Supplier Name
Customer Input Requirement Specification/Data Notes
Date:
Responsibility Target Date Completion Date
Programme (Customer / plant) Model Year Lead Part Number Lead Part Name
Programme Details
Programme Manager Senior PD Engineer PD Engineer Programme Buyer Supplier Programme Engineer Manufacturing Engineer Plant Quality Engineer Systems/Validation Engineer
Prototype Tool Try Out 1PP - (delivery of PSW parts?)? FEU (builds post 1PP / PSW, prior Job 1) - ? Craftsmanship IMDS Compliance Job 1 (SOP) Annual Volume Daily Planned Volume (DPV) Capacitised Planned Volume (CPV) Weekly Customer Gateway expectations Customer Gateway expectations -e.g. PCS / FPDS / VPDS
Materials Weight Quality Targets Warranty Targets Engineering Specifications Design Verification Production Verification
Design Goals
Specification/Data
Notes
Responsibility
Target Date
Completion Date
Manufacturing site and associated GSDB code Advanced Product Quality Planning (ie. timing plan to PPAP / PSW) APQP Status Reporting IMDS reporting Frequency of APQP status reporting after "kick-off" Use of additional APQP Status reports for new expectations Problem solving techniques - additional Quality Operating System (QOS / BOS) Launch Readiness Reviews % OEE (or TAKT times if required) R@R / PSW Production Trial Run PSW submission checklist including customer specific PSW / PPAP Approval Supplier Web page - Reportcard quality/delivery metrics Preferred MS Project using 23+2 elements (ability to make rapid changes to report) As provided by Customer Programme STA Evidence required in PPAP section 17 for PSW approval Typically monthly - submitted to STA, Programme Buyer + receiving plant As required (Typically Supplier or Customer issues / changes) Use of Global 8D problem solving Quality Roadmaps (data driven "gap" analysis) Tracking of internal and external rejects + resolution actions ? Use of OEE reports as build up to R@R / PSW PTR Customer attended R@R / PTR for all processes If STA sign-off required allow typical 2 weeks for planning
STA expectations
Lead Design Responsibility (see SoW) CAD system requirements (IDE-AS/Catia) Has CAD model interface been supplied (IGS?) Have Specifications been supplied (system + component) Has Design concept been supplied (CAD A Surface details etc.) DFMEA - supplier / customer input required Is Tooling sign off required - expectations? DVP - supplier / customer input required GD&T Required ? Engineering change control
PD Expectations
ASME Y14.5M-1994
Poke -Yoke due to flow through? General Poke-Yoke? Quality expectations Additional Launch Quality actions - additional quality - additional personnel cover Packaging Approval Delivery schedule (EDI)
Manufacturing expectations
PFMEA identified flow through must be Poke-Yoke Best practice should be used Zero Defect policy is in place (0 PPM and 0 Quality Rejects) Safe Launch Plan - plant approval necessary Confirmation of TS16949 customer specific requirements see Safe Launch Plan Use form Eu1121 (obtainable from Customer supplier website) Special requirements to be passed from plant
10/11/2013 12:41 AM
Page 1 of 3
Compatibility Report for APQP_Customer Input Requirement_ver2.xls Run on 08/10/2013 12:03 The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when opening this workbook in an earlier version of Excel or if you save this workbook in an earlier file format.
Minor loss of fidelity Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.