificates and calibration - Test efficiency - Check on availability of instruments - Check on certificates, calibration and marking - Test efficiency - Check on availability of instruments - Test efficiency -Check on certificates, calibration and marking - Check on the availability of thermocouples, heating elements, electrical generator, temperature indicating-crayons, insulation and cables. - Availability check of oven - Check on certificates, calibration and marking - Test efficiency - Check on availability and efficiency
Weather protection
Project specification
Visual inspection
Equipment for liquid penetrant examination Equipment for magnetic particle examination Equipment for hardness checks, Positive material identification, Ferrite measurements Special equipments (like Eddy current equipment, Oxygen meter, etc) Equipment for preheating, post heating and postweld heat treatment
Manufacturer recommendation / certification Manufacturer recommendation / certification Manufacturer recommendation / certification PMI specification Manufacturer recommendation / certification
Visual inspection
Notes:
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 10 / 31
e & p division
00
1. Construction Contractor will issued and submit to Company Welding Supervisor for approval written procedures detailing welding material and equipment receiving, storage, handling, preservation and maintenance. All procedures will be in accordance with the manufacturers recommendations (if any). 2. All item will be tested or monitored at specified intervals during progress of work as required by ASME B31.3 & ASME V and by accepted procedure. Relevant testing and measurement records will be maintained at site by Construction Contractor and be made available at all time to Company upon request. Construction Contractor shall demonstrate at all time all applicable and approved welding procedures has been followed as well as proper sequence of inspection or testing and shall ensure identification and traceability of material and equipment from receiving throughout all installation. 4.3 4.3.1 Welding inspection checklists Table 3 lists minimum welding inspection checklists to be developed implemented by Construction Contractor in accordance with the enclosed ITP(s)
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 11 / 31
e & p division
TABLE 3
WORK PHASE Pre-Welding Inspection -
00
DESCRIPTION OF INSPECTION/CHECKS Check presence of approved WPS Check removal of protective coating from bevel end. Check conformity of base materials in compliance with the WPS Check materials identification and transfer of material ID. All materials must be marked as to its material composition before starting of welding operations. Verify joint preparation (angle, gap, landing, etc.) and tack welds (presence, correctness). Verify consumables materials per WPS (type, size, etc.) and Brand/Manufacturer (if required). Check handling, storage & re-conditioning of electrodes Check calibration of welding machines (only for automatic machine) Verify correct alignment in reference to the specification Verify if weather conditions are acceptable for welding Verify NDT performed on cut fittings or for cut bevel pipe prior to welding Check segregation of SS materials and relevant tools from carbon steel materials and alloyed materials Check that consumables are reconditioned conforming to supplier recommendation. Check wind barriers as required Check remote current control utilized Check proper grounding and polarity Check protection of external coating Check removal internal clamp after completition 100% of the root pass Check removal external clamp after the execution 60% of the root pass Check removal of tack welds (if required) Check and verify pre-heating as per standard requirements (WPS procedure, applications, temperature diagrams, etc) Check fulfilment of WPS variables Check heat input/run out of length (if required) Check monitoring of interpass temperature Check grinders for SS materials not contamined with CS material Verify weave not exceeding 3X diameter electrode (as required by WPS) Verify correct application of shielding and internal purging gas (if required) Visual inspection of each pass Check back-gouging (if applicable): method, surface appearance and NDT application. Verify consumables and rod ovens Verify quivers and rod ovens are in use and at temperature Verify rebake ovens are properly set and used
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 12 / 31
e & p division
Post-Welding Inspection -
00
Visual Inspection (weld profile, size, reinforcement, visual defects, etc) Verify weld and welder ID markings Check Postheat (when required) Check PWHT (when required) Check Hardness testing (when required) Check NDT Verify welding/quality records, weld table/map and daily weld summary sheet PMI of alloy welds
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 13 / 31
e & p division 5
5.1 5.1.1 5.1.2
00
ATTACHMENTS
ITP (s) General ITP for Initial Inspection: ITP N WL-0001 Document review and material receiving Specific ITP for construction: ITP N WL - 0101 Welding of: piping components, saddles and supports- pressure vessel storage tank Steel Structure Forms List Inspection and test report forms: MDT.WL.CDQ.0132 Positive material identification report MDT.WL.CDQ.0133 Register sheet of approved WPS/WPQR MDT.WL.CDQ.0134 Register sheet of approved Welders and Welding Operators MDT.WL.CDQ.0135 Register sheet of approved NDE Operators MDT.WL.CDQ.0136 Register sheet of approved Welding Procedures MDT.WL.CDQ.0141 Radiographic examination report MDT.WL.CDQ.0142 Liquid penetrant examination Daily report MDT.WL.CDQ.0143 Ultrasonic examination Daily report MDT.WL.CDQ.0144 Ultrasonic examination Daily report for lamination MDT.WL.CDQ.0145 Summary of Welds - Ndt (Weekly Report) MDT.WL.CDQ.0150 Alignment and welding visual inspection daily report MDT.WL.CDQ.0160 Welding summary list MDT.DT.CDQ.0610 Golden weld
5.2 5.2.1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets 14 / 31
e & p division
ITP N WL-0001 Title: DOCUMENT REVIEW AND MATERIAL CONSUMABLE RECEIVING QC CODE
WL 0001 01
00
Description
Before commencement the Project works review and approval of following documents: -Welding Summary List -WPS/PQR
Acceptance Criteria -API 650 for TANK - AWS D1.1 for Steel structures
ASME IX ASME B31.3 ASME IX ASME B31.3
Quality Records/ Document Register list of WPS and PQR used in Project MDT.WL.CDQ.0 133 Register List MDT.WL.CDQ.0 134
Involvement Notes CC
P
QC
H
SP
R
TP
CO
CL
Issue WPS, Welding Table, Weld Map (for Equipment) according to Piping class / Construction drawings (for Equiment) for SP-WES approval. Register in dedicated list for each welders/operators project qualified under SP-WES supervision.
WL
0001
02
Project SPC..
WL
0001
03
Magnetic particle Test Penetrant Test Radiographic Test Ultrasonic Test Visual Test
Register in dedicated list each NDE operators project qualified under SP-WES supervision.
WL
0001
04
Project SPC..
ASME B31.3
Qualification/ certification
INVOLVEMENT CODE P Perform/Submit W Witness (minimum 20% inspection rate) S Surveillance H Hold Point (100% inspection rate) R Review M- Monitoring
Sheet of Sheets 15 / 31
e & p division
ITP N WL-0001 Title: DOCUMENT REVIEW AND MATERIAL CONSUMABLE RECEIVING QC CODE
WL 0001 05
00
Description Procedures review: 1. Procedure for Storage, Drying, Reconditioning, Handling and Scrapping of Welding Consumables. 2. Procedure for Weld Identification and Weld Traceability (original, modified and repaired welds) 3. Weld Repair Method 4. Production Weld Hardness Testing Procedure* 5. Post Weld Heat Treatment Procedure* 6. Positive Material Identification Procedure* 7. Procedure for Control of Welding Consumables 8. Penetrant Test 9. Magnetic Particle Test 10. Radiographic Test 11. Ultrasonic Test 12. Visual Test 13. Ferrite Test*
Receiving inspection and verification of welding consumables and theirs certificates
Acceptance Criteria
ASME IX ASME B31.3 ASME V
Involvement Notes CC
P
QC
H
SP
R
TP
CO
CL
SP-WES to file copy of approved procedures
* if required by Client
Specification
WL
0001
06
Project SPC..
ASME II Part C -API 650 for ASME B31.3 TANK - AWS D1.1 for Steel structures
INVOLVEMENT CODE P Perform/Submit W Witness (minimum 20% inspection rate) S Surveillance H Hold Point (100% inspection rate) R Review M- Monitoring
Sheet of Sheets 16 / 31
e & p division
ITP N WL-0001 Title: DOCUMENT REVIEW AND MATERIAL CONSUMABLE RECEIVING QC CODE
WL 0001 07
00
Description
Welding measurement devices: Calibration, Verification
Acceptance Criteria
Manufacturer Recommendation ASME B31.3 ASME V
Involvement Notes CC
P
QC
H
SP
W
TP
CO
CL
Welding measurement devices Register
WL
0001
08
Project SPC..
MDT.WL.CDQ. 0145
INVOLVEMENT CODE P Perform/Submit W Witness (minimum 20% inspection rate) S Surveillance H Hold Point (100% inspection rate) R Review M- Monitoring
Sheet of Sheets 17 / 31
e & p division
00
ITP N WL-0101 Title: WELDING OF: PIPING COMPONENTS, SADDLES AND SUPPORTS- PRESSURE VESSEL STORAGE TANK Steel Structure QC CODE
WL 0101 01
Description
Alignment and welding visual inspection report
Acceptance Criteria
Approved WPSs ASME B31.3
Involvement Notes CC
P
QC
H
SP
W
TP
CO
CL
CC shall maintain Quality Records in a register at QC/CC office to submit to SP-WES.
WL
0101
02
Golden Weld
MDT.WL.CDQ. 0610
WL
0101
03
- Selection of Weld seams position (Tank) - Control of Welded Joints, selection for NDE (a) - In-Process NDE Inspection (b)
Project SPC..
-API 650 for WSL TANK MDT.WL.CDQ.0160 - AWS D1.1 for Steel structure - ASME B31.3
- ASME V
(a) 100% witness: WI / WS shall participate in the selection of weld seams position (tank) , weld to be tested (b) CC shall maintain Quality Records in a register at QC/CC office to submit to SP-WES. P only If CC NDE Operators and Equipment are not approved by Client 100% RX reading, daily inspection on ongoing construction works due by SP no Notification is require
WL
0101
04
Project SPC..
- ASME V
INVOLVEMENT CODE P Perform/Submit W Witness (minimum 20% inspection rate) S Surveillance H Hold Point (100% inspection rate) R Review M- Monitoring
Sheet of Sheets 18 / 31
e & p division
ITP N WL-0101 Title: WELDING OF: PIPING COMPONENTS, SADDLES AND SUPPORTS- PRESSURE VESSEL STORAGE TANK Steel Structure QC CODE
WL 0101 05
00
Description
Application of Post Weld Heat Treatment Hardness Testing Application and Results
Involvement Notes CC
P
QC
W
SP
W
TP
P
CO
CL
As defined in WPS laboratory test result
WL
0101
06
Positive Material Identification (PMI) of deposited weld for alloyed materials (where applicable)
- ASME B31.3
MDT.WL.CDQ. .0132
WL
0101
07
Final Welding Inspection: Check Welding Summary Report, Weld Map and all quality records (NDT, PMI, FERRITE, PWHT, HARDNESS, REPAIR).
Project SPC..
WSL MDT.WL.CDQ.0160
INVOLVEMENT CODE P Perform/Submit W Witness (minimum 20% inspection rate) S Surveillance H Hold Point (100% inspection rate) R Review M- Monitoring
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
INSPECTION
Line number Spool number Heat number Pmi Elements Acceptable Yes Not
NOTES:
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME
TP
NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
WPS N
WPQR N
QUALIFICATION RANGE
APPROVED DATE
NOTES:
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
NOTES:
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
NOTES:
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
PROCEDURES
1.
2.
Procedure for Storage, Drying, Reconditioning, Handling and Scrapping of Welding Consumables Procedure for Weld Identification and Weld Traceability (original, modified and repaired welds) Weld Repair Method Production Weld Hardness Testing Procedure Post Weld Heat Treatment Procedure Positive Material Identification Procedure Procedure for Control of Welding Consumables Penetrant Test Magnetic Particle Test Radiographic Test Ultrasonic Test Visual Test Ferrite Test Welding Procedures
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
PAGE
FILM PROGR. N WELD N FILM LOCATION DRW/ ISO/SPOOL N DIAM. [] THICK. [mm] WELDER STAMP
OF
JUDGEMENT (1)
MATERIAL
NX NR RX NT EX
(1) A = ACCEPTABLE; NX = UNACCEPTABLE RADIOGRAPHY; NR = TO BE REPAIRED; RX = RADIOGRAPHY TO BE REPEATED; NT = TO BE CUT; EX = EXAMINATION TO BE EXTENDED NOTES: INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME
TP
NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
SURFACE CONDITION
As welded Ground
As rolled Brushed
As Forged Machined
As cast As bent
Conformance to processes of :CLEANING, PENETRANT APPLICATION / REMOVAL, DRYING, DEVELOPER APPLICATION , PENETRATION TIME
TAG/LINE NUMBER
DRW/ISO/SPOOL
WELD NUMBER
MATERIAL A
JUDGEMENT (1)
;
EX
NR
RX
NT
(1) A = ACCEPTABLE; NR = TO BE REPAIRED; RX = TO BE REPEATED; NT = TO BE CUT; EX = EXAMINATION TO BE EXTENDED NOTES: Attach list of welds examinated INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME
TP
NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
OF
MATERIAL JUDGEMENT (1) A NA EX
[]
THICK.SS [mm]
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
SIGNATURE
TP
SIGNATURE
CLIENT
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
Progres. number
Weld number
Pipe Number
Material
Type of indication
Evaluation (1)
A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC A NR NC
NDE procedure: Legend: (1) A= Acceptable
NOTES:
Code/Standard:
Drawing:
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME
TP
NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
OF
Actual week
Total previous
WITH RT
EXISTING WELDS EXECUTED WELDS n. CHECKED ACCEPTED REPAIRS CUT RT REFUSED DEFECT TO REPAIR n. n: n. n. n. n.
WITH UT
RT + UT
WITH RT
WITH UT
RT + UT
n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n. n.
Lack of penetration Lack of fusion (in root) Root concavity Overlap Porosity cluster Undercut Undercut (in root) Slag inclusion Wormholes Cold lap Crack Crater crack Gas inclusion Excess weld metal Excessive penetration Poor restart
DEFECT TO CUT
Crack Stray flash or arc strike Summary defect Welds not accepted by RT Welds not accepted by UT
THE LAST FOUR POSITIONS REFER EXCLUSIVELY TO THE WELDS CHECKED USING BOTH METHODS (RT+UT)
NOTES: INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME
SP
NAME NAME
CLIENT
SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
Date
Date
Date
Date
CLIENT
JOB
UNIT 100
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
PAGE
OF
REPORT
FOR TANK /VESSEL
PLATE TO PLATE N NOZZLE N
STEEL STRUCTURE
TAG / ELEMENT
FOR PIPING.
WELD N. LINE NUMBER SPOOL NUMBER
ALIIGNEMENT: - PIPE To PIPE -/PIPE to FLANGE - PLATE to -PLATE -BEAM To BEAM -NOZZLE
A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT A NR NT
A = ACCEPTABLE; NR = TO BE REPAIRED; NT = TO BE CUT NOTES: INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT. CONTRACTOR
NAME NAME SIGNATURE SIGNATURE Date Date Form code: MDT.WL.CDQ.0150 Date Date SIGNATURE SIGNATURE
SP
NAME NAME
CLIENT
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT 100
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
Weld
Weld No
Welder Stamp NPS
MATERIAL
Result Result
WPS
Control NDT
Result Result Result Result Mark Item Piece No Heat No
VT PT / MT RT 1 RT 2 UT 1 UT 2 Preheating PWHT
Other Information
HB Test
Golden Weld
inch
Thick mm
Test Pack
Description
Type of Material
Manufacturer
Date
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
CLIENT
JOB
UNIT 100
e & p division
Construction Contractor
PLANT LOCATION
QC CODE
ONSHORE
PROJECT TITLE
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.