ut pp in detail

Application area pp Client 810 user id pp01

Unit testing AH01


sl no 1 Bill of material

work center

routing

sop

Demand management

Page 1

ut pp in detail

production planning

7 8

production control settlement profile

Page 2

ut pp in detail

Project Envision

g AH01
points to be tested create of bom change of bom display of bom create work center change work center display work center create routing change routing display routing create rough cut plan change the plan display plan copying the inactive plan to a active plan transferring of plan to demand managemnet checking the plan in stock and reqt list tr code cs01 cs02 cs03 cr01 cr02 cr03 ca01 ca02 ca03 mc87 mc88 mc89

unit testing

mc74

mc78

md04
Page 3

ut pp in detail

crest cust ind reqrmnts (cir) change cust ind reqrmnts (cir) display cust ind reqrmnts (cir) create planned ind reqt.(pir) change planned ind reqt.(pir) display planned ind reqt.(pir)

md81 md82 md83 md61 md62 md63

Page 4

ut pp in detail

unit testing AK01

Page 5

bom

Unit testing for BOM in detail creation of a BOM sl no details of testing description input

1 creation of a BOM

ENTER DETAILS ENTER THE REQUIRED DETAILS of bom items

a) Go to sap easy access and put transaction code cs01 and observe that CREATE MATERIAL CS01 BOM screen opens b) ENTER THE DETAILS IN EACH plant,material,b FIELD om usage items and its unit of c) ENTER THE REQUIRED DETAILS of bom items measurement
d) SAVE THE BOM Click on SAVE Button

SAVE THE BOM

sl no

details of testing

change of BOM description input


a) Go to sap easy access and put transaction code cs02 and observe that changeBOM screen opens cs02

1 change a BOM

ENTER DETAILS

B)ENTER DETAILS
Page 6

Material: Plant: Usage:

bom

CHANGE THE REQUIRED DETAILS

Item Category: CHANGE THE REQUIRED VALUES Component: Quantity:

MESSAGE of the result

a message should come as Bom change saved

------

sl no

details of testing

Display of a BOM description input


Go to sap easy access and put transaction code - CS03

OPEN TRANSACTION SCREEN

CS03

ENTER DETAILS

ENTER THE DETAILS IN EACH FIELD

Material: Plant: Usage: Item Category: Component: Quantity:

CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED VALUES

Page 7

bom

n detail

actual result expected result

remark

Bom creation screen opens a new screen should open

Bom creation screen opens a new screen should open

no error message no error message should should trigger trigger


BOM Will get saved and message will display bom was saved BOM get saved and message displayed

actual result expected result

remark

Bom change screen opens

Bom change screen should open

Press ENTER and observe that GENERAL ITEM ITEM OVERVIEW screen should OVERVIEW screen appears appear
Page 8

bom

Press ENTER and observe that System reads the Unit of Measure, Component Description data from the material master. Try to change the quantity of components and save is

message displayed

the Bom should save the details message should be displayed as Bom change was saved

actual result expected result


Press ENTER and observe that DISPLAY MATERIAL MATERIAL BOM screen in display mode should open BOM screen opens Press ENTER and observe that GENERAL ITEM OVERVIEW screen appears Item Category: Component: Quantity: displayed

remark

GENERAL ITEM OVERVIEW screen appears Item Category: Component: Quantity: should be displayed

Page 9

wc

Unit testing for work center sl no details of testing description


1 creation of a work center
ENTER THE DETAILS IN EACH FIELD Go to sap easy access menu and put transaction code cr01 ENTER THE DETAILS IN EACH FIELD

creation of a work center input


CR01 Plant: Work center name, Work center Category: Description: Work center Category: Person Responsible: Location: Usage: Standard Value Key: Control Key: Suitability: Set Type Key: Wage Group: Setup: MIN, Machine: MIN, Labour: MIN Capacity.cat: Set UP Formula: Processing Formula: Capacity Category Discription: Capacity Planner Group: Grouping: Factory Calender ID: Active Version: Base Unit Of Measure: Start : Finish: Length of Breaks: Capacity Utilization: No.of.Indiv.cap: Capacity Category: Setup Formula: Processing Formula: Location group: Std.queue time: Min.queue time:

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED DETAILS


Page 10

wc

SAVE THE WORK CENTER

ENTER THE REQUIRED DETAILS SAVE THE WORK CENTER

Cost Center: Activity Type: Click on SAVE Button

Change Work Cente sl no details of testing description


1 change a work center
Go to sap easy access menu and put transaction code cr02 ENTER THE DETAILS IN EACH FIELD

input
cr02
Plant: Work center name, Work center Category: Description: Work center Category: Person Responsible: Location: Usage: Standard Value Key: Control Key: Suitability: Set Type Key: Wage Group: Setup: MIN, Machine: MIN, Labour: MIN Capacity.cat: Set UP Formula: Processing Formula: Capacity Category Discription: Capacity Planner Group: Grouping: Factory Calender ID: Active Version: Base Unit Of Measure: Start : Finish: Length of Breaks: Capacity Utilization: No.of.Indiv.cap:

ENTER DETAILS

CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS DETAILS

CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS DETAILS CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS DETAILS

CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS DETAILS

Page 11

wc

CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS VALUES

Capacity Category: Setup Formula: Processing Formula: Location group: Std.queue time: Min.queue time:

CHANGE THE REQUIRED CHANGE THE REQUIRED DETAILS DETAILS SAVE THE WORK CENTER SAVE THE WORK CENTER MESSAGE MESSAGE

Cost Center: Activity Type: Click on SAVE Button

sl no details of testing description


1 display of work center
ENTER DETAILS Go to sap easy access menu and put transaction code cr03 ENTER THE DETAILS IN EACH FIELD

Display of a work center input


cr03
Plant: Work center:, work center category Description: Work center Category: Person Responsible: Location: Usage: Standard Value Key: Control Key: Suitability: Set Type Key: Wage Group: Setup: MIN, Machine: MIN, Labour: MIN Capacity.cat: Set UP Formula: Processing Formula:

CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED VALUES

CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED DETAILS

Page 12

wc

CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS

CHECK THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS

Capacity Category Discription: Capacity Planner Group: Grouping: Factory Calender ID: Active Version: Base Unit Of Measure: Start : Finish: Length of Breaks: Capacity Utilization: No.of.Indiv.cap: Capacity Category: Setup Formula: Processing Formula: Location group: Std.queue time: Min.queue time: Cost Center: Activity Type:

Page 13

wc

on of a work center actual result


Put tr. Code cr01 and Press ENTER and observe that CREATE WORK CENTER screen opensCREATE

expected result
WORK CENTER screen should open

remark

Press ENTER and observe that BASIC DATA screen appears BASIC DATA screen should appears

Click on the 'Default Valeues' tab and observe that DEFAULT VALUES DEFAULT VALUES screen should screen opens open

Click on the 'Capacity' tab and observe that CAPACITY OVERVIEW screen opens Double Click on the 'Capacity Category' and observe that CAPACITY HEADER screen opens

CAPACITY OVERVIEW screen should open CAPACITY HEADER screen should open

go back and click on the 'Scheduling' tab and observe that SCHEDULING screen opens SCHEDULING screen should open

Click on the 'Costing' tab and observe that COST CENTER ASSIGNMENT screen opens

COST CENTER screen should open


Page 14

wc

Press Enter Work center Will get saved

data sholuld be accepted by the fields and and no error message sholuld display

Change Work Center actual result


Put tr. Code cr01 and Press ENTER and observe that Change WORK CENTER screen open change

expected result
Change WORK CENTER screen should open

remark

Press ENTER and observe that BASIC DATA screen appears BASIC DATA screen should appears

Click on the 'Default Valeues' tab and observe that DEFAULT VALUES DEFAULT VALUES screen should screen opens open

Click on the 'Capacity' tab and observe that CAPACITY OVERVIEW screen opens Double Click on the 'Capacity Category' and observe that CAPACITY HEADER screen opens

CAPACITY OVERVIEW screen should open CAPACITY HEADER screen should open

go back and click on the 'Scheduling' tab and observe that SCHEDULING screen opens SCHEDULING screen should open

Page 15

wc

Click on the 'Costing' tab and observe that COST CENTER ASSIGNMENT screen opens

COST CENTER screen should open

Press Enter Work center Will get saved

data sholuld be accepted by the fields and and no error message sholuld display

y of a work center actual result

expected result

remark

DISPLAY of WORK CENTER screen DISPLAY of WORK CENTER screen opens should open Press ENTER and observe that BASIC DATA screen appears BASIC DATA screen should appear

Click on the 'Default Valeues' tab and observe that DEFAULT VALUES screen opens

Click on the 'Capacity' tab and observe that CAPACITY OVERVIEW screen opens Double Click on the 'Capacity Category' and observe that CAPACITY HEADER screen opens

Page 16

wc

go back and click on the 'Scheduling' tab and observe that SCHEDULING screen opens

Click on the 'Costing' tab and observe that COST CENTER ASSIGNMENT screen opens Press Enter

Page 17

routing

Unit testing details of routing sl no details of testing


to create a routing
ENTER THE REQUIRED DETAILS

description
IN SAP EASY ACCESS TYPE IN COMMAND FIELD - CA01 ENTER THE DETAILS IN EACH FIELD

Creation of routing input


ca01
Material: Plant: Usage: Status: From Lot Size: To Lot Size:

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED VALUES

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED VALUES

Work Center: Control Key:

ENTER THE REQUIRED DETAILS

ENTER THE REQUIRED VALUES

ENTER THE REQUIRED DETAILS SAVE THE ROUTING MESSAGE

ENTER THE REQUIRED VALUES SAVE THE ROUTING MESSAGE

Operation/Activity: Sequence: Click on SAVE Button

sl no

details of testing
1 change a routing

change of a routing description input


IN SAP EASY ACCESS TYPE IN COMMAND FIELD CA02
Page 18

ca02

routing

ENTER DETAILS

ENTER THE DETAILS IN EACH FIELD

Material: Plant:

CHANGE THE REQUIRED DETAILS

Work Center: CHANGE THE REQUIRED DETAILS Control Key:

CHANGE THE REQUIRED DETAILS

CHANGE THE REQUIRED DETAILS

CHANGE THE REQUIRED DETAILS SAVE THE ROUTING MESSAGE

Operation/Activity: CHANGE THE REQUIRED DETAILS Sequence: Click on SAVE Button MESSAGE

sl no

details of testing
1 display of routing

Display of routing description input


IN SAP EASY ACCESS TYPE IN COMMAND FIELD - CA03

ca03

ENTER DETAILS

ENTER THE DETAILS IN EACH FIELD

Material: Plant:

CHANGE THE REQUIRED DETAILS

Work Center: CHANGE THE REQUIRED DETAILS Control Key:

Page 19

routing

CHANGE THE REQUIRED DETAILS

CHANGE THE REQUIRED DETAILS

CHANGE THE REQUIRED DETAILS

Operation/Activity: CHANGE THE REQUIRED DETAILS Sequence:

Page 20

routing

routing expected result remark

ation of routing actual result

Press ENTER and observe that CREATE ROUTING CREATE ROUTING screen should screen opens open Press ENTER and observe that HEADER DETAILS screen appears Click on the 'Operation' tab and observe that OPERATION OVERVIEW screen opens Select one operation and click on the 'Component Allocation' tab and observe that MATERIAL COMPONENT OVERVIEW screen opens Select the components and click on the 'New Assignment' tab and observe that NEW ASSIGNMENT Popup window opens Click on Continue and observe that components are allocated; go back Routing Will get saved Routing was saved with Group--- and material ---

actual result
Press ENTER and observe that CHANGE ROUTING screen opens

expected result

remark

Page 21

routing

Press ENTER and observe that OPERATION OVERVIEW screen appears Select one operation and click on the 'Component Allocation' tab and observe that MATERIAL COMPONENT OVERVIEW screen opens Select the components and click on the 'New Assignment' tab and observe that NEW ASSIGNMENT Popup window opens Click on Continue and observe that components are allocated; go back Routing Will get saved Routing was saved with Group--- and material ---

actual result
Press ENTER and observe that DISPLAY ROUTING screen opens Press ENTER and observe that OPERATION OVERVIEW screen appears Select one operation and click on the 'Component Allocation' tab and observe that MATERIAL COMPONENT OVERVIEW screen opens

expected result

remark

Page 22

routing

Select the components and click on the 'New Assignment' tab and observe that NEW ASSIGNMENT Popup window opens Click on Continue and observe that components are allocated; go back

Page 23

SOP & DM

Unit testing details SOP create rough cut plan sl no details of testing
1 2

description

input

create rough cut plan


give all the details

go to sap easy menu put the trnsaction code mc87 and press enter mc87 fill all the required fields Mat , plant, give the quantity accordind to the date or month or week of requirement required quantity

give all the details

4 5

ENTER THE REQUIRED DETAILS SAVE THE SOP

ENTER THE DETAILS IN EACH FIELD

Sales Plan for Oct:250, Nov:300

OPEN TRANSACTION SCREEN

CLICK ON SAVE BUTTON IN SAP EASY ACCESS TYPE IN COMMAND FIELD MC78 MC78

ENTER THE REQUIRED DETAILS

OPEN TRANSACTION SCREEN

ENTER THE REQUIRED DETAILS

10

OPEN TRANSACTION SCREEN

ENTER THE DETAILS IN EACH FIELD Source: 006 IN SAP EASY ACCESS TYPE IN COMMAND FIELD MC74 MC74 Version:A00; Requirement ENTER THE DETAILS IN Type:VSF; EACH FIELD Version:01 IN SAP EASY ACCESS TYPE IN COMMAND FIELD MD04 MD04 ENTER THE DETAILS IN EACH FIELD CHECK THE DETAILS IN EACH FIELD Material: ABC; Plant: AH01

11 12

ENTER THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS

Page 24

SOP & DM

sl no details of testing
1 2

Change Rough Cut Plan description input


go to sap easy menu put the trnsaction code mc88 and press enter mc88 fill all the required fields Mat , plant, give the quantity accordind to the date or month or week of requirement required quantity

create rough cut plan


give all the details

give all the details

4 5

ENTER THE REQUIRED DETAILS SAVE THE SOP

ENTER THE DETAILS IN EACH FIELD

Sales Plan for Oct:250, Nov:300

OPEN TRANSACTION SCREEN

CLICK ON SAVE BUTTON IN SAP EASY ACCESS TYPE IN COMMAND FIELD MC78 MC78

ENTER THE REQUIRED DETAILS

OPEN TRANSACTION SCREEN

ENTER THE REQUIRED DETAILS

10

OPEN TRANSACTION SCREEN

ENTER THE DETAILS IN EACH FIELD Source: 006 IN SAP EASY ACCESS TYPE IN COMMAND FIELD MC74 MC74 Version:A00; Requirement ENTER THE DETAILS IN Type:VSF; EACH FIELD Version:01 IN SAP EASY ACCESS TYPE IN COMMAND FIELD MD04 MD04 ENTER THE DETAILS IN EACH FIELD CHECK THE DETAILS IN EACH FIELD Material: ABC; Plant: AH01

11 12

ENTER THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS Description: Transaction Code: Performed on:

Display Planned Indepen

MD63 24/09/201

Page 25

SOP & DM

sl no details of testing
1 OPEN TRANSACTION SCREEN

description

input

ENTER THE REQUIRED DETAILS

IN SAP EASY ACCESS TYPE IN COMMAND FIELD MD63 MD63 Material: Plant: Version: From Date: ENTER THE DETAILS IN To Date: Planning EACH FIELD Period:

3 4

ENTER THE REQUIRED DETAILS CHECK THE REQUIRED DETAILS

ENTER THE DETAILS IN EACH FIELD CHECK THE DETAILS IN EACH FIELD

Plant: Requirement Type: Quantity:

Page 26

SOP & DM

expected result
create planning screen should open news screen opens

actual result remark


create planning screen opens create plan screen should open

goto EDIT and Click on 'Create Production plan synchronous to Sales Plan' and observe that production Plan will get created Observe the Message that Plan saved under the version number 006 Press ENTER and observe that COPY PLANNING VERSION screen opens Click on the INACTIVE button in 'Source Version' and select 006 version & Click on the ACTIVE button in the 'Target Version' and Click on COPY and observe the message that 'A00 version already Exits' and Pr ess Enter and observe that a pop-up window opens 'Do you want to Reset the version A00' and click on RESET button Press ENTER and observe that TRANSFER PLANNING DATA TO DEMAND MANAGEMENT screen opens

Click on the TRANSFER NOW Button Press ENTER and observe that STOCK/REQUIREMENTS LIST screen opens Press Enter and observe the STOCK/REQUIREMENTS LIST AS OF --HRS screen opens Observe that Planned Independent Requirements Created

Page 27

SOP & DM

expected result
create planning screen should open news screen opens

actual result remark


create planning screen opens create plan screen should open

goto EDIT and Click on 'Create Production plan synchronous to Sales Plan' and observe that production Plan will get created Observe the Message that Plan saved under the version number 006 Press ENTER and observe that COPY PLANNING VERSION screen opens Click on the INACTIVE button in 'Source Version' and select 006 version & Click on the ACTIVE button in the 'Target Version' and Click on COPY and observe the message that 'A00 version already Exits' and Pr ess Enter and observe that a pop-up window opens 'Do you want to Reset the version A00' and click on RESET button Press ENTER and observe that TRANSFER PLANNING DATA TO DEMAND MANAGEMENT screen opens

Click on the TRANSFER NOW Button Press ENTER and observe that STOCK/REQUIREMENTS LIST screen opens Press Enter and observe the STOCK/REQUIREMENTS LIST AS OF --HRS screen opens Observe that Planned Independent Requirements Created

play Planned Independent Requirements


MD63 24/09/2011

Page 28

SOP & DM

expected result
Press ENTER and observe that DISPLAY PLANNED INDEPENDENT REQUIREMENTS screen opens

actual result remark


PASS

Click on the 'User Parameters' tab and observe that a popup window opens PASS Click on Continue and observe Information message appears that USER PARAMETERS WERE SAVED & Press Enter and observe that PLANNING TABLE screen opens PASS PASS

Page 29

Unit testing details for PIR


Description: Transaction Code: Performed on: MD61 24/09/2011

Create Planned Independent Requiremen

sl no details of testing description


OPEN TRANSACTION SCREEN ENTER THE REQUIRED DETAILS ENTER THE REQUIRED DETAILS ENTER THE REQUIRED DETAILS MESSAGE

input

IN SAP EASY ACCESS TYPE IN COMMAND FIELD - MD61 MD61 Material: Plant: Version: From ENTER THE DETAILS IN EACH Date: To Date: FIELD Planning Period: Plant: Requirement Type:

ENTER THE DETAILS IN EACH FIELD ENTER THE DETAILS IN EACH FIELD

4 5

Quantity:

Description: Transaction Code: Performed on:

Change Planned Independent Requireme


MD62 24/09/2011

sl no details of testing description


1 OPEN TRANSACTION SCREEN ENTER THE REQUIRED DETAILS

input

IN SAP EASY ACCESS TYPE IN COMMAND FIELD - MD62 MD62 Material: Plant: Version: From ENTER THE DETAILS IN EACH Date: To Date: FIELD Planning Period:

4 5

ENTER THE REQUIRED DETAILS CHANGE THE REQUIRED DETAILS MESSAGE

ENTER THE DETAILS IN EACH FIELD CHANGE THE REQUIRED DETAILS

Plant: Requirement Type:

Quantity:

Description:

Display Planned Independent Requiremen

Transaction Code: Performed on:

MD63 24/09/2011

sl no details of testing description


1 OPEN TRANSACTION SCREEN ENTER THE REQUIRED DETAILS

input

IN SAP EASY ACCESS TYPE IN COMMAND FIELD - MD63 MD63 Material: Plant: Version: From ENTER THE DETAILS IN EACH Date: To Date: FIELD Planning Period:

3 4

ENTER THE REQUIRED DETAILS CHECK THE REQUIRED

Plant: ENTER THE DETAILS IN EACH Requirement FIELD Type: CHECK THE DETAILS IN EACH FIELD Quantity:

Planned Independent Requirements


MD61 24/09/2011

expected result
Press ENTER and observe that CREATE PLANNED INDEPENDENT REQUIREMENTS screen opens

actual result remark

Click on the 'User Parameters' tab and observe a popup opens Click on that Continue andwindow observe Information message appears that USER PARAMETERS WERE SAVED & Press Enter and observe that PLANNING TABLE screen opens Click on SAVE button and the Requirement get saved Requirement saved

Planned Independent Requirements


MD62 24/09/2011

expected result
Press ENTER and observe that CHANGE PLANNED INDEPENDENT REQUIREMENTS screen opens Click on the 'User Parameters' tab and observe that a popup window opens

actual result remark


PASS

PASS

Click on Continue and observe Information message appears that USER PARAMETERS WERE SAVED & Press Enter and observe that PLANNING TABLE screen opens PASS Click on SAVE button and the Requirement get saved Requirement saved

PASS PASS

Planned Independent Requirements

MD63 24/09/2011

expected result
Press ENTER and observe that DISPLAY PLANNED INDEPENDENT REQUIREMENTS screen opens

actual result remark


PASS

Click on the 'User Parameters' tab and observe that a popup window opens PASS Click on Continue and observe Information message appears that USER PARAMETERS WERE SAVED & Press Enter and observe that PLANNING TABLE screen opens PASS PASS

MRP

Unit testing details for MRP


Description: Transaction Code: Performed on: Single-Item, Multi-Level MD02 24/09/2011

STEP

NAME

DESCRIPTION

INPUT

OPEN IN SAP EASY ACCESS TRANSACTION TYPE IN COMMAND FIELD SCREEN - MD02 MD02 Material: Plant: Processing Key: Create Purchase Requisition: Delivery Schedules: Create MRP List: Planning Mode: Scheduling: Also ENTER THE DETAILS IN Plan Unchanged Materials(Y/N); EACH FIELD AND SELECT Display Results before they are THE REQUIRED CHECK saved(Y/N); Display Material BOXES List(Y/N)

2 3

ENTER THE REQUIRED DETAILS MESSAGE

SAVE THE MRP RUN CLICK ON SAVE BUTTON

Page 34

MRP

details for MRP

DESIRED RESULT

PASS/FAIL COMMENTS

Press ENTER and observe that SINGLE-ITEM, MULTI-LEVEL screen opens

PASS

Press Enter and observe the Information Message 'Please Check Input Parameters'; check and Press Enter and observe the PLANNING LINES screen PASS MRP Carried out for Material --A screen opens with all the details of statistics, Parameters, Data base Statistics, Run Time Statistics related to that material PASS

PASS

Page 35