FAT

No

Item Schedulle

FAT Date

Mechanical 1 Waste Water System 2 Service Water Supply 3 Compressed Air System 4 Fire Fighting System 5 Over Head Travelling Crane 6 Mechanical Bulk Material 7 Piping Bulk Material Electrical 1 Transformer 2 MV & LV Service System 3 Emergency Service System 4 Lighting, Ligthtening and Earthing 5 Telephone System & PABX 6 Electrical and I&C bulk Material

Wednesday, December 11, 2013 Wednesday, December 11, 2013 Wednesday, December 11, 2013 Saturday, January 25, 2014 Thursday, February 20, 2014 Wednesday, December 11, 2013 Wednesday, December 11, 2013

Sunday, February 09, 2014 Sunday, February 09, 2014 Wednesday, December 11, 2013 Wednesday, December 11, 2013 Wednesday, December 11, 2013 Wednesday, December 11, 2013

FAT Date Actual Schedulle

Material On Site Actual

Friday, January 10, 2014 Friday, January 10, 2014 Friday, January 10, 2014 Monday, February 24, 2014 Tuesday, March 11, 2014 Friday, January 10, 2014 Friday, January 10, 2014

Tuesday, March 11, 2014 Tuesday, March 11, 2014 Friday, January 10, 2014 Friday, January 10, 2014 Friday, January 10, 2014 Friday, January 10, 2014

Construction Excecution Schedulle Start

Finish

Duration (Days) 7 14 30 30 30 171 171

1/11/2014 1/17/2014 1/11/2014 1/24/2014 1/11/2014 2/9/2014

2/25/2014 3/26/2014 3/12/2014 4/10/2014 11/15/2013 11/15/2013 5/4/2014 5/4/2014

3/12/2014 4/10/2014 3/12/2014 4/27/2014 3/12/2014 4/10/2014 1/11/2014 2/9/2014

30 47 30 30 30 30

4/11/2014 5/10/2014 4/11/2014 5/10/2014

No. Item Work Preparation Work 1 Mobilization personil & equipment Mobilization Equipment Setting Out Site Cleaning & Preparation Material Puring Test Job Mix Desain Temporary Utilities and Facilities Temporary Field Office for Contractor & Owner Temporary Jetty at ITEUNG Beach (Including Road & Bridge Strenghened/as required)

Start (Date) 23-Sep-13 23-Sep-13 24-Sep-13 24-Sep-13 27-Sep-13 24-Sep-13 27-Sep-13 27-Sep-13 27-Sep-13 27-Sep-13

Finish (Date) 31-Oct-13 23-Sep-13 7-Oct-13 26-Sep-13 10-Oct-13 26-Sep-13 31-Oct-13 31-Oct-13 16-Oct-13 31-Oct-13

Civil Work No. Item Work Foundation ,construction & floor 1 Turbin Foundation Demister Foundation Pipe Support Sleeper Flash Tank Foundation Auxilary Cooler Foundation Clean and dirty Oil Tank Foundation Lube Oil Cooler Foundation Cooling Water Pump Foundation Separator Concrete Foundation Transformer and NGR Foundation Rock Muffler Cable Duct Floor Power House 2 Turbine Building Work (Structure and architecture) Turbine Building - Steel Structure - Overhead crane 3 Other Works

Start (Date) 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 13-Oct-13 27-Oct-13 18-Oct-13 18-Oct-13 5-Nov-13 12-Mar-14 11-Apr-14 12-Mar-14 31-Oct-13

Finish (Date) 30-Apr-14 1-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 4-Nov-13 20-Nov-13 6-Nov-13 6-Nov-13 30-Apr-14 30-Apr-14 30-Apr-14 10-Apr-14 30-Apr-14

Duration (Days) 39 0 14 3 14 3 35 35 20 35

Remarks delay delay delay delay

Duration (Days) Remarks 200 20 23 23 23 23 23 23 23 23 23 25 20 20 177 50 20 30 182

Mechanical Work No. Item Work Mechanical Work Major Equipment Installation (TG) 1 Generator Lube and control Oil System Steam piping and separator Flash Tank Pressure control and venting Auxilary Cooling System Pipe Work 2 BOP Waste Water System Service Water Supply Compressed air system Fire Fighting System Overhead Travelling Crane Laboratory and environmental Equipment Workshop and store equipment HVAC Pre-Commisioning (RE Scope) Commisioning Test (RE scope)

Start 15-Nov-13 15-Nov-13 15-Nov-13 6-Dec-13 11-Jan-14 11-Jan-14 10-Feb-14 3-Mar-14 11-Jan-14 19-Dec-13 11-Jan-14 11-Jan-14 11-Jan-14 25-Feb-14 12-Mar-14 11-Jan-14 19-Dec-13 11-Jan-14 11-Apr-14 25-Apr-14

3 4

Finish Duration Remarks 4-May-14 171 23-Mar-14 129 Data FAT, MDR & MDS, certificate if any for Turbin?? 5-Dec-13 21 Data FAT, MDR & MDS ?? 4-Jan-14 30 (who do flushing oil work)?? 9-Feb-14 30 limit supply of gasket, bolt. 24-Jan-14 14 2-Mar-14 21 23-Mar-14 21 9-Feb-14 30 Requirment for PWHT, NDT (point) and Hydrotest (value) Limit?? 10-Apr-14 17-Jan-14 24-Jan-14 9-Feb-14 26-Mar-14 10-Apr-14 24-Jan-14 8-Jan-14 20-Jan-14 24-Apr-14 4-May-14 113 7 14 30 30 30 14 21 10 14 10

MDS, MDR, tes load with Disnaker??

scope (MP) ? With TA or not? Tools and special tools? scope (MP) ? With TA or not? Tools and special tools?

No.

Electrical and I&C Equipment Item Work Electrical and I&C Equipment Installation Generator Output system Transformer Medium voltage service system Low voltage service system Emergency service system Lighting, Lightning and earthing Telephone System Including PABX Control And Monitoring System Pulling Cable and support Electrical Pre Commisioning Test

Start 13-Dec-13 13-Dec-13 13-Dec-13 12-Mar-14 12-Mar-14 12-Mar-14 12-Mar-14 11-Jan-14 11-Apr-14 11-Apr-14 11-Jan-14 28-Apr-14 28-May-14 28-May-14 7-Jun-14

Finish Duration 27-May-14 166 10-May-14 149 1-Jan-14 20 10-Apr-14 30 10-Apr-14 30 27-Apr-14 47 10-Apr-14 30 9-Feb-14 30 10-May-14 30 10-May-14 30 12-Mar-14 61 27-May-14 30 1-Jul-14 6-Jun-14 1-Jul-14 35 10 25

Start Up and Commissioning PRE Commissioning Commissioning

Remarks

Data FAT, MDR & MDS, certificate if any for Turbin?? Data FAT, MDR & MDS ?? (who do flushing oil work)?? limit supply of gasket, bolt.

Requirment for PWHT, NDT (point) and Hydrotest (value) Limit??