You are on page 1of 11

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Study Case: LF

LOAD FLOW REPORT

Bus
ID
Bus bntla

Voltage
kV

kV

70.000

67.111

Ang.
-33.1

Generation
MW

Load

Mvar
0

MW
0

Load Flow
Mvar

ID
0

Bus brloe

70.000

65.860

-31.6

Bus bwja

30.000

26.740

-31.9

Bus daya1

70.000

66.152

-32.5

70.000

66.152

-32.5

-0.462

111.8

99.9

-12.990

-0.462

111.8

99.9

Lbus bntla1

7.634

0.258

65.7

99.9

Lbus bntla2

8.529

0.317

73.4

99.9

Lbus bntla3

9.817

0.350

84.5

99.9

Sbus tello4

-2.724

-0.033

23.9

100.0

Lbus brloe

2.724

0.033

23.9

100.0

Sbus tello2

-5.535

-0.309

119.7

99.8

Lbus bwaja

5.535

0.309

119.7

99.8

Sbus tello5

-14.017

15.141

180.1

-67.9

0.000

-0.009

0.1

0.0

Bus daya2

14.017

-15.132

180.0

-68.0

Lbus daya1

6.599

2.479

61.5

93.6

Cbus daya

Bus panakukang

150.000

61.579

135.301

-33.8

-29.8

%PF

-12.990

Bus daya1

70.000

Amp

Bus Tlama 1

Lbus daya2

Bus mandai

Mvar

Bus Tlama 1

Mandai-Daya~

Bus daya2

MW

XFMR

7.418

0.251

64.8

99.9

-14.017

15.132

180.0

-68.0

0.000

-17.862

155.9

0.0

Sbus pangkep2

-4.807

-0.766

45.6

98.8
98.8

Sbus pangkep2

-4.807

-0.766

45.6

Lbus mandai1

4.807

0.766

45.6

98.8

Lbus mandai1

4.807

0.766

45.6

98.8

Mbus tello2

-17.148

-5.503

76.8

95.2
95.2

Mbus tello2

-17.148

-5.503

76.8

Lbus pnkg1

16.500

5.176

73.8

95.4

Lbus pnkg2

8.848

3.574

40.7

92.7

LBus Pkang 3

8.948

2.256

39.4

97.0

Buspltd pajlseng

20.000

18.757

-18.3

Sbus soppeng

0.000

0.000

0.0

-47.5

Buspltd palopo2

20.000

18.055

-22.0

Gb pltd masamba

0.000

0.000

0.0

-42.0

Lbus palopo2

0.000

0.000

0.0

-42.0

Sbus pinrang2

0.000

0.000

0.0

-39.4

Buspltd suppa1

12.000

11.104

-18.9

Sbus pinrang2

0.000

0.000

0.0

-39.4

Bus pltd talassa I

12.000

10.816

-29.6

Mbus tlasa1

0.000

0.000

0.0

7.6

Bus pltd talassa II

12.000

10.816

-29.6

Mbus tlasa1

0.000

0.000

0.0

8.4

Bus pltd talassa III

12.000

10.816

-29.6

Bus pltd talassa III-1

0.000

0.000

0.0

7.1

Bus pltd talassa III-1

12.000

10.816

-29.6

Mbus tlasa1

0.000

0.000

0.0

7.1

Bus pltd talassa III

0.000

0.000

0.0

7.1

Mbus tlasa1

0.000

0.000

0.0

7.1

Bus pltd talassa IV

12.000

10.816

-29.6

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID
Bus pltd talassa V
Buspltu barru1

Buspltu barru2

Bus Sinjai

Study Case: LF

Voltage
kV

kV

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

XFMR
Mvar

Amp

%PF

12.000

10.816

-29.6

Mbus tlasa1

0.000

0.000

0.0

7.6

150.000

135.699

-24.8

Mbus pare1

-98.445

10.582

421.3

-99.4

pngp-brru1

98.445

-10.582

421.3

-99.4

150.000

150.000

135.699

141.098

-24.8

-18.9

Buspltu barru2

0.000

0.000

0.0

-44.7

Gb barru1

0.000

0.000

0.0

-19.5

Buspltu barru1

0.000

0.000

0.0

-44.7

10.954

4.119

47.9

93.6
-99.3

Mbus bulukumba1
Mbus bone1

Bus Tlama 1

MW

70.000

67.220

-32.8

-16.552

2.028

68.2

Lbus sinjai

0.020

-9.071

37.1

-0.2

LBus sinjai2

5.578

2.925

25.8

88.6

13.008

0.521

111.8

99.9

Bus bntla
Bus bntla

13.008

0.521

111.8

99.9

Mbus tellolama2

-13.008

17.922

190.2

-58.7

Mbus tellolama2

-13.008

17.922

190.2

-58.7

CBUS Tlama

0.000

-36.886

316.8

0.0

Cbus daya

70.000

66.152

-32.5

0.000

-17.862

Bus daya2

0.000

17.862

155.9

0.0

Cbus pangkep

70.000

62.553

-32.8

0.000

-19.964

Sbus pangkep2

0.000

19.964

184.3

0.0

CBUS Tlama

70.000

67.220

-32.8

0.000

-36.886

Bus Tlama 1

0.000

36.886

316.8

0.0

Gb alstm1

12.000

10.796

-31.2

Sbus tello2

0.000

0.000

0.0

4.6

Gb barru1

20.000

18.093

-24.8

Buspltu barru2

0.000

0.000

0.0

-19.5

Gb bili1

12.000

11.282

-32.3

Lbus brloe

0.000

0.000

0.0

-37.4

Gb bili2

12.000

11.282

-32.3

Lbus brloe

0.000

0.000

0.0

-39.0

* Gb bkru1

12.000

12.000

0.0

95.716

23.579

Mbus bakaru2

95.716

23.579

4742.8

97.1

* Gb bkru2

12.000

12.000

0.0

84.230

20.750

Mbus bakaru2

84.230

20.750

4173.7

97.1

Gb GE1

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

5.9

Gb mitsbshi1

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

0.0

Gb mitsbshi2

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

7.9

Gb PLTD COKDO1

12.000

11.795

-29.9

0.000

23.604

Mbus tello2

0.000

23.604

1155.4

0.0

Gb PLTD COKDO2

12.000

11.795

-29.9

0.000

23.604

Mbus tello2

0.000

23.604

1155.4

0.0

Gb pltd masamba

5.000

4.514

-22.0

Buspltd palopo2

0.000

0.000

0.0

-42.0

Gb pltg ge2

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

6.0

Gb pltu1

12.000

10.796

-31.2

Sbus tello2

0.000

0.000

0.0

5.7

Gb pltu2

12.000

10.796

-31.2

Sbus tello2

0.000

0.000

0.0

5.7

* Gb s11

12.000

12.000

0.0

135.384

35.048

Mbus sengkang2

135.384

35.048

6728.4

96.8

Gb s12

12.000

11.529

-14.5

Mbus sengkang2

0.000

0.000

0.0

-54.1

Gb s18

12.000

11.529

-14.5

Mbus sengkang2

0.000

0.000

0.0

-54.1

* Gb s21

12.000

12.000

0.0

135.384

35.048

Mbus sengkang2

135.384

35.048

6728.4

96.8

Gb s22

12.000

12.678

-14.6

0.000

56.653

Mbus sengkang2

0.000

56.653

2580.0

0.0

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Study Case: LF

Voltage
kV

Generation

kV

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

MW

XFMR
Mvar

Amp

%PF

Gb sawito

5.000

4.863

-17.8

0.000

1.605

Lbus pinrang1

0.000

1.605

190.5

0.0

Gb swd1

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

7.9

Gb swd2

12.000

10.836

-29.7

Mbus tello2

0.000

0.000

0.0

7.9

gbuspltu jeen1

12.000

10.816

-29.6

mbus pltu jenn

0.000

0.000

0.0

7.6

gbuspltu jeen2

12.000

10.816

-29.6

mbus pltu jenn

0.000

0.000

0.0

7.6

Gb westc

12.000

10.796

-31.2

Sbus tello2

0.000

0.000

0.0

5.7
99.8

Lbus bakaru

20.000

19.383

-9.3

1.841

0.130

Mbus bakaru2

-1.841

-0.130

55.0

Lbus barru2

20.000

17.835

-28.9

4.181

1.002

Mbus barru

-4.181

-1.002

139.2

97.2

Lbus bntla1

20.000

19.129

-35.0

7.621

0.004

Bus bntla

-7.621

-0.004

230.0

100.0

Lbus bntla2

20.000

19.123

-35.2

8.511

0.000

Bus bntla

-8.511

0.000

257.0

100.0

Lbus bntla3

20.000

19.134

-35.1

9.802

0.000

Bus bntla

-9.802

0.000

295.8

100.0

Lbus bone1

20.000

18.888

-17.4

Mbus bone2

0.000

0.000

0.0

-50.9

Lbus bone2

20.000

18.614

-19.6

8.792

2.547

Mbus bone2

-8.792

-2.547

283.9

96.1

150.000

134.717

-28.7

9.259

4.327

Mbus bosowa2

-9.259

-4.327

43.8

90.6

20.000

18.803

-32.3

2.722

0.000

Bus brloe

-2.722

0.000

83.6

100.0

Lbus bosowa
Lbus brloe

Gb bili1

0.000

0.000

0.0

-37.4

Gb bili2

0.000

0.000

0.0

-39.0
98.9

Lbus bulukumba1

20.000

18.541

-21.0

5.114

0.782

Mbus bulukumba2

-5.114

-0.782

161.1

LBus bulukumba2

20.000

18.343

-22.1

11.128

3.356

Mbus bulukumba2

-11.128

-3.356

365.9

95.7

Lbus bwaja

20.000

17.735

-35.1

5.515

0.000

Bus bwja

-5.515

0.000

179.5

100.0

Lbus daya1

20.000

18.669

-34.1

6.587

2.257

Bus daya2

-6.587

-2.257

215.3

94.6

Lbus daya2

20.000

18.856

-34.4

7.404

0.004

Bus daya2

-7.404

-0.004

226.7

100.0

Lbus jeneponto1

20.000

18.460

-21.7

8.171

1.550

Mbus jeneponto2

-8.171

-1.550

260.1

98.2

LBus jeneponto2

20.000

18.606

-19.9

Mbus jeneponto2

0.000

0.000

0.0

-50.7

Lbus majene

20.000

18.766

-14.7

5.115

1.109

Mbus majene2

-5.115

-1.109

161.0

97.7

Lbus makale

20.000

18.274

-21.3

5.668

1.169

Mbus makale2

-5.668

-1.169

182.9

97.9

Lbus plta malea

0.000

0.000

0.0

-41.2

Lbus mamuju

20.000

18.872

-13.7

Mbus mamuju2

0.000

0.000

0.0

-43.5

Lbus mamuju2

20.000

18.834

-15.3

7.449

0.124

Mbus mamuju2

-7.449

-0.124

228.4

100.0

Lbus mandai1

20.000

17.506

-35.2

9.600

1.287

Bus mandai

-4.800

-0.644

159.7

99.1

Bus mandai

-4.800

-0.644

159.7

99.1

Lbus mros

20.000

17.915

-28.8

10.110

2.487

mbus maros2

-10.110

-2.487

335.5

97.1

Lbus palopo 1

20.000

18.121

-21.8

5.689

1.839

Mbus palopo2

-5.689

-1.839

190.5

95.2

Lbus palopo2

20.000

18.055

-22.0

6.504

2.510

Mbus palopo2

-6.504

-2.510

222.9

93.3

0.000

0.000

0.0

-42.0

Buspltd palopo2
LBus palopo3

20.000

18.231

-22.8

11.051

0.465

Mbus palopo2

-11.051

-0.465

350.3

99.9

Lbus pangkep

20.000

17.675

-29.9

8.747

3.280

Mbus pangkep2

-8.747

-3.280

305.2

93.6

Lbus pare

20.000

18.368

-20.1

9.093

2.657

Mbus pare2

-5.448

-1.619

178.7

95.9

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Lbus pinrang1

Study Case: LF

Voltage
kV

kV

20.000

18.664

Generation

Ang.

-17.6

MW

Load

Mvar

MW

Load Flow
Mvar

4.694

ID

1.402

MW

XFMR
Mvar

Amp

%PF

Mbus pare2

-3.644

-1.038

119.1

96.2

Mbus pinrang2

-4.700

0.138

145.5

-100.0

0.006

-1.540

47.6

-0.4
95.4

Gb sawito
Lbus pinrang2

20.000

18.416

-18.0

6.410

2.018

Mbus pinrang2

-6.410

-2.018

210.7

LBus Pkang 3

20.000

17.880

-30.5

8.896

2.126

Bus panakukang

-8.896

-2.126

295.3

97.3

Lbus plta malea

20.000

18.274

-21.3

0.000

0.000

0.0

-41.2

Lbus pnkg1

20.000

17.834

-31.7

16.474

4.564

Bus panakukang

-16.474

-4.564

553.4

96.4

Lbus pnkg2

20.000

17.760

-31.8

8.832

3.202

Bus panakukang

-8.832

-3.202

305.4

94.0

Lbus polmas

20.000

18.665

-15.2

8.414

2.317

Mbus polmas2

-8.414

-2.317

269.9

96.4

Lbus sengkang

20.000

18.640

-18.1

17.372

6.775

Mbus sengkang2

-17.372

-6.775

577.6

93.2

Lbus sgmnsa

20.000

18.367

-32.8

0.000

9.442

13.916

3.964

Mbus sgmnsa2

-13.916

5.478

470.1

-93.0

Lbus sidrap

20.000

18.412

-20.0

12.042

4.450

Mbus sidrap2

-12.042

-4.450

402.6

93.8

Lbus sidrap 1

20.000

18.719

-17.9

Mbus sidrap2

0.000

0.000

0.0

-13.0

Lbus sinjai

20.000

19.583

-19.1

0.000

9.442

Bus Sinjai

0.000

9.442

278.4

0.0

LBus sinjai2

20.000

18.677

-19.3

5.555

2.869

Bus Sinjai

-5.555

-2.869

193.3

88.8

Lbus tbnga

20.000

17.682

-32.0

19.807

7.715

Mbus tbnga2

-19.807

-7.715

694.1

93.2

Lbus tello1

20.000

17.677

-32.4

23.022

8.640

Mbus tello2

-23.022

-8.640

803.1

93.6

L bus Tlama 2

20.000

17.754

-32.6

11.584

3.530

Mbus tellolama2

-11.584

-3.530

393.8

95.7

Lbus Tlama 3

20.000

17.787

-32.3

10.243

3.211

Mbus tellolama2

-10.243

-3.211

348.4

95.4

Lbus tlsa

20.000

17.727

-32.5

10.213

2.514

Mbus tlasa2

-10.213

-2.514

342.6

97.1

Lbus tonasa4

70.000

61.938

-33.3

28.324

8.035

Sbus pangkep2

-28.324

-8.035

274.4

96.2

Lbus tonasa5

70.000

62.147

-33.4

28.356

8.044

Sbus pangkep2

-28.356

-8.044

273.8

96.2

Mbus bakaru1

150.000

145.516

-8.9

Mbus pinrang1

103.592

8.621

412.4

99.7

Mbus polmas1

73.672

6.867

293.6

99.6

Mbus bakaru2

-177.264

-15.488

706.0

99.6

1.842

0.145

7.3

99.7

Gb bkru1

-95.269

-8.315

379.4

99.6

Gb bkru2

-83.837

-7.317

333.9

99.6

Mbus bakaru1

99.6

Mbus bakaru2

Mbus barru

Mbus bone1

Mbus bone2

150.000

150.000

150.000

150.000

145.516

134.575

141.657

141.657

-8.9

-27.9

-17.4

-17.4

0.000

-0.013

Lbus makale

Lbus bakaru

177.264

15.488

706.0

pngp-brru1

-2.094

-0.542

9.3

96.8

pngp-brru2

-2.094

-0.542

9.3

96.8

Lbus barru2

4.187

1.083

18.6

96.8
100.0

Mbus bulukumba1

13.711

0.422

55.9

Bus Sinjai

16.675

-2.214

68.6

-99.1

Mbus soppeng2

-19.599

-0.564

79.9

100.0

Mbus soppeng2

-19.599

-0.564

79.9

100.0

Mbus bone2

8.812

2.919

37.8

94.9

Lbus bone1

0.000

0.000

0.0

-50.9

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Mbus bosowa1

Study Case: LF

Voltage
kV

150.000

kV

134.717

Ang.

-28.7

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID

150.000

134.717

-28.7

Mbus bulukumba2

Mbus jeneponto1

Mbus jeneponto2

Mbus majene1

Mbus majene2

Mbus makale1

150.000

150.000

150.000

150.000

150.000

150.000

150.000

139.781

139.781

139.547

139.547

141.665

141.665

138.068

-19.7

-19.7

-19.9

-19.9

-13.4

-13.4

-19.7

0.000

-0.013

Mbus makale2

150.000

138.068

-19.7

Mbus mamuju1

150.000

141.542

-13.7

Amp

%PF

Lbus bone2

8.813

2.933

37.9

-8.812

-2.919

37.8

94.9

-29.272

8.398

130.5

-96.1

mbus pangkep1

94.9

20.013

-12.725

101.6

-84.4

Mbus bosowa2

9.259

4.327

43.8

90.6

Mbus bosowa1

-9.259

-4.327

43.8

90.6

9.259

4.327

43.8

90.6

Mbus bone1

-13.558

-1.026

56.2

99.7

Bus Sinjai

-10.905

-4.440

48.6

92.6

Mbus jeneponto1

4.096

0.341

17.0

99.7

Mbus jeneponto1

4.096

0.341

17.0

99.7

Mbus bulukumba2

16.272

4.784

70.1

95.9

Lbus bulukumba1

5.121

0.906

21.5

98.5

Lbus bosowa
Mbus bulukumba1

XFMR
Mvar

Mbus bone1

Mbus tello1

Mbus bosowa2

MW

LBus bulukumba2

11.151

3.891

48.8

94.4

Mbus bulukumba1

-16.272

-4.784

70.1

95.9

Mbus bulukumba1

-4.091

-0.708

17.2

98.5

Mbus bulukumba1

-4.091

-0.708

17.2

98.5

MBUS TIP 57 1

0.000

-0.202

0.8

0.1

MBUS TIP -57 2

0.000

-0.202

0.8

0.1

Mbus jeneponto2

8.182

1.820

34.7

97.6

LBus jeneponto2

0.000

0.000

0.0

-50.7

Lbus jeneponto1

8.182

1.821

34.7

97.6

Mbus jeneponto1

-8.182

-1.820

34.7

97.6

3.872

-0.079

15.8

-100.0

Mbus mamuju1
Mbus mamuju1

3.593

-0.392

14.7

-99.4

Mbus polmas2

-6.293

-0.381

25.7

99.8

Mbus polmas2

-6.293

-0.381

25.7

99.8

Mbus majene2

5.122

1.234

21.5

97.2

5.122

1.234

21.5

97.2

Mbus majene1

Lbus majene

-5.122

-1.234

21.5

97.2

Mbus sidrap1

-14.515

-3.342

62.3

97.4

Mbus sidrap1

-14.515

-3.342

62.3

97.4

Mbus palopo1

11.677

2.678

50.1

97.5

Mbus palopo1

11.677

2.678

50.1

97.5

Mbus makale2

5.677

1.329

24.4

97.4

Lbus makale

5.677

1.329

24.4

97.4

Mbus makale1

-5.677

-1.329

24.4

97.4

Mbus majene1

-3.869

-0.311

15.8

99.7

Mbus majene1

-3.589

-0.022

14.6

100.0

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Mbus mamuju2

Study Case: LF

Voltage
kV

kV

150.000

141.542

Ang.

-13.7

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID

mbus maros2

150.000

150.000

135.787

135.787

-26.9

-26.9

Mbus palopo2

mbus pangkep1

150.000

150.000

137.375

137.375

134.712

-20.3

-20.3

-27.8

7.458

0.333

30.5

99.9

0.000

0.0

-43.5

Lbus mamuju2

7.458

0.333

30.5

99.9

-7.458

-0.333

30.5

99.9

-52.021

6.914

223.1

-99.1

Mbus sidrap2
Mbus sidrap2

-52.021

6.914

223.1

-99.1

mbus maros2

104.041

-13.829

446.3

-99.1

Mbus sgmnsa1

46.956

-8.338

202.8

-98.5

Mbus sgmnsa1

46.956

-8.338

202.8

-98.5

Mbus pare1

150.000

134.712

138.800

-27.8

-18.9

150.000

138.800

-18.9

44.7

96.3

446.3

-99.1

-11.643

-2.858

50.4

97.1

-11.643

-2.858

50.4

97.1

Mbus palopo2

23.286

5.717

100.8

97.1

Lbus palopo 1

5.698

2.013

25.4

94.3

Lbus palopo2

6.516

2.748

29.7

92.1

LBus palopo3

11.072

0.956

46.7

99.6

Mbus palopo1

-23.286

-5.717

100.8

97.1

Mbus bosowa1

29.398

-8.107

130.7

-96.4

Mbus tello1

60.230

-26.923

282.8

-91.3

pngp-brru2

-70.370

11.521

305.6

-98.7

75.706

7.940

326.2

99.5

-94.965

15.569

412.4

-98.7

Lbus pangkep

8.763

3.652

40.7

92.3

Sbus pangkep1

22.314

1.429

95.8

99.8

Sbus pangkep1

22.314

1.429

95.8

99.8

Sbus pangkep1

22.314

1.429

95.8

99.8

mbus pangkep1

-75.706

-7.940

326.2

99.5

Buspltu barru1

101.294

-0.737

421.3

100.0

75.626

-0.715

314.6

100.0

Mbus pinrang1

-87.664

10.124

367.1

-99.3

Mbus polmas1

-49.693

5.175

207.8

-99.5

Mbus pare2

pngp-brru2

Mbus pare2

2.847
13.829

Mbus makale1

pngp-brru1
150.000

10.129
-104.041

Mbus makale1

Mbus pangkep2

Mbus pangkep2

%PF

0.000

mbus maros1
150.000

Amp

Mbus mamuju2

Lbus mros

Mbus palopo1

XFMR
Mvar

Lbus mamuju

Mbus mamuju1
mbus maros1

MW

-39.563

-13.847

174.4

94.4

Mbus sidrap1

-3.587

-2.125

17.3

86.0

Mbus sidrap1

-45.078

-14.468

196.9

95.2

Sbus pinrang1

0.000

-0.061

0.3

0.0

Sbus pinrang1

0.000

-0.061

0.3

0.0

Lbus pare

5.454

1.747

23.8

95.2

Lbus pare

3.649

1.123

15.9

95.6

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Mbus pinrang1

Study Case: LF

Voltage
kV

kV

150.000

140.138

Ang.

-15.9

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID

Mvar

Mbus pare1

39.563

13.847

174.4

94.4

Mbus pare1

88.926

-5.816

367.1

-99.8

-100.058

3.535

412.5

-99.9

Mbus bakaru1

Mbus pinrang2

mbus pltu jenn

150.000

150.000

140.138

135.203

-15.9

-29.6

Mbus polmas2

Mbus sengkang1

Mbus sengkang2

150.000

150.000

150.000

150.000

141.866

141.866

144.115

144.115

-13.1

-13.1

-14.5

-14.5

11.132

2.281

46.8

98.0

4.707

-0.003

19.4

100.0

Lbus pinrang2

6.425

2.284

28.1

94.2

Mbus pinrang1

-11.132

-2.281

46.8

98.0

Mbus tlasa1

0.000

0.000

0.0

76.3

gbuspltu jeen1

0.000

0.000

0.0

7.6

gbuspltu jeen2

0.000

0.000

0.0

7.6

PGAYA

0.000

0.000

0.0

23.2

0.000

0.000

0.0

23.2

51.104

-0.886

208.0

-100.0

Mbus bakaru1

-72.139

-1.811

293.7

100.0

Mbus polmas2

21.035

2.697

86.3

99.2

Mbus majene1

6.301

0.015

25.6

100.0

Mbus majene1

6.301

0.015

25.6

100.0

Lbus polmas

8.433

2.666

36.0

95.3

Mbus polmas1

-21.035

-2.697

86.3

99.2

Mbus sidrap2

75.709

12.500

307.4

98.7

Mbus sidrap2

75.709

12.500

307.4

98.7

Mbus soppeng1

49.862

9.346

203.2

98.3

Mbus soppeng1

49.862

9.346

203.2

98.3

Mbus sengkang2

-251.142

-43.692

1021.2

98.5

Gb s11

-134.360

-0.140

538.3

100.0

Gb s12

0.000

0.000

0.0

-54.1

Gb s21

-134.360

-0.140

538.3

100.0

Gb s22

0.151

-51.520

206.4

-0.3

17.428

8.108

77.0

90.7

0.000

0.000

0.0

-54.1

Mbus pare1

Gb s18

150.000

135.313

-29.5

%PF

Mbus pinrang2

Lbus sengkang

Mbus sgmnsa1

Amp

Lbus pinrang1

PGAYA
Mbus polmas1

XFMR

MW

Mbus sengkang1

251.142

43.692

1021.2

98.5

mbus maros2

-46.373

10.116

202.5

-97.7

mbus maros2

-46.373

10.116

202.5

-97.7

Mbus tlasa1

5.124

1.261

22.5

97.1

Mbus tlasa1

5.124

1.261

22.5

97.1

Mbus tbnga1

12.247

5.311

57.0

91.7

Mbus tbnga1

7.610

3.274

35.3

91.9

Mbus tello2

24.344

-13.372

118.5

-87.6

Mbus tello2

24.344

-13.372

118.5

-87.6

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Mbus sgmnsa2

Study Case: LF

Voltage
kV

kV

150.000

135.313

Ang.

-29.5

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID

Mbus sidrap2

150.000

150.000

140.394

140.394

-17.9

-17.9

-4.595

62.7

13.953

-4.595

62.7

-95.0

-13.953

4.595

62.7

-95.0

Mbus makale1

14.659

2.990

61.5

98.0

Mbus makale1

14.659

2.990

61.5

98.0

Mbus pare2

3.608

0.217

14.9

99.8

Mbus pare2

45.341

15.252

196.7

94.8

Mbus sidrap2

-78.266

-21.448

333.7

96.4

Mbus sengkang1

-74.366

-8.032

307.6

99.4

Mbus sengkang1

-74.366

-8.032

307.6

99.4

54.324

0.288

223.4

100.0

Mbus soppeng2

150.000

142.437

-16.4

-16.4

54.324

0.288

223.4

100.0

-25.126

-5.465

105.7

97.7

Mbus soppeng1

-25.126

-5.465

105.7

97.7

12.070

4.968

53.7

92.5

Lbus sidrap 1

0.000

0.000

0.0

-13.0
96.4

Mbus sidrap1

78.266

21.448

333.7

Mbus sidrap2

25.339

5.771

105.3

97.5

Mbus sidrap2

25.339

5.771

105.3

97.5

Mbus sengkang1

-49.569

-7.871

203.4

98.8

Mbus sengkang1

-49.569

-7.871

203.4

98.8

Mbus soppeng2

48.459

4.200

197.2

99.6

Mbus bone1

19.697

0.545

79.9

100.0

Mbus bone1

19.697

0.545

79.9

100.0

Sbus soppeng

Mbus tbnga1

Mbus tbnga2

Mbus tello1

Mbus tello2

150.000

150.000

150.000

150.000

135.146

135.146

135.446

135.446

-29.6

-29.6

-29.7

-29.7

-95.0

Mbus soppeng1

Lbus sidrap

142.437

%PF

13.953

mbus maros1

150.000

Amp

Mbus sgmnsa2

mbus maros1

Mbus soppeng1

XFMR
Mvar

Lbus sgmnsa
Mbus sgmnsa1

Mbus sidrap1

MW

9.065

3.110

38.8

94.6

Mbus soppeng1

-48.459

-4.200

197.2

99.6

Mbus sgmnsa1

-12.242

-5.336

57.0

91.7

Mbus sgmnsa1

-7.607

-3.342

35.5

91.6
91.6

Mbus tbnga2

19.848

8.678

92.5

Lbus tbnga

19.848

8.678

92.5

91.6

Mbus tbnga1

-19.848

-8.678

92.5

91.6

mbus pangkep1

-59.637

28.886

282.5

-90.0

Mbus bosowa1

-19.896

12.896

101.1

-83.9

Mbus tellolama1

24.039

-12.250

115.0

-89.1

Mbus tellolama1

24.039

-12.250

115.0

-89.1

Mbus tello2

31.455

-17.283

153.0

-87.6

Bus panakukang

17.158

5.502

76.8

95.2

Bus panakukang

17.158

5.502

76.8

95.2

-24.333

13.416

118.4

-87.6

Mbus sgmnsa1

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Study Case: LF

Voltage
kV

kV

Ang.

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID
Mbus sgmnsa1

Mbus tellolama1

Mbus tellolama2

150.000

150.000

135.567

135.567

-29.9

-29.9

XFMR

MW

Mvar

Amp

%PF

-24.333

13.416

118.4

Sbus tello1

5.591

0.530

23.9

-87.6
99.6

Sbus tello3

8.489

-11.105

59.6

-60.7

Sbus tello3

8.489

-11.105

59.6

-60.7

Gb mitsbshi1

0.000

0.000

0.0

0.0

Gb mitsbshi2

0.000

0.000

0.0

7.9

Gb PLTD COKDO1

0.081

-21.683

92.4

-0.4

Gb PLTD COKDO2

0.081

-21.683

92.4

-0.4

Gb GE1

0.000

0.000

0.0

5.9

Gb pltg ge2

0.000

0.000

0.0

6.0

Gb swd1

0.000

0.000

0.0

7.9

Gb swd2

0.000

0.000

0.0

7.9

Lbus tello1

23.076

9.929

107.1

91.9

Mbus tello1

-31.455

17.283

153.0

-87.6

Mbus tello1

-24.007

12.312

114.9

-89.0

Mbus tello1

-24.007

12.312

114.9

-89.0

Mbus tellolama2

48.013

-24.624

229.8

-89.0

Lbus Tlama 3

10.263

3.696

46.5

94.1

L bus Tlama 2

11.610

4.150

52.5

94.2

Bus Tlama 1

13.070

-16.235

88.8

-62.7

Bus Tlama 1

13.070

-16.235

88.8

-62.7

Mbus tellolama1

-48.013

24.624

229.8

-89.0

MBUS TIP 57 1

150.000

139.554

-19.9

Mbus jeneponto1

0.000

0.000

0.0

-33.1

MBUS TIP -57 2

150.000

139.554

-19.9

Mbus jeneponto1

0.000

0.000

0.0

-33.1

Mbus tlasa1

150.000

135.198

-29.6

Mbus sgmnsa1

-5.122

-1.386

22.7

96.5

Mbus sgmnsa1

-5.122

-1.386

22.7

96.5

PGAYA

0.000

-0.152

0.6

0.0

mbus pltu jenn

0.000

-0.152

0.6

0.0

Bus pltd talassa I

0.000

0.000

0.0

7.6

Bus pltd talassa II

0.000

0.000

0.0

8.4

Bus pltd talassa III-1

0.000

0.000

0.0

7.1

Bus pltd talassa IV

0.000

0.000

0.0

7.1

Bus pltd talassa V

0.000

0.000

0.0

7.6
95.8

Mbus tlasa2

PGAYA

150.000

150.000

135.198

135.203

-29.6

-29.6

Mbus tlasa2

10.244

3.076

45.7

Lbus tlsa

10.244

3.077

45.7

95.8

Mbus tlasa1

-10.244

-3.076

45.7

95.8

Mbus tlasa1

0.000

0.000

0.0

76.3

mbus pltu jenn

0.000

0.000

0.0

23.2

mbus pltu jenn

0.000

0.000

0.0

23.2

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

10

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID
pngp-brru1

Study Case: LF

Voltage
kV

kV

150.000

134.712

Ang.
-27.8

Generation
MW

Load

Mvar
0

MW
0

Load Flow
Mvar

ID
0

Buspltu barru1
Mbus barru
mbus pangkep1

pngp-brru2

Sbus pangkep1

Sbus pangkep2

150.000

70.000

70.000

134.712

62.553

62.553

-27.8

-32.8

-32.8

Sbus pinrang2

150.000

150.000

138.801

138.801

-18.9

-18.9

Sbus soppeng

20.000

18.757

-18.3

9.051

2.771

Sbus tello1

30.000

26.989

-31.2

Sbus tello3

Sbus tello4

Sbus tello5

30.000

70.000

70.000

70.000

26.989

65.899

65.899

65.899

-31.2

-31.6

-31.6

-31.6

0.000

-8.863

Amp

%PF

-97.060

15.376

421.2

2.095

0.193

9.0

99.6

94.965

-15.569

412.4

-98.7

-98.8

2.095

0.193

9.0

99.6

Mbus pare1

-72.465

11.328

314.3

-98.8

mbus pangkep1

70.370

-11.521

305.6

-98.7

Mbus pangkep2

-22.242

0.537

205.4

-100.0

Mbus pangkep2

-22.242

0.537

205.4

-100.0

Mbus pangkep2

-22.242

0.537

205.4

-100.0

Sbus pangkep2

66.727

-1.612

616.1

-100.0

Lbus tonasa5

28.454

8.391

273.8

95.9
98.7

Bus mandai

4.869

0.803

45.5

Bus mandai

4.869

0.803

45.5

98.7

Lbus tonasa4

28.535

8.355

274.4

96.0

-66.727

1.612

616.1

-100.0

Cbus pangkep

0.000

-19.964

184.3

0.0

Mbus pare2

0.000

0.000

0.0

-13.5
-13.5

Mbus pare2

0.000

0.000

0.0

Sbus pinrang2

0.000

0.000

0.0

-13.5

Buspltd suppa1

0.000

0.000

0.0

-39.4

Buspltd suppa1

0.000

0.000

0.0

-39.4

Sbus pinrang1

0.000

0.000

0.0

-13.5

-9.051

-2.771

291.3

95.6

Mbus soppeng2
Buspltd pajlseng

Sbus tello2

Mvar

Mbus barru

Sbus pangkep1

Sbus pinrang1

XFMR

MW

0.000

0.000

0.0

-47.5

Mbus tello2

-5.582

-0.375

119.7

99.8

Sbus tello2

5.582

0.375

119.7

99.8

Bus bwja

5.582

0.375

119.7

99.8

Gb alstm1

0.000

0.000

0.0

4.6

Gb pltu1

0.000

0.000

0.0

5.7

Gb pltu2

0.000

0.000

0.0

5.7

Gb westc

0.000

0.000

0.0

5.7

Sbus tello1

-5.582

-0.375

119.7

99.8

Mbus tello2

-8.461

11.865

127.7

-58.1

Mbus tello2

-8.461

11.865

127.7

-58.1

Sbus tello5

14.196

-14.897

180.3

-69.0

Sbus tello4

2.726

-8.833

81.0

-29.5

Bus brloe

2.726

0.030

23.9

100.0

Sbus tello3

-2.726

8.833

81.0

-29.5

Bus daya1

14.196

-14.877

180.2

-69.0

%Tap

Project:

ETAP

Studi Sistem SULSEL (SVC)

7.0.0

Page:

11

Date:

16-11-2013

Location:

Sulawesi Selatan

Contract:

Universitas Hasanuddin

SN:

12345678

Engineer:

Ricky & Maximilianus

Revision:

Base

Filename:

TUGAS AKHIR 2013

Config.:

Normal

Bus
ID

Study Case: LF

Voltage
kV

kV

Ang.

Generation
MW

Load

Mvar

MW

Load Flow
Mvar

ID
tello-mandai~

MW

XFMR
Mvar

Amp

%PF

0.000

-0.020

0.2

0.0

Sbus tello3

-14.196

14.897

180.3

-69.0

tello-mandai~

70.000

65.900

-31.6

Sbus tello5

0.000

0.000

0.0

13.3

Mandai-Daya~

70.000

66.152

-32.5

Bus daya1

0.000

0.000

0.0

12.5

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

%Tap