Shear Design for Pilecap To BS5400 1) Dimension XX Section 2) Dimension YY Section 3) Effective Depth in XX Section 4) Effective Depth in YY Section

5) Total Reinforcement Provison in XX Dir 6) Total Reinforcement Provison in YY Dir 7) Concrete Grade 8) Reinforcement Grade 9) Pile Size 10) Pile Nos in xx row 11) Pile Nos in xx row 12) Shear Reinforcement Provided Shear Check at Section 1 1 2 3 4 5 6 7 8 9 10 11 12 13 Shear force at section considered Distance of pile from face of support,av Shear stress,v Allowble shear stress Remark Ultimate shear stress in concrete,vc Depth factor Enhanced shear stress Shear Capacity, F Shear reinforcement, Asv/sv Nos of stirrup legs Spacing of link provided, Sv Provision of Shear reinforcement Shear Check at Section 2 1 2 3 4 5 6 7 8 9 10 11 12 13 Shear force at section considered Distance of pile from face of support,av Shear stress,v Allowble shear stress Remark Ultimate shear stress in concrete,vc Depth factor Enhanced shear stress Shear Capacity, F Shear reinforcement, Asv/sv Nos of stirrup legs Spacing of link provided, Sv Provision of Shear reinforcement Shear Check at Section 3 kN mm N/mm2 N/mm2 N/mm2 N/mm2 kN mm2/mm mm kN mm N/mm2 N/mm
2

= = = = = = = = = = = =

6 5 2000 1800 50000 60000 40 460 300 4 6 12 XX-Dir 5000 760 0.42 4.74 OK 0.55 0.71 2.053 9142 0.82 7 962 NO XX-Dir 5000 100 0.42 4.74 OK 0.55 0.71 4.750 15614 -7.26 7 -109 NO XX-Dir

m m mm mm mm2 mm2 N/mm2 N/mm2 mm

mm YY-Dir 5000 100 0.56 4.74 OK 0.65 0.73 4.750 17077 -11.77 20 -192 NO YY-Dir 5000 100 0.56 4.74 OK 0.65 0.73 4.750 0 11.94 20 189 YES YY-Dir

N/mm2 N/mm2 kN mm2/mm mm

Shear Check at Section 3 1 2 3 4 5 6 7 8 9 10 11 12 13 Shear force at section considered Distance of pile from face of support,av Shear stress,v Allowble shear stress Remark Ultimate shear stress in concrete,vc Depth factor Enhanced shear stress Shear Capacity, F Shear reinforcement, Asv/sv Nos of stirrup legs Spacing of link provided, Sv Provision of Shear reinforcement kN mm N/mm2 N/mm2 N/mm2 N/mm2 kN mm2/mm mm

XX-Dir 5000 100 0.42 4.74 OK 0.55 0.71 4.750 15614 -7.26 7 -109 NO

YY-Dir 5000 100 0.56 4.74 OK 0.65 0.73 4.750 0 11.94 20 189 YES

1 2 3 4 5 6 7 6 8 9 10 11 12 13 14

Punching Shear Check Critical shear force at section considered Critical section width,b Distance from face of support to pile, av Average effective depth in both direction Average of reinforcement both direction Shear stress,v Allowable shear stress, v Ultimate shear stress in concrete, vc Depth factor Enhanced shear stress Shear capacity of the section Reinforcement required Ortogonal reinforcement required Nos of stirrup legs provided Spacing of the link required

1000 4432 585 1900 55000 0.12 4.74 0.64 0.72 2.98 5304 NO Rqrd 15 -

kN mm mm mm mm2 N/mm2 N/mm2 N/mm2 N/mm2 kN mm2/mm mm2/mm mm

``

Early Thermal Cracking Of Concrete BD28/87 1) Section Properties

B 1) 2) 3) 4) 5) 6) 7) 7) 2) Width Depth Concre Grade Reinforcement Grade Cement Content Formwork Climate Condition Short-term fall in temperature Using Prediction Method Effective area of concrete Min area of reinforcement 3) For crack control Bar Type fct/fb Permissible Crack Width Ult. tensile Strain of Concrete Shrinkage strain of concrete Coefficient of thermal expansion Long-term fall in temperature Thermal strain of concrete Restraint condition Restraint factor = = = = = = = = = = 0.5 0.67 0.25 200 100 0.000012 0 0.000432
O

= = = = = = = =

6700 6700

mm mm N/mm2 N/mm2 kg/m3

45

= =

3350000 11559

mm2 mm2

mm microstrain microstrain

Required reinforcement bar Area of reinforcement required

= =

16

mm

2 11922.78 mm