ENGINEERING GUIDELINE
PDVSA
Men Principal
JUN.01
Page
Indice norma
Since PDVSA has decided to adopt the PIP (Process Industry Practices) document PIP PCELI001 Level Measurement Guidelines as an integral part of the Engineering Design Manual (MID), the requirements in this document are additions or modifications to the PIP PCELI001 and the section/paragraph numbers and the associated headings used in this document correspond to the ones used in PIP PCELI001.
1.2
Scope (Add)
Tank gauging for custody transfer applications are not covered by these guidelines. Refer to API MPMS recommendations and local government regulations for these applications.
2
2.0
REFERENCES
Petrleos de Venezuela Standards (PDVSA) (Add)
PDVSA K300 PDVSA K303 PDVSA K369 PDVSA SIS01 PDVSA SOS02 Introduction to PDVSA Instrumentation Level Instrumentation Instrumentation QA/QC Gerencia de la Seguridad de los Procesos (GSP) Lineamientos Corporativos Guas de Seguridad para Trabajo con Radiaciones Ionizantes
2.3
ENGINEERING GUIDELINE
PDVSA
Men Principal
JUN.01
Page
Indice norma
1. 2. 3. 4.
ISA S20.20 Differential Pressure Instruments ISA S20.26 Level Instruments, Displacer or Float ISA S20.27 Level Instruments, Capacitance Type ISA S20.28 Level Instruments, Gage Glasses and Cocks
HEAD MEASUREMENT
Figure 1. (Modify) First sentence should read When the fluid level is at or below . . .
5.1
5.2
5.2.1
5.2.2
Mounting Recommendations (Addition) For level bubblers, flow regulation of purge gas may also be achieved by using restriction orifices in conjunction with pressure regulators. If purge gas supply is sufficiently constant, pressure regulators may be obviated.
5.4
5.4.2
Level Gauges
Magnetic Gauges (Addition) Magnetic level gauges should not be used for viscous fluids.
6
6.3
HEIGHT MEASUREMENTS
NonContacting Instruments
General (Modify 4th paragraph to read) Correct mounting of the probe is important. Internal obstructions in the vessel or reflections from the vessel walls may cause erroneous readings. 6.3.1
ENGINEERING GUIDELINE
PDVSA
Men Principal
JUN.01
Page
Indice norma
6.4
6.4.1
Nuclear Instruments
General (Addition) h. Very hot services