Professional Documents
Culture Documents
STEERING - TROUBLESHOOTING
TROUBLESHOOTING
SR13T-01
BLEEDING
1. CHECK FLUID LEVEL
(See page SR-4 )
2. JACK UP FRONT OF VEHICLE AND SUPPORT IT
WITH STANDS
3. TURN STEERING WHEEL
With the engine stopped, turn the steering wheel slowly from
lock to lock several times.
NOTICE:
Take care that some fluid remains in the oil reservoir.
4. LOWER VEHICLE
5. START ENGINE
Run the engine at idle for a few minutes.
6. TURN STEERING WHEEL
(a) With the engine at idling, turn the steering wheel to left or
right full lock and keep it there for 2-3 seconds, then turn
the wheel to the opposite full lock and keep it there for 2-3
seconds.
(b) Repeat (a) several times.
7. STOP ENGINE
8. CHECK FOR FOAMING OR EMULSIFICATION
Normal Abnormal If the system has to be bled twice specifically because of foam-
ing or emulsification, check for fluid leaks in the system.
9. CHECK FLUID LEVEL
(See page SR-4 )
R07281
INSPECTION
1. CHECK FLUID LEVEL
(a) Keep the vehicle level.
With the engine stopped, check the fluid level in the oil
reservoir.
If necessary, add fluid.
Fluid: ATF DEXRON® II or III
HINT:
R00441
Check that the fluid level is within the HOT LEVEL range on the
dipstick of the reservoir cap. If the fluid is cold, check that it is
within the COLD LEVEL range.
(b) Start the engine and run it at idle.
(c) Turn the steering wheel from lock to lock several times to
boost fluid temperature.
Fluid temperature: 80°C (176°F)
R07281
5 mm (0.20 in.) (e) With the engine idling, measure the fluid level in the oil
or less reservoir.
(f) Stop the engine.
(g) Wait a few minutes and remeasure the fluid level in the
reservoir.
Maximum fluid level rise: 5mm (0.20 in.)
If a problem is found, bleed power steering system.
(See page SR-3 )
Engine Idling Engine Stopped
R10552 (h) Check the fluid level.
2JZ-GE: 2JZ-GTE:
SST SST
IN Pressure Feed Tube
Attachment
OUT
Z16580
(f) With the engine idling, close the valve of the SST and ob-
Oil serve the reading on the SST.
Reservior Minimum fluid pressure:
7,355 kPa (75 kgf.cm2, 1,067 psi)
PS Gear Closed NOTICE:
Do not keep the valve closed for more than 10 se-
PS Vane conds.
Pump Do not let the fluid temperature become too high.
SST
Z15498
(i) With the engine idling and valve fully opened, turn the
Oil wheel to full lock.
Reservior Minimum fluid pressure:
7,355 kpa (75 kgf,cm2, 1,067 psi)
PS Gear Open NOTICE:
Do not maintain lock position for more than 10 se-
PS Vane conds.
Pump Do not let the fluid temperature become too high.
SST (j) Disconnect the SST.
Z15500
INSPECTION
CHECK IDLE-UP
(a) Turn the air conditioner switch off.
(b) Start the engine and run it at idle.
(c) Fully turn the steering wheel.
(d) Check that the engine speed decreases when the vacu-
um hose of the air control valve is pinched.
2JZ-GTE: (e) Check that the engine speed increases when the hose is
released.
Z13450
INSPECTION
1. CHECK STEERING WHEEL FREEPLAY
With the vehicle stopped and tires pointed straight ahead, rock
the steering wheel gently back and forth with light finger pres-
sure.
Freeplay should not exceed the maximum.
Maximum freeplay: 30 mm (1.18 in.)
COMPONENTS
REMOVAL
1. REMOVE STEERING WHEEL PAD
NOTICE:
If the airbag connector is disconnected with the ignition
switch at ON or ACC, DTCs will be recorded. Never use air-
bag parts from another vehicle. When replacing parts, re-
place with new parts.
(c) Pull the pad out from the steering wheel and disconnect
the airbag connector.
CAUTION:
When storing the pad, keep the upper surface of the pad
facing upward. Never disassemble the pad.
NOTICE:
When removing the pad, take care not to pull the airbag
wire harness.
DISASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1. REMOVE IGNITION KEY CYLINDER ILLUMINATION
2. REMOVE INTERMEDIATE SHAFT
Remove the bolt.
Tilt No.2 Bolt 17. REMOVE COLUMN UPPER TUBE WITH MAIN SHAFT
Plate Washer ASSEMBLY
Nut
(a) Set SST, the nut (10 mm nominal diameter, 1.25 mm
pitch), plate washer (36 mm outer diameter) and bolt (10
Bolt
mm nominal diameter, 1.25 mm pitch, 50 mm length) to
the tilt No.2 bolt, as shown.
SST
SST 09910-00015 (09911-0001 1, 09912-00010)
Reference:
R09495 Nut 90170-10004
Plate washer 90201-10201
Bolt 91111-51050
(b) Remove the 2 tilt No.2 bolts by using the sliding hammer
on SST.
(c) Remove the upper tube with the shaft assembly from the
column lower tube.
INSPECTION
1. INSPECT COLUMN UPPER BRACKET
Check that the steering lock mechanism operates properly.
R11204
R01835
REASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1. COAT MOLYBDENUM DISULFIDE LITHIUM BASE
GREASE
(See page SR-9 )
2. INSTALL MAIN SHAFT BUSHING STOPPER AND
MAIN SHAFT COLLAR
R07550
12.61 - 12.67
2 B
(0.4965 - 0.4988)
12.54 - 12.60
3 C
(0.4937 - 0.4961)
12.47 - 12.53
4 D
(0.4909 - 0.4933)
12.40 - 12.46
5 E
(0.4882 - 0.4906)
12.26 - 12.32
7 G
(0.4827 - 0.4850)
(d) After selecting the stopper, check that on both sides the
pawl and ratchet are fully engaged.
11. INSTALL 2 TILT PAWL STOPPERS
INSTALLATION
1. INSTALL STEERING COLUMN ASSEMBLY
(a) Torque the 4 column assembly set nuts.
Torque: 25 N·m (260 kgf·cm, 19 ft·lbf)
(b) Connect the connectors.
(c) Install the brake pedal return spring.
(d) Tighten the hole cover clamp.
W02982
COMPONENTS
2JZ-GE:
Return Tube
PS Vane Pump
Assembly
Battery Cover
Gasket
Pressure Feed Tube
Terminal Terminal
Union Bolt
Drive Belt
Battery
Battery Carrier
2JZ-GTE:
Battery Clamp
Battery Cover
Oil Reservoir to
Pump Hose
Terminal Terminal
Union Bolt
Gasket
Vane Pump Pulley
Battery Carrier
2JZ-GE:
Oil Reservoir
Reservoir Cap
2JZ-GTE:
Suction Port Union
O-Ring
Gasket
O-Ring Spring
Oil Seal
Bearing
O-Ring
O-Ring
Wave Washer
Straight Pin
Rear Housing
Side Plate
x10
Vane Pump Rotor Cam Ring
Vane Plate Straight Pin
Non-reusable part
: Power steering fluid
Z19281
REMOVAL
1. REMOVE ENGINE UNDER COVER
Remove the 10 screws.
2. REMOVE BATTERY
(a) Disconnect the 2 terminals.
(b) Remove the bolt, nut and battery clamp.
(c) Remove the battery cover.
(d) Remove the battery and battery carrier.
3. 2JZ-GTE:
REMOVE AIR HOSE No.5
4. REMOVE DRIVE BELT
Loosen the drive belt tension by turning the drive belt tensioner
clockwise, and remove the drive belt.
5. 2JZ-GTE:
DISCONNECT OIL RESERVOIR TO PUMP HOSE
Remove the clip and disconnect the hose.
NOTICE:
Take care not to spill fluid on the A/C compressor rotor.
R06091 6. 2JZ-GE:
DISCONNECT RETURN TUBE
NOTICE:
Take care not to spill fluid on the A/C compressor rotor.
7. 2JZ-GTE:
REMOVE VANE PUMP PULLEY
Using SST to stop the pulley rotating, remove the nut.
SST 09960-10010 (09962-01000, 09963-01000)
R07429
R07432
SST
DISASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1. 2JZ-GE:
REMOVE VANE PUMP PULLEY
Using SST to stop the pulley rotating, remove the pulley set nut.
SST 09960-10010 (09962-01000, 09963-01000)
R06768
Z06059
Z06062
INSPECTION
Vane Pump Shaft
NOTICE:
When using a vise, do not overtighten it.
1. MEASURE OIL CLEARANCE BETWEEN VANE PUMP
SHAFT AND BUSHING
Using a micrometer and a caliper gauge, measure the oil clear-
Bushing Front Housing ance.
Standard clearance:
Z16583
0.03 - 0.05 mm (0.0012 - 0.0020 in.)
Maximum clearance:
0.07 mm (0.0028 in.)
If it is more than maximum, replace the front housing and vane
pump shaft.
Thickness
2. INSPECT VANE PUMP ROTOR AND VANE PLATES
(a) Using a micrometer, measure the height, thickness and
Height length of the 10 vane plates.
Minimum height: 8.6 mm (0.339 in.)
Minimum thickness: 1.40 mm (0.0551 in.)
Mininum length: 14.99 mm (0.5902 in.)
Length
Z06061
Feeler
Gauge
R10282
14.999-15.001
None 44345-26010
(0.59051-0.59059)
14.997-14.999
1 44345-26020
(0.59043-0.59051)
14.995-14.997
2 44345-26030
(0.59035-0.59043)
14.993-14.995
3 44345-26040
(0.59027-0.59035)
14.991-14.993
4 44345-26050
(0.59020-0.59027)
R07603
R07591
If necessary, replace the valve with one having the same letter
as inscribed on the front housing.
Inscribed mark:
A, B, C, D, E or F
Inscribed
Mark
R07600
4. INSPECT SPRING
Using calipers, measure the free length of the spring.
Minimum free length: 33mm (1.30 in.)
If it is not within the specification, replace the spring.
Calipers
R08702
Z08200
(b) Coat a new oil seal lip with power steering fluid.
(c) Using a socket wrench (24 mm), press in the oil seal.
NOTICE:
Make sure to install the oil seal facing the correct direction.
Z06067
REASSEMBLY
NOTICE:
SST When using a vise, do not overtighten it.
1. COAT WITH POWER STEERING FLUID
(See page SR-23 )
Vinyl Tape 2. INSTALL VANE PUMP SHAFT WITH BEARING
(a) Wind vinyl tape on the serrated part of the shaft.
(b) Using SST, press in the shaft with the bearing to the front
Z06071
housing.
SST 09608-04031
NOTICE:
Be careful not to damage the oil seal.
(c) Using snap ring pliers, install a new snap ring to the front
housing.
3. INSTALL STRAIGHT PINS
Using a plastic hammer, drive in 2 new straight pins to the front
housing.
Z06072
Z06073
R01149
R06769
INSTALLATION
1. INSTALL PS VANE PUMP ASSEMBLY
Torque the 2 bolts.
Torque:
RH side bolt: 39 N·m (400 kgf·cm, 29 ft·lbf)
LH side bolt: 58 N·m (590 kgf·cm, 42 ft·lbf)
2. CONNECT PRESSURE FEED TUBE
Using a spanner (24 mm) to hold the pressure port union,
torque the union bolt with a new gasket.
HINT:
Make sure that the stopper of the tube is touching the PS vane
Stopper pump assembly as shown, before torquing the union bolt.
Torque: 49 N·m (500 kgf·cm, 36 ft·lbf)
Z09176
3. 2JZ-GTE:
INSTALL VANE PUMP PULLEY
Using SST to stop the pulley rotating, torque the nut.
SST 09960-10010 (09962-01000, 09663-01000)
Torque: 43 N·m (440 kgf·cm, 32 ft·lbf)
4. 2JZ-GE:
CONNECT RETURN TUBE
5. 2JZ-GTE:
R07429 CONNECT OIL RESERVOIR TO PUMP HOSE
Connect the hose and install the clip.
6. INSTALL DRIVE BELT
Loosen the drive belt tension by turning the drive belt tensioner
clockwise, and install the drive belt.
7. 2JZ-GTE:
INSTALL AIR HOSE No.5
8. INSTALL BATTERY
(a) Install the battery carrier and battery.
(b) Install the battery cover.
R06091 (c) Install the battery clamp with bolt and nut.
(d) Connect the 2 terminals.
9. INSTALL ENGINE UNDER COVER
Install the 10 screws.
10. BLEED POWER STEERING SYSTEM
(See page SR-3 )
COMPONENTS
Union Bolt
Gasket
Return Tube
Cotter Pin
Cotter
Rack Housing Bracket Pin
x10
Non-reusable part
R11266
Union Bolt
Gasket
Union Seat
Union Bolt
Gasket
Dust Cover
Pressure Control
Valve Assembly
O-Ring
O-Ring
Oil Seal
Solenoid Valve
Teflon Ring
Teflon Ring
O-Ring
Rack Housing
Bearing
Control Valve Assembly
Oil Seal
Non-reusable part
Molybdenum disulfide lithium base grease
Power Steering fluid
Z18140
REMOVAL
1. PLACE FRONT WHEELS FACING STRAIGHT AHEAD
2. REMOVE STEERING WHEEL PAD
(See page SR-1 1)
3. REMOVE STEERING WHEEL
(See page SR-1 1)
4. REMOVE ENGINE UNDER COVER
Remove the 10 bolts.
5. REMOVE FR SUSPENSION MEMBER PROTECTOR
Remove the 4 bolts.
6. DISCONNECT INTERMEDIATE SHAFT
(See page SR-1 1)
7. DISCONNECT RH AND LH TIE ROD ENDS
(See page SA-12 )
8. DISCONNECT PRESSURE FEED TUBE
Remove the union bolt and gasket.
9. DISCONNECT RETURN TUBE
Remove the union bolt and 2 gaskets.
10. DISCONNECT PPS SOLENOID CONNECTOR
11. REMOVE RACK HOUSING BRACKET AND GROMMET
Remove the 2 bolts and nuts.
12. REMOVE PS GEAR ASSEMBLY
Remove the 2 bolts and nuts.
DISASSEMBLY
NOTICE:
SST When using a vise, do not overtighten it.
1. SECURE PS GEAR ASSEMBLY IN VISE
Using SST, secure the gear assembly in a vise.
SST 09612-00012
R06961
SST
R07510
Z06090
(b) Using a spanner (22 mm) to hold the steering rack and us-
ing SST, remove the rack end.
SST 09922-10010
NOTICE:
Use SST 09922-10010 in the direction shown in the il-
lustration.
Mark the RH and LH rack ends.
SST
R07107
R07439
R07336
R07099
R07362
SST
Spacer
SST
Oil Seal
W00208
INSPECTION
NOTICE:
When using a vise, do not overtighten it.
1. INSPECT STEERING RACK
(a) Using a dial indicator, check the rack for runout and for
teeth wear or damage.
Maximum runout: 0.30mm (0.018 in.)
(b) Check the back surface for wear or damage.
R10072
(d) Using SST, remove the oil seal from the rack housing.
Cutouts SST 09612-30012
NOTICE:
Be careful not to damage the rack housing.
SST HINT:
When using SST, apply the tips of SST to the cutouts in the rack
housing.
Oil Seal
R07109
Press (e) Coat a new oil seal lip with power steering fluid.
(f) Using SST, press in the oil seal.
SST SST 09950-60010 (09951-00280, 09951-00390,
09952-06010), 09950-70010 (09951-07100)
NOTICE:
Make sure to install the oil seal facing the correct direction.
Oil Seal
SST
W00209
Bearing
W00210
Bearing
W00211
(b) Coat a new oil seal lip with power steering fluid.
(c) Using SST, press in the oil seal.
SST
SST 09950-60010 (09951-00320),
09950-70010 (09951-07200)
NOTICE:
Make sure to install the oil seal facing the correct direction.
Bearing
W00213
R10955
R06172
Z06082
(e) Carefully slide the tapered end of SST over the rings to
seal them.
SST 09631-20081
NOTICE:
Be careful not to damage the rings.
Z06085
REASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1. COAT WITH POWER STEERING FLUID OR MOLYBDE-
NUM DISULFIDE LITHIUM BASE GREASE (See page
SR-35 )
W02101
W00215
W00216
(b) Using a hexagon wrench (24 mm) to hold the rack guide
Hexagon Wrench spring cap, and using SST, torque the nut.
SST 09922-10010
Torque: 50 N·m (513 kgf·cm, 37 ft·lbf)
NOTICE:
SST
Use SST 09922-10010 in the direction shown in the illustra-
tion.
Fulcrum Length HINT:
W02628 Use a torque wrench with a fulcrum length of 345 mm (13.58
in.).
(c) Recheck the total preload.
Preload (turning):
1.0 - 1.9 N·m (10 - 20 kgf·cm, 8.7 - 17.4 in.·lbf)
(d) Remove the RH and LH rack ends.
14. INSTALL DUST COVER
R07337
(b) Using a spanner (22 mm) to hold the steering rack steady,
and using SST, torque the rack end.
Fulcrum SST 09922-10010
Length Torque: 77 N·m (782 kgf·cm, 57 ft·lbf)
NOTICE:
Use SST 09922-10010 in the direction shown in the illustra-
SST tion.
HINT:
F04167 Use a torque wrench with a fulcrum length of 380 mm (14.96
in.).
(c) Using a brass bar and a hammer, stake the washer.
NOTICE:
Avoid any impact to the rack.
R06400
Clamp
R07474
INSTALLATION
1. INSTALL PS GEAR ASSEMBLY
(a) Temporarily install the 2 bolts and nuts.
(b) After installing the rack housing bracket and grommet, torque the 2 bolts and nuts.
Torque: 75 N·m (770 kgf·cm, 55 ft·lbf)
2. INSTALL RACK HOUSING BRACKET AND GROMMET
Torque the 2 bolts and nuts.
Torque: 75 N·m (770 kgf·cm, 55 ft·lbf)
3. CONNECT PPS SOLENOID CONNECTOR
4. CONNECT PRESSURE FEED TUBE
Torque the union bolt over a new gasket.
Torque: 49 N·m (500 kgf·cm, 36 ft·lbf)
5. CONNECT RETURN TUBE
Torque the union bolt over 2 new gaskets.
Torque: 49 N·m (500 kgf·cm, 36 ft·lbf)
6. CONNECT RH AND LH TIE ROD ENDS (See page SA-17 )
7. CONNECT INTERMEDIATE SHAFT (See page SR-21 )
8. INSTALL FR SUSPENSION MEMBER PROTECTOR
Tighten the 4 bolts.
9. INSTALL ENGINE UNDER COVER
Install the 10 bolts.
10. POSITION FRONT WHEELS FACING STRAIGHT AHEAD
HINT:
Do it with the front of the vehicle jacked up.
11. CENTER SPIRAL CABLE (See page SR-21 )
12. INSTALL STEERING WHEEL
(a) Align the matchmarks on the wheel and steering column main shaft.
(b) Temporarily tighten the wheel set nut.
(c) Connect the connector.
13. BLEED POWER STEERING SYSTEM (See page SR-3 )
14. CHECK STEERING WHEEL CENTER POINT
15. TORQUE STEERING WHEEL SET NUT
Torque: 35 N·m (360 kgf·cm, 26 ft·lbf)
16. INSTALL STEERING WHEEL PAD (See page SR-21 )
17. CHECK FRONT WHEEL ALIGNMENT (See page SA-2 )
LOCATION
PPS ECU
Heater to Register
No.4 Duct
PPS ECU
Heater to Register
No.5 Duct
F00595
F03098
SR4680
R07587