You are on page 1of 3

191453027.xls.

ms_office

Updated 07/26/02

R/3 4.6C Integration


R/3 Transaction Master system for data maintenance (Create and Change): R/3 or APO Rule for User Exit/Comments Corresponding R/3 View Blocked Field

APO Product Master (View / TAB)

APO Field

Comments Only load the Production Planners at 1020 and 1100 for Prepacks using the prepack SNP Planner numbers - this is needed to support the Prepack Heuristic For products that are shipped coast-tocoast the location-product at the destination warehouse should be set to 920 to allow visibility to the deployment planner. Not is use at this time T01 Products moving from 1080 to 1020 T02 Products moving from 1080 to 1150 T03 Products moving from 1150 to 1020 T04 Products moving from 1020 to 1100 T05 Products moving from 1080 to 1100 T06 Products moving from 1090 to 1100 T07 Products moving from 1100 to 1020 When loading Period Lot Size Calendars, item must be set to Lot-forlot Both R/3 and APO will need to be manually loaded after go-live. T = Days, W = Weeks When loading Period Lot Size Calendars, item must be set so that the number of weeks equals the weeks on the Planning Calendar, e.g. if the Planning Calendar = W4 010202 then the Number of Periods field must be set to 4. Setting this to any other number will cause calculation errors! When loading Period Lot Size Calendars, item must be set to Lot-forlot

Administration Prod. Planner /SAPAPO/PLANNER_PPS APO

For the value to maintain this No Directly field, look in the Material master Connected in R/3 in view "Work Scheduling" R/3 Field and field "Production Scheduler" For the value to maintain this No Directly field, look in the Material master Connected in R/3 in view "MRP1" and field R/3 Field "MRP Controller" No Directly Connected R/3 Field "Blank"

Work Scheduling

Administration SNP planner /SAPAPO/PLANNER_SNP Demand planner /SAPAPO/PLANNER_DEMAND APO APO

MRP1

Administration

Administration Transp. Planner /SAPAPO/PLANNER_TRANS Lot size Lot size Lot size Indicator:Lot-for-lot /SAPAPO/SL_LSZ_EXACT Indicator Lot Size by Period SAPAPO/SL_LSZ_PERI Period Type /SAPAPO/PERVR

APO

See Special procurement keys in R/3 they should always be No Directly maintiained so that they match. Connected Transportation planner is only R/3 Field maintained in the DC's Y - See Note Y - See Note Y - See Note Obtain input value information from Planner of the Product Change 1020, 1100 & 1150 to Lot-for-Lot Obtain input value information from Planner of the Product

R/3 R/3 / APO R/3 / APO

MM03 MM02 MM02

MRP1 MRP1 MRP1

Lot size Number of Periods /SAPAPO/RRP_PERAZ Lot size Planning Calendar /SAPAPO/TSTRID Y - See Note No Directly Connected R/3 Field Obtain input value information from Planner of the Product Obtain input value information from Planner of the Product

R/3 / APO

MM02

MRP1

APO

11/26/2013 5:08 AM

191453027.xls.ms_office

191453027.xls.ms_office

Lot size Safety stock Method Lot size Target Stock level Method TARGET_METHOD APO

APO

No Directly Connected R/3 Field No Directly Connected R/3 Field

Set to "MB" at locations 1020 and 1100

Set to "2"

Setting to "MB" tells the system to use the Safety Stock (Planned) value as seen in the SNP Interactive view. All Locations - Setting this field to "2" tells the system to use the safety stock as the target floor quantity. All Locations - Setting this field to "X" tells the system to use the value in the Period Factor field (see below) to determine the order dates whenever the SNP buckets are greater than 1 day. Leaving this field blank will cause orders to be dated on Thursdays when the buckets are one week in length. takes values from 0 -1. A setting of "0" (blank) causes the orders to be dated on Mondays if the Availability Date field (see above) is set to "X". A setting of 0.7 moves the date to Friday. If w change our settings we do not want to set the number so that the order creatin date is a non workday or no order will be created.

Lot size No Directly Set to "X" for all locations except Connected 1150. For 1150 leave the field R/3 Field blank.

Availability Date REQ_COVER_FLAG

APO

Lot size No Directly Connected R/3 Field No Directly Connected R/3 Field

Period Factor REQ_COVER_TYPE SNP 2 Demand profile /SAPAPO/SNPDPREX

APO

Leave the field blank.

APO

"DP_001" for all items

SNP 2

Supply profile /SAPAPO/SNPSPREX SNP 2 DeployPrfl /SAPAPO/SNPDPLEX

APO

APO

Prepacks at all locations use "PREPACK" Finished goods at all DC locations use "FG_9D" Finished Goods at all Plants use No Directly "FG_12D" Connected Finished Goods at R/3 Field SubContractors use "SUBCON" No Directly Connected R/3 Field "Z_P_A" for all products Allows dependent requirements for prepacks that are used when making other prepacks to be immediately planned when running the PP/DS heuristic for prepacks.

PP/DS Automatic planning in the Planning Run PP/DS Heuristics APO APO

No Directly Connected R/3 Field No Directly Connected R/3 Field

Set for Prepacks only in 1020 and 1100 Set Heuristic for Prepacks only to "MC_PP_002PPK" at both locations 1020 and 1100.

11/26/2013 5:08 AM

191453027.xls.ms_office

191453027.xls.ms_office

GR/GI

GR processng time /SAPAPO/GRPRT

APO

R/3 will be Set to "1". Since this field is blocked this APO field is "Blank". Load only for deployed item stock transfers moving Coast-toCoast = 1 day Load Coast-to-Coast Deployment items with ten (10) days to hold stock at source location = 10 days. Block for all other products.

MM02

MRP2

GR/GI

GI processing time /SAPAPO/GIPRT

APO

Need document to Populate equivalent R/3 Field 1020, 1050, 1080 This will prevent coast-to-coast stock transfer orders from being planned to ship the same day as the Deployment Heuristic is run.

ATP Checking horizon /SAPAPO/CHKHOR R/3 Y

MM03

ATP Checking horizon calendar /SAPAPO/CALIND Extras PP/DS Sequencing Extras Mfr_Se_-Grp Extras Dep_Sel_Grp Procurement Planned Delivery Time APO APO APO APO APO

Use EST Z6 for Locations 1020 No Directly & 1150; EST Z2 for Location Connected 1080; PST Z3 for Location 1090; R/3 Field and PST Z5 for Location 1100 No Directly Connected Obtain input value information R/3 Field from Planner of the Product No Directly Connected Obtain input value information R/3 Field from Planner of the Product No Directly Connected Obtain input value information R/3 Field from Planner of the Product This should only be populated for items that we buy from vendors and not for items shipped between facilities Y

This is used to define the sequencing order of products on a production line. File Name: Product Selection Groups.xls

11/26/2013 5:08 AM

191453027.xls.ms_office

You might also like