Saw drilling bails being layed down without tag line. Stopped operation and attached tag line 27-Dec 63 43 68.3% 6 6/2 Observed there was no safety wire on air supply hose to air tugger. Had mechanic install one 28-Dec 67 53 79.1% 4 4/3 Saw someone standing below TDS while men were working above with tools to disconnect TDS. Told him to stay away at a safe distance 29-Dec 66 54 81.8% 5 5/0 Someone was passing under derrick when it was being layed down. Stopped him and told him to stay safe distance away 30-Dec 69 59 85.5% 4 4/3 Saw many men giving crane operator signals. Stopped job and assigned only one banksman. 31-Dec 73 56 76.7% 4 4/2 Saw men standing close to another man using sledge hammer. Told them to stay safe distance away. 1-Jan 79 54 68.4% 4 4/2 While moving rig equipment one man was handling wire slings without having gloves on 2-Jan 77 27 35.1% 5 5/3 Worker was observed walking under suspended load of crane. Operation was stopped and worker was moved to safe location. Operation resumed after worker was informed of proper procedures. 3-Jan 65 48 73.8% 4 4/4 Worker was observed throwing hammer down from mast. Worker was instructed of possible hazards and informed of proper procedures. 4-Jan 65 46 70.8% 4 4/4 Worker was observed not wearing proper safety harness while working on BOPs. Worker was stopped & informed safety harness must be worn. 5-Jan 65 40 61.5% 4 4/4 I saw Worker was wearing all proper PPE & harness while working with power washer from inside crane man riding basket. 6-Jan 63 53 84.1% 4 4/4 Improper labeling of mud cleaner pump. Switch is labeled for a different pump. Spoke with STP to take corrective action and mark pump properly. 7-Jan 63 60 95.2% 4 4/4 Worker was observed not wearing proper PPE while on rig site . Worker was informed PPE must be worn while inside rig location. 8-Jan 64 60 93.8% 6 6/6 Observation of body harness shows contaminated with oil and other residue. Proper care & storage needs to be taken of safety harnesses. Spoke with HSE onsite to address the issue. 9-Jan 64 53 82.8% 5 5/5 Good communication & safety procedures followed by rig crews & crane operators during derrick lifting operations. 10-Jan 71 55 77.5% 5 5/5 Crane was observed moving with outriggers still extended. Crane was stopped and outriggers were pulled in. 11-Jan 65 56 86.2% 5 5/5 While rigging down raising lines with crane it was observed the boom was wrapped up with hoist wire in derrick. Operation was stopped & line was moved out of path of boom. 12-Jan 66 58 87.9% 5 5/5 During main camp inspection observed water leak from fire line connection. Shut down pump. Tightened connection & re-checked fire line. All ok 13-Jan 67 53 79.1% 5 5/5 Worker was observed going up on man rider with hand tools not secured. Worker was lowered & tools were secured. 14-Jan 65 58 89.2% 5 5/5 Air pressure gauge on man riding winch found broken. Shut down & installed new gauge. 15-Jan 65 57 87.7% 5 5/5 Worker observed going up in man riding winch with tools not properly secured. Hand was lowered to rig floor & tools were properly secured before resuming task. 16-Jan 63 53 84.1% 5 5/5 Crane operator preparing to lift load with sling not rated for load. Shut down & changed lifting sling. 17-Jan 63 43 68.3% 5 5/5 While lifting conductor pipe using two hoists, observed crew members causing confusion with too many people trying to give directions to hoist operators. Stopped job. Designated one person to flag hoist operators. Discussed possibility of color coding hoists to avoid confusion. 18-Jan 66 48 72.7% 5 5/5 Worker was observed attempting to step outside of man basket while working on BOP crane in substructure. Worker was stopped & lanyard was secured off. 19-Jan 63 54 85.7% 5 5/5 No storage container for PPE near mud mixing area. Will prepare proper PPE storage. 20-Jan 64 57 89.1% 5 5/5 Worker using grinder without face shield. Stopped job until face shield utilized 21-Jan 65 48 73.8% 5 5/5 Man putting arms under lifted crane load. (diesel tank) Explained dangers. 22-Jan 68 45 66.2% 5 5/5 Observed people working at height with tools not secured. Stopped & held safety meeting addressing the issue. 23-Jan 68 48 70.6% 5 5/5 Using two rig floor winches at one time. One man riding, one equipment lifting; Encounter confusion with signals. Stopped operation & only used one winch at a time. 24-Jan 68 47 69.1% 5 5/5 Observed man in work basket suspended with crane. No tag line connected. Shut down & utilized tag line. Held safety meeting. 25-Jan 61 51 83.6% 5 5/5 Worker was observed using high pressure air hose to clean off a chain without wearing safety glasses. Worker was stopped and explained the dangers - work continued after the worker was wearing safety glasses. 26-Jan 65 49 75.4% 5 5/5 Worker observed piece of wood lying on the ground with nails sticking out of it. Worker removed the piece of wood & pulled the nails out. 27-Jan 62 52 83.9% 5 5/5 1 234419244.xlsx.ms_office76/17/2014 6/17/2014 0% 20% 40% 60% 80% 100% 25-Dec 24-Jan 23-Feb 25-Mar 24-Apr RIG 797 STOP CARD PARTICIPATION_ NEFERTITI 3X KEYWORDS PTW Control by rig supv of work events thru SMS, coord with other people / work , hazard reduction - closed entry practices. Handovers PPE Used - Don in correct manner- fit for purpose, condition TRANSPORT Journey mgmt process, forklift, crane, onsite vehicles - DROPPED OBJECT Above 6ft overhead clean up particularly in derrick after rig move, pins absent STORED ENERGY Elec, Heights, Pressure, Fire, - awareness and regard for consequences. Washdown water and elec PINCH POINT Body position wrt moving and stationary object, rig moves, under loads, behind moving equipment or in blind spot, working on catwalk whole rig floor work ongoing HAND PLACEMENT Hand position, rings, hammers - putting hands where you cannot see them LIFTING Lifting Gear, selection use of, signal control, general banksmanship, tag lines, certs, manifest weight s. Correct lifting position PRACTICES Not following SOP, short cuts, lack of knowledge / awareness, hand tls misuse or poorboy repaired _ not complying with programmed drills. Not observing barriers, danger areas (catwalk). Not obeying topics discussed in safety meet. Observance by others on practices. Use of cell phones in non approved areas / while operating equipment. Teamwork and coperation between service co HOUSEKEEPING Improper storage and clean up, PPM and use of . Absence of signs. Area Lighting. Access / egress clear of obstruction PPM PPM and its implementation. Inadequate spares. Poor state of equipment, Service quality related ENVIRON Spillage, Cleanup,Disposal. Equip non compliance with procedure, Snakes HYGIENE Mess, kitchen routinely cleaned Food storage, coolers operational. Menu varied. Staff trained. Use water bottles for storage of other liquids.