You are on page 1of 1

SCOTT KIDNEY 5709 Denali St-Unit F, Anchorage, AK 99518 586.212.6993 s.kidney@shell.com QUALIFICATIONS Staff Drilling Engineer 4.

5 years of experience in the O&G industry as a Drilling Engineer. 1 3 months of onsite DSV experience in the Pinedale and SWaN Asset, with repeated BIC performance. Completed Round 1 and 2 exams as well as the FE exam. Current status is EIT with eligibility to sit PE exam in Oct 2014. EDUCATION, PROFESSIONAL REGISTRATION B.S., Chemical Engineering with Specialization in Polymer Science Michigan State University 2005-2009 PROFESSIONAL EXPERIENCE Control System Engineer-Motiva Enterprises, Norco LA Jun-Aug 2008 -Optimized Alky/Olefin ratios: resulted in reduced stream testing -Developed correlations between known PVT sensors, saving need for additional equipment -Developed abbreviated P&ID programs for ease of use

Drilling Engineer- Shell RMP, Denver CO

Aug 2009-Jan2013

-Responsible for management of the drilling process for rigs in Wyoming and Colorado. -Executed the principles of HSSE, Engineering, Key Performance Indicators and Best Practice Sharing. -Managed Thermal Desorption Unit (TWMA) research to determine optimized cuttings disposal, demonstrated technical ability to remove Hazardous Oilfield chemicals from Waste Stream. -Completed Round 1, Round 2 examination. Drill Site Supervisor-Craig CO, Pinedale WY. Oct 2010-Nov 2011

-Night Drilling Forman for Nabors Rig 16 in Pinedale WY and Nabors C111 in Craig, CO. -Delivered 13 wells in Pinedale, WY with Top Quartile performance and 2x BIC. No recordable injuries. -Delivered first Shell wells in Craig CO, in underpresured, high fractured formations, with N 2 Foam fluid system in horizontal wells. -Total Time on Wellsite: Approx 180 days -Total Time as stand-alone Night DSV: Approx 90 days Drilling Engineer- Shell, Anchorage AK Jan 2013-Present

- Project Design/Execution - Delivered world-class design/execution performance for Nordica Recovery Mission. -Provide Logistical Support for wells team for planning, management of well engineering and well construction operations, with the full integration of the Drilling Operations team, Venture subsurface team, and the Logistics team. Prepared procedures that incorporate the remote location and unique environment (weather, ice, permitting restrictions) of Alaska. -HSSE Responsible for integrating HSSE in the design, procedures, and execution operations. Actively promoted HSSE and Sustainable Development (SD) in all activities and ensured compliance with business principles. - Permitting provided support for the various permitting process necessary for the Alaska venture. - Rig and Fleet Support The Alaska venture requires the use of floating drilling rigs , oil spill response vessels, ice breakers, as well as other vessels. Provided engineering and logistical support to ensure these vessels are ready to deliver in the arctic. - Developed and maintained a very close working relationship with the Drilling Superintendents and subsurface team.

You might also like