PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH

FOR

ROAD AND BRIDGE WORKS ZERO LEAD BASED: (EXCLUDING CARRIAGE COST)

PUBLISHED UNDER THE AUTHORITY OF THE CHIEF ENGINEER (DESIGN & PLANNING) P.W.D, ARUNACHAL PRADESH

ITANAGAR

INDEX SUMMARY OF RATES CHAPTER-1 CHAPTER-2 CHAPTER-3 CHAPTER-4 CHAPTER-5 CHAPTER-6 CHAPTER-7 CHAPTER-8 CHAPTER-9 CARRIAGE OF MATERIALS SITE CLEARANCE EARTH WORK, EROSION CONTROL AND DRAINAGE SUB-BASES, BASES (NON- BITUMINOUS) AND SHOULDERS BASES AND SURFACE COURSES (BITUMINOUS) CEMENT CONCRETE PAVEMENTS GEOSYNTHETICS AND REINFORCED EARTH TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES PIPE CULVERTS

CHAPTER-10 MAINTENANCE OF ROADS CHAPTER-11 HORTICULTURE CHAPTER-12 FOUNDATIONS CHAPTER-13 SUB-STRUCTURE CHAPTER-14 SUPER-STRUCTURE CHAPTER-15 RIVER TRAINING AND PROTECTION WORKS CHAPTER-16 REPAIR AND REHABILITATION CHAPTER-17 STEEL BRIDGES

LEAD CHART FOR CARRIAGE OF MATERIALS TO VARIOUS DESTINATIONS IN ARUNACHAL PRADESH FROM GUWAHATI UNDER WESTERN ZONE
CAPITAL CIRCLE 1. 2. 3. 4. Guwahati to CD'A",Itanagar Guwahati to Naharlagun Guwahati to Doimukh Guwahati to CD'B',Itanagar = = = = 410 Km. 400 Km. 397 Km. 410 Km.

BOBIA CIRCLE 1. 2. 3. Guwahati to Seppa Guwahati to Bameng Guwahati to Sagalee = = = 410 Km. 462 Km. 468 Km.

RUPA CIRCLE 1. 2. 3. 4. 5. 6. Guwahati to Bomdila Guwahati to Tawang Guwahati to Jung Guwahati to Kalaktang Guwahati to Dirang Guwahati to Lumla = = = = = = 364 Km. 545 Km. 505 Km. 398 Km 406 Km 585 Km

UNDER CENTRAL ZONE 'A'


BASAR CIRCLE 1. 2. 3. 4. 5 Guwahati to Basar Guwahati to Dumporijo Guwahati to Daporijo Guwahati to Gensi Guwahati to Nacho = = = = = 621 Km. 736 Km. 745 Km. 561 Km. 860 Km.

YACHULI CIRCLE 1. 2. 3. 4. Guwahati to Ziro Guwahati to Sangram Guwahati to Tali Guwahati to Yazali = = = = 531 Km. 616 Km. 676 Km. 496 Km.

UNDER CENTRAL ZONE 'B'


BOLENG CIRCLE 1. 2. 3. 4. 5. Guwahati to Pasighat Guwahati to Boleng Guwahati to Yingkiong Guwahati to Mariyang Guwahati to Nari = = = = = 620 Km. 710 Km. 785 Km. 837 Km. 565 Km

ALONG CIRCLE 1. 2. 3. 4. Guwahati to Along Guwahati to Yomcha Guwahati to Rumgong Guwahati to Mechuka = = = = 671 Km. 758 Km. 701 Km. 921 Km.

UNDER EASTERN ZONE


JAIRAMPUR CIRCLE 1. 2. 3. 4. 5. Guwahati to Jairampur Guwahati to Changlang Guwahati to Khonsa Guwahati to Longding Guwahati to Kanubari = = = = = 587 Km. 589 Km. 633 Km. 685 Km. 645 Km.

TEZU CIRCLE 1. 2. 3. 4. 5. Guwahati to Namsai Guwahati to Tezu = = 545 Km. 602 Km. 587 Km. 702 Km. 821 Km.

Guwahati to Roing via Makum = Guwahati to Hayuliang Guwahati to Anini = =

CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT INCL!"ING LOA"ING, !NLOA"ING AN" STAC#ING$ Lead Average Number Number Diesel in speed of trips of KM consuKm !"# !N# done mption !L# *)+!,L+"# !,NL('# !Litre# (. Cost of Diesel $ Rs.46.52 per Litre ' .)6.-5 ,-'.) 0)).55 5'6.-%0-..6 '/0.0' '',.55 6.6.05 6'-.55 ).).,)'%.,6 -./.5 -%0.'' --%.%0 ./0'.56 ./6'.56 ...%.%% ..%5..' ..-..)5 .,,).%.,'%.05 .0/...' .00'.-) .06..)6 .5/'.6' .55..'% .56%.'. .%././5 .%50.%0 .%66./0 Mobil Cost of oil Mobil oil consu$ mption Rs.230.00 !Litre# per Litre 6 /..55 /.,,) /.,-) /.0%/.5.5 /.5'0 /.%//.%%. /.%-. /.',) /.''5 /.'-/.60, /.6'5 /.6-' /.),6 /.)%6 /.))' /.-.% /.-50 /.-6. /.--../,' ../%0 ../)/ .../6 ...00 ...%...)% ..,.. ) 00.., %,.55 ').%5 ),.%6 -%.,, ./'.5..6./6 .,'.60 .0%.-0 .55.55 .%,.6, .'/.66 .').0' .6%.6, .)0./) .-/.,. .-6... ,/0.6) ,./.5% ,.'.),,0.00 ,,-.66 ,0%.-) ,5,..,5).5 ,%5.'. ,'/.%,''.%6 ,6,.%% ,6).%0 Cost of labour !male# % Nos. $ Rs.250 M+3 4er Da1 .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// .,%/.// Hire C arges of truc& per da1 Rs.3,900 ./ 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// 0-//.// Total Cost Increase Avg. Cost per in cost cost per !C'(C) trip per addl.Km C-(C./# !C..+C0# Km after .st over !%Km2 previous ./Km2 Km ,/Km# .. ., .0 .5 %06../' %5--.,5 %'/'.-) 6%%.0. )5-..% -5...6 93.84 92.02 88.10 84.62 81.21 78.22 75.35 72.87 70.26 68.13 66.06 63.97 62.13 60.52 58.92 57.38 56.01 54.64 53.24 52.24 51.01 50.03 48.87 48.05 47.29 46.14 45.61 44.59 43.96 47.78 60.10 75.58

. . , 0 5 % ' 6 ) ./ .. ., .0 .5 .% .' .6 .) .,/ ,. ,, ,0 ,5 ,% ,' ,6 ,) ,0/

, .'.// .6.// .6.%/ .).// .).%/ .-.// .-.%/ ,/.// ,/.%/ ,..// ,..%/ ,,.// ,,.%/ ,0.// ,0.%/ ,5.// ,5.%/ ,%.// ,%.%/ ,'.// ,'.%/ ,6.// ,6.%/ ,).// ,).%/ ,-.// ,-.%/ 0/.// 0/.%/ 0..//

0 6... '.5) %.-' %.%5 %..5.-/ 5.'' 5.55 5.,' 5../ 0.-% 0.)0 0.6. 0.'. 0.%. 0.50 0.0% 0.,) 0.,. 0..% 0./0./5 ,.-,.-% ,.-/ ,.)' ,.)0 ,.6,.6' ,.60

5 ,/.,, 0..-/ 5..65 %/.0. %6.-0 '5.)5 6...66... ),.') )6.-% -,.--6.)0 ./,.5./6./, ....5, ..%.6. ..-.-. .,5./0 .,)./) .0,./' .0%.-.0-.)' .50.'.56.56 .%..,, .%5.-5 .%).', .',.,) .'%.-. .'-.%,

% 5./5 '.0) ).0% ././' ...%.,.-6 .5.,5 .%.5, .'.%5 .6.%.).'/ .-.%6 ,/.%/ ,..5/ ,,.,) ,0..5 ,0.-) ,5.). ,%.', ,'.5. ,6.,/ ,6.-6 ,).65 ,-.50/.,5 0/.-0..6, 0,.5' 00..) 00.-/

%6//.%' ./,-.,6 %6)5.0- ...0.)%)%-.)% ..-%../ %-,-.%. .,60.0, %--5./6 .05).'6 '/%%.06 .5,..%5 '..,.60 .5-..)/ '.'6.-- .%%-.-0 ',,...6 .',%.-',6,./, .')-.-' '0,..,% .6%,./'0'-.%% .).,.'. '5.'.') .)6..%0 '5',.'' .-,).-. '%/6.-5 .-)5.-, '%%,.,- ,/0-.%' '%-%.5) ,/-,.)/ ''0).'6 ,.5%./5 '')/.-0 ,.-'./% '6,,.-' ,,5'./) '6'5./' ,,-5.-% ')/%..' ,050.// ')5'.,' ,0-/.,'))'.,/ ,50'.50 '-,'.'. ,5),./5 '-''./) ,%,'.'0 6//%.%' ,%6/.%-

CARRIAGE OF MATERIA ! "# MEC$A%ICA TRA%!&ORT 'I%C ()I%G OA)I%G* (% OA)I%G A%) !TAC+I%G,
Beyond 5 Km upto 10 Km addl. per Km 75.58 21.50 Beyond 10 Km upto 20 Km addl. per Km 60.10 11.11 Beyond 20 Km upto 30 Km addl. per Km 47.78 13./5 Beyond 30 Km addl. per Km 47.78 13./5

Sl. No.

Material

Capacity Net!

Unit of "ate

1 Km

2 Km

3 Km

4 Km

5 Km

Cost per trip 1. Sand# $ime# S%in&le# '&&rea&te# Sur(%i# )art%# Moorum# )*ca+ated roc( and Ker, -tone 'dd C234 5 106 Total 3.50 Cu.m.

755.31 215..

849.15 242./1

941.17 2/..01

1029.27 204.0.

1113.89 31..25

21.5. 237.38

24.2/ 266.87

2/..0 295.8

20.41 323.49

31..3 350.08

2.1/ 23.75

1.12 18.89

1.31 15.02

1.31 15.02

2. 7im,er# Bam,oo and Ballie 'dd C234 5 106 Total

Cu.m.

1....3 1.... 207.71

212.20 21.23 233.52

235.20 23.53 258.82

251.32 25.13 283.05

21..41 21..5 306.32

1..0 1..0 20.79

15.03 1.5 16.53

11.04 1.10 13.13

11.04 1.10 13.13

3. Cement# Steel# 'n&le and 7ee C%annel 'dd C234 5 106 Total

7on

101.0

121.31

134.45

141.04

150.13

10..

..50

/..3

/..3

10.10 118.69

12.13 133.44

13.45 147.9

14.1 161.74

15.01 175.04

1.0. 11.88

0../ 9.45

0./. 7.51

0./. 7.51

4. Bric('dd C234 5 106 Total

1500

1000

503.54 50.35 553.89

5//.1 5/./1 622.71

/21.45 /2.15 690.2

/./.1. /../2 754.80

142.50 14.2/ 816.85

50.30 5.04 55.43

40.01 4.01 44.08

31..5 3.10 35.04

31..5 3.10 35.04

5. 7ar# Bitumen 8ire9ood 'dd C234 5 106 Total

and

7on

151.0/ 15.11 166.17

1/0..3 1/.0. 186.81

1...23 1...2 207.05

205..5 20.50 226.44

222.1. 22.2. 245.06

15.12 1.51 16.63

12.02 1.2 13.22

0.5/ 0.0/ 10.52

0.5/ 0.0/ 10.52

/. Stone for ma-onary : -olin& 'dd C234 5 106 Total

3.50

Cu.m.

215..0 21.5. 237.38

242./1 24.2/ 266.87

2/..01 2/..0 295.8

204.0. 20.41 323.49

31..25 31..3 350.08

21.50 2.1/ 23.75

11.11 1.12 18.89

13./5 1.31 15.02

13./5 1.31 15.02

1. S; 2ipe a! 100 mm dia. 'dd C234 5 106 Total ,! 150 mm dia. 'dd C234 5 106 Total 4.0 100 m 151.3/ 15.14 173.1 314.11 31.41 346.18 11/.01 11./0 194.6 353..1 35.3. 389.19 10/.0. 10./1 215.69 302.15 30.22 431.37 214.43 21.44 235.87 42.../ 42..0 471.75 232.0/ 23.21 255.27 4/4.12 4/.41 510.53 15.15 1.5. 17.33 31.40 3.15 34.64 12.52 1.25 13.77 25.04 2.5 27.54 0.05 1 10.95 10.01 1.00 21.9 0.05 1 10.95 10.01 1.00 21.9

240

100 m

CARRIAGE OF MATERIA ! "# MEC$A%ICA TRA%!&ORT 'I%C ()I%G OA)I%G* (% OA)I%G A%) !TAC+I%G,
Beyond 5 Km upto 10 Km addl. per Km 75.58 55.00 5./ 61.59 11.0. 1.2 79.18 .0.0. 0 98.98 114.52 11.45 125.97 151.4/ 15.15 173.21 220.04 22.00 251.94 210.03 21.00 307.92 314.03 31.40 346.42 410.0 41.00 461.89 Beyond 10 Km upto 20 Km addl. per Km 60.10 44.52 4.45 48.97 51.24 5.12 62.96 11.55 1.1/ 78.71 01.0/ 0.11 100.17 125.21 12.52 137.73 1.2.12 1..21 200.33 222.50 22.2/ 244.85 250.42 25.04 275.46 333..0 33.30 367.28 Beyond 20 Km upto 30 Km addl. per Km 47.78 35.30 3.54 38.93 45.5 4.55 50.05 5/... 5./0 62.57 12.30 1.24 79.63 00.54 0.05 109.49 144.1. 14.4. 159.26 11/.0/ 11.10 194.66 100.0. 10.01 218.99 2/5.44 2/.54 291.98 Beyond 30 Km addl. per Km 47.78 35.30 3.54 38.93 45.5 4.55 50.05 5/... 5./0 62.57 12.30 1.24 79.63 00.54 0.05 109.49 144.1. 14.4. 159.26 11/.0/ 11.10 194.66 100.0. 10.01 218.99 2/5.44 2/.54 291.98

Sl. No.

Material

Capacity Net!

Unit of "ate

1 Km

2 Km

3 Km

4 Km

5 Km

Cost per trip c! 200 mm dia. 'dd C234 5 106 Total d! 230 mm dia. 'dd C234 5 106 Total e! 250 mm dia. 'dd C234 5 106 Total f! 300 mm dia. 'dd C234 5 106 Total &! 350 mm dia. 'dd C234 5 106 Total %! 400 mm dia. 'dd C234 5 106 Total i! 450 mm dia. 'dd C234 5 106 Total <! 500 mm dia. 'dd C234 5 106 Total (! /00 mm dia. 'dd C234 5 106 Total 135 100 m

755.31 550.40 55.05 615.44 110.34 11.03 791.27 .00.1. .0.02 989.1 1144.41 114.44 1258.85 1513.5/ 151.3/ 1730.92 22....2 22.... 2517.70 2101.44 210.14 3077.18 3141.13 314.11 3461.84 410/.11 410./2 4615.79

849.15 /20 /2.0 691.90 .0..11 .0..1 889.58 1010..0 101.00 1111.98 12./.50 12..// 1415.25 11/0.0/ 11/.01 1945.97 2513.1. 251.32 2830.5 3145.00 314.5 3459.5 353..13 353..1 3891.94 4111.50 411.15 5189.25

941.17 /01.1/ /0.12 766.88 .0/.35 .0./4 985.99 1120.44 112.04 1232.48 142/.02 142./ 1568.62 10/0.11 10/.0. 2156.85 2.52.03 2.5.2 3137.23 34.5..1 34..5. 3834.39 3021.54 302.15 4313.69 522..12 522..1 5751.59

1029.27 1/2.42 1/.24 838.66 0.0.2/ 0..03 1078.29 1225.32 122.53 1347.85 1550.5 155.05 1715.45 2144.31 214.43 2358.74 3110 311.0 3430.9 3.12.11 3.1.21 4193.32 42.../3 42.../ 4717.49 511..11 511..2 6289.99

1113.89 .25.1 .2.51 907.61 10/0..5 10/.00 1166.94 132/.0/ 132./1 1458.67 1/.1.11 1/..11 1856.48 2320./ 232.0/ 2552.66 3315.42 331.54 3712.96 4125.52 412.55 4538.07 4/41.21 4/4.12 5105.33 /1...2. /1...3 6807.11

105

100 m

.4

100 m

//

100 m

4.

100 m

33

100 m

21

100 m

24

100 m

1.

100 m

.. "C 2ipe-# 'C 2ipe-# 4ume# Steel and C= 2ipe

a! 100 mm dia. 'dd C234 5 106 Total ,! 125 mm dia. 'dd C234 5 106 Total

202..0

100 m

251.0/ 25.. 283.76 343.05 34.4 378.35

200.01 20 319.01 3././. 3../1 425.35

321.44 32.14 353.58 42..5. 42../ 471.44

351.53 35.15 386.68 4/..1 4/..1 515.57

3.0.43 3..04 418.47 501.24 50.12 557.96

25..1 2.5. 28.39 34.42 3.44 37.86

20.53 2.05 22.58 21.31 2.14 30.11

1/.32 1./3 17.95 21.1/ 2.1. 23.94

1/.32 1./3 17.95 21.1/ 2.1. 23.94

210./0

100 m

CARRIAGE OF MATERIA ! "# MEC$A%ICA TRA%!&ORT 'I%C ()I%G OA)I%G* (% OA)I%G A%) !TAC+I%G,
Beyond 5 Km upto 10 Km addl. per Km 75.58 41.3 4.13 45.43 /...4 /... 75.72 Beyond 10 Km upto 20 Km addl. per Km 60.10 32..4 3.2. 36.12 54.14 5.41 60.21 Beyond 20 Km upto 30 Km addl. per Km 47.78 2/.11 2./1 28.72 43.51 4.35 47.86 Beyond 30 Km addl. per Km 47.78 2/.11 2./1 28.72 43.51 4.35 47.86

Sl. No.

Material

Capacity Net!

Unit of "ate

1 Km

2 Km

3 Km

4 Km

5 Km

Cost per trip c! 150 mm dia. 'dd C234 5 106 Total d! 200 mm dia. 'dd C234 5 106 Total 1.3 100 m

755.31 412.14 41.21 454.01 /.1.0 /..10 756.69

849.15 4/4.02 4/.4 510.42 113.3/ 11.34 850.7

941.17 514.30 51.43 565.73 .51.11 .5.12 942.89

1029.27 5/2.44 5/.24 618.68 031.40 03.14 1031.14

1113.89 /0../. /0..1 669.55 1014.41 101.45 1115.92

100..0

100 m

e! 250 mm dia. 'dd C234 5 106 Total f! 300 mm dia. 'dd C234 5 106 Total &! 350 mm dia. 'dd C234 5 106 Total %! 400 mm dia. 'dd C234 5 106 Total i! 450 mm dia. 'dd C234 5 106 Total

.0.52

100 m

03..04 03.. 1031.84 1213.03 121.30 1335.32 1110.14 111.01 1891.71 2202.00 220.3 2522.29 204..13 204..1 3242.94 4121.3. 412.14 4540.12

1054.5. 105.4/ 1160.04 13/4.15 13/.4. 1501.23 1033.4 103.34 2126.74 2511..1 251.10 2835.66 3314.4 331.44 3645.84 4/40.1/ 4/4.02 5104.18

11/.../ 11/..0 1285.75 1512./5 151.21 1663.92 2142.02 214.20 2357.21 2.51.23 2.5.12 3142.95 3/13.5. 3/1.3/0 4040.94 5143.01 514.30 5657.31

121..2. 121..3 1406.11 1/54.24 1/5.42 1819.66 2343.51 234.35 2577.86 3124./. 312.41 3437.15 4011.45 401.15 4419.2 5/24.43 5/2.44 6186.87

13.3.31 13..34 1521.71 1100.24 110.02 1969.26 253/.1. 253./2 2789.8 33.1.51 33..1/ 3719.73 4341.14 434.11 4782.51 /0./..3 /0../. 6695.51

03..1 0.30 103.26 121.4. 12.15 133.63 112.00 11.21 189.3 220.45 22.05 252.4 205.01 20.5 324.51 413.02 41.3 454.32

14./4 1.4/ 82.10 0/.50 0.// 106.25 13/..4 13./. 150.52 1.2.45 1..25 200.7 234.5. 23.4/ 258.04 32..42 32..4 361.26

50.34 5.03 65.27 1/.10 1./. 84.47 10..10 10... 119.67 145.05 14.51 159.56 1./.40 1../5 205.14 2/1.00 2/.11 287.2

50.34 5.03 65.27 1/.10 1./. 84.47 10..10 10... 119.67 145.05 14.51 159.56 1./.40 1../5 205.14 2/1.00 2/.11 287.2

/2.22

100 m

43.02

100 m

32.04

100 m

25./2

100 m

<! /00# 100# 150# .00# 1..30 000# 1200 mm dia. 'dd C234 5 106 Total

100 m

(A) Usage Rates of Plant and Machinery


Sl. No.
P&M-001 P&M-002 P&M-00$ P&M-00& P&M-005 P&M-00) P&M-007 P&M-00. P&M-000 P&M-010 P&M-011 P&M-012 P&M-01$ P&M-01& P&M-015 P&M-01) P&M-017 P&M-01. P&M-010 P&M-020 P&M-021 P&M-022 P&M-02$ P&M-02& P&M-025 P&M-02) P&M-027 P&M-02. P&M-020 P&M-0$0 P&M-0$1 P&M-0$2 P&M-0$$

Description of Machine
Air Compressor

Activity
2enera! Purpose

Output of Machine
capacity in cfm cum/hour cum/hour s(m/hour capacity in !itre cum / hour cum / hour capacity in cum cum/hour cum/hour

Output
170/250 20 1$ 1750 1500 20 $$ / 22 1 215 715

Unit
hour hour hour hour hour hour hour hour hour hour hour hour hour

Rate 516 2440 2033 1174 217 2923 279 17 242 242 1398 932 389 3615 2632 873 1253 787 545 1135 25579 18917 15127 12112 2880 1571 9470 19921 339 68 389 2617 1101

Batching and Mi ing P!ant "a# Concrete Mi ing $0 cum capacity Batching and Mi ing P!ant "%# Concrete Mi ing 15 - 20 cum capacity Bitumen Pressure 'istri%utor App!ying %itumen tac/ coat Bitumen Boi!er oi! fired Bitumen 3praying

Concrete Pa*er +inisher ,ith Pa*ing of concrete surface &0 -P Motor Concrete Pump of &5 & $0 cum capacity Concrete Buc/et Pumping of concrete +or Pouring concrete

Concrete Mi er "a# 01&/012. Concrete Mi ing cum Concrete Mi er "%# 1 cum Crane "a# .0 tonnes Cranes %# $5 tonnes Cranes c# $ tonnes 'o5er ' - .0 - A 12 'o5er ' - 50 - A 15 6mu!sion Pressure 'istri%utor +ront 6nd !oader 1 cum %uc/et capacity 2enerator "a# 125 78A 2enerator" %# )$ 78A 23B P!ant 50 cum -otmi P!ant - 120 9Pcapacity -otmi P!ant - 100 9Pcapacity Concrete Mi ing 4ifting Purpose 4ifting Purpose 4ifting Purpose 3preading /Cutting / C!earing 3preading /Cutting / C!earing App!ying emu!sion tac/ coat 3oi! !oading / Aggregate !oading 2enration of e!ectric 6nergy 2enration of e!ectric 6nergy Producing 23B 'BM/BM/3'C/ Premi 'BM/BM/3'C/ Premi

cum/hour cum/hour s(m/hour cum/hour 78A 78A cum/hour cum/hour cum/hour cum/hour cum/hour s(m/hour cum/hour 9P9P;m/hour capacity in tonne s(m/hour cum/hour s(m/hour

$00/ 150/250 200/ 120/150 1750 )0 /25 100 50 &0 &0 $0 25 17 1500 )0 /)0 /)0 100 200 .0 1 1250 200/200/50/50 2700

hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour

-otmi P!ant - )0 to 00 9P'BM/BM/3'C/ Premi capacity -otmi P!ant - &0 to )0 9P'BM/BM/3'C/ Premi capacity -ydrau!ic Chip 3preader 3urface 'ressing

-ydrau!ic 6 ca*ator of 1 cum 3oi! <rdinary/3oi! Marshy / 3oi! =nsuita%!e %uc/et :ntegrated 3tone Crusher 1009-P :ntegrated 3tone Crusher 200 -P 7er% Casting Machine Mastic Coo/er Crushing of 3pa!!s Crushing of 3pa!!s 7er% Ma/ing Mastic >earing coat

Mechanica! Broom -ydrau!ic 3urface C!eaning Motor 2rader $1$5 mtr %!ade C!earing /3preading /23B />BM Mo%i!e s!urry sea! e(uipment Mi ing and !aying s!urry sea!

P&M-0$& P&M-0$5 P&M-0$) P&M-0$7 P&M-0$. P&M-0$0 P&M-0&0 P&M-0&1 P&M-0&2 P&M-0&$ P&M-0&& P&M-0&5 P&M-0&) P&M-0&7 P&M-0&. P&M-0&0 P&M-050 P&M-051 P&M-052 P&M-05$ P&M-05& P&M-055 P&M-05) P&M-057 P&M-05. P&M-050 P&M-0)0 P&M-0)1 P&M-0)2

Pa*er +inisher -ydrostatic Pa*ing of 'BM/ BM/3'C/ Premi ,ith sensor contro! 100 9PPa*er +inisher Mechanica! 100 9PPi!ing ;ig ,ith Bantonite Pump Pneumatic ;oad ;o!!er Pneumatic 3in/ing P!ant Pot -o!e ;epair Machine Pa*ing of >MM /Pa*ing of '4C 0175 m dia to 112 m dia Boring attachment ;o!!ing of Aspha!t 3urface Pneumatic 3in/ing of ,e!!s ;epair of potho!es

cum/hour cum/hour ;m/hour cum/hour cum/hour cum/hour

&0 &0/$0 2 to $ 25 115 to 2100 &

hour hour hour hour hour hour hour

2923 1065 5972 1359 4557 991 141 31 19 101 504 1250 31 0 609 1016 0 932 0 427 366 377 24 488 24 658 488 24 1317 Rates 569 18755 1815 1815 3170 4235 input 666

Prestressing ?ac/ ,ith Pump 3tressing of stee! ,ires/stands & access ;ipper ;ota*ator ;oad mar/ing machine 3carifying 3carifying ;oad mar/ing cum/hour cum/hour 3(m/hour cum/hour cum/hour Capacity in cum Capacity in cum Capacity in cum cum/hour cum/hour cum/hour cum/hour capacity in -P )0 25 100 70/25 $0 515 515 515 &15 &15 $ $ 50

hour hour hour hour hour /m tonne1/m hour hour tonne1/m hour tonne1/m hour hour hour

3mooth >hee!ed ;o!!er . 3oi! Compaction /BM Compaction tonne 9andem ;oad ;o!!er 9ipper - 5 cum 9ipper - 5 cum 9ipper - 5 cum 9ransit Mi er &10/&15 cum 9ransit Mi er &/&15 cum 9ransit Mi er $10 cum 9ransit Mi er $10 cum 9ractor 9ractor ,ith ;ote*ator 9ractor ,ith ;ipper ;o!!ing of Aspa!t 3urface 9ransportation of soi!@ 23B@ >MM@ -otmi etc1 9ransportation of soi!@ 23B@ >MM@ -otmi etc1 9ransportation of soi!@ 23B@ >MM@ -otmi etc1 9ransportation of Concrete Mi to site 9ransportation of Concrete Mi to site 9ransportation of Concrete Mi to site 9ransportation of Concrete Mi to site Pu!!ing ;ate of 9ractor B ;ote*ator ;ate of 9ractor )B ;ipper

9ruc/ 515 cum per 10 tonnes Materia! 9ransport 9ruc/ 515 cum per 10 tonnes Materia! 9ransport 9ruc/ 515 cum per 10 tonnes Materia! 9ransport 9hree ,hee! .0-100 /A 3tatis ;o!!er >ater 9an/er >ater 9an/er >et Mi P!ant )0 9P6arth or soi! / 23B / >BM >ater 9ransport >ater 9ransport >et Mi

capacity/cum capacity/cum capacity/cum cum/hour capacity in 74 capacity in 74 cum/hour

&15 &15 &15 100/)0/)0 ) ) 25

/m hour tonne1/m hour hour /m hour

Sl. No.
P&M-0)$ P&M-0)& P&M-0)5 P&M-0)) P&M-0)7 P&M-0). P&M-0)0 P&M-070

Description of Machine
Air compressor ,ith pneumatic chise! attachment for cutting hard c!ay1 Batch type co!d mi ing p!ant 100-120 9P- capacity producing an a*erage output of 75 tonne per hour Be!t con*eyor system Boat to carry at!east 20 persons Cement concrete %atch mi p!ant C 20 cum per hour "effecti*e output# Cement concrete %atch mi p!ant C 75 cum per hour Co!d mi!!ing machine C 20 cum per hour Crane 5 tonne capacity

Unit
hour hour hour hour hour hour hour hour

P&M-071 P&M-072 P&M-07$ P&M-07& P&M-075 P&M-07) P&M-077 P&M-07. P&M-070 P&M-0.0 P&M-0.1 P&M-0.2 P&M-0.$ P&M-0.& P&M-0.5 P&M-0.) P&M-0.7 P&M-0.. P&M-0.0 P&M-000 P&M-001 P&M-002 P&M-00$ P&M-00&

Crane 10 tonne capacity Crane 15 tonne capacity Crane 20 tonne capacity Crane &0 9 capacity Crane ,ith gra% 0175 cum capacity Compressor ,ith guniting e(uipment a!ong ,ith accessories 'rum mi p!ant for co!d mi es of appropriate capacity %ut not !ess than 75 tonnes/hour1 6po y :nDection gun 2enerator $$ 78A 2enerator 100 78A 2enerator 250 78A :nduction@ deinduction and erection of p!ant and e(uipment inc!uding a!! components and accessories for pneumatic method of ,e!! sin/ing1 ?oint Cutting Machine ,ith 2-$ %!ades "for rigid pa*ement# ?ac/ for 4ifting &0 tonne !ifting capacity1 Pi!ing rig :nc!uding dou%!e acting pi!e dri*ing hammer "-ydrau!ic rig# P!ate compactor 3no, %!o,er e(uipment 1&0 -P C )00 cum per hour 9e turing machine "for rigid pa*ement# 9ruc/ 9rai!or $0 tonne capacity 9ruc/ 9rai!or $0 tonne capacity 9unne! Boring machine 8i%rating Pi!e dri*ing hammer comp!ete ,ith po,er unit and accessories1 >et Mi P!ant 100 9P>et Mi P!ant 75 9P-

hour hour hour hour hour hour hour hour hour hour hour hour hour day hrs hour hour hour hour t1/m hour hour hour

690 726 787 968 726 726 363 3025 407 762 908 input 97 input 5972 303 input 242 input input input input 1815 1452

(B) Labour
Sl. No.
4-01 4-02 4-0$ 4-0& 4-05 4-0) 4-07 4-0. 4-00 4-10 4-11 4-12 4-1$ 4-1& 4-15 4-1) 4-17 4-1. 4-10

Description of Labour
B!ac/smith "::nd c!ass# B!ac/smith ":st c!ass#/ >e!der/ P!um%er/ 6!ectrician B!aster "3tone cutter# Carpenter : C!ass Chise!!er "-ead Ma5door# 'ri!!er "?umper# 'i*er +itter Ma!i Mason "::nd c!ass# Mason ":st c!ass# Mate / 3uper*isor Ma5door Ma5door/'resser "3emi 3/i!!ed# Ma5door/'resser/3in/er "3/i!!ed# Medica! <fficer <perator"grouting# Painter : c!ass Para medica! personne!

Unit
day day day day day day day day day day day day day day day day day day day

Rate 300 400 300 400 300 300 700 400 300 300 400 300 250 300 400 1200 400 400 700

(C) Materials
Sl. No.
M-001 M-002 M-00$ M-00& M-005 M-00) M-007 M-00. M-000 M-010 M-011 M-012

Description
3tone Bou!der of si5e 150 mm and %e!o, at Cruser P!ant 3upp!y of (uarried stone 150 - 200 mm si5e for -and Bro/en at site Bou!der ,ith minimum si5e of $00 mm for Pitching at 3ite Coarse sand at Mi ing P!ant Coarse sand at 3ite +ine sand at 3ite Moorum at 3ite 2ra*e!/Fuarry spa!! at 3ite 2ranu!ar Materia! or hard murrum for 23B ,or/s at 3ite 2ranu!ar Materia! or hard murrum for 23B ,or/s at Mi ing P!ant +!y ash conforming to :3E $.12 " Part :: & :# at-MP P!ant / Batching P!ant / Crushing P!ant +i!ter media/+i!ter Materia! as per 9a%!e $00-$ "Mo;9&- 3pecification#

Unit
cum cum cum cum cum cum cum Cum Cum Cum Cum Cum

Rate 518 490 435 540 540 540 250 400 390 250 input 1150

!e"c#ipti$n
M-01$ M-01& M-015 M-01) M-017 M-01. M-010 M-020 M-021 M-022 M-02$ M-02& M-025 M-02) M-027 M-02. M-020 M-0$0 M-0$1 M-0$2 M-0$$ M-0$& M-0$5 M-0$) M-0$7 M-0$. M-0$0 M-0&0 M-0&1 M-0&2 M-0&$ M-0&& M-0&5 M-0&) M-0&7 M-0&. M-0&0 M-050 M-051 M-052 M-05$ M-05& M-055 C!ose graded 2ranu!ar su%-%ase Materia! 5$ mm to 015 mm C!ose graded 2ranu!ar su%-%ase Materia! $715 mm to 015 mm C!ose graded 2ranu!ar su%-%ase Materia! 2)15 mm to 015 mm C!ose graded 2ranu!ar su%-%ase Materia! 015 mm to &175 mm C!ose graded 2ranu!ar su%-%ase Materia! 015 mm to 21$) mm C!ose graded 2ranu!ar su%-%ase Materia! &175mm to 21$) mm C!ose graded 2ranu!ar su%-%ase Materia! &175mm to 75 micron mm C!ose graded 2ranu!ar su%-%ase Materia! 21$) mm 3tone crusher dust finer than $mm ,ith not more than 10G passing 01075 sie*e1 Coarse graded 2ranu!ar su%-%ase Materia! 21$) mm & %e!o, Coarse graded 2ranu!ar su%-%ase Materia! &175mm to 75 micron mm Coarse graded 2ranu!ar su%-%ase Materia! &175 mm to 21$) mm Coarse graded 2ranu!ar su%-%ase Materia! 015 mm to &175 mm Coarse graded 2ranu!ar su%-%ase Materia! 2)15 mm to &175 mm Coarse graded 2ranu!ar su%-%ase Materia! 2)15 mm to 015 mm Coarse graded 2ranu!ar su%-%ase Materia! $715 mm to 015 mm Coarse graded 2ranu!ar su%-%ase Materia! 5$ mm to 2) 15mm Aggregates %e!o, 51) mm Aggregates 221& mm to 21$) mm Aggregates 221& mm to 51) mm Aggregates &5 mm to 21. mm Aggregates &5 mm to 221& mm Aggregates 5$ mm to 21. mm Aggregates 5$ mm to 221& mm Aggregates )$ mm to 21. mm Aggregates )$ mm to &5 mm Aggregates 00 mm to &5 mm Aggregates 10 mm to 5 mm Aggregates 1112 mm to 0100 mm Aggregates 1$12 mm to 0100 mm Aggregates 1$12 mm to 51) mm Aggregates 1$12 mm to 10 mm Aggregates 20 mm to 10 mm Aggregates 25 mm to 10 mm Aggregates 10 mm to ) mm Aggregates $715 mm to 10 mm Aggregates $715 mm to 25 mm Aggregates ) mm nomina! si5e Aggregates 10 mm nomina! si5e Aggregates 1$12/1215 mm nomina! si5e Aggregates 20 mm nomina! si5e Aggregates 25 mm nomina! si5e Aggregates &0 mm nomina! si5e

Unit

Rate at Plant (HMP/Batchi Rate at ite ng)

cum cum cum cum cum cum

800 850 650 700 680 600 580 540 560 560 600 600 650 700 750 800 850 1640 875 1365 640 850 700 826 675 804 782 1750 950 815 1500 1338 1400 1350 1465 950 850 1740 1750 1700 1600 1550 1250

800 850 650 700 680 600 580 540 560 560 600 600 650 700 750 800 850 1640 875 1365 640 850 700 826 675 804 782 1750 950 815 1500 1338 1400 1350 1465 950 850 1740 1750 1700 1600 1550 1250

cum cum cum

cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum

Sl. No.
M-05) M-057 M-05. M-050 M-0)0 M-0)1 M-0)2 M-0)$ M-0)& M-0)5 M-0)) M-0)7 M-0). M-0)0 M-070 M-071 M-072 M-07$ M-07& M-075 M-07) M-077 M-07. M-070 M-0.0 M-0.1 M-0.2 M-0.$ M-0.& M-0.5 M-0.) M-0.7 M-0.. M-0.0 M-000 M-001 M-002 M-00$ M-00& M-005 M-00) M-007 M-00. M-000 M-100 M-101 M-102 M-10$ M-10& AC pipe 100 mm dia Acry!ic po!ymer %onding coat A!!uminium Paint A!uminium a!!oy p!ate 2mm 9hic/ A!uminium a!!oy/ga!*anised stee!

Description

Unit
metre !itre !itre s(m tonne s(m nos /g nos nos nos nos nos nos nos /g /g tonne tonne tonne tonne tonne tonne each /g tonne tonne nos s(m each /g tonne /g cum !iter each cum metre 100 nos /g /g /g /g each each nos s(m kg /g

Rate 31 121 303 input 53931 145 484 90 input 302500 14520 266200 60500 181500 14520 2%45 80 39586 49642 48810 52367 39586 44379 9 55 8120 53650 126 682 55 660 61 60 231 49 input 0 9900 990 220 input 121 99 60 13 33 170 198 148

A!uminium sheeting fi ed ,ith encapsu!ated !ens type ref!ecti*e sheeting inc!uding 2G to,ards !ettering@ cost of ang!e iron@ cost of dri!!ing ho!es@ nuts@ %o!ts etc1and signs as app!ica%!e A!uminium studs 100 100 mm fitted ,ith !ense ref!ectors Bar%ed ,ire Bearing "Cost of parts# Bearing "Cast stee! roc/er %earing assem%!y of 250 tonne # Bearing "6!astomeric %earing assem%!y consisting of 7 interna! !ayers of e!astomer %onded to ) nos1 interna! reinforcing stee! !aminates %y the process of *u!canisation@# Bearing "+orged stee! ro!!er %earing of 250 tonne Bearing "Pot type %earing assem%!y consisting of a meta! piston supported %y a disc@ P9+6 pads pro*iding s!iding surfaces against stain!ess stee! mating together ,ith cast stee! assem%!ies/fa%ricated structura! stee! assem%!ies du!y painted ,ith a!! components Bearing "P9+6 s!iding p!ate %earing assem%!y of .0 tonnes # Bearing "3upp!y of s!iding p!ate %earing of .0 tonne# Bentonite Binding ,ire Bitumen " Cationic 6mu!sion # Bitumen ")0-70 grade# Bitumen ".0-100 grade # Bitumen "Cut%ac/ # Bitumen "emu!sion# Bitumen "modified graded# Bric/ C1:1shoes for the pi!e Cement Co!d t,isted %ars "-H3' Bars# Co!!er for Doints $00 mm dia Compressi%!e +i%re Board"20mm thic/# Connectors/ 3tap!es Copper P!ate"12m !ong 250mm,ide# Corrosion resistant 3tructura! stee! Corrugated sheet@ $ mm thic/@ I9hrieI %eam section rai!ing Credit for e ca*ated roc/ found suita%!e for use Curing compound 'e!ineators from :3: certified firm as per the standard dra,ing gi*en in :;C - 70 6arth Cost or compensation for earth ta/en from pri*ate !and 6!astomeric s!a% sea! e pansion Doint assem%!y manufactured %y using ch!oroprene@ e!astomer for e!astomeric s!a% unit conforming to c!ause 01511 of :;CE .$ "part ::#@ 6!ectric 'etonators C 1 detonator for 1/2 ge!atin stic/ of 125 gms each 6po y compound ,ith accessories for preparing epo y mortar 6po y mortar 6po y primer 6po y resin-hardner mi for prime coat +!ag of red co!or c!oth )00 )00 mm +!o,ering P!ants 2a!*anised M3 f!at c!amp 2a!*anised stee! ,ire crates of mesh si5e 100 mm 100 mm ,o*en ,ith &mm dia1 2: ,ire in ro!!s of re(uired si5e1 2a!*anised structura! stee! p!ate 200 mm ,ide@ ) mm thic/@ 2& m !ong 2e!atin .0G

M-105 M-10) M-107 M-10. M-100 M-110 M-111 M-112 M-11$ M-11& M-115 M-11) M-117 M-11. M-110 M-120 M-121 M-122 M-12$ M-12& M-125 M-12) M-127

2eo grids 2eomem%rane 2eonets 2eote ti!e 2eote ti!e fi!ter fa%ric 2: %o!t 10 mm 'ia 2routing pump ,ith agitator 2rass "'oo%# 2rass "+ine# -'P6 pipes 75mm dia -'P6 pipes 00mm dia -edge p!ants -e!ica! pipes )00mm diameter -ot app!ied thermop!astic compound -93 strand ?oint 3ea!ant Compound ?ute netting@ open ,ea*e@ 215 cm s(uare opening for seeding and Mu!ching 4'< for steam curing M131 C!amps M131 C!amps M131shoes C $5 7g per pi!e of 15 m 9or 3tee! %ars Modu!ar strip/%o sea! e pansion Doint inc!uding anchorage catering to a hori5onta! mo*ement %eyond 70 mm and upto 1&0mm assem%!y comprising of edge %eams@ centra! %eam@2 modu!es ch!oroprene sea!@ anchorage e!ements@ support and contro! system@ a!! stee! sections protected against corrosion and insta!!ed %y the manufacturer or his authorised representati*e Modu!ar strip/%o sea! e pansion Doint catering to a hori5onta! mo*ement %eyond 1&0mm and upto 210mm %o /%o sea! Doint assem%!y containing $ modu!es/ce!!s and comprising of edge %eams@ t,o centra! %eams@ ch!oroprene sea!@ anchorage e!ements@ support and contro! system@ a!! stee! sections protected against corrosion and insta!!ed %y the manufacturer or his authorised representati*e Aipp!es 12mm Auts and %o!ts Paint Pa*ement Mar/ing Paint Pa*ing +a%ric Perforated geosynthetic pipe 150 mm dia Perforated pipe of cement concrete@ interna! dia 100 mm Pesticide Pipes 200 mm dia@ 215 m !ong for drainage P!astic sheath@ 1125 mm thic/ for do,e! %ars P!astic tu%es 50 cm dia@ 112 m high Po!ymer %raids Pre mou!ded ?oint fi!!er@25 mm thic/ for e pansion Doint1 Pre-coated stone chips of 1$12 mm nomina! si5e Preformed continuous ch!oroprene e!astomer or c!osed ce!! foam sea!ing e!ement ,ith high tear strength@ *u!canised in a sing!e operation for the fu!! !ength of a Doint to ensure ,ater tightness1 Pre-mou!ded aspha!t fi!!er %oard Pre-pac/ed cement %ased po!ymer concrete of strength &5 Mpa at 2. days Primer Fuic/ setting compound ;andom ;u%%!e 3tone ;CC Pipe AP 2 hea*y duty non presure pipe 1000 mm dia ;CC Pipe AP 2 hea*y duty non presure pipe 1200 mm dia ;CC Pipe AP 2 hea*y duty non presure pipe $00 mm dia ;ef!ectorising g!ass %eads

s(m s(m s(m s(m s(m nos hour /g /g metre metre each metre !itre tonne /g s(m !itre nos /g /g tonne metre

input input input 27 input 38 165 13 13 42 input 7%7 1155 179 63800 302 13 40 55 220 50 53650 209000

M-12.

metre

231000 27 100 198 176 input input 85 308 input 0%9 input input 550 1045 4400 60 33 170 50 517 852 1155 423 208

M-120 M-1$0 M-1$1 M-1$2 M-1$$ M-1$& M-1$5 M-1$) M-1$7 M-1$. M-1$0 M-1&0 M-1&1 M-1&2 M-1&$ M-1&& M-1&5 M-1&) M-1&7 M-1&. M-1&0 M-150 M-151 M-152

nos /g !itre !itre s(m metre metre /g metre s(m nos metre s(m cum metre s(m /g /g /g cum metre metre metre /g

M-15$ M-15& M-155 M-15) M-157 M-15. M-150 M-1)0 M-1)1 M-1)2 M-1)$ M-1)& M-1)5 M-1)) M-1)7 M-1). M-1)0 M-170 M-171 M-172 M-17$ M-17& M-175 M-17) M-177 M-17. M-170 M-1.0 M-1.1 M-1.2 M-1.$ M-1.& M-1.5 M-1.) M-1.7 M-1.. M-1.0 M-100 M-101 M-102 M-10$ M-10& M-105 M-10)

;einforcement strips )0 mm ,ide 5 mm thic/ as per c!ause $1021 "Copper 3trips# ;einforcement strips )0 mm ,ide 5 mm thic/ as per c!ause $1021 "2a!*anised car%on stee! strips# ;einforcement strips )0 mm ,ide 5 mm thic/ as per c!ause $1021 "2!ass reinforced po!ymer/fi%re reinforced po!ymer/po!ymeric strips# ;einforcement strips )0 mm ,ide 5 mm thic/ as per c!ause $1021 "3tain!ess stee! strips# ;einforcement strips )0 mm ,ide 5 mm thic/ as per c!ause $1021 A!uminium strips# ;i*ets 3and %ags "Cost of sand and 6mpty cement %ag# 3ap!ing 2 m high 25 mm dia 3crap tyres of si5e 000 20 3eeds 3e!ected earth 3eparation Mem%rane of impermea%!e p!astic sheeting 125 micron thic/ 3heathing duct 3hru%s 3!udge / +arm yard manure C 011. cum per 100 s(m at site of ,or/ for turfing 3odium *apour !amp 3(uare ;u%%!e Coursed 3tone 3tee! circu!ar ho!!o, po!e of standard specification for street !ighting to mount !ight at 5 m height a%o*e dec/ !e*e! 3tee! circu!ar ho!!o, po!e of standard specification for street !ighting to mount !ight at 0 m height a%o*e road !e*e! 3tee! drum $00 mm dia 112 m high/empty %itumen drum 3tee! he!met and cushion %!oc/ on top of pi!e head during dri*ing1 3tee! pipe 25 mm e terna! dia as per 3tee! pipe 50 mm e terna! dia as per 3tee! ,ire rope 20 mm 3tee! ,ire rope &0 mm 3trip sea! e pansion Doin 3tructura! 3tee! 3uper p!astisi5er admi ture :3 mar/ed as per 010$-1000 3ynthetic 2eogrids as per c!ause $1021. and appro*ed design and specifications1 9hrough and %ond stone 9ie rods 20mm diameter 9i!es si5e $00 $00 mm and 25 mm thic/ 9im%er 9raffic cones ,ith 150 mm ref!ecti*e s!ee*e 9u%e anchorage set comp!ete ,ith %earing p!ate@ permanent ,edges etc =nsta/ed !ime >ater >ater %ased cement paint >e!ded stee! ,ire fa%ric >ire mesh 50mm 50mm si5e of $mm ,ire >ooden %a!!ies 2I 'ia for %racing >ooden %a!!ies .I 'ia and 0 m !ong >ooden pac/ing >ooden staff for fastening of f!ag 25 mm dia@ one m !ong :3E12$0 :3E12$0

metre metre metre metre metre each nos each nos /g cum s(m metre each cum each cum each each nos /g metre metre /g /g metre tonne /g s(m each nos each cum nos nos tonne 74 litre /g /g each each cum each

input input input input input 0%9 8%8 88 121 302 181 27 99 11 121 1815 517 5500 9075 60 181 192 385 245 221 12100 57210 55 input 13 247 input 15400 1320 4180 11550 60 77 44 145 38 495 3630 60

<*erheads for ;oad >or/s Contractors profit for ;oad >or/s

10 G 10 G for input of <*erheads or Contractors profit p!ease type in co!!um C as !i/e %e!o, 9ype sym%!e of apostrope"J# then input *a!ue then one space then sym%!e of percentage "G# for e amp!e J0. G

<*erheads for Bridge >or/s 20 G <*erheads for Bridge >or/s 10 G ";eha%i!itation# Contractors profit for Bridge >or/s 10 G

4ead from Mi ing P!ant to ,or/ing site 4ead for 6/> %oro, area to site 4ead for f!y ash from source to site

0 /m $ /m 50 /m

Items No.
:tem .1$ :tem .1. :tem .10 :tem 121) "B# :tem 121) "A# :tem 121) "'# :tem 1217 "A # :tem 1217 "Add!# B# :tem 121. "A# :tem 121. "A# :tem 121. "B# PCC :tem 121. "C# :tem 121. "C# ;CC :tem 121. "C# :tem 121. "'# :tem 121. "'# :tem 121. "'# :tem 121. "6# :tem 121. "6# :tem 121. "+# :tem 121. "+# :tem 121. "2# :tem 121. "2# :tem 121. "-# :tem 121. "-# :tem 121. "-# :tem 121. "-# :tem 12111 "C# i :tem 12111 "C# i :tem 12111 "C# ii :tem 12111 "C# ii :tem 12111 "C# iii :tem 12111 "C# iii :tem 12111 "C# i*

u''a#( $) Rate" calculate* an* u"e* )$# anal("i" $) #ate" $) $the# ite'"
Printing ne, !etter and figures of any shade "ii# 6ng!ish ;oman Painting 9,o Coats on Ae, Concrete 3urfaces Painting ang!e iron post t,o coats Cement mortor 1E2 "6 c!uding <- & CP# Cement mortor 1E$ "6 c!uding <- & CP# Cement mortor 1E) "6 c!uding <- & CP# Course ;u%%!e masonary in cement mortor 1E$ "inc!uding <- & CP# ;andom ;u%%!e masonary in cement mortor 1E) "inc!uding <- & CP# PCC 2rade M15 inc!uding <- & CP for <pen +oundation %y Mi er PCC 2rade M15 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M20 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er ;CC 2rade M20 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er ;CC 2rade M20 inc!uding <- & CP for <pen +oundation %y Batching P!ant ;CC 2rade M20 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M25 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M25 inc!uding <- & CP for <pen +oundation %y Batching P!ant PCC 2rade M25 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant ;CC 2rade M25 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er ;CC 2rade M25 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M$0 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M$0 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant ;CC 2rade M$0 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er ;CC 2rade M$0 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant ;CC 2rade M$5 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er ;CC 2rade M$5 inc!uding <- & CP for <pen +oundation %y Batching P!ant ;CC 2rade M$5 e c!uding <- & CP for <pen +oundation %y Batching P!ant ;CC 2rade M$5 for <pen +oundation Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M20 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M20 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M25 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M25 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M$0 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er PCC 2rade M$0 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M$5 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Mi er

Unit
per cm height per !etter s(m s(m cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum

Rate
0%60 65%00 61%00 6&198%00 4&945%00 3&224%00 4&267%00 3&467%00 6&107%00 4&449%00 5&028%00 5&208%00 6&822%00 4&970%00 5&477%00 7&179%00 5&242%00 5&663%00 5&513%00 5&526%00 5&286%00 5&690%00 5&453%00 5&814%00 5&840%00 7&709%00 5&670%00 5&464%00 5&223%00 5&713%00 5&470%00 5&762%00 5&521%00 5&875%00

:tem 12111 "C# i* :tem 12111 "C# i* :tem 12111 "+# i* :tem Ao1 $11$ :tem Ao1 $11$ :tem 1&11"A# :tem 1&11"B# :tem 1&11"6# :tem 1&11"C# :tem 1&11"C# :tem 1&12 A :tem 1$1) :tem 5117 :tem 5121 Case-: :tem 5121 Case-:: :tem 5121 Case-:8 :tem 5121 Case-:8 :tem 5115 Case-: :tem 5115 Case-:: :tem 5115 Case-::: :tem 510 Case-: :tem 510 Case-::

PCC 2rade M$5 inc!uding <- & CP for >e!! +oundation "Bottom P!ug# %y Batching P!ant PCC 2rade M$5 for <pen +oundation "Bottom P!ug# Per Cum Basic Cost of 4a%our@ Materia! & Mechinery %y Batching P!ant PCC 2rade M$5 inc!uding <- & CP for >e!! +oundation ">e!! Cap# %y Batching P!ant 6 ca*ation for 3tructures "Manua! Means# 6 ca*ation for 3tructures "Mechenica! Meanse# ;CC 2rade M20 for super-structure inc!uding <- & CP %y Batching P!ant ;CC 2rade M20 for super-structure inc!uding <- & CP %y Batching P!ant ;CC 2rade M20 for super-structure inc!uding <- & CP %y Batching P!ant ;CC 2rade M$0 for super-structure inc!uding form,or/ and e c!uding <- & CP %y Batching P!ant ;CC 2rade M$0 for super-structure e c!uding form,or/ and e c!uding <- & CP %y Batching P!ant 3upp!ying @fitting and p!acing -H3' %ar reinforcement in super-structure e nc!uding <- & CP 3upp!ying@ fitting and p!acing -H3' inc!uding <- & CP for su%-structure +og 3ea! Crac/ Pre*ention courses1 Case-: 3tress A%sor%ing Mem%rane "3AM# crac/ ,idth !ess than ) mm Crac/ Pre*ention courses1 Case-:: 3tress A%sor%ing Mem%rane "3AM# ,ith crac/ ,idth ) mm to 0 mm Crac/ Pre*ention courses1 Case-::: 3tress A%sor%ing Mem%rane "3AM# crac/ ,idth a%o*e 0 mm and crac/ed area a%o*e 50 G Crac/ Pre*ention courses1 Case-:8 Bitumen :mpregnated 2eote ti!e 3!urry 3ea! Case-: 5 mm thic/ness 3!urry 3ea! Case-:: $ mm thic/ness 3!urry 3ea! Case ::: 115 mm thic/ness 3urface 'ressing Case-: 10 mm nomina! chipping si5e 3urface 'ressing Case-:: 1$ mm nomina! si5e chipping

cum cum cum cum cum cum cum cum cum cum tonne tonne s(m s(m s(m s(m s(m s(m s(m s(m s(m s(m

7&782%00 5&632%00 7&582%00 254%00 46.00 7,792.00 8,547.00 9,098.85 6,548.00 5,457.00 60&305%00 78&328%00 42%00 73%00 84%00 110%00 102%00 68%00 47%00 29%00 108%00 87%00

A. Roads Works

Basic Notes for Preparation of Schedule of Rates


The basic approach for the preparation of schedule of rates for Road Works is indicated as under :

Description of items
1. The description of items is given briefly and linked with the relevant clause of the MoRT&H Specifications for Road and Bridge Works, which may be referred for detailed description, provisions and interpretation. Mechanical Means Due to mechanization of construction work, rate for various items have been derived using mechanical means. However, manual means have also been provided for certain cases, where areas may be inaccessible for machines or quantum of work may not be large enough to justify deploy of machines. 3. Overhead Charges i. Site accomodation, setting up plant, access road, water supply, electricity and general site arrangements. Office furniture, equipment and communications. Expenditure on a) Corporate office of contractor b) Site Supervision c) Documentation and "as built" drawings iv. v. vi. vii. viii. Mobilisation/de-mobilisation of resources. Labour camps with minimum amenities and transportation to work sites. Light vehicles for site supervision including administrative and managerial requirements Laboratory equipment and quality control including field and laboratory testing Minor T&P and survey instruments and setting out works, including verification of line, dimensions, trial pits and bore holes, where required Watch and ward Traffic management during construction Expenditure on safeguarding environment Sundries Financing Expenditure Sales/Turn over tax Work Insurance/compensation

2.

ii. iii.

ix. x. xi. xii. xiii. xiv. xv. 3.1 4.

10 percent overhead charges has been considered in the schedule of rates Contractor Profit 10 percent of cost of works. Contractor profit is also added on overhead charges.

5.

Basic Inputs Basic inputs are only given in the standard data book. The rates for material and labour are as per

6. 6.1

Plants and Equipment A dozer is proposed for excavation where cutting and filling for the roadway is within 100 m. For longer leads, a combination of hydraulic excavator and tipper is proposed. Keeping in view the job and managerial factors and the age factor of machines, the output of plant and equipment is taken approximately 70 percent of the rated capacity given by manufacture under ideal conditions. It has been assumed that a water tanker would make one trip per hour on an average. Water charges have not been included for items where the requirement is very nominal. It is assumed that the same would be covered under sundries. Output of plant/equipment is considered for the compacted quantities. The usage charges for machines include ownership charges, cost of repair and maintenance including replacement of tyres and running and operating charges which includes crew, fuel and lubricants. Materials Quantities of materials considered in the rate are approximate for the purpose of estimating and include normal wastages. Actual consumption would have to be based on mix design. Arunachal Pradesh has typical and hard terrain having different altitude, wherein maximum construction material are brought from Assam and tulised in different station located in state. Hence, to maintain the uniformity in rates, it is decided to prepare the APSR-2005 without considering any lead on materials and aggregate. The transportation cost shall be included in the estimate as per distance from the source of procurement of material/aggregate. The following sources has been adopted in the schedule 2005.

6.2

6.3

6.4 6.5

7. 7.1

7.2

(1) (2) (3) (4) (5) (6) 7.3

All steel items/Bitumen product - Guwahati Cement :- Banderdewa/Bhalukpong/Likabali/Dholla/Margherita Bricks :- Klin in Assam nearby to Arunachal Pradesh Aggregate :- At quarry nearby site of work. Other items :- Avarage market rates fixed for all district headquarter of state. R.C.C. Hume Pipes :- Naharlagun/Likabali or nearby source in Assam.

The alternative proposal for crushing own aggregate by installing crusher is compared with procurement of crushed aggregates from the market and proposal found economical is adopted. The specifications of materials shall be governed by section 1000 of MoRT&H Specifications for Road and Bridge Works. Labour The avarage market rate has been adopted which are workable in the state One mate has been provided for 25 labours Carriage of Materials

7.4

8. 8.1 8.2 9.

9.1

The unit for vehicle for carriage has been taken as under : a) In hours where lead is variable. The loading and unloading for such cases have been provided sparetely. In tonne - km where lead is variable. The loading and unloading for such cases have been provided sparately. Ziro lead has been considered for the stone aggregate in order to work out the actual rates of aggregates by adding the transportation cost up to the site of work. In case of Hot Mix Plant Zero lead has been considered. The lead may be considered as per actual location of plant.

b)

c)

d)

9.2

Where the quantity of material to be tranported is small such as dismantled materials and the same are required to be loaded manually, provision of tractor-trolley has been made instead of tipper.

10. 10.1 10.2

General : The clause numbers refer to MoRT&H Specifications for Road and Bridges Works. Assumptions made have been indicated in respective chapter in the form of notes, where required.

10.3

Sundries to cater for unforeseen contincency and miscelleneous items have been added in the overhead charges. Arrangement for traffic during construction shall be as per Clause 112 of MoRT&H Specifications for Road and Bridge Works. Contractor will make his own arrangements for borrowing earth. However, compensation for earth taken from private land has been included in the rate for construction of embankment with borrowed earth. Credit for Dismantled Material Credit for dismantled materials has not been included in this schedule of rates. The dismantled materials should be examined and a realistic assessment made for such materials, which can be utilised for works and to be reflected in the estimate.

10.4

10.5

10.6

10.7

The source of material and samples are required to be approved by the Engineer before start of any work. The rates of items include cost of testing of soil, materials and works. The use of surface by construction vehicles shall be governed by Clause 119 of MoRT&H Specifications. The contractor shall arrange to provide and maintain an adequate equipment field laboratory as per Clause 121. Quality Control of works shall be governed by Section 900 of MoRT&H Specifications. The various activities of works shall also be documented by phtographs and vedio cassettes as per Clauses 125 & 126 of MoRT&H Specifications. The classification of soil shall be as per Clause 301.2 of MoRT&H Specifications. The earth excavated from foundations has been considered to be backfilled and balance utilised locally for road work except in the case of marshy soil.

10.8 10.9

10.10

10.11 10.12

10.13 10.14

10.15

The rate for removal of unsuitable soil does not provide for replacement by suitable soil which will have to be paid separately. Items for hilly terrain have been analysed separately. The hire charge rates for machinery and equipment are taken from the Standard Data Book and prevailing market rate. 10 per cent extra cement has been provided for concreting under water, where required. Grade of cement may be adopted as per mix design. Quantities of cement in various grades of cement concrete have been taken as per IRC:21-2000 and IRC:18-2000. The coarse and fine aggregates shall conform to IS:383. For pricing of RCC slab culverts, the items given in respective chapters in bridge section may be reffered. Some of major steel producing firms have evolved thermo-mechanically treated steel which has enhanced strength, better corrosion resistance, ductility, weld ability and high temparature thermal resistance. Enquiries from these are made on technical specifications and use of such products considered in works based on performance in works where these have already been used.

10.16 10.17

10.18 10.19 10.20

10.21 10.22

10.23

10.24

In case it is decided to include the following items and their maintenance in the BOQ, the scope and specifications should be worked out and defined in a detailed manner in the tender document to avoid any dispute during execution. Item Site office and furniture for Engineer and his staff. Site residential accomodation for Engineer and other supervisory staff. Providing and maintaining vehicle for the Engineer.

MoRT&H Clause 120 122 124

GENERAL Notes -Bridge works


The basic approach for the preparation of schedule of rates for Bridge works in indicated as under : 1. Description of items The description of items is given briefly and linked with relevant clause of MoRT&H's Specifications for Road and Bridge Works, which may be referred for detailed description, provisions and interpretation. Overhead Charges The rates include over head charges considering the following elements i. Site accomodation, setting up plant, access road, water supply, electricity and general site arrangements. Office furniture, equipment and communications. Expenditure on a) Corporate office of contractor b) Site Supervision c) Documentation and "as built" drawings iv. v. vi. vii. viii. Mobilisation/de-mobilisation of resources. Labour camps with minimum amenities and transportation to work sites. Light vehicles for site supervision including administrative and managerial requirements Laboratory equipment and quality control including field and laboratory testing Minor T&P and survey instruments and setting out works, including verification of line, dimensions, trial pits and bore holes, where required Watch and ward Traffic management during construction Expenditure on safeguarding environment Sundries Financing Expenditure Sales/Turn over tax Work Insurance/compensation

2.

ii. iii.

ix. x. xi. xii. xiii. xiv. xv. 3.1 4.

20 percent overhead charges has been considered in the schedule of rates Contractor Profit 10 percent of cost of works. Contractor profit is also added on overhead charges.

5.

Basic Inputs Basic inputs are only given in the standard data book. The rates for material and labour are as

6.

Plants and Equipment

The usage/hire charges of machinery/equipment have been worked out based upon present cost of equipments, repairs, POL and Operational charges. 7. 7.1 Materials Quantities of materials considered in the rate are approximate for the purpose of estimating and include normal wastages. Actual consumption would have to be based on mix design. Arunachal Pradesh has typical and hard terrain having different altitude, wherein maximum construction material are brought from Assam and utilised in different station located in state. Hence, to maintain the uniformity in rates, it is decided to prepare the APSR-2005 without considering any lead on materials and aggregate. The transportation cost shall be included in the estimate as per distance from the source of procurement of material/aggregate. The following sources has been adopted in the schedule 2005. (1) (2) (3) (4) (5) (6) 7.3 All steel items/Bitumen product - Guwahati Cement :- Banderdewa/Bhalukpong/Likabali/Dholla/Margherita Bricks :- Klin in Assam nearby to Arunachal Pradesh Aggregate :- At quarry nearby site of work. Other items :- Avarage market rates fixed for all district headquarter of state. R.C.C. Hume Pipes :- Naharlagun/Likabali or nearby source in Assam.

7.2

The alternative proposal for crushing own aggregate by installing crusher is compared with procurement of crushed aggregates from the market and proposal found economical is adopted. The specifications of materials shall be governed by section 1000 of MoRT&H Specifications for Road and Bridge Works. Labour The avarage market rate has been adopted which are workable in the state One mate has been provided for 25 labours Carriage of Materials The unit for vehicle for carriage has been taken as under : a) b) c) In hours where lead is variable. The loading and unloading for such cases have been provided sparetely. In tonne - km where lead is variable. The loading and unloading for such cases have been provided sparately. Ziro lead has been considered for the stone aggregate in order to work out the actual rates of aggregates by adding the transportation cost up to the site of work.

7.4

8. 8.1 8.2 9. 9.1

10. 10.1 10.2

General : The clause numbers refer to MoRT&H Specifications for Road and Bridges Works. Assumptions made have been indicated in respective chapter in the form of notes, where required. Sundries to cater for unforeseen contincency and miscelleneous items have been added in the overhead charges. Arrangement for traffic during construction shall be as per Clause 112 of MoRT&H Specifications for Road and Bridge Works.

10.3

10.4

10.5

Contractor will make his own arrangements for borrowing earth. However, compensation for earth taken from private land has been included in the rate for construction of embankment with borrowed earth. Credit for Dismantled Material Credit for dismantled materials has not been included in this schedule of rates. The dismantled materials should be examined and a realistic assessment made for such materials, which can be utilised for works and to be reflected in the estimate.

10.6

10.7

The source of material and samples are required to be approved by the Engineer before start of any work. The rates of items include cost of testing of soil, materials and works. The contractor shall arrange to provide and maintain an adequate equipment field laboratory as per Clause 121. Quality Control of works shall be governed by Section 900 of MoRT&H Specifications. The various activities of works shall also be documented by phtographs and vedio cassettes as per Clauses 125 & 126 of MoRT&H Specifications. The classification of soil shall be as per Clause 301.2 of MoRT&H Specifications. The earth excavated from foundations has been considered to be backfilled and balance utilised locally for road work except in the case of marshy soil. The rate for removal of unsuitable soil does not provide for replacement by suitable soil which will have to be paid separately. The hire charge rates for machinery and equipment are taken from the Standard Data Book and prevailing market rate. 10 per cent extra cement has been provided for concreting under water, where required. Grade of cement may be adopted as per mix design. Quantities of cement in various grades of cement concrete have been taken as per IRC:212000 and IRC:18-2000. The coarse and fine aggregates shall conform to IS:383. Some of major steel producing firms have evolved thermo-mechanically treated steel which has enhanced strength, better corrosion resistance, ductility, weld ability and high temparature thermal resistance. Enquiries from these are made on technical specifications and use of such products considered in works based on performance in works where these have already been used. In case it is decided to include the following items and their maintenance in the BOQ, the scope and specifications should be worked out and defined in a detailed manner in the tender document to avoid any dispute during execution. Guide Bund The item for the guide bund are excavation, embankment and protectin works. In case bridge construction works are to be done on wide and deep water channels in major rivers provision of floating barracges etc. for taking the construction materiasl and equipments inside water shall be made separately.

10.8 10.9

10.10 10.11

10.12 10.13

10.14

10.15

10.16 10.17 10.18

10.19 10.20

10.21

11. 11.1 11.2

11.3

The item for singking of wells cover diameters from 6 m to 12 and Twin D Type and size 12 m x 6 m. For other shapes like rectangular or any other size, the rates of sinking may be worked out on pro-rata basis. The lift for casting of concrete in well steining may be 2 to 2.5 m restricting the free fall of concrete to 1.5 m and concreting layer to 450 mm. Item Site office and furniture for Engineer and his staff. Site residential accomodation for Engineer and other supervisory staff. Providing and maintaining vehicle for the Engineer.

11.4

MoRT&H Clause 120 122 124

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1 CARRIAGE OF MATERIALS

Descriptions

Unit

Rate

1.1

Loading and unloading of stone boulde ! stone agg egates ! sand ! "an"e ! #oo u#. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) Loading and %nloading of &oulde s b' Manual Means Loading and %nloading of Ce#ent o Steel b' Manual Means and sta)"ing. Cost of Haulage E+)luding Loading and %nloading Su fa)ed Road %nsu fa)ed G a.elled Road /at)0a T a)" and T a)" in i.e bed ! nalla0 bed and )0oe bed.

cum cum tonne

135.00 149.00 182.00

1.$ 1.( 1.* ,i,ii,iii-

tonne.km tonne.km tonne.km

5.10 6.10 12.30

Su##a ' of Rate Anal'sis Item No.


CHAPTER-$ SITE CLEARA1CE

Descriptions

Unit

Rate

$.1

Cutting of T ees2 in)luding Cutting of T un"s2 & an)0es and Re#o.al (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit ) Gi t0 f o# (33 ## to 433 ## Gi t0 f o# 433 ## to 533 ## Gi t0 f o# 533 ## to 1633 ## Clea ing G ass and Re#o.al of Rubbis0 Clea ing and G ubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to !00 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 1"0 mm in thickness )

,i,ii,iii$.$ $.(

each each each hectare

240.00 442.00 841.00 15851.00

,iA & ,iiA & $.*

&' Manual Means7In a ea of lig0t 8ungle In a ea of t0o n' 8ungle &' Me)0ani)al Means In a ea of lig0t 8ungle In a ea of t0o n' 8ungle 9is#antling of St u)tu es (#ismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonr$, cement concrete, wood work, steel work, including %&P and scaffolding wherever necessar$, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Li#e !Ce#ent Con) ete &' Manual Means Li#e Con) ete2 )e#ent )on) ete g ade M-13 and belo: Ce#ent Con) ete G ade M-1; < M-$3 P est essed ! Reinfo )ed )e#ent )on) ete g ade M-$3 < abo.e &' Me)0ani)al Means fo ite#s 1o. $3$, b- < , )Ce#ent Con) ete G ade M-1; < M-$3 P est essed ! Reinfo )ed )e#ent )on) ete g ade M-$3 < abo.e 9is#antling & i)" ! Tile :o " In li#e #o ta In )e#ent #o ta In #ud #o ta 9 ' b i)" =it)0ing o b i)" soling 9is#antling Stone Mason ' Rubble stone #ason ' in li#e #o ta Rubble stone #ason ' in )e#ent #o ta . Rubble Stone Mason ' in #ud #o ta . 9 ' ubble #ason ' 9is#antling stone =it)0ing! d ' stone s=alls. 9is#antling boulde s laid in :i e ) ates in)luding o=ening of ) ates and sta)"ing dis#antled #ate ials. >ood :o " : oug0t f a#ed and fi+ed in f a#es of t usses u=to a 0eig0t of ; # abo.e =lint0 le.el Steel :o " in all t'=es of se)tions u=to a 0eig0t of ; # abo.e =lint0 le.el e+)luding )utting of i.et. In)luding dis#e#be ing E+)luding dis#e#be ing. E+t a o.e ite# 1o, ? - A and, ? - & fo )utting i.ets.

hectare hectare hectare hectare

48070.00 64437.00 45526.00 55167.00

,iI A & C II A & ,iiA & C 9 ,iiiA & C 9 E F ,i.,.A & C

cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum cum

365.00 429.00 1099.00 585.00 975.00 238.00 302.00 213.00 200.00 264.00 302.00 238.00 226.00 213.00 238.00 565.00 1411.00 1038.00 11.00

tonne tonne tonne

Su##a ' of Rate Anal'sis Item No.


,.iA & ,.iiA & ,.iii,i+A & C $.; I A & II A $.4
In li#e!Ce#ent #o ta In #ud #o ta S) a=ing of Stone f o# dis#antled stone #ason ' In )e#ent and li#e #o ta In Mud #o ta S)a =ing =laste in li#e o )e#ent #o ta f o# b i)"! stone #ason ' Re#o.ing all t'=e of 0u#e =i=es and sta)"ing :it0in a lead of 1333 #et es in)luding ea t0:o " and dis#antling of #ason ' :o "s. %= to 433 ## dia Abo.e 433 ## to 533 ## dia Abo.e 533 ## 9is#antling of Fle+ible Pa.e#ents (#ismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separatel$) &' Manual Means &itu#inous )ou ses G anula )ou ses &' Me)0ani)al Means &itu#inous )ou se 9is#antling of Ce#ent Con) ete Pa.e#ent (#ismantling of cement concrete pavement b$ mechanical means using pneumatic tools, breaking to pieces not exceeding 0 0' cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separatel$) 9is#antling Gua d Rails (#ismantling guard rails b$ manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable materials and unserviceable materials separatel$ ) 9is#antling /e b Stone (#ismantling kerb stone b$ manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre) 9is#antling /e b Stone )0annel (#ismantling kerb stone channel b$ manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre) 9is#antling /ilo#et e Stone (#ismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit ) ;t0 /M stone O dina ' /M Stone He)to#et e Stone 9is#antling of Fen)ing (#ismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit b$ manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable material and unserviceable material separatel$ ) 9is#antling of CI >ate Pi=e Line (#ismantling of C( water pipe line )00 mm dia including disposal with all lifts and lead upto 1000 metres and stacking of serviceable material and unserviceable material separatel$ under supervision of concerned department) Re#o.al of Ce#ent Con) ete Pi=e of Se:e Gutte (*emoval of cement concrete pipe of sewer gutter 1"00 mm dia under the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking of serviceable and unserviceable material separatel$ but excluding earth excavation and dismantling of masonr$ works ) Re#o.al of Tele=0one ! Ele)t i) Poles and Lines (*emoval of telephone / +lectric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separatel$)

Descriptions
S) a=ing of b i)"s dis#antled f o# b i)" :o " in)luding sta)"ing.

Unit
1000 numbers 1000 numbers cum cum sqm

Rate

1110.00 396.00 445.00 94.00 14.00 165.00 223.00 381.00

metre metre metre

cum cum cum cum

672.00 488.00 298.00 1292.00

$.@

metre metre metre

73.00 15.00 23.00

$.6 $.5 $.13 A & C $.11

each each each metre

352.00 210.00 42.00 47.00

$.1$

metre

114.00

$.1(

metre

162.00

$.1*

each

165.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-( EARTH >OR/2 EROSIO1 CO1TROL A19 9RAI1AGE

Descriptions

Unit

Rate

(.1 (.$

E+)a.ation in Soil b' Manual Means. (+xcavation for roadwa$ in soil using manual means including loading in truck for carr$ing of cut earth to embankment site with all lifts and lead upto1000 metres ) E+)a.ation in o dina ' o)" b' #anual #eans (+xcavation in ordinar$ rock using manual means including loading in a truck and carr$ing of excavated material to embankment site with in all lifts and leads upto 1000 metres ) E+)a.ation in Soil :it0 9oAe :it0 lead u=to 133 #et es , +xcavation for road wa$ in soil b$ mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead"0 metres), including trimming bottom and side slopes in accordance with re,uirements of lines, grades and cross sections ) E+)a.ation in O dina ' Ro)" :it0 9oAe :it0 lead u=to 133 #et es (+xcavation for roadwa$ in ordinar$ rock b$ deplo$ing a do-er, .0 /P including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead "0 metres ), trimming bottom and side slopes in accordance with the re,uirements of lines, grades and cross sections ) E+)a.ation in Ha d Ro)" , eBui ing blasting- :it0 dis=osal u=to 1333 #et es (+xcavation for roadwa$ in hard rock (re,uiring blasting) b$ drilling, blasting and breaking, trimming of bottom and side slopes in accordance with re,uirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) E+)a.ation in Soil using H'd auli) E+)a.ato C/ 53 and Ti==e s :it0 dis=osal u=to 1333 #et es. (+xcavation for roadwork in soil with h$draulic excavator of0 0 cum bucket capacit$ including cutting and loading in tippers, trimming bottom and side slopes, in accordance with re,uirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)

cum cum

168.00 234.00

(.(

cum

149.00

(.*

cum

252.00

(.;

cum

213.00

(.4

cum

66.00

(.@

E+)a.ation in O dina ' Ro)"using H'd auli) E+)a.ato C/-53 and Ti==e s :it0 dis=osal u=to 1333 #et es. (+xcavation for roadwa$ in ordinar$ rock with h$draulic excavator of 0 0 cum bucket capacit$ including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with re,uirements of lines, grades and cross sections )

cum

84.00

(.6

E+)a.ation in Ha d Ro)" ,blasting = o0ibited- (+xcavation for roadwa$ in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with re,uirements of lines, grades and cross sections )

A & (.5

Me)0anised Manual Met0od E+)a.ation in Ha d Ro)" ,)ont olled blasting- :it0 dis=osal u=to 1333 #et es (+xcavation for roadwa$ in hard rock with controlled blasting b$ drilling, blasting and breaking, trimming of bottom and side slopes in accordance with re,uirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) E+)a.ation in Ma s0' Soil (+xcavation for roadwa$ in marsh$ soil with h$draulic excavator 0 0 cum bucket capacit$ including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with re,uirements of lines, grades and cross sections )

cum cum cum

398.00 908.00 271.00

(.13

cum

74.00

(.11

Re#o.al of %nse .i)eable Soil :it0 9is=osal u=to 1333 #et es (*emoval of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement b$ suitable soil which shall be paid separatel$ as per clause !0" ) P e-s=litting of Ro)" E+)a.ation Slo=es (Carr$ing out excavation in hard rock to achieve a specified slope of the rock face b$ controlled use of explosives and blasting accessories in properl$ aligned and spaced drill holes, collection of the excavated rock b$ a .0 /P do-er, loading in tipper b$ a front end loader and disposing of the material with all lifts and lead upto 1000 m, all as specified in clause 1o !0!)

cum

67.00

(.1$

sqm

149.00

(.1(

E+)a.ation fo St u)tu es (+arth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent re,uired and utilising the remaining earth locall$ for road work )

Su##a ' of Rate Anal'sis Item No.


,iA & ,iiA & ,iiiA ,i.A ,.A & (.1*
O dina ' soil Manual Means ,9e=t0 u=to ( #Me)0ani)al Means ,9e=t0 u=to ( #O dina ' o)" ,not eBui ing blastingManual Means ,9e=t0 u=to ( #Me)0ani)al Means Ha d o)" , eBui ing blasting Manual Means Ha d o)" , blasting = o0ibited Me)0ani)al Means Ma s0' soil Manual #eans , u=to ( # de=t0Me)0ani)al Means S)a if'ing E+isting G anula Su fa)e to a 9e=t0 of ;3 ## b' Manual Means (2carif$ing the existing granular road surface to a depth of "0 mm and disposal of scarified material within all lifts and leads upto 1000 metres ) S)a if'ing e+isting bitu#inous su fa)e to a de=t0 of ;3 ## b' #e)0ani)al #eans (2carif$ing the existing bituminous road surface to a depth of "0 mm and disposal of scarified material with in all lifts and lead upto 1000 metres ) E#ban"#ent Const u)tion :it0 Mate ial Obtained f o# &o o: Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to re,uired slope and compacting to meet re,uirement of table !003') Const u)tion of E#ban"#ent :it0 Mate ial 9e=osited f o# Road:a' Cutting (Construction of embankment with approved materials deposited at site from roadwa$ cutting and excavation from drain and foundation of other structures graded and compacted to meet re,uirement of table !003') Const u)tion of Subg ade and Ea t0en S0oulde s (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to re,uired slope and compacted to meet re,uirement of table 1o !003') Co#=a)ting O iginal G ound Co#=a)ting o iginal g ound su==o ting subg ade (4oosening of the ground upto a level of"00 mm below the subgrade level, watered, graded and compacted in la$ers to meet re,uirement of table !003' for subgrade construction ) 7Co#=a)ting o iginal g ound su==o ting e#ban"#ent St i==ing and Sto ing To= Soil (2tripping, storing of top soil b$ road side at 1" m internal and re3application on embankment slopes, cut slopes and other areas in localities where the available embankment material is not conducive to plant growth) St i==ing2 sto ing and e-la'ing to= soil f o# bo o: a eas in ag i)ultu e fields. (2tripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and re3la$ing after taking the borrow earth to maintain fertilit$ of the agricultural field, finishing it to the re,uired levels and satisfaction of the farmer ) Tu fing :it0 Sods (5urnishing and la$ing of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed b$ the engineer including preparation of ground, fetching of rods and watering) Seeding and Mul)0ing (Preparation of seed bed on previousl$ laid top soil, furnishing and placing of seeds, fertili-er, mulching material, appl$ing bituminous emulsion at the rate of0 '! litres per s,m and la$ing and fixing 6ute netting, including watering for ! months all as per clause !0.) Su fa)e 9 ains in Soil (Construction of unlined surface drains of average cross sectional area 0 70 s,m in soil to specified lines, grades, levels and dimensions to the re,uirement of clause !01 and !00 +xcavated material to be used in embankment within a lead of"0 metres (average lead '" metres)) Me)0ani)al #eans Manual Means

Descriptions

Unit
cum cum cum cum cum cum cum cum sqm

Rate 254.00 46.00 317.00 62.00 548.00 783.00 564.00 238.00 24.00

(.1;

sqm

6.00

(.14

cum

291.00

(.1@

cum

104.00

(.16

cum

339.00

(.15 Case3(

cum cum cum

57.00 22.00 202.00

Case-II (.$3

(.$1

cum

90.00

(.$$

sqm

35.00

(.$(

sqm

112.00

(.$*

A &

metre metre

71.00 63.00

Su##a ' of Rate Anal'sis Item No.


(.$;

Descriptions
Su fa)e 9 ains in O dina ' Ro)" (Construction of unlined surface drain of average cross sectional area 0 7 s,m in ordinar$ rock to specified lines, grades, levels and dimensions as per approved design and to the re,uirement of clause !01 to !00 +xcavated material to be used in embankment at site ) Me)0ani)al Means Manual Means Su fa)e 9 ains in Ha d Ro)" (*ate per metre ma$ be worked out based on ,uantit$ of hard rock as per design ) Sub Su fa)e 9 ains :it0 Pe fo ated Pi=e (Construction of subsurface drain with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/ cement concrete/P8C, closel$ 6ointed, perforations ranging from ! mm to ) mm depending upon si-e of material surrounding the pipe, with 1"0 mm bedding below the pipe and !00 mm cushion above the pipe, cross section of excavation 7"0 x ""0 mm +xcavated material to be utilised in roadwa$ at site ) Agg egate Sub- Su fa)e 9 ains (Construction of aggregate sub surface drain !00 mm x 7"0 mm with aggregates conforming to table !0037, excavated material to be utilised in roadwa$ ) %nde g ound 9 ain at Edge of Pa.e#ent (Construction of an underground drain 1 m x 1 m (inside dimensions) lined with *CC3'0 cm thick and covered with *CC slab10 cm in thickness on urban roads) P e=a ation and Su fa)e T eat#ent of fo #ation. (Preparation and surface treatment of formation b$ removing mud and slurr$, watering to the extent needed to maintain the desired moisture content, trimming to the re,uired line, grade, profile and rolling with .310 tonne smooth wheeled roller, complete as per clause !10 ) Const u)tion of Ro)" fill E#ban"#ent (Construction of rock fill embankment with broken hard rock fragments of si-e not exceeding !00 mm laid in la$ers not exceeding "00 mm thick including filling of surface voids with stone spalls, blinding top la$er with granular material, rolled with vibrator$ road roller, all complete as per clause !1!) E+)a.ation in Hill A ea in Soil b' Me)0ani)al Means (+xcavation in soil in hill$ area b$ mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) 9e=ositing of e+)a.ated ea t0 on t0e ba en .alle' side. (+xcavation in soil in hill$ area b$ mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the 9arren 8alle$ side) E+)a.ation in Hill' A ea in O dina ' Ro)" b' Me)0ani)al Means not ReBui ing &lasting. (+xcavation in hill$ area in ordinar$ rock not re,uiring ballasting b$ mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )

Unit

Rate

A & (.$4 (.$@

metre metre metre

143.00 95.00

499.00

(.$6 (.$5 (.(3

metre metre

234.00 3446.00 2.00

sqm

(.(1

cum

55.00

(.($ ,i(.($ ,ii(.(( ,i-

cum cum cum cum cum

150.00 81.00 220.00 127.00 294.00 159.00 60.00 349.00 96.00

(.(( ,ii- 9is=osal of e+)a.ated ea t0 on t0e ba en .alle' side. (+xcavation in hill$ area in ordinar$ rock not re,uiring (.(*
blasting b$ mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valle$ side) E+)a.ation in Hill' A eas in Ha d Ro)" ReBui ing &lasting (+xcavation in hill$ areas in hard rock re,uiring blasting, b$ mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres ) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1 " m and a lead upto '0 m as per drawing and %echnical 2pecification Clause 1)0! 1)

(.(; ,i- A E+)a.ation in Hill' A eas in Soil b' Manual Means (+xcavation in soil in /ill$ :rea b$ ;anual ;eans

cum cum cum cum

(.(; ,i- & #educt for ,uantum of earthwork of all t$pes disposal directl$ b$ throwing into the valle$ without involving an$
lead and lift (<rdinar$ and /ard 2oil//ard 2hale, 2oil containing shingle or small si-e boulders

(.(; ,ii- E+)a.ation in Hill' A ea in O dina ' Ro)" b' Manual Means (+xcavation in <rdinar$ *ock using ;anual A ;eans including loading in a truck and carr$ing of excavated material to embankment site with a lift upto 1 " m
and lead upto '0 m as per Clause 1)0! ' )

(.(; ,ii- #educt for ,uantum of earthwork of all t$pes disposal directl$ b$ throwing into the valle$ without involving an$ & lead and lift (<rdinar$ and /ard *ock)

Su##a ' of Rate Anal'sis Item No.


CHAPTER-* S%&-&ASES2 &ASES , 1O1- &IT%MI1O%S- A19 SHO%L9ERS

Descriptions

Unit

Rate

*.1 A

G anula Sub-base :it0 Close G aded Mate ial ,Table7- *33-1Plant Mi+ Met0od (Construction of granular sub3base b$ providing close graded ;aterial, mixing in a mechanical mix plant at <;C, carriage of mixed ;aterial to work site, spreading in uniform la$ers with motor grader on prepared surface and compacting with vibrator$ power roller to achieve the desired densit$, complete as per clause 701 ) fo g ading- I Mate ial fo g ading- II Mate ial fo g ading-III Mate ial &' Mi+ in Pla)e Met0od (Construction of granular sub3base b$ providing close graded material, spreading in uniform la$ers with motor grader on prepared surface, mixing b$ mix in place method with rotavator at <;C, and compacting with vibrator$ roller to achieve the desired densit$, complete as per clause 701) fo g ading- I Mate ial fo g ading- II Mate ial fo g ading-III Mate ial G anula Sub-&ase :it0 Coa se G aded Mate ial , Table7- *33- $- (Construction of granular sub3base b$ providing coarse graded material, spreading in uniform la$ers with motor grader on prepared surface, mixing b$ mix in place method with rotavator at <;C, and compacting with vibrator$ roller to achieve the desired densit$, complete as per clause 701) fo g ading- I Mate ial fo g ading- II Mate ial fo g ading-III Mate ial Li#e Stabilisation fo I#= o.ing Subg ade (4a$ing and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with ! = slaked lime having minimum content of >0= of Ca<, grading with motor grader and compacting with the road roller at <;C to the desired densit$ to form a la$er of improved sub grade) &' Me)0ani)al Means &' Manual Means Li#e T eated Soil fo Sub- &ase (Providing, la$ing and spreading soil on a prepared sub grade, pulverising, mixing the spread soil in place with rotavator with ! = slaked lime with minimum content of >0= of Ca<, grading with motor grader and compacting with the road roller at <;C to achieve at least 0.=of the max dr$ densit$ to form a la$er of sub base ) Ce#ent T eated Soil Sub &ase! &ase (Providing, la$ing and spreading soil on a prepared sub grade, pulverising, adding the designed ,uantit$ of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at <;C to achieve the desired unconfined compressive strength and to form a la$er of sub3base/base ) In.e ted C0o"e (Construction of inverted choke b$ providing, la$ing, spreading and compacting screening 9 t$pe/ coarse sand of specified grade in uniform la$er on a prepared surface with motor grader and compacting with power roller etc) >ate &ound Ma)ada# (Providing, la$ing, spreading and compacting stone aggregates of specific si-es to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibrator$ roller .310 tonnes in stages to proper grade and camber, appl$ing and brooming re,uisite t$pe of screening/ binding ;aterials to fill up the interstices of coarse aggregate, watering and compacting to the re,uired densit$ )

,i,ii,iii&

cum cum cum

1345.00 1216.00 1201.00

,i,ii,iii*.$

cum cum cum

1200.00 1071.00 1056.00

,i,ii,iii*.(

cum cum cum

1223.00 1131.00 1061.00

A & *.*

cum cum cum

877.00 877.00 1091.00

*.;

cum

1045.00

*.6

cum

867.00

*.5

Su##a ' of Rate Anal'sis Item No.


A ,i,a,b,ii,a,b,),iii,a,b& ,i,a,b,ii,a,b,),iii,a,b*.13
&' Manual Means G ading- I ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-A ,1(.$## Agg.G ading- II ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-A ,1(.$## Agg.%sing S) eening T'=e-& ,11.$## Agg.G ading- III ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-& ,11.$## Agg.&' Me)0ani)al Means7 G ading- I ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-A ,1(.$## Agg.G ading- II ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-A ,1(.$## Agg.%sing S) eening T'=e-& ,11.$## Agg.G ading- III ,%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el%sing S) eening C us0able t'=e su)0 as Moo u# o G a.el %sing S) eening T'=e-& ,11.$## Agg.C us0ed Ce#ent Con) ete Sub-base ! &ase (9reaking and crushing of material obtained b$ breaking damaged cement concrete slabs to si-e range not exceeding >" mm as specified in table 700 > transporting the aggregates obtained from breaking of cement concrete slabs at a lead of 4 km , la$ing and compacting the same as sub base/ base course, constructed as ?9; to clause 707 except the use of screening or binding ;aterial ) Penet ation Coat O.e To= La'e of C us0ed Ce#ent Con) ete &ase (2pra$ing of bitumen over cleaned dr$ surface of crushed cement concrete base at the rate of '" kg per 10 s,m b$ a bitumen pressure distributor, spreading of ke$ aggregates at the rate of 0 1! cum per 10 s,m b$ a mechanical gritter and rolling the surface as per clause "0) ! .) >et Mi+ Ma)ada# (Providing, la$ing, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the ;aterial with water at <;C in mechanical mix plant carriage of mixed ;aterial b$ tipper to site, la$ing in uniform la$ers with paver in sub3 base / base course on well prepared surface and compacting with vibrator$ roller to achieve the desired densit$ )

Descriptions

Unit

Rate

cum cum cum cum cum cum cum

1540.00 2029.11 1570.00 1835.00 2014.00 1603.00 2046.00

cum cum cum cum cum cum cum

1397.00 1885.50 1427.00 1691.00 1871.00 1459.00 1903.00

cum

218.00

*.11

sqm

36.00

*.1$

cum

1451.00

Su##a ' of Rate Anal'sis Item No.


*.1(

Descriptions
Const u)tion of Median and Island :it0 Soil Ta"en f o# Road:a' Cutting (Construction of ;edian and (sland above road level with approved material deposited at site from roadwa$ cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 70>)

Unit

Rate 244.00

cum

*.1*

Const u)tion of Median and Island :it0 Soil Ta"en f o# &o o: A eas (Construction of median and (sland above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 70>) Const u)tion of S0oulde s (: +arthen 2houlders) C us0e Run Ma)ada# &ase (Providing crushed stone aggregate, depositing on a prepared surface b$ hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibrator$ roller to clause 710 to form a la$er of sub3base/9ase)

cum

499.00

*.1; *.1@

&' Mi+ in Pla)e Met0od

(i) For 53 mm maximum size (ii) For 45 mm maximum size &


&' Mi+ing Plant 7

cum cum cum cum sqm

2147.00 2445.00 2286.00 1619.00 65.00

(i) For 53 mm maximum size (ii) For 45 mm maximum size *.16 ,A- P e=a ation of sub g ade (Preparation of sub grade b$ excavating earth to an average depth of '' "0 cm,
dressing to camber and consolidating with road roller, making good the undulations etc and disposal of surplus earth, lead upto "0 m )

*.16 ,&- Consolidation of sub3grade with road roller of . to 1' tonne capacit$ including making good the undulations etc
with earth or ,uarr$ spoils etc and rerolling the sub grade

sqm

3.59

Su##a ' of Rate Anal'sis Item No.


CHAPTER-; &ASES A19 S%RFACE CO%RSES ,&IT%MI1O%S-

Descriptions

Unit

Rate

;.1

P i#e )oat (Providing and appl$ing primer coat with bitumen emulsion on prepared surface of granular 9ase including clearing of road surface and spra$ing primer at the rate of 0 )0 kg/s,m using mechanical means )

sqm

31.00

;.$

Ta)" )oat P o.iding and a==l'ing ta)" )oat :it0 bitu#en e#ulsion using e#ulsion = essu e dist ibuto at t0e ate of 3.$3 "g =e sB# on t0e = e=a ed bitu#inous!g anula su fa)e )leaned :it0 #e)0ani)al b oo#.

sqm

11.00

;.(

&itu#inous Ma)ada# (Providing and la$ing bituminous macadam with 10031'0 %P/ hot mix plant producing an average output of >" tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previousl$ prepared surface with paver finisher to the re,uired grade, level and alignment and rolled as per clauses "01 ) and "01 > to achieve the desired compaction)

,i,ii;.*

fo G ading I , *3 ## no#inal siAe fo G ading II ,15 ## no#inal siAe&itu#inous Penet ation Ma)ada# (Construction of penetration macadam over prepared 9ase b$ providing a la$er of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and ke$ aggregates and rolling with a smooth wheeled steel roller .310 tonne capacit$ to achieve the desired degree of compaction) ;3 ## t0i)" @; ## t0i)" &uilt-%=-S= a' G out (Providing, la$ing and rolling of built3up3spra$ grout la$er over prepared base consisting of a two la$er composite construction of compacted crushed coarse aggregates using motor grader for aggregates ke$ stone chips spreader ma$ be used with application of bituminous binder after each la$er, and with ke$ aggregates placed on top of the second la$er to serve as a 9ase conforming to the line, grades and cross3section specified, the compacted la$er thickness being >" mm)

cum cum

7897.00 8153.00

A & ;.;

sqm sqm

368.00 501.00

sqm

292.00

;.4

9ense G aded &itu#inous Ma)ada# (Providing and la$ing dense bituminous macadam with 10031'0 %P/ batch t$pe /;P producing an average output of >" tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 7 0 to 7 "= b$ weight of total mix of mix and filler, transporting the hot mix to work site, la$ing with a h$drostatic paver finisher with sensor control to the re,uired grade, level and alignment, rolling with smooth wheeled, vibrator$ and tandem rollers to achieve the desired compaction as per ;o*%/ specification clause 1o "0> complete in all respects )

,i,ii;.@

fo G ading I , *3 ## no#inal siAe fo G adingII,15 ## no#inal siAeSe#i - 9ense &itu#inous Con) ete (Providing and la$ing semi dense bituminous concrete with 10031'0 %P/ batch t$pe /;P producing an average output of >" tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 7 " to " = of mix and filler, transporting the hot mix to work site, la$ing with a h$drostatic paver finisher with sensor control to the re,uired grade, level and alignment, rolling with smooth wheeled, vibrator$ and tandem rollers to achieve the desired compaction as per ;o*%/ specification clause 1o "0. complete in all respects)

cum cum

9927.00 10167.00

,i,ii-

fo G ading I , 1( ## no#inal siAe fo G adingII,13 ## no#inal siAe-

cum cum

10566.00 11376.00

Su##a ' of Rate Anal'sis Item No.


;.6

Descriptions
&itu#inous Con) ete (Providing and la$ing bituminous concrete with 10031'0 %P/ batch t$pe hot mix plant producing an average output of >" tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ " 7 to " ) = of mix and filler, transporting the hot mix to work site, la$ing with a h$drostatic paver finisher with sensor control to the re,uired grade, level and alignment, rolling with smooth wheeled, vibrator$ and tandem rollers to achieve the desired compaction as per ;<*%/ specification clause 1o "00 complete in all respects) fo G ading-I , 1( ## no#inal siAe fo G ading-II,13 ## no#inal siAeSu fa)e 9 essing (Providing and la$ing surface dressing as wearing course in single coat using crushed stone aggregates of specified si-e on a la$er of bituminous binder laid on prepared surface and rolling with .310 tonne smooth wheeled steel roller) 15 ## no#inal )0i==ing siAe 1( ## no#inal siAe )0i==ing O=en - G aded P e#i+ Su fa)ing (Providing, la$ing and rolling of open 3 graded premix surfacing of '0 mm thickness composed of 1! ' mm to " ) mm aggregates either using penetration grade bitumen or cut3back or emulsion to re,uired line, grade and level to serve as wearing course on a previousl$ prepared base, including mixing in a suitable plant, la$ing and rolling with a smooth wheeled roller .310 tonne capacit$, finished to re,uired level and grades ) Case - I7 Me)0ani)al #et0od using Penet ation g ade &itu#en and HMP of a== o= iate )a=a)it' not less t0an @; tonnes!0ou . Case - II7 O=en-G aded P e#i+ Su fa)ing using )ationi) &itu#en E#ulsion Close G aded P e#i+ Su fa)ing!Mi+ed Seal Su fa)ing ,Me)0ani)al #eans using HMP of a== o= iate )a=a)it' not less t0an @; tonnes!0ou . P o.iding2 la'ing and olling of )lose-g aded = e#i+ su fa)ing #ate ial of $3 ## t0i)"ness )o#=osed of 11.$ ## to 3.35 ## ,T'=e-a- o 1(.$ ## to 3.35 ## ,T'=eb- agg egates using =enet ation g ade bitu#en to t0e eBui ed line2 g ade and le.el to se .e as :ea ing )ou se on a = e.iousl' = e=a ed base2 in)luding #i+ing in a suitable =lant2 la'ing and olling :it0 a S#oot0 :0eeled olle 6-13 tonne )a=a)it'2 and finis0ing to eBui ed le.el and g ade. -

Unit

Rate

,i,ii;.5

cum cum

11395.00 11387.00

Case -1 Case - II ;.13

sqm sqm

106.00 86.00

,i,ii;.11

sqm sqm

159.00 166.00

sqm

183.00

;.1$ ,i,ii-

Seal Coat (Providing and la$ing seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using %$pe : and 9 seal coats) Case - I 7 T'=e A Case - II 7 T'=e & (Providing and la$ing of premix sand seal coat with /;P of appropriate capacit$ not less than >" tonnes/ hours using crushed stone chipping ) > mm si-e and penetration bitumen of suitable grade ) Su==l' of Stone Agg egates fo Pa.e#ent Cou ses (2uppl$ of stone aggregates from approved sources confirming to the ph$sical re,uirement, specified in the respective specified clauses, including ro$alties, fees rents, collection, transportation, stacking and testing and measured in cum as per clause "17 " Competitive market rates to be ascertained :lternativel$, rates for stone crushing given in chapter 1ma$ be adopted, if found economical (n case for suppl$ of aggregates at site are not available, nearest crusher site ma$ be ascertained 4oading and un3loading charges and cost of carriage ma$ be added to these rates to arrive at the cost at site ) Masti) As=0alt (Providing and la$ing '" mm thick mastic asphalt wearing course with paving grade bitumen meeting the re,uirements given in table "003'0, prepared b$ using mastic cooker and laid to re,uired level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine3grained hard stone chipping of 1! ' mm nominal si-e at the rate of 0 00"cum per 10 s,m and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 7 mm over mastic surface, all complete as per clause "1" )

sqm sqm

82.00 60.00

;.1(

cum

;.1*

sqm

706.00

Su##a ' of Rate Anal'sis Item No.


;.1;

Descriptions
Slu ' Seal Providing and la$ing slurr$ seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurr$ seal in a suitable mobile plant, la$ing and compacting to provide even riding surface) ; ## t0i)"ness ( ## t0i)"ness 1.; ## t0i)"ness Fog S= a' 1.In )ase it is de)ided b' t0e enginee to blind t0e fog s= a'2 t0e follo:ing #a' be added

Unit

Rate

,i,ii,iii;.1@ added ;.16

sqm sqm sqm sqm sqm

76.00 47.00 29.00 37.00 5.00

&itu#inous Cold Mi+ ( (ncluding Aravel +mulsion) (Providing, la$ing and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of suitable t$pe and capacit$, transporting, la$ing, compacting and finishing to specified grades and levels )

,i,ii,iii,i.;.15

%sing bitu#en e#ulsion and 5.; ## o 1(.$ ## no#inal siAe agg egate %sing bitu#en e#ulsion and 15 ## o $4.; ## no#inal siAe agg egate %sing )utba)" bitu#en and 5.; ## o 1(.$ ## no#inal siAe agg egate %sing )utba)" bitu#en and 15 ## o $4.; ## no#inal siAe agg egate Sand As=0alt &ase Cou se (Providing, la$ing and rolling sand3asphalt base course composed of sand, mineral filler and bituminous binder on a prepared sub3grade or sub3base to the lines, levels, grades and cross sections as per the drawings including mixing in a plant of suitable t$pe and capacit$, transporting, la$ing, compacting and finishing ) Modified &inde (2uppl$ of modified binder produced b$ mixing bitumen with modifier such as natural rubber or crumb rubber or an$ other pol$mer found compatible with bitumen and which allows properties given in clause "'1 ! and (*CB 2PB "! blending of modifier with bitumen to be done either at the refiner$ or at the site plant capable of producing the modified binder to be delivered in drums which shall be agitated in melted condition using suitable device before use to ensure uniform dispersion )

cum cum cum cum cum

11875.00 11526.00 10504.00 10156.00 8824.00

;.$3

tonne

;.$1 ,i-

C a)" P e.ention Cou ses St ess Abso bing Me#b ane ,SAM- ) a)" :idt0 less t0an 4 ## (Providing and la$ing of a stress absorbing membrane over a cracked road surface, with crack width below ) mm after cleaning with a mechanical broom, using modified binder compl$ing with clause "'1, spra$ed at the rate of 0 kg per 10 s,m and spreading " ) mm crushed stone aggregates @ 0 11 cum per 10 s,m with h$draulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 00' )

sqm

73.00

,ii-

St ess Abso bing Me#b ane ,SAM- :it0 ) a)" :idt0 4 ## to 5 ## (Providing and la$ing of a stress absorbing membrane over a cracked road surface, with crack width ) to 0 mm after cleaning with a mechanical broom, using modified binder compl$ing with clause "'1, spra$ed at the rate of 11 kg per 10 s,m and spreading 11 ' mm crushed stone aggregates @ 0 1' cum per 10 s,m, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 00' )

sqm

84.00

Su##a ' of Rate Anal'sis Item No.


,iii-

Descriptions
St ess Abso bing Me#b ane ,SAM- ) a)" :idt0 abo.e 5 ## and ) a)"ed a ea abo.e ;3 C (Providing and la$ing a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 0 mm and cracked area above "0 = after cleaning with a mechanical broom, using modified binder compl$ing with clause "'1, spra$ed at the rate of 1" kg per 10 s,m and spreading 11 ' mm crushed stone aggregates @ 0 1' cum per 10 s,m, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 00' ) Re)i=e Cold Mi+ (Providing and la$ing of premix of crushed stone aggregates and emulsion binder, mixed in a batch t$pe cold mixing plant, laid over prepared surface, b$ paver finisher, rolled with a pneumatic t$red roller initiall$ and finished with a smooth steel wheel roller, all as per clause "10 !) @; ## t0i)"ness *3 ## t0i)"ness $; ## t0i)"ness

Unit

Rate

sqm

110.00

;.$$

,i,ii,iii-

cum cum cum

7842.00 11159.00 12629.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-4 CEME1T CO1CRETE PA?EME1TS

Descriptions

Unit

Rate

4.1

9 ' Lean Ce#ent Con) ete Sub- base (Construction of dr$ lean cement concrete 2ub3 base over a prepared sub3grade with coarse and fine aggregate conforming to (2B !.!, the si-e of coarse aggregate not exceeding '" mm, aggregate cement ratio not to exceed 1"B1, aggregate gradation after blending to be as per table )0031, cement content not to be less than 1"0 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 ;pa at > da$s, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with .310 tonnes vibrator$ roller, finishing and curing )

cum

3741.00

4.$

Ce#ent Con) ete Pa.e#ent (Construction of un3reinforced, dowel 6ointed, plain cement concrete pavement over a prepared sub base with 7! grade cement @ 700 kg per cum, coarse and fine aggregate conforming to (2 !.!, maximum si-e of coarse aggregate not exceeding '" mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal 6oints, 6oint filler, separation membrane, sealant primer, 6oint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )

cum

7482.00

4.(

Rolled Ce#ent Con) ete &ase (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to (2B!.!, the si-e of coarse aggregate not exceeding '" mm with minimum, aggregate cement ratio1"B1 and minimum cement content of '00 kg/cum, aggregate gradation to be as per table )0037 after blending, mixing in batching plant at optimum moisture content, transporting to site, la$ing with a paver with electronic sensor, compacting with .310 tonnes smooth wheeled vibrator$ roller to achieve, the designed flexural strength, finishing and curing )

cum

4234.00

4.*

T ansition se)tion bet:een igid and fle+ible =a.e#ent (#ue to change in the properties of materials and t$pe of construction, a gradual changeover from rigid pavement to flexible pavement is desirable to avoid an$ damage at the butting 6oint :fter provision of an expansion 6oint in the cement concrete slab, the thickness of slab should be tapered to 10 cm over a length of ! m towards the flexible pavement %he deficienc$ of thickness caused due to tapering of the slab should be made up b$ the asphaltic la$ers )

Su##a ' of Rate Anal'sis Item No.


CHAPTER-6 TRAFFIC SIG1S2 MAR/I1GS < OTHER ROA9 APP%RTE1A1CES

Descriptions

Unit

Rate

6.1

Cast in Situ Ce#ent Con) ete M$3 "e b (Construction of cement concrete kerb with top and bottom width 11" and 1)" mm respectivel$, '"0 mm high in ; '0 grade PCC on ;310 grade foundation 1"0 mm thick, foundation having "0 mm pro6ection be$ond kerb stone, kerb stone laid with kerb la$ing machine, foundation concrete laid manuall$, all complete as per clause 70.) %sing Con) ete Mi+e %sing Con) ete &at)0ing and Mi+ing Plant Cast in Situ Ce#ent Con) ete M $3 /e b :it0 C0annel (Construction of cement concrete kerb with channel with top and bottom width 11" and 1)" mm respectivel$, '"0 mm high in ; '0 grade PCC on ;10 grade foundation 1"0 mm thick, kerb channel !00 mm wide, "0 mm thick in PCC ;'0 grade, sloped towards the kerb, kerb stone with channel laid with kerb la$ing machine, foundation concrete laid manuall$, all complete as per clause 70.) %sing Con) ete Mi+e %sing Con) ete &at)0ing and Mi+ing Plant P inting ne: lette and figu es of an' s0ade (Printing new letter and figures of an$ shade with s$nthetic enamel paint black or an$ other approved colour to give an even shade) Hindi ( ;atras commas and the like not to be measured and paid for /alf letter shall be counted as half )

A & 6.$

metre metre

340.00 340.00

A & 6.(

metre metre

636.00 640.00

,i-

cm height per letter cm height per letter

0.90 0.60

,ii-

Englis0 and Ro#an

6.;

9i e)tion and Pla)e Identifi)ation signs u=to 3.5 sB# siAe boa d. (Providing and erecting direction and place identification retro3reflectorised sign asper (*CB)> made of encapsulated lens t$pe reflective sheeting vide clause .01 !, fixed over aluminium sheeting, ' mm thick with area not exceeding 0 0 s,m supported on a mild steel single angle iron post >" x >" x ) mm firml$ fixed to the ground b$ means of properl$ designed foundation with ;1" grade cement concrete 7" x 7" x )0 cm, )0 cm below ground level as per approved drawing) 9i e)tion and Pla)e Identifi)ation signs :it0 siAe #o e t0an 3.5 sB# siAe boa d. (Providing and erecting direction and place identification retro3 reflectorised sign asper (*C B)> made of encapsulated lens t$pe reflective sheeting vide clause .01 !, fixed over aluminium sheeting, ' mm thick with area exceeding 0 0 s,m supported on a mild steel angle iron post >" mm x >" mm x ) mm, ' 1os firml$ fixed to the ground b$ means of properl$ designed foundation with ; 1" grade cement concrete7" cm x 7" cm x )0 cm, )0 cm below ground level as per approved drawing) Painting T:o Coats on 1e: Con) ete Su fa)es (Painting two coats after filling the surface with s$nthetic enamel paint in all shades on new plastered concrete surfaces)

sqm

2624.00

6.4

sqm

5130.00

6.6

sqm

68.00

6.5

Painting on Steel Su fa)es (Providing and appl$ing two coats of read$ mix paint of approved brand on steel surface after through cleaning of surface to give an even shade)

sqm

64.00

6.13

Painting on >ood Su fa)es (Providing and appl$ing two coats of read$ mix paint of approved brand on wood surface after through cleaning of surface to give an even shade)

sqm

71.00

Su##a ' of Rate Anal'sis Item No.


6.11

Descriptions
Painting Lines2 9as0es2 A o:s et) on Roads in T:o Coats on 1e: >o " (Painting lines, dashes, arrows etc on roads in two coats on new work with read$ mixed road marking paint conforming to (2B1)7 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) Over 10 cm in wid ! "# o 10 cm in wid ! Painting Lines2 9as0es2 A o:s et) on Roads in T:o Coats on Old >o " (Painting lines, dashes, arrows etc on roads in two coats on old work with read$ mixed road marking paint confirming to (2B 1)7 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) Over 10 cm in wid ! "# o 10 cm in wid ! Road Ma "ing :it0 Hot A==lied T0e #o=lasti) Co#=ound :it0 Refle)to ising Glass &eads on &itu#inous Su fa)e (Providing and la$ing of hot applied thermoplastic compound ' " mm thick including reflectorising glass beads @ '"0 gms per s,m area, thickness of ' " mm is exclusive of surface applied glass beads as per (*CB!" %he finished surface to be level, uniform and free from streaks and holes ) /ilo Met e Stone (*einforced cement concrete ;1"grade kilometre stone of standard design as per (*CB.3 10.0, fixing in position including painting and printing etc) 5 ! $i%ome re s one (#recas ) Ordinar& 'i%ome er s one ((recas ) )ec ome er s one ((recas ) &ounda ' =illa (*einforced cement concrete ;1" grade boundar$ pillars of standard design as per (*CB'"3 10)>, fixed in position including finishing and lettering but excluding painting)

Unit

Rate

,i,ii6.1$

sqm sqm

108.00 92.00

,i,ii6.1(

sqm sqm sqm

74.00 79.00 607.00

6.1*

,i,ii,iii6.14

each each each each

3921.00 2383.00 662.00 551.00

6.1@

G.I &a bed :i e Fen)ing 1.$ #et e 0ig0 (Providing and fixing 1 ' metres high A( barbed wire fencing with 1 . m angle iron posts 70 mm x 70 mm x ) mm placed ever$ ! metres center to center founded in ;1" grade cement concrete, 0 ) metre below ground level, ever$ 1"th post, last but one end post and corner post shall be strutted on both sides and end post on one side onl$ and provided with 0 hori-ontal lines and ' diagonals interwoven with hori-ontal wires, fixed with A( staples, turn buckles etc complete as per clause .0> ) G.I &a bed :i e Fen)ing 1.6 #et e 0ig0 (Providing and fixing 1 . metres high A( barbed wire fencing with ' 7 m angle iron posts "0 mm x "0 mm x ) mm placed ever$ ! metres center to center founded in ;1" grade cement concrete, 0 ) metre below ground level, ever$ 1"th post, last but one end post and corner post shall be strutted on both sides and end post on one side onl$ and provided with 1' hori-ontal lines and ' diagonals interwoven with hori-ontal wires, fixed with A( staples, turn buckles etc complete as per clause .0> )

metre

335.00

6.16

metre

548.00

Su##a ' of Rate Anal'sis Item No.


6.15

Descriptions
Fen)ing :it0 :elded steel :i e Fab i) @; ## + ;3 ## ,Suggesti.e- (Providing 1 '0 metre high fencing with angle iron posts "0 mm x "0 mm x ) mm at ! metre center to center with 0 70 metre embedded in ;1" grade cement concrete, corner, end and ever$ 10th post to be strutted, provided with welded steel wire fabric of >" mm x "0 mm mesh or >" mm x '" mm mesh and fixed to iron posts b$ flat iron "0 x " mm and bolts etc complete in all respects ) Tubula Steel Railing on Mediu# >eig0t steel )0annel , ISMC se ies- 133 ## + ;3 ## (Providing, fixing and erecting "0 mm dia steel pipe railing in ! rows dul$ painted on medium weight steel channels ((2;C series) 100 mm x "0 mm, 1 ' metres high above ground, ' m centre to centre, complete as per approved drawings)

Unit

Rate

metre

628.00

6.$3

metre

2679.00

6.$1

Tubula Steel Railing on P e)ast RCC =osts2 1.$ # 0ig0 abo.e g ound le.el (Providing, fencing and erecting "0 mm dia painted steel pipe railing in ! rows on precast ;'0 grade *CC vertical posts1 . metres high (1 ' m above A4) with ! holes "0 mm dia for pipe, fixed ' metres centre to, complete as per approved drawing)

metre

2129.00

6.$$

Reinfo )ed Ce#ent Con) ete C as0 &a ie (Provision of an *einforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with ;3'0 grade concrete with /C2# reinforcement conforming to (*CB'1 and dowel bars '" mm dia, 7"0 mm long at expansion 6oints filled with pre3moulded asphalt filler board, ke$ed to the structure on which it is built and installed as per design given in the enclosure to ;<2% circular 1o *?/1/ 3 !!0''/1/073#< ((( dated '7 Dune 1007 as per dimensions in the approved drawing and at locations directed b$ the +ngineer, all as specified) * 20 +rade concre e Metal &ea# C as0 &a ie T'=e - A2 D>D 7 Metal &ea# C as0 &a ie (Providing and erecting a E?E metal beam crash barrier comprising of ! mm thick corrugated sheet metal beam rail, >0 cm above road/ground level, fixed on (2;C series channel vertical post, 1"0 x >" x " mm spaced ' m centre to centre, 1 . m high, 1 1 m below ground/road level, all steel parts and fitments to be galvanised b$ hot dip process, all fittings to conform to (2B1!)> and (2B1!)7, metal beam rail to be fixed on the vertical post with a spacer of channel section 1"0 x >" x " mm, !!0 mm long complete as per clause .10) T'=e - &2 DTHRIED 7 Metal &ea# C as0 &a ie (Providing and erecting a E%hrieE metal beam crash barrier comprising of ! mm thick corrugated sheet metal beam rail, ." cm above road/ground level, fixed on (2;C series channel vertical post, 1"0 x >" x " mm spaced ' m centre to centre, ' m high with 1 1" m below ground level, all steel parts and fitments to be galvanised b$ hot dip process, all fittings to conform to (2B1!)> and (2B1!)7, metal beam rail to be fixed on the vertical post with a space of channel section 1"0 x >" x " mm, "7) mm long complete as per clause .10) Road T affi) Signals ele)t i)all' o=e ated (2ince it is a read$ made item commerciall$ produced and erected b$ specialised firm in the electrical and electronic field, rate ma$ be taken based on market en,uir$ from firms specialised in this field and (2( certified for the approved design and drawing ) Fle+ible C as0 &a ie 2 >i e Ro=e Safet' &a ie (Providing and erecting a wire rope safet$ barrier with vertical posts of medium weight *2 Doist ((2;9 series) 100 mm x >" mm (11 "0 kg/m), 1 "0 m long 0 ." m above ground and 0 )" m below ground level, split at the bottom for better grip, embedded in ; 1" grade cement concrete 7"0 x 7"0 x 7"0 mm, 1 "0 m center to center and with 7 hori-ontal steel wire rope 70 mm dia and anchored at terminal posts 1" m apart %erminal post to be embedded in ; 1" gradecementconcretefoundation'700 x 7"0 x 000 mm (depth), strengthened b$ a strut of *2 6oist 100 x >" mm, ' m long at 7"0 inclination and a tie 100 x . mm, 1 "0 m long at the bottom, all embedded in foundation concrete as per approved design and drawing, rate excluding excavation and cement concrete ) St eet Lig0ting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 0 m high spaced 70 m apart, 1 . m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firml$ in concrete foundation ) Fo Fi+ing in Median Fo fi+ing in Foot=at0 Lig0ting on & idges (Providing and fixing lighting on bridges, mounted on steel hollow circular poles of standard specifications, " m high fixed on parapets with cement concrete, '0 m apart and fitted with sodium vapour lamp)

,i6.$( A

metre

4189.00

metre

3617.00

&

metre

4634.00

6.$*

6.$;

metre

3424.00

6.$@

,i,ii6.$6

each each each

14470.00 14401.00 9333.00

Su##a ' of Rate Anal'sis Item No.


6.$5

Descriptions
Cable 9u)t A) oss t0e Road (Providing and la$ing of a reinforced cement concrete pipe duct, !00 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of *CC pipe as per (*CB0.3100>, bedded on a 0 ! m thick la$er of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe sub6ect to minimum 7"0 mm in case of double and triple row ducts, 6oints to be made leak proof, invert level of duct to be above higher than ground level to prevent entr$ of water and dirt, all as per (*CB 0. 3 100> and approved drawings ) Single Ro: fo one utilit' se .i)e 9ouble Ro: fo t:o utilit' se .i)es T i=le Ro: fo t0 ee utilit' se .i)es Road Ma "e s!Road Stud :it0 Lense Refle)to (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface b$ drilling hole !0 mm upto a depth of )0 mm and bedded in a suitable bituminous grout or epox$ mortar, all as per 92 .>! part 7B10>!) T affi) Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low densit$ pol$eth$lene (4#P+) material with a s,uare base of !00 x !00 x !" mm and a height of >>0 mm, 7 kg in weight, placed at 1 " m interval, all as per 92 .>!) Ru#ble St i=s (Provision of 1" nos rumble strips covered with premix bituminous carpet, 1"3'0 mm high at center, '"0 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint ) Hig0 Mast Pole Lig0ting at Inte )0anges and Fl'o.e s (Providing and erecting a high mast pole lighting with !0 m high hot dip galvanised mast designed to withstand forces exerted with wind speeds of 1.0 km per hour with ! seconds gust, as per (2B.>" (Part !) 3 10>., fitted with a base flange, door at the base of mast with heav$ dut$ internal lock, lantern carriage, suitable winching arrangement for safe working load of >"0 kg and high powered electricall$ driven power tools for raising and lowering of lantern carriage, flexible . core electric cable, lightening conductor, earthing terminal, and fixing ' nos aviation obstruction lights on top of the mast, all complete as per approved design and drawings %his is a specialised work and is generall$ done b$ firms who specialise in such 6obs %he detailed designs and estimates are submitted b$ the firms alongwith their tender for checks b$ the #epartment %he cost of this work is re,uired to be worked out based on approved design, drawings and estimate of the lowest tender : separate contract for this work is concluded as the contractors for road and bridge works generall$ donot undertake such 6obs ) Po table &a i)ade in Const u)tion Eone ((nstallation of a steel portable barricade with hori-ontal rail !00 mm wide, ' " m in length fitted on a F:F frame made with 7" x 7" x " mm angle iron section, 1 " m in height, hori-ontal rail painted (' coats) with $ellow and white stripes, 1"0 mm in width at an angle of 7"0, F:F frame painted with ' coats of $ellow paint, complete as per (*CB2PB""3'001 )

Unit

Rate

,i,ii,iii6.(;

metre metre metre each

1202.00 2163.00 3144.00 651.00

6.(4

each

1600.00

6.(6

sqm

6.*3

6.*(

each

3390.00

Su##a ' of Rate Anal'sis Item No.


6.** A

Descriptions
Pe #anent T'=e &a i)ade in Const u)tion Eone >it0 Steel Co#=onents (Construction of a permanent t$pe barricade made of steel components, 1 " m high from road level, fitted with ! hori-ontal rails '00 mm wide and 7 m long on "0 x "0 x " mm angle iron vertical support, painted with $ellow and white strips, 1"0 mm in width at an angle of7"0, complete as per (*CB2PB""3'001 ) >it0 >ooden Co#=onents (Construction of a permanent t$pe barricade made of wooden components, 1 " m high from road level, fitted with ! hori-ontal planks '00 mm wide and ! )) m long on 100 x 100mm wooden vertical post, painted with $ellow and white striups, 1"0 mm in width at an angle of7"0, complete as per (*CB2PB""3'001 ) >it0 & i)"s (Construction of a permanent t$pe barricade made with brick work in mud mortar, 1 " m high, 7 m long, )00 mm thick, plastered with cement mortar 1B), painted with $ellow and white strips)

Unit

Rate

each

5374.00

&

each

4077.00

each

22623.00

6.*;

9 u# 9elineato in Const u)tion Eone (Provision of metal drum/empt$ bitumen drum delineator, !00 mm in diameter, .00 mm high, filled with earth for stabilit$, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors ! 1os of > " cm dia, all as per (*CB2PB""3'001)

each

396.00

6.*4

Flag#an (Positioning of a smart flagman with a $ellow vest and a $ellow cap and a red flag )00 x )00 mm securel$ fastened to a staff 1 m in length for guiding the traffic)

each

462.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-5 PIPE C%L?ERTS

Descriptions

Unit

Rate

5.1

PCC 17(74 in Foundation (Plain cement concrete 1B!B) mix with crushed stone aggregate 70 mm nominal si-e mechanicall$ mixed, placed in foundation and compacted b$ vibration including curing for 17 da$s ) La'ing Reinfo )ed Ce#ent Con) ete Pi=e 1P$!= est ssed )on) ete =i=e on fi st )lass bedding in single o: . ,La'ing Reinfo )ed )e#ent )on) ete =i=e 1P$!= est ssed )on) ete =i=e fo )ul.e ts on fi st )lass bedding of g anula #ate ial in single o: in)luding fi+ing )olla :it0 )e#ent #o ta 17$ but e+)luding e+)a.ation2 = ote)tion :o "s2 ba)"filling2 )on) ete and #ason ' :o "s in 0ead :alls and =a a=ets . -

cum

4723.00

5.$

A & 5.(

1333 ## dia 1$33 ## dia La'ing Reinfo )ed Ce#ent Con) ete Pi=e 1P $ != est ssed )on) ete =i=e on fi st )lass bedding in double o: . ,La'ing Reinfo )ed )e#ent )on) ete =i=e 1P$ != est ssed )on) ete =i=e fo )ul.e ts on fi st )lass bedding of g anula #ate ial in double o: in)luding fi+ing )olla :it0 )e#ent #o ta 17$ but e+)luding e+)a.ation2 = ote)tion :o "s2 ba)"filling2 )on) ete and #ason ' :o "s in 0ead :alls and =a a=ets . -

metre metre

1365.00 1838.00

A &

1333 ## dia 1$33 ## dia

metre metre

2862.00 3818.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-13 MAI1TE1A1CE OF ROA9S

Descriptions

Unit

Rate

13.1

Resto ation of Rain Cuts (*estoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for !00 mm width, la$ing fresh material in la$ers not exceeding '"0 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes)

cum

221.00

13.$

Maintenan)e of Ea t0en S0oulde ,filling :it0 f es0 soil- (;aking up loss of material/ irregularities on shoulder to the design level b$ adding fresh approved soil and compacting it with appropriate e,uipment )

sqm

86.00

13.(

Maintenan)e of Ea t0 S0oulde ,st i==ing e+)ess soil- (2tripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor)

sqm

23.00

13.*

Filling Pot- 0oles and Pat)0 Re=ai s :it0 o=en - g aded P e#i+ su fa)ing2 $3##. (*emoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause "0!, back filling the pot holes with hot bituminous material as per clause "11, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause !007 ')

sqm

179.00

13.;

Filling Pot- 0oles and Pat)0 Re=ai s :it0 - &itu#inous )on) ete2 *3##. , *emoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause "0!, back filling the pot holes with hot bituminous material as per clause "07, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause !007 ') fo g ading I Mate ial fo g ading II Mate ial C a)" Filling (5illing of crack using slow 3 curing bitumen emulsion and appl$ing crusher dust in case crack are wider than !mm ) 9usting (:ppl$ing crusher dust to areas of road where bleeding of excess bitumen has occurred )

,i,ii13.4 13.@ 13.6 A & ,i,ii,iii,i.C ,i,ii,iii9 ,i,ii13.5

sqm sqm metre sqm

401.00 426.00 4.00 1.39 0.00

Fog Seal (ref item " 1>) C a)" P e.ention )ou ses. (ref item " '1) St ess Abso bing Me#b ane ,SAM- ) a)" :idt0 less t0an 4 ## St ess Abso bing Me#b ane ,SAM- :it0 ) a)" :idt0 4 ## to 5 ## St ess Abso bing Me#b ane ,SAM- ) a)" :idt0 abo.e 5 ## and ) a)"ed a ea abo.e ;3 C

sqm sqm sqm sqm

&itu#en I#= egnated Geote+tile Slu ' Seal (ref item " 1") ; ## t0i)"ness ( ## t0i)"ness 1.; ## t0i)"ness Su fa)e 9 essing fo #aintan)e :o "s. (ref item " 0) 15 ## no#inal )0i==ing siAe 1( ## no#inal siAe )0i==ing The above mentioned items have already been included in Chapter 5. Re=ai of 8oint G oo.es :it0 E=o+' Mo ta *epair of spalled 6oint grooves of contraction 6oints, longitudinal 6oints and expansion 6oints in concrete pavements using epox$ mortar or epox$ concrete)

sqm sqm sqm sqm sqm sqm

metre

341.00

13.13

Re=ai of old Foints Sealant (*emoval of existing sealant and re sealing of contraction, longitudinal or expansion 6oints in concrete pavement with fresh sealant material)

metre

61.00

Su##a ' of Rate Anal'sis Item No.


13.11 13.1$ ,i-

Descriptions
Hill Side 9 ain Clea an)e (*emoval of earth from the choked hill side drain and disposing it on the valle$ side manuall$) Land Slide Clea an)e in soil Clearance of land slides in soil and ordinar$ rock b$ a bull3do-er # .0 :31', 1.0 /P and disposal of the same on the valle$ side

Unit
metre

Rate 33.00

cum cum cum cum sqm

76.00 56.00 116.00 4.00 110.00 1089.00 2251.00 63.00 1061.00

,ii- Clearance of land slides in soil and ordinar$ rock b$ a bull3do-er # "0 :31" and disposal of the same on the valle$
side

13.1(

Land slide Clea an)e in Ha d Ro)" ReBui ing &lasting (Clearing of land slide in hard rock re,uiring blasting for "0= of the boulders and disposal of the same on the valle$ side with 9ulldo-er # "0) Sno: Clea an)e on Roads :it0 9oAe (2now clearance from road surface b$ a bull3 do-er 1)" /p and disposing it on the valle$ side) Maintenan)e of >&M Road (;aintenance of ?9; road including filling up of pot holes, ruts and rectif$ing corrugated surface, damaged edges and ravelling as per technical specification clause 100))

13.1* 13.1;

13.14 Maintenan)e of Hu#e Pi=e (;aintenance of /ume Pipe Culvert b$ wa$ of Cleaning, Clearing, +rosion repair,
repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 100.)

each

13.1@ Maintenan)e of Cul.e ts Slab t'=e (;aintenance of 2lab t$pe Culvert b$ wa$ of Cleaning, Clearing, +rosion
repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 100.)

each

13.16 Maintenan)e of Cause:a' (;aintenance of Causewa$ b$ wa$ of minor 2urface repairs, replacing Auide Posts,
repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specifications Clause 1000)

metre

13.15 Maintenan)e of Road signs (;aintenance of *oad signs b$ wa$ of cleaning and repainting of
mandator$/regulator$/cautionar$/informator$ and place identifications sign board as per drawings and technical specifications Clause 1010)

km

13.$3 Cutting of b an)0es of t ees s0 ubs and t i##ing of g ass and :eeds ,i- Cutting of branches of tress and shrubs from the road wa$ or with in * < ? including disposal of wood and
leaves to suitable location as per technical specification Clause 1017

per tree per shrub sqm

113.00 6.00 2.00

,ii- Cutting of shrubs from the road wa$ or with in * < ? and disposal of shrubs to suitable location as per technical
specification Clause 1017

,iii- %riming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per
technical specifications Clause 1017

13.$1 >0ite :as0ing of =a a=et :alls of C9 :o " and t ee t un"s (?hite washing two coats on parapet walls and
tree trunks including preparation of surface b$ cleaning scraping etc as per technical specifications Clause 101")

sqm

19.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-11 HORTIC%LT%RE

Descriptions

Unit

Rate

11.1

S= eading of Sludge Fa # Ga d Manu e o !and good Ea t0 (2preading of sludge farm $ard manure or/ and good earth in re,uired thickness (cost of sludge, farm3 $ard manure or/and good earth to be paid for separatel$)) G assing :it0 H 9oobsH G ass (Arassing with F#oobsF grass including watering and maintenance of the lawn for !0 da$s or more till the grass forms a thick lawn free from weeds and fit for moving including suppl$ing good earth if needed) In o:s 1; )# a=a t in eit0e di e)tion In o:s @.; )# a=a t in eit0e di e)tion Ma"ing La:ns in)luding Ploug0ing and 9 agging :it0 HS:ag0aH & ea"ing of Clod (;aking lawns including ploughing and breaking of clod, removal of rubbish, dressing and suppl$ing doobs grass roots and planting at 1" cm apart, including suppl$ing and spreading of farm $ard manure at rate of 0 1. cum per 100 s,m) Maintenan)e of La:ns o Tu fing of Slo=es (;aintenance of lawns or %urfing of slopes (rough grassing) for a period of one $ear including watering etc) Tu fing La:ns :it0 Fine G assing in)luding Ploug0ing2 9 essing (%urfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal of rubbish, dressing and suppl$ing doobs grass roots at 10 cm apart, including suppl$ing and spreading of farm $ard manure at rate of0 ) cum per 100 s,m) Maintenan)e of La:ns :it0 Fine G assing fo t0e Fi st Gea a- Planting Pe #anent Hedges in)luding 9igging of T en)0es (Planting permanent hedges including digging of trenches, )0 cm wide and 7" cm deep, refilling the excavated earth mixed with farm$ard manure, supplied at the rate of 7 )" cum per 100 metres and suppl$ing and planting hedge plants at !0 cm apart) Maintenan)e of Hedge fo one 'ea aPlanting Flo:e ing Plants and S0 ubs in Cent al ?e ge Maintenan)e of Flo:e ing Plants and S0 ubs in Cent al ?e ge fo one Gea Planting of T ees and t0ei Maintenan)e fo one Gea (Planting of trees b$ the road side (:venue trees) in 0 )0 m dia holes, 1 m deep dug in the ground, mixing the soil with deca$ed farm $ard/sludge mannure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one $ear) Reno.ation La:ns in)luding2 >eeding2 Fo "ing t0e G ound2 To= 9 essing :it0 Fo "ed Soil (*enovation lawns including, weeding, forking the ground, top dressing with forked soil, watering and maintenance the lawns, for !0 da$s or more, till the grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubbish as directed, including suppl$ing good earth, if needed but excluding the cost of well deca$ed farm $ard manure) Su==l' at Site >ell 9e)a'ed Fa # Ga d Manu e (2uppl$ at site of work well deca$ed farm $ard manure, from an$ available source, approved b$ the engineer in charge including screening and stacking) Half & i)" Ci )ula T ee Gua d2 in $nd )lass & i)"2 inte nal dia#et e 1.$; #et es2 and 0eig0t 1.$ #et es2 abo.e g ound and 3.$3 #et e belo: g ound (/alf brick circular tree guard, in 'nd class brick, internal diametre 1 '" metres, and height 1 ' metres, above ground and 0 '0 metre below ground, bottom two courses laid dr$, and top three courses in cement mortar 1B) ( 1 cement ) sand) and the intermediate courses being in dr$ hone$ comb masonr$, as per design complete)

cum

21.00

11.$

,i,ii11.(

sqm sqm sqm

25.00 43.00 25.00

11.*

sqm

190.00

11.;

sqm sqm metre metre km km each

29.00 198.00 124.00 164.00 33520.00 193094.00 2573.00

11.4 11.@

,b11.6 ,b11.5

11.13

sqm

15.00

11.11

cum

146.00

11.1*

each

2817.00

11.1;

Edging :it0 $nd )lass & i)"s2 laid d ' lengt0:ise ,Edging :it0 $nd )lass b i)"s2 laid d ' lengt0:ise2 in)luding e+)a.ation2 efilling2 )onsolidation2 :it0 a 0and =a)"ing and s= eading nea l' su =lus ea t0 :it0in a lead of ;3 #et es-

metre

58.00

Su##a ' of Rate Anal'sis Item No.


11.14

Descriptions
Ma"ing T ee Gua d ;( )# dia and 1.( # 0ig0 as =e design f o# e#=t' bitu#en d u# (;aking tree guard "! cm dia and 1 ! m high as per design from empt$ bitumen drum, slit suitabl$ to permit sun and air, (supplied b$ the department at stock issue rate) including providing and fixing ' nos ;2 sheet rings "0 x 0 " mm with rivets, complete in all respect) Ma"ing T ee Gua d ;( )# dia and $ #et es 0ig0 as =e design f o# e#=t' bitu#en d u#s (;aking tree guard "! cm dia and ' metres high as per design from empt$ bitumen drums, slit suitabl$ to permit sun and air, ( supplied b$ the department at stock issue rate) including providing and fixing four legs 70 cm long of !0 x ! mm ;2 riveted to tree guard and providing and fixing ' nos ;2 sheet rings "0 x 0 " mm with rivets complete in all respects) > oug0t I on and Mild Steel >elded >o " ,> oug0t i on and #ild steel :elded :o "- (using angles, s,uare bars, tees and channel grills, grating frames, gates and tree guards of an$ si-e and design etc including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separatel$) T ee Gua d :it0 MS I on (Providing and fixing ;2 iron tree guard )0 cm dia and ' metre high above ground level formed of 7 1os ('" x ) mm) and . 1os ('" x ! mm) vertical ;2 riveted to ! 1os ('" x ) mm) iron rings in two halves, bolted together with . mm dia and !0 mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete in all respects ) T ee Gua d :it0 MS Angle I on and Steel >i e (Providing and fixing tree guard 0 )0 metre s,uare, ' 00 metre high fabricated with ;2 angle iron !0 x !0 x ! mm, ;2 iron '" x ! mm and steel wire! mm dia welded and fabricated as per design in two halves bolted together) Co#=ensato ' Affo estation (Planting trees as compensator$ afforestation at the rate of '00 trees per hectare at a spacing of ) m b$ grubbing and leveling the ground upto a depth of 1"0 mm, digging holes 0 0 m dia, 1 m deep, mixing farm $ard/sludge manure with soil, planting of sapling ' m high with '" cm dia stem, backfilling the hole and watering)

Unit

Rate

each

243.00

11.1@

each

470.00

11.16

quintal

9398.00

11.15

each tree guard each tree guard

2337.00

11.$3

3843.00

11.$1

hectare

112519.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1$ FO%19ATIO1S

Descriptions

Unit

Rate

1$.1

E+)a.ation fo St u)tu es (+arth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material ) O dina ' soil Manual Means u=to ( # de=t0 ( # to 4 # de=t0 Abo.e 4 # de=t0 Me)0ani)al Means 9e=t0 u=to ( # 9e=t0 ( # to 4 # 9e=t0 abo.e 4# O dina ' o)" ,not eBui ing blastingManual Means 9e=t0 u=to ( # Me)0ani)al Means Ha d o)" , eBui ing blasting Manual Means Ha d o)" , blasting = o0ibited Me)0ani)al Means Ma s0' soil u=to ( # de=t0 Manual #eans Me)0ani)al Means &a)" Filling in Ma s0' Foundation Pits Filling Annula S=a)e A ound Footing in Ro)" (4ean cement concrete 1B!B) nominal mix *ate ma$ be taken as per items 1! 7 ) Sand Filling in Foundation T en)0es as =e 9 a:ing < Te)0ni)al S=e)ifi)ation PCC 17(74 in Foundation (Plain cement concrete 1B!B) nominal mix in foundation with crushed stone aggregate 70 mm nominal si-e mechanicall$ mixed, placed in foundation and compacted b$ vibration including curing for 17 da$s ) & i)" #ason ' :o " in )e#ent #o ta 17( in foundation )o#=lete e+)luding =ointing and =laste ing2 as =e d a:ing and te)0ni)al s=e)ifi)ations Ce#ent #o ta 17( ,1)e#ent 7( sandCe#ent #o ta 17$ ,1)e#ent 7$ sandCe#ent #o ta 17* ,1)e#ent 7* sandCe#ent #o ta 174 ,1)e#ent 74 sandStone #ason ' :o " in )e#ent #o ta 17( in foundation )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ation SBua e Rubble Cou sed ubble #ason ', fi st so t Rando# Rubble Mason '

I A ,i,ii,iii& ,i,ii,iiiII A ,i& III A I? A ? ,iA & ?I 1$.$ 1$.( 1$.*

cum cum cum cum cum cum

121.00 156.00 208.00 63.00 72.00 88.00

cum cum cum cum

173.00 81.00 462.00 582.00

cum cum cum

496.00 141.00 361.00

cum cum

958.00 5177.00 8495.00 4945.00 6196.00 4116.00 3298.00 4267.00 4171.00

1$.; 1$.4 A & C 9 1$.@ ,a,b-

cum cum cum cum cum cum cum

Su##a ' of Rate Anal'sis Item No.


1$.6 A & C Case I Case II 9 Case I Case II E Case I Case II F Case I Case II G Case I Case II H Case I Case II 1$.5 A & C 1$.13 1$.11 A ,iCase I Case II

Descriptions
Plain!Reinfo )ed )e#ent )on) ete in o=en foundation )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations PCC G ade M1; PCC G ade M$3 RCC G ade M$3 %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= PCC G ade M$; %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M$; %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= PCC G ade M(3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(; %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= P o.iding and )onst u)ting te#=o a ' island 14 # dia#ete fo )onst u)tion of :ell foundation fo 6# dia. >ell. Assu#ing de=t0 of :ate 1.3 # and 0eig0t of island to be 1.$;#. Assu#ing de=t0 of :ate *.3 # and 0eig0t of island *.; #. P o.iding and )onst u)ting one s=an se .i)e oad to ea)0 island lo)ation f o# one =ie lo)ation to anot0e =ie lo)ation P o.iding and la'ing )utting edge of #ild steel :eig0ing *3 "g =e #et e fo :ell foundation )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ation. Plain!Reinfo )ed )e#ent )on) ete2 in :ell foundation )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ation >ell )u b RCC M$3 G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#=

Unit

Rate

cum cum cum cum cum cum cum cum cum cum cum cum cum cum

6107.00 6902.00 7149.00 6822.00 7500.00 7179.00 7754.00 7428.00 7549.00 7222.00 7773.00 7449.00 7904.00 7582.00

each each metre tonne

39040.00 257510.00 2424.00 104806.00

cum cum

8249.00 7872.00

Su##a ' of Rate Anal'sis Item No.


,iiCase I Case II ,iiiCase I Case II & ,I,ii,iiiCase I Case II ,i.Case I Case II ,.Case I Case II
RCC M$; G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M(; G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= >ell steining PCC M1; G ade PCC M$3 G ade RCC M$3 G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= PCC M$; G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M$; G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#=

Descriptions

Unit
cum cum cum cum cum cum cum cum cum cum cum cum

Rate 8970.00 8733.00 9209.00 8981.00 6460.00 7301.00 7562.00 7216.00 7953.00 7611.00 8223.00 8005.00

Su##a ' of Rate Anal'sis Item No.


,.iCase I Case II ,.iiCase I Case II ,.iiiCase I Case II ,i+C ,iCase I Case II ,iiCase I Case II ,iiiCase I Case II ,i.Case I Case II 9 ,ICase I Case II ,iiCase I Case II ,iiiCase I Case II E ,iCase I ,iiCase I
PCC M(3 G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M(3 G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M(; G ade %sing )on) ete #i+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M*3 G ade &otto# Plug PCC G ade M$3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= PCC G ade M$; %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= PCC G ade M(3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= PCC G ade M(; %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= Inte #ediate =lug G ade M$3 PCC %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= G ade M$; PCC %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= G ade M(3 PCC %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= To= =lug G ade M1; PCC %sing Con) ete Mi+e G ade M$3 PCC %sing Con) ete Mi+e

Descriptions

Unit
cum cum cum cum cum cum

Rate 8024.00 7675.00 8262.00 7918.00 8442.00 8233.00 8329.00

cum cum cum cum cum cum cum cum

7544.00 7215.00 7890.00 7557.00 7957.00 7628.00 8115.00 7782.00

cum cum cum cum cum cum

7212.00 6894.00 7541.00 7220.00 7606.00 7288.00

cum cum

5873.00 6637.00

Su##a ' of Rate Anal'sis Item No.


,iiiCase I Case II ,i.Case I Case II F ,iCase I Case II ,iiCase I Case II ,iiiCase I Case II ,i.Case I Case II ,.1$.1$
G ade M$; PCC %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= G ade M(3 PCC %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and C ane!)on) ete =u#= >ell )a= RCC G ade M$3 %sing )on) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M$; %sing )on) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(; %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC M*3 G ade Sin"ing of 4 # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . Cla'e' soil , 4# dia. >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 #

Descriptions

Unit
cum cum cum cum

Rate 7230.00 6919.00 7294.00 6978.00

cum cum cum cum cum cum cum cum cum

7082.00 6753.00 7754.00 7430.00 7773.00 7448.00 7904.00 7582.00 7854.00

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii,iiia b ,i.-

metre metre metre metre

3476.00 4872.00 6436.00 12073.00 14487.00

metre

28685.00
metre metre metre metre metre

34423.00 4905.00 11462.00 15138.00 15894.00

Su##a ' of Rate Anal'sis Item No.


a b ) ,.a b ) C ,i9 ,i1$.1(

Descriptions
Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing of t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" ,4# dia :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" ,4# dia :ell 9e=t0 of soft o)" st ata u=to (# Sin"ing of @ # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou - . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil , @# dia. >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -.

Unit
metre metre metre metre metre metre metre metre

Rate 28392.00 37265.00 35490.00 67456.00 84995.00 80948.00 18311.00 17316.00

A ,i,ii,iiia ,i.a b ,.a b & ,I,ii,iiia b ,i.a b ) ,.a b )

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

10115.00 6795.00 8975.00 16833.00 20200.00 39992.00 47991.00 6795.00 9700.00 12811.00 13451.00 24029.00 31538.00 30036.00 57088.00 71930.00 68505.00

Su##a ' of Rate Anal'sis Item No.


C ,i9 ,i1$.1*
Soft o)" , @# dia :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" , @# dia :ell 9e=t0 u=to ( # Sin"ing of 6 # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete

Descriptions

Unit
metre metre

Rate 15543.00 20726.00

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii,iiia b ,i.a b ) ,.a b )

metre metre

6268.00 7680.00

metre
&e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete

10143.00

metre
Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou .

19026.00 22831.00

metre
&e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete

metre
Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil , 6# dia. >ell 9e=t0 u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -.

6688.00 8025.00 8327.00 12445.00 16436.00 17258.00 30828.00 40462.00 38535.00 73243.00 92286.00 87892.00

metre metre metre metre metre

metre metre metre metre metre metre

Su##a ' of Rate Anal'sis Item No. Descriptions Unit


metre metre

Rate 17248.00 21136.00

C Soft o)" , 6# dia :ell ,i- 9e=t0 in soft o)" st ata u=to (# 9 Ha d o)" , 6# dia :ell ,i- 9e=t0 in 0a d o)" st ata u=to ( # 1$.1; Sin"ing of 5 # e+te nal dia#ete :ell , other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata
na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el.

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii,iiia b ,i.a b ) ,.a b ) C ,i9 ,i1$.14

Sand' soil 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil , 5# dia. >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" , 5# dia :ell 9e=t0 u=to (# Ha d o)" , 5# dia :ell 9e=t0 of 0a d o)" st ata u=to ( # Sin"ing of 13 # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou .

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

6371.00 8413.00 11111.00 20843.00 25012.00 49521.00 59425.00 8829.00 13385.00 17678.00 18562.00 33160.00 43523.00 41451.00 78786.00 99271.00 94543.00 21145.00 24889.00

A ,i,ii,iiia ,i.a b

metre metre metre metre metre

7528.00 8923.00 11783.00 22103.00 26523.00

Su##a ' of Rate Anal'sis Item No.


,.a b & ,i,ii,iiia b ,i.a Hb ) ,.a b ) C ,i9 ,i1$.1@

Descriptions
&e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil ,13# dia. >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" ,13# dia :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" ,13# dia :ell 9e=t0 of 0a d o)" st ata u=to ( # Sin"ing of 11 # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 f o# bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil ,11 # dia. >ell 9e=t0 f o# bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0

Unit
metre metre metre metre metre metre metre metre metre metre metre

Rate 52513.00 63015.00 9922.00 13550.00 17896.00 18790.00 33569.00 44059.00 41961.00 79756.00 100493.00 95707.00 21517.00 27303.00

metre metre

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii-

metre metre

17014.00 14363.00 18969.00

metre

metre metre metre metre metre metre

35581.00 42697.00 84534.00 101441.00 16555.00 28263.00

Su##a ' of Rate Anal'sis Item No.


,iiia b ,i.a b ) ,.a b ) C ,i9 ,i1$.16
&e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" ,11# dia :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" ,11# dia :ell 9e=t0 of 0a d o)" u=to ( # Sin"ing of 1$ # e+te nal dia#ete :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil I- 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil ,1$ # dia. >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed.

Descriptions

Unit
metre metre metre metre metre metre metre metre metre metre

Rate 37327.00 39194.00 70017.00 91897.00 87521.00 166351.00 209603.00 199621.00 47786.00 60689.00

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii,iiia b

metre metre metre metre metre metre metre metre metre metre metre

35680.00 40798.00 53881.00 101067.00 121280.00 240119.00 288143.00 40293.00 68180.00 90043.00 94545.00

Su##a ' of Rate Anal'sis Item No.


,i.a b ) ,.a b ) C ,i9 ,i1$.15
&e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" ,1$# dia :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" ,1$# dia :ell 9e=t0 of 0a d o)" st ata u=to ( # Sin"ing of T:in 9 T'=e :ell ( other than pneumatic method of sinking ) t0 oug0 all t'=es of st ata na#el' sand' soil2 )la'e' soil and o)" as s0o:n against ea)0 )ase2 )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. 9e=t0 of sin"ing is e)"oned f o# bed le.el. Sand' soil 9e=t0 f o# bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13# u=to $3# Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou . &e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent2 and Labou et). Cla'e' soil ,T:in 9 T'=e >ell 9e=t0 belo: bed le.el u=to (.3 M &e'ond (# u=to 13# de=t0 &e'ond 13 # u=to $3 # Add ;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add fo de:ate ing I ;C of )ost2 if eBui ed. &e'ond $3# u=to (3 # Add @.;C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing on t0e )ost2 if eBui ed Add $;C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -.

Descriptions

Unit
metre metre metre metre metre metre metre metre

Rate 168897.00 221677.00 211121.00 401275.00 505606.00 481530.00 110088.00 135399.00

A ,i,ii,iiia ,i.a b ,.a b & ,i,ii,iiia b ,i.a b )

metre metre metre metre metre metre metre metre metre metre metre metre metre metre

8022.00 8693.00 11480.00 21534.00 25840.00 51161.00 61393.00 9595.00 15019.00 19836.00 20827.00 37206.00 48833.00 46508.00

Su##a ' of Rate Anal'sis Item No.


,.a b ) C ,i9 ,i1$.$1 1$.$$ 1$.$(
&e'ond (3# u=to *3 # Add 13C fo e.e ' additional #ete de=t0 of sin"ing o.e t0e ate of sin"ing fo t0e = e.ious #ete Add ;C of )ost fo de:ate ing2 if eBui ed Add $3C of )ost fo /entledge in)luding su==o ts2 loading a ange#ent and Labou -. Soft o)" ,T:in 9 T'=e :ell 9e=t0 of soft o)" st ata u=to (# Ha d o)" ,T:in 9 T'=e :ell 9e=t0 of 0a d o)" st ata u=to ( # Sand filling in :ells )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations P o.iding steel line 13 ## t0i)" fo )u bs and 4## t0i)" fo steining of :ells in)luding fab i)ating and setting out as =e detailed d a:ing &o ed )ast-in-situ M(; g ade R.C.C. =ile e+)luding einfo )e#ent )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations and e#o.al of e+)a.ated ea t0 :it0 all lifts and lead u=to 1333 #. (Pile diameter3>"0 mm) &o ed )ast-in-situ M(; g ade R.C.C. =ile e+)luding einfo )e#ent )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations and e#o.al of e+)a.ated ea t0 :it0 all lifts and lead u=to 1333 #. (Pile diameter31000 mm) &o ed )ast-in-situ M(; g ade R.C.C. =ile e+)luding einfo )e#ent )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations and e#o.al of e+)a.ated ea t0 :it0 all lifts and lead u=to 1333 #. (Pile diameter31'00 mm) 9 i.en )ast-in-=la)e .e ti)al M(; g ade R.C.C. =ile e+)luding einfo )e#ent )o#=lete as =e d a:ing and < Te)0ni)al S=e)ifi)ation (Pile diameter 3 >"0 mm) 9 i.en )ast-in-=la)e .e ti)al M(; g ade R.C.C. =iles e+)luding einfo )e#ent )o#=lete as =e d a:ing and < Te)0ni)al S=e)ifi)ation (Pile diameter 3 1000 mm) 9 i.en )ast-in-=la)e .e ti)al M(; g ade R.C.C. =iles e+)luding einfo )e#ent )o#=lete as =e d a:ing and < Te)0ni)al S=e)ifi)ation (Pile diameter 3 1'00 mm) Pile load test on single .e ti)al =ile in a))o dan)e :it0 IS7$511,Pa t-I?,a- Initial and outine load test ,b- Late al load test

Descriptions

Unit
metre metre metre metre metre cum tonne metre

Rate 88394.00 111377.00 106073.00 24468.00 28718.00 958.00 94837.00 6799.00 11214.00

1$.$*

metre

1$.$;

metre metre metre metre tonne tonne

14525.00 5752.00 9218.00 13457.00 300.00 5000.00

1$.$4 1$.$@ 1$.$6 1$.(@

Su##a ' of Rate Anal'sis Item No.


1$.(6 A ,i,ii& ,i,iiC ,i,ii9 ,i,ii1$.(5 1$.*3 1$.*1

Descriptions
Ce#ent )on) ete fo einfo )ed )on) ete in =ile )a= )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ation RCC G ade M$3 %sing Con) ete Mi+e %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M$; %sing )on) ete #i+e . %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(3 %sing )on) ete #i+e . %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M(; %sing )on) ete #i+e . %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Le.elling )ou se fo Pile )a= Su==l'ing2 fitting and =la)ing un-)oated HGS9 ba einfo )e#ent in foundation )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations Su==l'ing2 fitting and =la)ing un-)oated Mild steel einfo )e#ent )o#=lete in foundation as =e d a:ing and te)0ni)al s=e)ifi)ation

Unit

Rate

cum cum cum cum cum cum cum cum cum onne tonne

7092.00 6795.00 7739.00 7444.00 7820.00 7524.00 7991.00 7696.00 5786.00 78187.00 78496.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1( S%&-STR%CT%RE

Descriptions

Unit

Rate

1(.1 1(.$ 1(.( 1(.* A & C 1(.; A ,=& ,=C ,=Case I Case II ,BCase I Case II ,Case I Case II 9 ,=Case I Case II ,BCase I Case II ,Case I Case II E ,=Case I Case II

& i)" #ason ' :o " in 17( in sub-st u)tu e )o#=lete e+)luding =ointing and =laste ing2 as =e d a:ing and te)0ni)al s=e)ifi)ations Pointing :it0 )e#ent #o ta ,17( - on b i)" :o " in subst u)tu e as =e Te)0ni)al s=e)ifi)ations Plaste ing :it0 )e#ent #o ta ,17( - on b i)" :o " in sub-st u)tu e as =e Te)0ni)al s=e)ifi)ations Stone #ason ' :o " in )e#ent #o ta 17( fo subst u)tu e )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ations Rando# Rubble Mason ' Cou sed ubble #ason ' ,fi st so t As0la #ason ' , fi st so t Plain!Reinfo )ed )e#ent )on) ete in sub-st u)tu e )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations PCC G ade M1; Heig0t u=to ;# PCC G ade M$3 Heig0t u=to ;# PCC G ade M$; Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= PCC G ade M(3 Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M$3 Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#=

cum sqm sqm

8628.00 64.10 138.50 4227.00 4372.00 5519.00

cum cum cum

cum cum

6460.00 7301.00

cum cum cum cum cum cum

7953.00 7611.00 8242.00 7888.00 8603.00 8234.00

cum cum cum cum cum cum

8024.00 7675.00 8316.00 7954.00 8680.00 8303.00

cum cum

7562.00 7216.00

Su##a ' of Rate Anal'sis Item No.


,BCase I Case II ,Case I Case II F ,=Case I Case II ,BCase I Case II ,Case I Case II G ,=Case I Case II ,BCase I Case II ,Case I Case II H ,=Case I Case II ,BCase I Case II ,Case I Case II 1(.4 1(.@ 1(.6
Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= RCC G ade M$; Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 RCC G ade M(3 Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 RCC G ade M(; Heig0t u=to ;# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t ;# to 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Heig0t abo.e 13# %sing )on) ete Mi+e >it0 &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Su==l'ing2 fitting and =la)ing HGS9 ba einfo )e#ent in sub-st u)tu e )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations Su==l'ing2 fitting and =la)ing Mild steel einfo )e#ent )o#=lete in sub-st u)tu e as =e d a:ing and te)0ni)al s=e)ifi)ation P o.iding :ee= 0oles in & i)" #ason '!Plain!Reinfo )ed )on) ete abut#ent2 :ing :all! etu n :all :it0 133 ## dia AC =i=e2 e+tending t0 oug0 t0e full :idt0 of t0e st u)tu e :it0 slo=e of 1? 7$3H to:a ds d a:ing fo)e. Co#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ations T ansit Mi+e and Con) ete Pu#=

Descriptions

Unit
cum cum cum cum

Rate 7837.00 7479.00 8181.00 7807.00

cum cum cum cum cum cum cum cum cum cum cum

8223.00 8005.00 8492.00 8267.00 8895.00 8660.00 8262.00 7918.00 8495.00 8141.00 8825.00 8458.00

T ansit Mi+e and Con) ete Pu#=

T ansit Mi+e and Con) ete Pu#=

T ansit Mi+e and Con) ete Pu#=

cum

cum cum cum cum cum cum tonne tonne each

8442.00 8233.00 8626.00 8412.00 8902.00 8682.00 78328.00 77710.00 140.00

Su##a ' of Rate Anal'sis Item No.


1(.5 A & 1(.13

Descriptions
&a)" filling be0ind abut#ent2 :ing :all and etu n :all )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation G anula #ate ial Sand' #ate ial P o.iding and la'ing of Filte #edia :it0 g anula #ate ials!stone ) us0ed agg egates satisf'ing t0e eBui e#ents laid do:n in )lause $;3*.$.$. of MoRTH s=e)ifi)ations to a t0i)"ness of not less t0an 433 ## :it0 s#alle siAe to:a ds t0e soil and bigge siAe to:a ds t0e :all and = o.ided o.e t0e enti e su fa)e be0ind abut#ent2 :ing :all and etu n :all to t0e full 0eig0t )o#=a)ted to a fi # )ondition )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ation.

Unit

Rate

cum cum

963.00 1201.00

cum

2122.00

1(.11

Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el )ast steel o)"e bea ing )onfo #ing to IRC7 6(,Pt.-1- se)tion IJ and )lause $33( of MoRTH s=e)ifi)ations )o#=lete in)luding all a))esso ies as =e d a:ing and Te)0ni)al S=e)ifi)ations. Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el fo ged steel olle bea ing )onfo #ing to IRC7 6(,Pt.-1- se)tion IJ and )lause $33( of MoRTH s=e)ifi)ations )o#=lete in)luding all a))esso ies as =e d a:ing and Te)0ni)al S=e)ifi)ations. Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el sliding =late bea ing :it0 PTFE su fa)e sliding on stainless steel )o#=lete in)luding all a))esso ies as =e d a:ing and Te)0ni)al S=e)ifi)ations and &S7 ;*332 se)tion 5.1 < 5.$ ,fo PTFE- and )lause $33* of MoRTH S=e)ifi)ations. Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el elasto#e i) bea ing )onfo #ing to IRC7 6( ,Pa t-II- se)tion IJ and )lause $33; of MoRTH s=e)ifi)ations )o#=lete in)luding all a))esso ies as =e d a:ing and Te)0ni)al S=e)ifi)ations. Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el sliding =late bea ing :it0 stainless steel =late sliding on stainless steel =late :it0 #ild steel #at i+ )o#=lete in)luding all a))esso ies as =e d a:ing and Te)0ni)al S=e)ifi)ations. Su==l'ing2 fitting and fi+ing in =osition t ue to line and le.el POT-PTFE bea ing )onsisting of a #etal =iston su==o ted b' a dis) o un einfo )ed elasto#e )onfined :it0in a #etal )'linde 2 sealing ings2 dust seals2 PTFE su fa)e sliding against stainless steel #ating su fa)e2 )o#=let e asse#bl' to be of )ast steel!fab i)ated st u)tu al steel2 #etal and elasto#e ele#ents to be as =e IRC7 6( =a t-I < II es=e)ti.el' and ot0e =a ts )onfo #ing to &S7 ;*332 se)tion 5.1 < 5.$ and )lause $334 of MoRTH S=e)ifi)ations )o#=lete as=e d a:ing and a== o.ed te)0ni)al s=e)ifi)ations.

tonne capacity tonne capacity tonne capacity cubic centimetre tonne capacity

1616.00

1(.1$

1422.00

1(.1(

3032.00

1(.1*

1.00

1(.1;

248.00

1(.14

tonne capacity

326.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1* S%PER-STR%CT%RE

Descriptions

Unit

Rate

1*.1 A Case I ,i,=,B,,ii,=,B,Case II ,i,=,B,,ii,=,B,& Case I ,i,=,B,,ii,=,B,Case II ,i,=,B,,ii,=,B,-

Fu nis0ing and Pla)ing Reinfo )ed!P est essed )e#ent )on) ete in su=e -st u)tu e as =e d a:ing and Te)0ni)al S=e)ifi)ation RCC G ade M$3 %sing Con) ete Mi+e Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# RCC G ade M$; %sing Con) ete Mi+e Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13#

cum cum cum cum cum cum

8172.00 8512.00 8853.00 8512.00 8853.00 9193.00

cum cum cum cum cum cum

7792.00 8117.00 8441.00 8117.00 8441.00 8766.00

cum cum cum cum cum cum

8917.00 9289.00 9661.00 9289.00 9661.00 10032.00

cum cum cum cum cum cum

8547.00 8903.00 9259.00 8903.00 9259.00 9615.00

Su##a ' of Rate Anal'sis Item No.


C Case I ,i,=,B,,ii,=,B,Case II ,i,=,B,,ii,=,B,9 Case 1 ,i,=,B,,ii,=,B,,iii,=,B,Case II ,i,=,B,,ii,=,B,RCC G ade M (3 %sing Con) ete Mi+e Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#=. Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# RCC!PSC G ade M(; %sing )on) ete #i+e . Fo solid slab su=e -st u)tu e2 16-$6C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $(-((C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo bo+ gi de and balan)ed )antile.e 2 (6-;6C of )ost of )on) ete. Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Fo solid slab su=e -st u)tu e2 16-$6C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $(-((C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13#

Descriptions

Unit

Rate

cum cum cum cum cum cum

9039.00 9416.00 9793.00 9416.00 9793.00 10169.00

cum cum cum cum cum cum

8643.00 9003.00 9364.00 9003.00 9364.00 9724.00

cum cum cum cum cum cum cum cum cum

9083.00 9468.00 9853.00 9468.00 9853.00 10237.00 10622.00 11392.00 12162.00

cum cum cum cum cum cum

8690.00 9058.00 9426.00 9058.00 9426.00 9795.00

Su##a ' of Rate Anal'sis Item No.


,iii,=,B,E Case 1 ,i,=,B,,ii,=,B,Case II ,i,=,B,,ii,=,B,,iii,=,B,F ,i,=,B,,ii,=,B,,iii,=,B,Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# PSC G ade M-*3 %sing )on) ete #i+e . Fo solid slab su=e -st u)tu e2 $3-(3C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $;-(;C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# %sing &at)0ing Plant2 T ansit Mi+e and Con) ete Pu#= Fo solid slab su=e -st u)tu e2 16-$6C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo T-bea# < slab2 $(-((C of ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo bo+ gi de and balan)ed )antile.e 2 (6-;6C of )ost of )on) ete. Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# PSC G ade M-*; Fo solid slab!.oided slab su=e -st u)tu e2 14-$4C of )ost of )on) ete ,aKbK)Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo I-bea# < slab in)luding laun)0ing of = e)ast gi de s b' laun)0ing t uss u=to *3 # s=an2 $1-(1C of )ost of )on) ete. Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# Fo )ast-in-situ bo+ gi de 2 seg#ental )onst u)tion and balan)ed )antile.e 2 (4-;4C of )ost of )on) ete. Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13#

Descriptions
Fo bo+ gi de and balan)ed )antile.e 2 (6-;6C of )ost of )on) ete.

Unit
cum cum cum

Rate 10163.00 10899.00 11636.00

cum cum cum cum cum cum

9539.00 9936.00 10334.00 9936.00 10334.00 10731.00

cum cum cum cum cum cum cum cum cum

8945.00 9324.00 9703.00 9324.00 9703.00 10082.00 10461.00 11219.00 11977.00

cum cum cum cum cum cum cum cum cum

9240.00 9638.00 10037.00 9638.00 10037.00 10435.00 10833.00 11630.00 12426.00

Su##a ' of Rate Anal'sis Item No.


G ,i,=,B,H ,i,=,B,1*.$ 1*.( 1*.* 1*.;
PSC G ade M-;3 Fo )ast-in-situ bo+ gi de 2 seg#ental )onst u)tion and balan)ed )antile.e 2 (;-;;C of )ost of )on) ete Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# PSC G ade M- ;; Fo )ast-in-situ bo+ gi de 2 seg#ental )onst u)tion and balan)ed )antile.e 2 (;-;;C of )ost of )on) ete Heig0t u=to ;# Heig0t ;# to 13# Heig0t abo.e 13# a- Su==l'ing2 fitting and =la)ing HGS9 ba einfo )e#ent in su=e -st u)tu e )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations Hig0 tensile steel :i es!st ands in)luding all a))esso ies fo st essing2 st essing o=e ations and g outing )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ations P o.iding and la'ing Ce#ent )on) ete :ea ing )oat M-(3 g ade in)luding einfo )e#ent )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ations Masti) As=0alt (Providing and la$ing 1' mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the re,uirements given in table "003'0, prepared b$ using mastic cooker and laid to re,uired level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 0 " mm nominal si-e at the rate of 0 00"cum per 10 s,m and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg C, protruding 1 mm to 7 mm over mastic surface, all complete as per clause "1" )

Descriptions

Unit

Rate

cum cum cum

11125.00 11949.00 12773.00

cum cum cum tonne tonne cum

11707.00 12574.00 13441.47 79602.00 119653.00 13223.00

sqm

382.00

1*.4

Const u)tion of = e)ast RCC ailing of M(3 G ade2 agg egate siAe not e+)eeding 1$ ##2 t ue to line and g ade2 tolu en)e of .e ti)al RCC =ost not to e+)eed 1 in ;332 )ent e to )ent e s=a)ing bet:een .e ti)al =ost not to e+)eed $333 ##2 lea.ing adeBuate s=a)e bet:een .e ti)al =ost fo e+=ansion2 )o#=lete as =e a== o.ed d a:ings and te)0ni)al s=e)ifi)ations.

metre

2183.00

1*.@

Const u)tion of RCC ailing of M(3 G ade in-situ :it0 $3 ## no#inal siAe agg egate2 t ue to line and g ade2 tolu en)e of .e ti)al RCC =ost not to e+)eed 1 in ;332 )ent e to )ent e s=a)ing bet:een .e ti)al =ost not to e+)eed $333 ##2 lea.ing adeBuate s=a)e bet:een .e ti)al =ost fo e+=ansion2 )o#=lete as =e a== o.ed d a:ings and te)0ni)al s=e)ifi)ations.

metre

2122.00

1*.6 1*.5 1*.13 1*.11 1*.1;

P o.iding2 fitting and fi+ing #ild steel ailing )o#=lete as =e d a:ing and Te)0ni)al S=e)ifi)ation 9 ainage S=outs )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation PCC M1; G ade le.eling )ou se belo: a== oa)0 slab )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation Reinfo )ed )e#ent )on) ete a== oa)0 slab in)luding einfo )e#ent and fo #:o " )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation C as0 &a ie s (%he rate anal$sis for rigid crash barrier in reinforced cement concrete, semi3rigid crash barrier with metal beam and flexible crash barrier with wire ropes have been made and included in chapter3. on %raffic and %ransportation ) Painting on )on) ete su fa)e (Providing and appl$ing ' coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and appl$ing paint @ of 1 litre for ' 2, m )

metre each cum cum

3857.00 771.00 5873.00 11322.00

1*.14

metre

78.00

Su##a ' of Rate Anal'sis Item No.


1*.1@

Descriptions
&u ied Foint (Providing and la$ing a burried expansion 6oint, expansion gap being '0 mm, covered with 1' mm thick, '00 mm wide galvanised wieldable structural steel plate as per (2B '0)', placed s$mmetrical to centre line of the 6oint, resting freel$ over the top surface of the deck concrete, welding of . mm dia 100 mm long galvanised nails spaced !00 mm c/c along the centre line of the plate, all as specified in clause ')07 )

Unit

Rate

metre

1443.00

1*.16 ,i,ii,iii-

Fille 8oint P o.iding < fi+ing $ ## t0i)" )o ugated )o==e =late in e+=ansion 8oint )o#=lete as =e d a:ing < Te)0ni)al S=e)ifi)ation. P o.iding < fi+ing $3 ## t0i)" )o#= essible fib e boa d in e+=ansion 8oint )o#=lete as =e d a:ing < Te)0ni)al S=e)ifi)ation. P o.iding and fi+ing in =osition $3 ## t0i)" = e#oulded 8oint fille in e+=ansion 8oint fo fi+ed ends of si#=l' su==o ted s=ans not e+)eeding 13 # to )ate fo a 0o iAontal #o.e#ent u=to $3 ##2 )o.e ed :it0 sealant )o#=lete as =e d a:ing and te)0ni)al s=e)ifi)ations. P o.iding and filling 8oint sealing )o#=ound as =e d a:ings and te)0ni)al s=e)ifi)ations :it0 )oa se sand and 4C bitu#en b' :eig0t As=0alti) Plug 8oint (Providing and la$ing of asphaltic plug 6oint to provide for hori-ontal movement of '" mm and vertical movement of ' mm, depth of 6oint var$ing from >" mm to 100 mm, width var$ing from "00 mm to >"0 mm (in traffic direction), covered with a closure plate of '00mm x )mm of wieldable structural steel conforming to (2B '0)', asphaltic plug to consist of pol$mer modified bitumen binder, carefull$ selected single si-e aggregate of 1' " mm nominal si-e and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications )

metre metre metre metre

4030.00 232.00 228.00 25.00

,i.1*.15

metre

3088.00

1*.$3

Elasto#e i) Slab Steel E+=ansion Foint (Providing and la$ing of an elastomeric slab steel expansion 6oint, catering to right or skew (less than '0 deg , moderatel$ curved with maximum hori-ontal movement upto "0 mm, complete as per approved drawings and standard specifications to be installed b$ the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturerFs instructions for installation and clause ')0) of ;o*%/ specifications for road & bridge works )

metre

13773.00

1*.$1

Co#= ession Seal Foint (Providing and la$ing of compression seal 6oint consisting of steel armoured nosing at two edges of the 6oint gap suitabl$ anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam 6oint sealer compressed and fixed into the 6oint gap with special adhesive binder to cater for a hori-ontal movement upto 70 mm and vertical movement of ! mm )

metre

16098.00

1*.$$

St i= Seal E+=ansion Foint (Providing and la$ing of a strip seal expansion 6oint catering to maximum hori-ontal movement upto >0 mm, complete as per approved drawings and standard specifications to be installed b$ the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturerFs instructions for installation ) Modula St i= ! &o+ Seal Foint (Providing and la$ing of a modular strip 9ox steel expansion 6oint including anchorage catering to a hori-ontal movement be$ond >0 mm and upto 170mm, complete as per approved drawings and standard specifications to be installed b$ the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturerFs instructions for installation )

metre

16813.00

1*.$(

metre

275927.00

1*.$*

Modula St i= ! &o+ Seal Foint (Providing and la$ing of a modular strip box seal expansion 6oint catering to a hori-ontal movement be$ond 170mm and upto '10mm, complete as per approved drawings and standard specifications to be installed b$ the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturerFs instructions for installation )

metre

304979.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1; RI?ER TRAI1I1G A19 PROTECTIO1 >OR/S

Descriptions

Unit

Rate

1;.1 A 1;.$

P o.iding and la'ing boulde s a= on on i.e bed fo = ote)tion against s)ou :it0 stone boulde s :eig0ing not less t0an *3 "g ea)0 )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation. &oulde laid d ' :it0out :i e ) ates. &oulde a= on laid in :i e ) ates (Providing and la$ing of boulder apron laid in wire crates made with 7mm dia A( wire conforming to (2B '.0 & (2B7.') in 100mm x 100mm mesh (weaved diagonall$) including 10= extra for laps and 6oints laid with stone boulders weighing not less than 70 kg each ) Ce#ent )on) ete blo)"s ,siAe 3.; + 3.; + 3.; #- (Providing and la$ing of apron with cement concrete blocks of si-e 0 "x0 "x0 " m cast in3situ and made with nominal mix of ;31" grade cement concrete with a minimum cement content of '"0 kg/cum as per (*CB '13'000 ) P o.iding and la'ing Pit)0ing on slo=es laid o.e = e=a ed filte #edia in)luding boulde a= on laid d ' in f ont of toe of e#ban"#ent )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ations Stone!&oulde Ce#ent Con) ete blo)"s of siAe 3.(+3.( +3.( # )ast in )e#ent )on) ete of G ade M1; P o.iding and la'ing Filte #ate ial unde neat0 =it)0ing in slo=es )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation Toe = ote)tion (: toe wall for toe protection can either be in dr$ rubble masonr$ in case of dr$ rubble pitching or pitching with stones in wire crates or it can be in PCC ;1" nominal mix if cement concrete block have been used for pitching *ates for toe wall can be adopted from respective clauses depending upon approved design %he rate for excavation for foundation, dr$ rubble masonr$ and PCC ;1" have been anal$sed and given in respective chapters ) P o.iding and la'ing Floo ing )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ations laid o.e )e#ent )on) ete bedding. Rubble stone laid in )e#ent #o ta 17( Ce#ent Con) ete blo)"s G ade M1; 9 ' ubble Floo ing Cu tain :all )o#=lete as =e d a:ing and Te)0ni)al s=e)ifi)ation Stone #ason ' in )e#ent #o ta ,17(Ce#ent )on) ete G ade M1; Fle+ible A= on 7Const u)tion of fle+ible a= on 1 # t0i)" )o#= ising of loose stone boulde s :eig0ing not less t0an *3 "g be'ond )u tain :all. Gabian St u)tu e fo Retaining Ea t0 (Providing and construction of a gabain structure for retaining earth with segments of wire crates of si-e > m x ! m x 0 ) m each divided into 1 " m compartments b$ cross netting, made from 7 mm galvanised steel wire @ !' kg per 10 s,m having minimum tensile strength of !00 ;pa conforming to (2B'.0 and galvani-ing coating conforming to (2B7.'), woven into mesh with double twist, mesh si-e not exceeding 100 x 100 mm, filled with boulders with least dimension of '00 mm, all loose ends to be tied with 7 mm galvanised steel wire)

cum cum

1128.00 1886.00

1;.(

cum

6229.00

1;.* A & 1;.; 1;.@

cum cum cum

1128.00 6229.00 2303.00

1;.6 A & 1;.5 1;.13 A & 1;.11 1;.1$

cum cum cum cum cum cum

5124.00 8204.00 1486.00 4267.00 6107.00 1173.00

cum

1990.00

1;.1(

Gabian St u)tu e fo E osion Cont ol2 Ri.e T aining >o "s and P ote)tion :o "s (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of si-e ' m x 1 m x 0 ! m each divided into 1m compartments b$ cross netting, made from 7 mm galvanised steel wire @ !' kg per 10 s,m having minimum tensile strength of !00 ;pa conforming to (2B'.0 and galvani-ing coating conforming to (2B7.'), woven into mesh with double twist, mesh si-e not exceeding 100 mm x 100 mm, filled with boulders with least dimension of '00 mm, all loose ends to be securel$ tied with 7 mm galvanised steel wire )

cum

3346.00

Su##a ' of Rate Anal'sis Item No.


CHAPTER-14 REPAIR A19 REHA&ILITATIO1

Descriptions

Unit

Rate

14.1

Re#o.al of e+isting )e#ent )on) ete :ea ing )oat in)luding its dis=osal )o#=lete as =e Te)0ni)al s=e)ifi)ation :it0out )ausing an' det i#ental effe)t to an' =a t of t0e b idge st u)tu e and e#o.al of dis#antled #ate ial :it0 all lifts and lead u=to 1333# (%hickness >" mm) Re#o.al of e+isting as=0alti) :ea ing )oat )o#= ising of ;3 ## t0i)" as=0alti) )on) ete laid o.e 1$ ## t0i)" #asti) as=0alt in)luding dis=osal :it0 all lift and lead u=to 1333#. Guniting )on) ete su fa)e :it0 )e#ent #o ta a==lied :it0 )o#= esso afte )leaning su fa)e and s= a'ing :it0 e=o+' )o#=lete as =e Te)0ni)al s=e)ifi)ation P o.iding and inse ting ni==les :it0 a== o.ed fi+ing )o#=ound afte d illing 0oles fo g outing as =e Te)0ni)al s=e)ifi)ations in)luding subseBuent )utting! e#o.al and sealing of t0e 0ole as ne)essa ' of ni==les afte )o#=letion of g outing :it0 Ce#ent!E=o+' Sealing of ) a)"s!=o ous )on) ete b' in8e)tion = o)ess t0 oug0 ni==les!G outing )o#=lete as =e Te)0ni)al s=e)ifi)ation. Ce#ent G out Ce#ent #o ta ,171- G outing Pat)0ing of da#aged )on) ete su fa)e :it0 =ol'#e )on) ete and )u ing )o#=ounds2 initiato and = o#ote 2 a.ailable in = esent fo #ulations2 to be a==lied as =e inst u)tions of #anufa)tu e and as a== o.ed b' t0e Enginee . Sealing of ) a)" ! =o ous )on) ete :it0 E=o+' G out b' in8e)tion t0 oug0 ni==les )o#=lete as =e )lause $63(.1. Re#o.al of defe)ti.e )on) ete2 )leaning t0e su fa)e t0o oug0l'2 a==l'ing t0e s0ot) ete #i+tu e #e)0ani)all' :it0 )o#= essed ai unde = essu e2 )o#= ising of )e#ent2 sand2 )oa se agg egates2 :ate and Bui)" setting )o#=ound in t0e = o=o tion as =e )lause $63@.1.2 sand and )oa se agg egates )onfo #ing to IS7 (6( and table 1 of IS7 531$ es=e)ti.el'2 :ate )e#ent atio anging f o# 3.(; to 3.;32 densit' of gunite not less t0an $333 "g!)u#2 st engt0 not less t0an $; M=a and :o "#ans0i= )onfo #ing to )lause $63@.4.

sqm sqm sqm each

121.00 91.00 923.00 140.00

14.$ 14.( 14.*

14.; A & 14.4

kg kg sqm kg

41.00 134.00 1359.00 767.00

14.@ 14.5

sqm

347.00

14.13 14.11 14.1@ 14.16 14.15 14.$3 14.$1

A==l'ing = e-=a)"ed )e#ent based =ol'#e #o ta of st engt0 *; M=a at $6 da's fo e=la)e#ent of s=alled )on) ete E= o+' bonding of ne: )on) ete to old )on) ete Re=la)e#ent of E+=ansion Foints )o#=lete as =e d a:ings Re=la)e#ent of da#aged )on) ete ailing. Re=la)e#ent of ) as0 ba ie . Re=la)e#ent of da#aged #ild steel ailing Re=ai of ) as0 ba ie (*epair of concrete crash barrier with cement concrete of ;3!0 grade b$ cutting and trimming the damaged portion to a regular shape, cleaning the area to be repaired thoroughl$, appl$ing cement concrete after erection of proper form work ) Re=ai of RCC Railing (Carr$ing out repair of *CC ;!0 railing to bring it to the original shape ) Re=ai of steel Railing (*epair of steel railing to bring it to the original shape)

sqm sqm metre metre metre metre metre metre metre

111.00 139.00 2769.00 210.00 369.00 178.00 228.00 151.00 312.00

14.$$ 14.$(

Su##a ' of Rate Anal'sis Item No.


CHAPTER-1@ STEEL &RI9GES

Descriptions

Unit

Rate

1@.1

Su==l' and fab i)ation of steel :o " at Fab i)ato s :o "s0o= )o#= ising of Main Gi de s2 C oss Gi de s2 Conne)ting =lates2 st inge 2 stiffening =lates et). f o# steel =lates and st u)tu al steel of s=e)ified g ades as =e a== o.ed d a:ing in)luding st aig0tening2 des)aling2 deg easing2 )utting to siAe and s0a=e2 d illing2 :elding and g inding2 su==l' of all MS!HTS s0o= o site bolts2 nuts < :as0e s2 0olding do:n bolts and nuts et).2 t ial asse#bling at :o "s0o=2 one = i#ing )oat of s0o= =aint :it0 ed lead =aint )onfo #ing to IS-13$ :it0 all labou 2 #ate ial2 )ost of =aints2 )onsu#ables2 sta)"ing in = ote)ted )ondition et). )o#=lete as =e s=e)ifi)ation and as di e)ted b' t0e Enginee -inC0a ge ,Ca iage )ost f o# fab i)ato :o " s0o= to a)tual b idge site :ill be =aid se=e atel'-.

A COMPOSITE &RI9GE ,ase (i) >o "ed out based on *3# single s=an o in Multi=les

tonne

104805.00

1@.$

Ta"ing deli.e ' of fab i)ated steel:o " f o# sta)"s at site as ne)essa '2 asse#bling and e e)tion of fab i)ated steel st u)tu e to = o=e line 2 le.el and )a#be as =e a== o.ed d a:ings )o#=lete in all es=e)t in)luding t ans=o tation and 0andling su==l' of all faste ne s. Painting of all e+=osed su fa)es of steel:o " afte e e)tion :it0 one )oat of ed lead )onfi #ing to IS-13$ and t:o )oats Alu#uni#iu# =aint to IS-$((52 g outing of an)0o bolts in =osition2 in)luding all labou 2 )onsu#ables2 #ate ials2 #a)0ine '2 tools and ta)"les )o#=lete as =e s=e)ifi)ation and as di e)ted b' t0e Enginee -in-C0a ge

A COMPOSITE &RI9GE ,ase (i) >o "ed out based on *3# single s=an o in Multi=les

tonne

32718.00