BILAD (OMAN) LLC

STEEL INDUSTRIES

INCOMING MATERIAL INSPECTION REPORT


Project Client Contractor
Sl. No.

Format Number BO/QCF/01 Rev_0 JOB No. : REPORT DATE : REPORT No. :

: : :
Material Specification Test Certificate No. Heat No. / Batch No. Material Traceability No. GIN No.

Item Description

Quantity Received

Quantity Accepted

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 INSPECTION REMARKS :

Vendor
Name : Sign : Date : Name : Sign : Date :

Contractor/Consultant
Name : Sign : Date :

Client

Format Number BO/QCF/01 Rev_0

Quantity Rejected

BILAD OMAN LLC


STEEL INDUSTRIES

WELD VISUAL AND DIMENSIONAL INSPECTION REPORT


Project Client Consultant Structure ID Job No. Report No.

Format Number BO/QCF/02 Rev_1

Report Date Page No.

Drawing No.

Rev No.

Item No.

Mark No.

IMIR Material Fit-Up / Fabrication Report Traceability No. Date Result No.

Joint Type

WPS No.

Welder ID

Weld Visual Date Result

NDT Report No. MT UT

Remarks: Released for Blasting & Painting


Name : Sign : Date : Name : Sign : Date : Name : Sign : Date :

Bilad Oman LLC

Consultant/Contractor

Client

BILAD OMAN LLC


STEEL INDUSTRIES

BLASTING AND PAINTING INSPECTION REPORT


Project Client Consultant Building ID

Item No. / Mark No. :

SURFACE PREPARATION Date of Surface Preparation Time of Surface Preparation Type of abrasive Method of surface preparation Surface Cleanliness - Required Surface Cleanliness - Achieved Surface Profile Required Surface Profile Measured Soluble Salt Test (Random Sampling) Holiday Test (Random Sampling)

COATING APPL

Date of coating Paint Product Name and Colour Application method Start time for coating Hrs Finish time for coating Hrs Average DFT Required m Average DFT Measured m Final Colour

Visual Inspection Released for Despatch

BILAD
Name: Signature: Date: Name: Signature: Date:

CONSULTANT

N LLC

IES

SPECTION REPORT

Format Number BO/QCF/03 Rev 1


Job No. Report No. Report Date Page No.

COATING APPLICATION PRIMER COAT MID COAT TOP COAT

tch Name: Signature: Date:

ANT

YES / NO CLIENT

Bilad (Oman) LLC


Steel Industries Form Number BO/QCF/04 Rev_0

Inspection Release Note (IRN)


PROJECT : CLIENT : CONTRACTOR : BUILDING ID : Sl. No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 REMARKS

JOB No. : REPORT DATE : REPORT No. : PAGE No. : Drawing Fabrication Item No. Mark No. Rev No. No Report No.

Painting Report No.

VENDOR Name : Sign : Date : Bilad (Oman) LLC

CONTRACTOR

CLIENT/TPI

BILAD (OMAN) LLC


STEEL INDUSTRIES

LOW HYDROGEN ELECTRODE ISSUING LOG


Baking Oven No. & Calibration Due Date : Holding Oven No. & Calibration Due Date :
Electrode Details Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CLASS

ISSUE DETAILS

WELDER'S SIGN DIAMETER MANUFACTURER BATCH No. WELDER ID QUANTITY TIME (mm)

E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018

QC ENGINEER (OR) WELDING INSPECTOR

Name : Sign : Date :

LC
Format Number BO/QCF/06 Rev 0

SUING LOG
Report Date : Report No. :
RETURNED
QUANTITY TIME IN WELDING SUPERVISOR / FOREMAN'S SIGN

BILAD (OMAN) LLC


STEEL INDUSTRIES

ELECTRODE BAKING / HOLDING REGISTER


Baking Oven No. & Calibration Due Date : Holding Oven No. & Calibration Due Date :
Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Date of Baking
Quantity (Nos.)

Electrode Details
CLASS MANUFACTURER BATCH No. DIAMETER (mm) 1ST OR 2ND CYCLE

BAKING
TEMP. 0 C TIME IN

E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018 E 7018

3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C 3500 C

QC ENGINEER (OR) WELDING INSPECTOR

Name : Sign : Date :

LC
REGISTER
Report Date : Report No. :
HOLDING
TIME OUT TEMP. 0 C TIME IN

Format Number BO/QCF/ 05 Rev 0

KING

1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C 1200 C

WELDING SUPERVISO R/ FOREMAN's