You are on page 1of 6

ACTION PLAN FOR DESIGN ENGINEERING

HYDRO ELECTRIC PROJECTS

SL. NO.

COMPONENT

SUB-COMPONENT

DETAILS OF DRAWINGS

1 Hydrology & overall planning

i) Compilation & Analysis of Data ii) Computation of peak flood iii)Pre construction surveying Surveying a) General Planning & Layout b)Diversion c) Foundation Treatment d) Weir Wall i)Coffer Dam 1 2 1 2 1 2 1 2 3 4 5 1 2 3 4 1 2 1 2 3 4 5 6 7 8

TOTAL

2 Dam/Barrage/Weir i) Civil works

e) Energy Dissipating System (EDS)

f) Nonoverflow section g)Intake

Gen. Layout Plan Plan & Elevation of weir Plan showing 1st & 2nd Stage Diversion Cross sections of Coffer dam Foundation Treatment Drilling & Grouting Details of Key Trench Crest Reinforcement Contraction Joints Pier/Abutment Reinforcements Scouring sluices Alternatives-Layout Reinforcement details Anchorages Details of training walls & reinforcements Section and plan Details of key wall Structural details and embedments Reinforcement datails Hoist slab, Hand rail, coarse rack,etc., Details of bellmouth

g) Construction Sluices INTAKE e) Pier Design f) Hoist Bridge DESANDER

Instrumentation Drgs. 12) Construction Sluice17) Embankment for Ramp 20) Control Cabin 21) EDS 22) Drainage & Anchorage for EDS Total

ii) Gates

a) Embedded parts b) Service Gate c) Stop log d) Hoists e) Gantry

1) G.A Drg. for Gates for Gates & Dogging 2) Block out Details 3) Groove Details 4) Service Gate 5) Stop Log Gate 6) Details of Hoist 7) Gantry 8) Ele. Cabling Total

iii) Protection Works

a) U/S guide wall b) D/S guide wall c) Protection Works d) U/S & D/S Aprons

1) Gen. layout Plan 2) Det. of U/S Guide wall 3) Det. of D/S Guide wall 4) U/S Protection Works 5) D/S Protection Works 6) D/S Apron 7) U/S Apron 8) Surface Drainage Total

SL

COMPONENT

SUB-COMPONENT

DETAILS OF DRAWINGS

No.

iv) Other Civil Works

a) Approach Road b) Lowering below Rly Bridge c) Field Office d) Security Fencing

1) Plan & L-Section of Approach Road 2) Cross Section 3) C.D Works 4) Lowering Below Rly Bridge 5) Field Office 6) Security Fencing Total 1) Plan & other Details of Diversion 2) Excavation Drg for Jack Well 3) Details of Jack Well 4) Reinforcement Det. of Base Slab 5) Det of Int. Joists 6) Renf. Det. of Floor Slab 7) Renf. Det. of Roof Slab 8) Piping Support det. 9) Inlet Vents 10) Gates 11) Plan & L-Section of App. Channel 12) Cross Section & Lining Details 13) Slope Protection & Drainage 14) Plan & L-Section of Bridge 15) Cross Section, Bearing & other Details 16) Pier & Abutment 17) Approach & Return wall 18) Field Office 19) Security Fencing 1) Plan & L-Section 2) Cross Sections 3) Anchor Blocks 4) Saddle Supports 5) Valve Chambers 6) C.D Works 7) Terminal Arrangements 8) Bye- pass Arrangements 9) Piping for Mud Pump Total

3 Intake i) Civil Works

a) Coffer Dam b) Jack Well c) Foundation Design d) Approach Channel e) Slope Protection f) Approach Bridge g) Field Office h) Security Fencing i) Gates j) Piping

4 Pipe Line

a) Piping b) Valves c) C.D Works d) Terminal Arrangements e) Bye-Pass f) Piping for Mud Pump.

Grand Total

MAN DAY REQUIREMENT FOR (AEE/AE) SIZE NO. OF OF DRG. DRG. FIELD WORK DESIGN DRG. TOTAL 10 A0 A1 A1 A2 A1 A1 1 2 1 1 1 1 35 10 5 10 15 20 0 0 3 3 15 6 10 10 10 15 20 13 35 3 15 6 20 15 20

A1 A2 A1

2 1 2

5 15 15

5 10 10

10 25 25

A1 A1 A1 A1 A1 A1 A1 A1 A2 A1 A1 A2

1 2 1 2 2 2 1 3 1 1 2 1 31

20 25 10 5 15 15 5 25 5 10 15 5 215 25 30 30 20 15

8 7 5 7 7 5 5 15 5 8 8 5 164 15 15 10 30 30 15 15 8 138 10 15 10 10 10 8 6 4 73

28 32 15 12 22 20 10 40 10 18 23 10 379 40 45 40 50 30 30 15 8 258 30 25 10 30 15 12 10 9 141

A1 A1 A1 A1 A1 A1 A1 A1

1 1 1 3 3 2 2 1 14

120 20 10 20 5 4 4 5 68

A0 A1 A1 A1 A1 A1 A1 A1

1 2 2 2 2 1 1 1 12

SIZE

NO.

MAN DAY REQUIREMENT

OF DRG. A1 A2 A2 A1 A2 A2

OF DRG. 1 1 2 1 1 1 7 1 1 2 1 1 1 1 1 1 2 1 1 1 1 2 2 1 1 1 23 2 1 1 1 1 2 1 1 1 11

FOR (AEE/AE) DESIGN DRG. 8 5 5 3 3 3 27 10 30 8 5 10 3 4 25 10 5 5 5 20 5 10 10 5 1 171 30 15 20 10 8 10 93 7 6 15 5 3 3 39

TOTAL 15 11 20 8 6 6 66 10 38 15 11 14 8 9 35 16 25 7 11 11 30 13 20 15 8 4 300 40 25 28 6 16 23 8 15 10 171

A1 A1 A1 A2 A2 A1 A1 A1 A1 A1 A1 A2 A1 A1 A1 A1 A2 A2 A2 A1 A2 A2 A2 A2 A2 A1 A1 A1

8 7 6 4 5 5 10 6 20 7 6 6 10 8 10 5 3 3 129 10 10 8 6 6 15 8 5 10 78

98

729

621

1350