APQP APQP WAS WAS FIRST EVOLVED FIRST EVOLVED BY BY THE THE GREAT SAINT GREAT SAINT T THIRUVALLUVAR HIRUVALLUVAR
Mobile : + 91 98402 61401 Email: ram@jvrconsultants.net
Website: www.jvrconsultants.net
AUTHOR & FACULTY
V. RAMAVALLABHAN. B.Sc.,PGDMBA,DPM.
CERTIFIED LEAD AUDITOR : ISO 9001 (IRCA & RABQSA),
ISO / TS 16949 (SMMT-IF IATF, & AIAG), AS 9100C (RABQSA)
ISO 14001 BY IEMA, OHSAS 18001 BY IRCA & ISO 50001 BY BSI
CERTIFIED IPC SPECIALIST IPC/WHMA-A-620 BY IPC
CERTIFICATE OF LEAN COMPETENCY LEAN MANUFACTURING FROM QCI
CONSULTANT: BPR, WCM, TQM, TPM, LEAN, 5S, VE, WM, ISO Series, etc.
ABOUT THE FACULTY
Background:
Physics Graduate with Post Graduate Diploma in Master of Business Administration (PGDMBA), Diploma in
Production Management (DPM).
Certified Lead Auditor ISO 9001 (IRCA & RABQSA), ISO/TS 16949 (SMMT-IF IATF & AIAG), AS 9100C
(RABQSA), ISO 14001 (IEMA), OHSAS 18001 (IRCA) and ISO 50001 (BSI).
Certificate of Lean Competency Lean Manufacturing from QCI.
Certified IPC Specialist : IPC/WHMA-A-620 Requirements and Acceptance for Cable and Wire Harness
Assemblies.
Key Attributes:
Over 2 decades exposed to Multi Branches of industries namely Electrical, Electronics, Mechanical, Plastics and
sophisticated screen printing, in the areas of R & D, Manufacturing, Quality, Reliability, Supplier Development,
Product Transfer, Agency Approvals, Customer Support, Process Engineering, Etc.
Traveled to countries like Singapore, USA and Srilanka for New Product development, Supplier development,
2
JVR CONSULTANTS www.jvrconsultants.net The symbol of success
Traveled to countries like Singapore, USA and Srilanka for New Product development, Supplier development,
Product Transfer, Training & Development of the employees.
Presented papers in International seminar on various topics like TQM, Global Warming, etc.
Currently since the year 2005 offers Training (Technical & Soft skills) and covered 1000s of participants.
On Consulting, completed and working on various projects on Business Process Development, TQM, Product
Transfer, 5S, Waste Elimination, Kaizen, FMEA, PPAP Documentation, ISO 9001, ISO 14001,OHSAS 18001,
ISO/TS 16949, ISO/TS 29001,etc.
The industries trained and undertook projects include Automobile, Electronics, Electrical, Mechanical, Plastics,
Printing, FMCG, Cement, Sugar, Rubber, Chemical, Construction, Fabrication, etc.
His approach on implementing system will be Simple, Practical and Cost effective.
Awards: Received Awards for best Soft Skills and Corporate Trainer.
Member: NIQR INDIA, QCI INDIA, IPC-USA
For more information (especially on Service record on training and projects, Clients, interesting Articles, etc.):
Please visit www.jvrconsultants.net
wII @u IIw
w u w 8@.
u @ u u wI
I I m w@u, IIw
wIU 8u w @@@u.
Appropriate method of executing an activity has to be neatly
planned before starting the same; planning after execution is an
APQP APQP WAS WAS FIRST EVOLVED FIRST EVOLVED BY BY THE THE GREAT SAINT GREAT SAINT T THIRUVALLUVAR HIRUVALLUVAR
planned before starting the same; planning after execution is an
offence.
0 : @8@O Source :
Thirukkural
: @O@ Author : Thiruvalluvar
0 : @L0 0 Subject : Whealth :
Royalty
u 47 : 0 Chapter 47 : Deliberation
Before Action
@O : 407 Poem : 407
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
When Pithamahar Bhishma was about to leave the world, laying on
the bed made of arrows, advices Pandavas especially to Yudhishtra the
eldest among the Pandavas who is supposed to take the crown, as
follows:
One must get down to work after determining which task are
very essential and which are marginal. Only those who can
The following are decoded from Mahabharatha
by a Telugu Scholar Prayaga Ramakrishna
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
very essential and which are marginal. Only those who can
determine priorities whithout delay may be said to be sagacious.
If there is no plan for programme implementation, all allotted
time gets wasted. So planning must be right. It is termed
strategy. If all work is to be completed effectively and
efficiaently, the strategy must be sound.
HOPE THIRUVALLUVAR MIGHT HAVE THE DEEP KNOWLEDGE ABOUT HOPE THIRUVALLUVAR MIGHT HAVE THE DEEP KNOWLEDGE ABOUT
THIS AND REFERED. THIS AND REFERED.
APQP APQP -- OVERVIEW OVERVIEW
Planning the Quality into Product Planning the Quality into Product
Objectives Objectives
Design Design
5
Process Process
Quality product Quality product
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
APQP carried out in five phases APQP carried out in five phases
Planning Planning
Concept Concept
Approval Approval
Program Program
Approval Approval
Prototype Prototype
Approval Approval
Pilot Lot Pilot Lot Launch Launch
APQP APQP TIMING CHART TIMING CHART
6
Product Design & Development Product Design & Development
Process Design & Development Process Design & Development
Production Production
Feedback Assessment & corrective action Feedback Assessment & corrective action
Product and Process Validation Product and Process Validation
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
5.0 MANAGEMENT RESPONSIBILITY
5.4 PLANNING
Top management shall ensure that quality objectives, including those
needed to meet requirements for product (see 7.1a) are
established at relevant functions and levels within the
organisation. These quality objectives shall be measurable and
5.4.1 QUALITY OBJECTIVES
ISO 9001:2008 Quality Mangement System ISO 9001:2008 Quality Mangement System
7
organisation. These quality objectives shall be measurable and
consistent with the quality policy.
Top Management shall ensure that
a) The planning of the quality system is carried out in order to meet
the requirements given in 4.1 General Requirements as well as
quality objectives.
b) The integrity of the QMS is maintained when changes to the
QMS are planned and implemented.
5.4.2 QUALITY MANAGEMENT SYSTEM PLANNING
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
Jumping into action without strategic planning will yield Jumping into action without strategic planning will yield
undesirable results. undesirable results.
Planning should be made based on data and application of Planning should be made based on data and application of
SMART principles which are Specific, Measurable, SMART principles which are Specific, Measurable,
Achievable, Realistic and Time Bound. Achievable, Realistic and Time Bound.
LEARNING LEARNING
8
JVR CONSULTANTS www.jvrconsultants.net The symbol of success The symbol of success The symbol of success The symbol of success
Achievable, Realistic and Time Bound. Achievable, Realistic and Time Bound.
If you If you fail to plan then you are planning to fail. fail to plan then you are planning to fail.
Once again to stress on the point whatever we come across Once again to stress on the point whatever we come across
on certain concepts in the name of system are told by our on certain concepts in the name of system are told by our
ancient poet or in the epic. ancient poet or in the epic.
JVR CONSULTANTS JVR CONSULTANTS JVR CONSULTANTS JVR CONSULTANTS
The symbol of success The symbol of success The symbol of success The symbol of success
9
KSHEERABDHI 29 Ramachandra Road, Nehru Nagar, Chromepet, Chennai 600 044. KSHEERABDHI 29 Ramachandra Road, Nehru Nagar, Chromepet, Chennai 600 044.
Mobile: +91 9840261401. Email: Mobile: +91 9840261401. Email: ram@jvrconsultants.net ram@jvrconsultants.net, Website:www.jvrconsultants.net , Website:www.jvrconsultants.net
020910

You might also like