Checked the work permit is available for subject Tag
number of equipments (Verify Tag No carefully before energi!es the electrical equipments" # $nsulation %esistance tested and recorded in approved format &i'(ot test done for medium and high voltage equipments ) Confirmed *witchgear +us Contact resistance test record available ) ,quipment foundation released from Civil and grouting completed (if required - Confirmed that there is no loose connection in Control wiring termination and control power supply is available as per requirement for respective equipments" . Checked all inter tripping functions are as per logic and all indications are function well / Checked all alarm and annunciations available in 0nnunciator (anel 1 Confirmed grounding cable connected well and tested 2 Checked the switchgear 0T* function are as per scheme 3 Checked the %elay setting as per relay coordination table 14 Verified all CT 5 VT and %elay test records and its setting" 11 Confirmed 0mmeter and Volt 6eter test record available and no physical damages appear in those meters 1# Checked *elector switches and lockout %elay are function well and identified as schematic drawing 1- 0ll cables restored and connected after insulation test and enclosure covers closed properly 7p *tream 8own *tream 11 Confirmed all +us bar connection along the +us 8uct is checked" ((hase *equence 5 Torque 12 Confirmed Contact resistance test records available and accepted by owner representative 13 Checked +us duct enclosure9s covers are fi:ed properly along the +us 8uct" 0nd both end of bus duct are grounded" #4 Checked +us 8uct entry is sealed by fire retardant material ( $f +us 8uct (assing thru ;all ;itnessed Name *ignature 8ate Construction <C $nspector (,(C <C (6T =thers
#1 Confirmed *witchgear control function test annunciation are activated in 0nnuncitor panel ## Checked all logic interlocks and tripping schemes from up stream and down stream and all indication are acceptable #) Checked all mechanical interlocks of +reaker in the up stream feeder and it is ready for %ack $n" #- Checked all mechanical interlocks of +reaker in the down stream $ncomer and it is %ack =ut" #. Checked ,arth switch operation" 7p *tream 8own *tream #/ Confirm that the earth switch is open before rack in the breaker> contactor #1 Confirmed that VT mechanical operation (%ack $n 5 %ack =ut and fuses are ok in 8own *tream $ncomer #2 Checked the 8own *tream incomer grounding connected well and tested" #3 Checked all gauges (winding and oil temperature? (ressure and level are good condition working well )4 Confirmed the *pace heater is working )1 Checked all test result 5 <V8s for @eeder ,quipment )# ,quipment 8ata sheet available" )) Checked the Tap changer position is as per requirement and locked on power transformer )- Checked all radiator Valves are opened ). Checked the *witchgear oil level and pressure are sufficient" )/ Checked the ,quipment and *urrounding area clean well )1 Checked @ire e:tinguisher available nearby equipments )2 Checked %ubber *hoes and &and Alows are suitable for use of the nominal voltage" )3 Checked calibration certificate is valid for measuring instruments as %equired ( (hase *equence 6eter? Clamp on meter? 6ulti meter? Thermometer? Noise level meter -4 +arricaded surrounding equipment and confirmed that there is no other activity is under progress -1 Checked communication radio available ;itnessed Name *ignature 8ate Construction <C $nspector (,(C <C (6T =thers
-# @ire 0larm system should be activated prior to energi!e the substation (NoteB (ermission to be obtain from (6T to energi!e substation? $f the @ire 0larm system was not activated at the time of energi!ation %emarks 5 %ecommendationB ;itnessed Name *ignature 8ate Construction <C $nspector (,(C <C (6T =thers