Oracle HRMS Functional Document

AIM Phases and Documentations


Part 0.3

This Document is created only for Class Room Training Purpose


By
Regintala Chandra Sekhar
ora17hr@gmail.com

Skylark Groups

2
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com

Oracle Project AIM

Documents which are Prepared at the time of Implementation
Documents
BR Business Mapping and Gap Resolution 10 30 50 90 100 110
MD Gaps and Interface Resolutions 50 70 80 90 110 120
TE Business System Testing 20 30 40 50 60 70 80 100 110 120 130
BP Business Process Document 40 70 80
CF
CV Data Migration 10 50 60 70 80 90 100 110 130
RD Business Requirement Document 20 50 80
TA Creation of Application and Technical Architecture 10 120 140 150
DO Documentation 50 70 90


AIM Phases:



1. Project Definition
This is the phase of project scoping; project planning, resource planning, phase planning, budgeting and
defining constraints and facilitate crucial informed project startup decisions.

This is also the phase to lay down the communication channel, design an effective infrastructure for
delegation and ensure project executive team is in place. In this phase executive team is engaged in
interactive sessions and project team is organized and oriented.

In case, business process change is applicable, then high-level process scenarios are developed.

The main tasks in this phase are:
a. Understanding the current business process and baseline current business process.
b. Develop the Preliminary Conceptual Architecture (TA.030).
c. Develop TO-BE process model, i.e. determine the high-level architectural, technological, and
configuration requirements to support the functional and information needs of the application
system (BP.080).
d. Design improved high-level business processes (BP.070).



2. Operation Analysis

This phase is mainly to drill down to the next levels of details from where it was in the previous phase. In
this phase flow of information, function and process models are captured and detailed with all possible
variants.

This is also the phase to define the detailed function, data, and operational requirements that the new
application system must support and map business requirements to application capabilities and propose
solutions to gaps. This will demonstrate that the proposed business process design is feasible for the
organization.

The technical architecture of hardware and software is refined and a transition strategy is for moving from
the current system to the new application system is drawn.

Performance testing models and scenarios should be developed and proposed.


Skylark Groups

3
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com


3. Solution Design

The objectives of Solution Design are to produce a design that meets functional requirements within
business, technical, and financial constraints and document the design specifications in a way that
facilitates and supports future maintenance of the system.

In this phase functional and technical designs for custom extensions, interfaces, conversion programs and
database extensions are developed along with security architecture and application set-up and test plans.
Also unit, link, system, and system integration test scripts are developed. Test scripts, test transaction
programs and test data load programs are prepared for taking up system performance testing.

User-learning needs and User Learning Plans are developed in this phase.


4. Build

The objectives of the Build phase is to Develop, test, and accept custom software, including application
extensions, interface programs, data conversion software, custom application subsystems integrated with
Oracle Applications, temporary bridge subsystems which transaction data between legacy and new systems
during multiple
Deployments.

The Application and Database Server Architecture (TA.090), Platform and Network Architecture (TA.120)
and Development Environment (MD.090) are defined prior to start the development work.

In this phase, all documentation deliverables are developed and delivered to customer.
They may be User Reference Manual (DO.060), User Guide (DO.070), Technical Reference Manual (DO.080)
and System Management Guide (DO.090).

The database extension and installation routines are created, tested, and accepted along with performance
testing and reports.


5. Transition

The transition phase is to plan cut-over and actual scheduling of cut-over. This phase calls for preparation
of going live in terms of application, operating environment, user readiness and cut-over plans. This is the
period of end-user training, users learning and adoption plans is executed.

After the application environment is prepared for production instance and all application, database
extensions are in place, the application is loaded with initial configuration set-ups.

Once the initial configuration set-up is ready, the environment is prepared to load application set-ups for
individual modules and master data files are loaded either using loading scripts are using manual process.

The master data is then verified with users and legacy files to assess data accuracy and ensure that masters
are loaded error-free.

The dynamic data files are then extracted from the legacy and verified for their correctness and then
loaded inside application tables using loading scripts or manual process. All these data are cut-off data on a
given date. Generally, the amount of legacy data to be loaded in the new system is as per the agreed
migration strategy. However, the dynamic data needs to be validated to ensure accuracy and its reliability.
By this time all jobs and routines must have been set. Once the migration process is successful, the system
is handed over to production support.


6. Production
This is the period of hand-holding support for the system newly gone live and devote attention to
post-implementation issues like user acceptance

Skylark Groups

4
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com

Trying to understand AIM (Application Implementation Methodology):



1. Understand the Existing Business Processes and current business baseline


RD.020 Conduct Current Business Baseline (C)
Understand current processes and practices and document the main activities that keep the
organization operating today.
Output: Current Business Baseline

BP.040 Develop Current Process Model (O)
Examine current business processes and practices and to identify how the existing business system
meets current business requirements.
Output: Current Process Model



2. Creating Future Business Model



RD.050 Gather Business Requirements (C)
Define detailed business requirements and perform an initial assessment of application fit
to these requirements.
Output: Business Requirement Scenarios

BP.070 Develop High-Level Process Designs (C)
Produce high-level designs, documenting how the new organization will operate after the
applications are implemented.
Output: High Level Process Design

BP.080 Develop Future Process Model (C)
Defining the future business model in the form of integrated process flows built on the
business processes supported by the new applications.
Output: Future Process Model

RD.080 Identify Reporting and Information Access Requirements (C)
Identify organizations future reporting requirements.
Output: Master Report Tracking List


3. Business Mapping and Gap Resolution



BR.030 Map Business Requirements (C)
Assess the fit of standard application and system features to detailed business
requirements.
Output: Mapped Business Requirements

AS-IS Business Model
TO-BE Business Model
Mapping and Gap Identification
Skylark Groups

5
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com


BR.010 Analyze High Level Gaps (C)
Compare the process as envisioned in the High-Level Process Designs (BP.070) with the
processes supported by Oracle Applications. The differences (gaps) revealed by this analysis need to be
resolved by producing alternatives that balance change in the application against change in processes and
organization.
Output: High Level Gap Analysis

BR.050 Conduct Integration Fit Analysis (O)
Identify the new integration points that you require, based on your conceptual
architecture and the mapping of the new applications onto the existing architecture.
Output: Integration Fit Analysis

BR.090 Confirm Integrated Business Solution (O)
Secure approval for proposed business alternatives.
Output: Confirmed Business Solution

BR.100 Define Application Set-up (C)
Capture the setup decisions and implement them in the appropriate environment.
Output: Application Setup Document

BR.110 Define Security Profile (O)
Gather role and function information and relate them to application security and
responsibilities. As business requirements are established and mapped to application features, you also
begin to define the user security necessary to support the selected alternative in a controlled environment.
Output: Security Profile


4. Creation of Application and Technical architecture



TA.010 Define Architecture Requirements and Strategy (C)
Identify the application and technical architecture requirements and strategy that would
be used for the design and development of the system being implemented. This includes support for both
the final production environment and interim development and project support requirements.
Output: Architecture Requirements and Strategy

TA.120 Define Platform and Network Architecture (C)
Define the physical platform and network configuration to support your final platform and
network architecture. You map the physical application and database server architecture onto specific
computing platforms. This task focuses on the future production environment and not interim environments
to support the project activities. This includes ongoing production supporting testing and learning
environments.
Output: Platform and Network Architecture

TA.140 Assess Performance Risk (C)
Identify any performance risks that are apparent based on the proposed architecture and
suggest techniques to mitigate the risks. This task focuses on the future production environment and not
interim environments to support the project activities. This includes ongoing production supporting testing
and learning environments.
Output: Performance Risk Assessment

System Installation and Environment Creation
Skylark Groups

6
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com

TA.150 Define System Management Procedures (O)
Design the procedures and specify the tools that the client staff will need to manage the
new system. After you design the procedures in this task, you need to test and refine them later in the
project, prior to incorporating them into the System Management Guide (DO.090) and conducting learning
events for the system support staff. This task focuses on the future production environment and not interim
environments to support the project activities. This includes ongoing production supporting testing and
learning environments.
Output: System Management Procedure


5. Gaps and Interfaces Resolution



MD.050 Create Application Extension Functional Design (O)
Document the functional features, use, and behavior of required customizations. The
Application Extensions Functional Design confirms that you understand user requirements, and allows users
to evaluate and approve the resulting features that the new modules will provide.
Output: Application Extension Functional Design

MD.070 Create Application Extension Technical Design (O)
Document the technical specifications for modifications, extensions, and configurable
extensions.
Output: Application Extension Technical Design

MD.080 Review Application Extension Functional and Technical Designs (O)
Set up a design review meeting between business analysts, key users, technical analysts,
and developers. The goal is to secure final acceptance of the complete designs.
Output: Approved Designs

MD.090 Prepare Development Environments (C)
Establish a platform and software environment that supports custom development.
Output: Development Environments

MD.110 Create Application Extension Modules (O)
Produce the modules to support customizations to the Applications. You also perform the
first round of testing as part of this task.
Output: Module Source Code

MD.120 Create Installation Routines (C)
In this task, you develop automated functions and detailed instructions to install
customizations in the testing and production environments.
Output: Installation Routines


6. Business System Testing



TE.020/070 Develop/Perform Unit Test Scripts (C)
TE.020 - Develop the script to test individual application extension components. The tests validate
that the application extension inputs, outputs, and processing logic function as designed.
Output: Unit Test Scripts
GAP Resolution
CRP and Module Testing
Skylark Groups

7
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com


TE.070 - Test application extension components on an individual basis to verify that the inputs, outputs, and
processing logic of each application extension component functions without errors. Unit testing is performed
in either the development environment or a testing environment. The goal is to find errors in the smallest
unit of software before you logically link it into larger units. If successful, subsequent link testing should only
reveal errors related to the integration between application extensions.
Output: Unit-Tested Modules

TE.030/080 Develop/Perform Integrated Test Scripts (C)
TE.030 - Develop scripts to test modifications to standard Oracle Applications as well as new
application extensions as part of a business flow. This uncovers any integration problems with other
application extension components that provide or use the data manipulated by the target modules.
Output: Integrated Test Scripts

TE.080 - Test several application extension components together as part of a business flow to uncover any
integration problems with other application extension components that provide or use the data manipulated
by the target component. Link testing is performed in either the development environment or a testing
environment. The scope of each link test typically includes the set of components that support or are
affected by a single application extension. An application extension is defined for each gap identified during
requirements mapping and is described by a functional design and corresponding technical design
document.
Output: Link-Tested Modules

TE.100 Prepare Key Users for Testing (C)
Provide basic training to key users participating in Business System Testing. A test environment is
used to prepare key users for testing.
Output: Prepared Key Users

TE.040/110 Develop/ Perform System Test Scripts (C)
TE.040 - Develop the script to test the integration of application extensions with Oracle
Applications modules. A system test script contains detailed steps which testers follow to verify the system
setup and the integrity of custom application extensions for supporting business processes.
Output: System Test Scripts

TE.110 - Test the integration of all business system flows within the target application system, including all
standard and custom processes and reports. This task is equivalent to a full conference room pilot (CRP)
where the environment simulates the future production environment. The system test is performed in a test
environment.
Output: System Tested Applications

TE.050/120 Develop/ Perform System Integration Test Scripts (O)
TE.050 - Develop the test script that validates the integration between your new application
system and other third-party and legacy systems.
Output: System Integration Test Scripts

TE.120 - Test systems integration with other application systems in a production-like environment. The
systems integration test is performed in a test environment.
Output: Integration Tested System

TE.060 Develop Testing Environments (C)
Install and configure one or more testing environments to support all testing activities.
Output: Testing Environments

Skylark Groups

8
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com

TE.130 Perform Acceptance Testing (C)
Support users in performing their acceptance test of the new production system. The acceptance
test is performed in the Production Environment. This task also involves scheduling the acceptance test
team, support staff, and user facilities.
Output: Acceptance Test Results


7. Data Migration




CV.010 Define Data Conversion (Migration) Strategy (C)
Define the scope of the conversion project, conversion objectives and approach, and prepare a
strategy for converting information from the legacy systems to the new application environment.
Part of defining the scope is documenting your conversion requirements at the application and
business object level. Additionally, this task provides a roadmap for performing the conversion of
data from the legacy system to the new Oracle system and defines the task steps and resources
needed to fulfill this strategy.
Output: Data Conversion Requirements and Strategy

CV.050 Define Manual Data Conversion (Migration) Procedures (C)
Define the plan to convert the business objects that require manual conversion. The resulting
procedure provides a detailed guide for manually converting data to successfully meet conversion
project milestones.
Output: Manual Conversion Procedures

CV.060/070/080 Design/ Prepare/ Develop Conversion Programs (O)
CV.060 - Design and document the conversion programs. Completion of this task provides the
developer with the necessary information for writing an accurate conversion program.
Output: Conversion Program Designs

CV.070 - Outline the testing plans for the unit, business object, and validation testing for
conversion. The unit tests confirm that each module successfully completes the task it is designed
to perform. For example, a unit test should verify that the download program has extracted the
expected number of records from the legacy system. The business object test verifies that the
quality of the data converted to the Oracle system is accurate and a function properly in the
individual Oracle Application to which it has been converted. Validation testing verifies that the
converted legacy data performs accurately within the entire suite of Oracle Applications.
Output: Conversion Test Plans

CV.080 - Create the conversion programs that perform all of the functions required to convert
legacy business objects to the target Oracle Applications. The conversion of each business object
typically involves the creation of five types of programs, including a download program, interface
table creation program, upload program, translation program, and an interface and validation
program. The download program is used to extract the data from the legacy system and create an
ASCII flat file that can be uploaded to the Oracle tables. The interface table creation program
creates tables that store the legacy data before the data is validated and inserted into the
production tables of the Oracle Application. The upload program uploads the legacy ASCII flat file
data to the interface tables, while the translation program performs any data-required translation,
Migration
Skylark Groups

9
Regintala Chandra Sekhar Email ID: ora17hr@gmail.com
transformation, or manipulation required before moving the data to the production tables. Finally,
the interface and validation program performs validation of the data in the interface tables and
updates the data into the Oracle production tables.
Output: Conversion Programs

CV.090/100/110 Perform Conversion Unit/ Business Object / Validation Tests (C)
CV.090 - Test the conversion programs to verify that all programs work without errors and
according to the conversion testing specifications pre-defined in the conversion unit testing
components of the Conversion Test Plans (CV.070).
Output: Unit Tested Conversion Programs

CV.100 - Test the complete conversion of each business object by executing all conversion modules
for the business object in the appropriate sequence and verify that the resulting data is correct.
Output: Business-Object Tested Conversion Programs

CV.110 - Validate that the target applications function correctly with the converted business
objects. Output: Validation Tested Conversion Programs

CV.130 Convert and Verify Data (C)
Convert and migrate the production data from the old system to the new Oracle production
environment. Completion of this task provides data that is ready for production use.
Output: Converted and Verified Data

8. Documentation



DO.050 Produce Documentation Prototypes and Templates
Build and review a single prototype for each type of documentation deliverable. The results
conform to the look and feel of each documentation deliverable, as well as present a clear
expectation of what will be delivered. You also create templates for later use.
Output: Documentation Prototypes and Templates

DO.070 Publish User Guide
Publish a User Guide that defines a set of detailed procedures for using the applications.
This task is often performed in parallel with Perform System Test (TE.110).
Output: User Guides

DO.090 Publish System Management Guide
Gather material for the System Management Guide and publish the final version. Perform
this task in parallel with the execution of the business system test.
Output: System Management Guide

Thank You....