Work description HOT WORK

Those present
Name Company Signed

JOB SEQUENCE HAZARD/S CONTROL/S

Cutting and Welding Burn, Injury Safety guard must install/ only
It may be injured when persons with professional
cutting by broken disk certificate granted by competent
wheel. authority are allowed to do the
Works.
It may be burn when
cutting or welding near Trained operators
by the exist storage Must wear personnel protective
Damaged insulation on equipment (PPE)
welding leads, electrode Check the equipment before use
holders and connections. Providing fire extinguishers at the
Faulty earth leads welding/ cutting area.
Combustible material removed
from the area.
PROJECT:

DATE :

REF:

SAFETY: JOB SAFETY ANALYSIS ( J.S.A. )


Work description Excavation for water tank of supply building

Those present
Name Company Signed

JOB SEQUENCE HAZARD/S CONTROL/S

1. Plan Setup Underground system Excavation permits must be


obtained before digging
Checking the technical
infrastructure drawings of
industrial Park, And other Works
already built or installed by other
contractors

2. Excavation The drivers can not see


everything. Driver’s license + medical
certificate
Excavator hit against Providing a guiding man
person Markings for excavation areae
Method statement
Land collapse Barricading and sign posting of all
excavation work.
Toxic gases, volatile
gases Installing water pumps

Storm water flood Providing with a ladder for access

Personal falling All dirt must be piled at least meter


back from edge of excavation
Gear rolling into water
tank Providing kick boards to prevent

Exhausts and fumes of Chamfer digging


machinery heavier than
air can fill the hole
PROJECT:

DATE :

REF:

SAFETY : JOB SAFETY ANALYSIS ( J.S.A. )


Work description Temporary electrical supply

Those present
Name Company Signed

JOB SEQUENCE HAZARD/S CONTROL/S

Installing/ Using The cranes, vehicles Using the red sign, flag to warning
electrical equipment strike against power line
on site There are no bare wires visible/ the
Serious injuries on site cables is damaged, cut or worn
by electricity/ burn/
electrical shock Inspecting before starting work

There are no taped or other defect


joint in the cable

The color insulation of the internal


wires should be visible.

There are no over heating or burn


marks on the plug, cable
equipment

ELCB protection are working


effectively

The cable sheath is gripped where


it enters the fug and the
equipment
Coâng trình :

Ngaøy thaøng :

Soá :

PHAÂN TÍCH ATLÑ TRONG THI COÂNG


ATLÑ :
( J.S.A. )
Moâ taû coâng Ñoå beâ toâng cho nhaø Warehouse
vieäc

Thaønh phaàn tham döï


Hoï vaø teân Coâng ty Kyù teân

Trình töï coâng vieäc Ruûi ro Bieän phaùp phoøng ngöøa

1. Ñoå beâ toâng Saét chôø : Vaáp teù An toaøn vieân nhaéc nhôû
ñaøi coïc
Xieân voâ Ñaët baûng caûnh baùo : “ Khu
ngöôøi vöïc nguy hieåm ñang thi coâng “
Daây caûnh baùo khu vöïc thi
coâng.
Saép xeáp goâng goïn theo moät
phöông khoâng vöôn ra ngoaøi.

2. Choáng moái Muøi gaây dò öùng, Chæ nhöõng ngöôøi coù söùc
khoù chòu khoûe toát, khoâng bò beänh
thaàn kinh, hoâ haáp môùi ñöôïc
laøm vieäc.
Ngöôøi coâng nhaân laøm vieäc
phaûi ñöôïc trang bò phöông tieän
baûo veä caù nhaân : muõ, aùo,
gaêng tay, khaåu trang.
Thi coâng theo höôùng ngöôïc
chieàu gioù.
Thuoác phaûi ñeå trong kho.
Thu doïn veä sinh saïch seõ caùc
voû bao, raùc, thieát bò sau khi thi
coâng xong, ñoùng kieän laïi ñeå
xöû lyù .
Uoáng phaûi thuoác
choáng moái Coâng nhaân sau khi thi coâng
xong phaûi taém röûa veä sinh
saïch seõ.
Coù saün thuoác xuùc röûa neáu
coâng nhaân uoáng phaûi.

3. Ñaø kieàng Chaùy noå : söû duïng Kieåm tra thieát bò khi thi coâng.
PROJECT:

DATE :

REF:

SAFETY: JOB SAFETY ANALYSIS ( J.S.A. )


Work description Concreting for slab of Warehouse

Those present
Name Company Signed

JOB SEQUENCE HAZARD/S CONTROL/S

1. Concreting pile All protruding reinforcing


plug steel, onto which an
2. Ground beam individual could fall, the
hazard of impalement.
3. Build formwork
for slab, Inadequate shoring,
reinforcement which can lead to
formwork collapse
4. Concreting for
slab Failure to guard the end
of reinforcing steel.
Only workers no allergic, diseases
Uncomfortable smell are allowed
5. Termite Allergic Only trained workers with
Treatment Suffocation due to lack knowledge in safe working method
of oxygen supply program, no sign of infections,
neurology and respiratory diseases
6. Remove or any kind are allowed.
formwork Ventilation fan must be installed
Always person out to alert, help