You are on page 1of 60

Sr.

No.
Date Location Observation Existing control measure
1
######
Crusher
House Bld.
Riser line erected but pending
for arrangement of landing valve
and accessibility of water.
Landing valve should be
provided.And ensure about
availability of water
2
######
Conv-3A,3B
Spray line erected but pending
for arrangement of nozzles.
Spray nozzles should be provided
to protect the conveyor during
fire.
3
######
Conv-2A,2B
Spray line erected but pending
for arrangement of nozzles.
Spray nozzles should be provided
to protect the conveyor during
fire.
4
######
Conv-
11A,11B
Spray line erected but pending
for arrangement of nozzles.
Spray nozzles should be provided
to protect the conveyor during
fire.
5
######
CHP
Control
Room
Alarm System erected but
not in operative mode
Ensure about operation of system.
6
######
CHP
Control
Room
Spray System erected but
pending for arrangement of
nozzles.
Spray nozzles must be arranged and
ensure about availability of water
7
######
CHP
Control
Room
Detection System installed
but not in operation
System must be erected on
operative mode.
8
######
Con-4A
Fire System erected but pending
for arrangement of spray
nozzles and supply of water
Fire System should be arranged
with proper water supply.
9
######
Con-5A
Hydrant Line laid down but
disconnected with the spray line
of Con 5
Spray line must be provided with
proper connection and availability
of water supply.
10
######
TT-2
Riser line and landing
valve installed but
missing of operating
wheel.And Pending for
arrangement of nozzles
Operating wheel should be arranged
for smooth functioning during
fire.And spray nozzles should be
provided for protection of
conveyor.
11
######
FOPH
Unloading
area
Double hydrant
connected with the
other out source for
washing/general use.
Hudrant system is used for
emergency .So it should
preserve separately.
12
######
FOPH Panel
Room
Alarm system erected but not in
operational mode
Alarm system must be available on
operational mode to detect the fire
hazard/Emergency.
KMPCL, Nariyara
Fire System Status Report
13
######
FOPH Panel
Room
Detection system erected but
not in operational mode
Detection system must be available on
operational mode to detect the fire
hazard/Emergency.
14
######
Oil Tank area
Deluge Valve System in
operation but Inlet Butterfly
valve closed
System should be charged always in auto
mode for protection during fire hazard.
15
######
Foam Pourer System Building
The door of the building
closed.Fire fighter can not
handle during emergency/Fire.
The main door should be opened or key
should be kept such a place so that in
case of emergency it can be easily
accessed.
16 ###### HT Cable
gallery
Fire detection system
inslalled but not in operation.
Detection system should be take a
operation ealiest posible to avoid the
big mishappening.
17 ###### HT Cable
gallery
It was found that nozzel were
not installed in water spray
system.
It should be provided to proper
operation during fire.
18 ###### MCC Room
Zero Mtr in
TG#3
Fire detection system
inslalled but not in operation.
Detection system should be take a
operation ealiest posible to avoid the
big mishappening.
19 ###### C&I control
in 6.9 mtr.
Fire detection system
inslalled but not in operation.
Detection system should be take a
operation ealiest posible to avoid the
big mishappening.
20 ###### In front of
TG zero
Mtr .
DV of water spray system
was not connected with
water spray system of MOT.
It should be properly connected with
spray system line to avoid any
mishappening.
21 ###### In front of
TG zero
Mtr .
DV of water spray system
was not connected with
water spray system of TG seal
oil tank.
It should be properly connected with
spray system line to avoid any
mishappening.
22 ###### CPU Room
in CCR
Building
zero mtr
It was found no safety
shower in CPU room.
safety shower should be provided at
nearest of CPU room.
23 ###### GT #3A,B,C It was found that handle of
DV of GT #3ABC were locked
with the help of chain and
lock.
It should be kept open to minimize
time loss during fire.
24 ###### UT #3A,B It was found that handle of
DV of UT#3A,B were locked
with the help of chain and
lock.
It should be kept open to minimize
time loss during fire.
25 ###### TG#3 Zero
Mtr ( TG
seal oil
tank)
It was found that nozzel were
missing in water spray
system.
It should be provided on their to
proper operation during fire.
26 ###### TG#3 Zero
Mtr ( TG
Mail oil
tank)
It was found that nozzel were
missing in water spray
system.
It should be provided on their to
proper operation during fire.
27 ###### TG#3 Zero
Mtr ( Small
Turbine DC
lube oil
tank)
It was found that nozzel were
missing in water spray
system.
It should be provided on their to
proper operation during fire.
28 ###### Boiler # 3
Zero Mtr
DV installed for water spray
system on burner during fire
but both handle of butter fly
valve were missing in North
side.
Handle of both valve should be
provided to minimize the reponse time
during fire.
29 ###### Boiler # 3
Zero Mtr
DV installed for water spray
system on burner during fire
but both handle of butter fly
valve were missing in south
side and and one bypass line
also disconnected.
Handle of both valve should be
provided to minimize the reponse time
during fire and line should be properly
connected.
30 ######
Conv-8
Spray System erected but
pending for arrangement of
nozzles.
Spray nozzles must be arranged and
ensure about availability of water
31 ######
Conv-6
Spray System erected but
pending for arrangement of
nozzles.
Spray nozzles must be arranged and
ensure about availability of water
Team
Member
Photo Status SEPCO KMPCL
Very
critical
Critical Design Others
Qazi Ikbal
Husain
CLOSED TURBINE AttendedAttended
Qazi Ikbal
Husain
2014.02.20
TURBINE
2014.02
.20
Not attended VC
Qazi Ikbal
Husain
2014.02.23
TURBINE
2014.02
.23
Not attended VC
Qazi Ikbal
Husain
2014.02.10
TURBINE
2014.02
.10
Not attended VC
Qazi Ikbal
Husain
2014.2.25
C&I
2014.2.
25
Not attended VC
Qazi Ikbal
Husain
2014.02.22
7
2014.02
.22
Not attended VC
Qazi Ikbal
Husain
2014.2.25
C&I
2014.2.
25
Not attended VC
Qazi Ikbal
Husain
2014.02.20
6
2014.02
.20
Not attended VC
Qazi Ikbal
Husain
2014.02.20
6
2014.02
.20
Not attended VC
Qazi Ikbal
Husain
CLOSED
TURBINE AttendedAttended
Qazi
Ikbal
Husain
BOIL
ER
2014.2.20

2014.
2.20
Not attended VC
Qazi Ikbal
Husain
2014.2.28
C&I
2014.2.
28
Not attended VC
KMPCL, Nariyara
Fire System Status Report
Qazi Ikbal
Husain
2014.2.28
C&I
2014.2.
28
Not attended VC
Qazi Ikbal
Husain
CLOSED
7
AttendedNot attended VC
Qazi Ikbal
Husain
CLOSED
7
AttendedNot attended VC
Ashok
Singh
Yadav
2014.2.28
C&I
2014.2.
28
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
7
AttendedAttended
Ashok
Singh
Yadav
2014.2.28
C&I
2014.2.
28
Not
attende
d
VC
Ashok
Singh
Yadav
2014.2.28
C&I
2014.2.
28
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
3
Attended
Not in
operati
on
Ashok
Singh
Yadav
CLOSED
3
Attended
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
1
Attended
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
6
AttendedAttended
Ashok
Singh
Yadav
CLOSED
6
AttendedAttended
Ashok
Singh
Yadav
CLOSED
7
Attended
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
7
Attended
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
7
Attended
Not
attende
d
VC
Ashok
Singh
Yadav
CLOSED
3
AttendedAttended
Ashok
Singh
Yadav
CLOSED
3
AttendedAttended
Qazi Ikbal
Husain
2014.02.15 TURBINE
Not
attende
d
Not
attende
d
VC
Qazi Ikbal
Husain
2014.02.15 TURBINE
Not
attende
d
Not
attende
d
VC
S.no Location
5 North side 62 mtr
6
LDO- HFO storage
area
7
LDO- HFO storage
area
9
LDO- HFO storage
area
10 ST#2
11
Hydrogen Generation
Plant
13 CHP
14 CHP
15 Coal Mill 3A to 3G
Safety
16
Condencer Pit
Unit #3
17
Condencer Pit
Unit #3
18
Condencer Pit
Unit #3
21 Day Oil Tank area
23 Day Oil Tank area
26
DM Plant UF Area
and HP pump area
27 DM Plant
28 HCL acid storage tank
29 HCL acid storage tank
30 HCL acid storage tank
31
CHP Near 4C&D
Conveyor Tail Pulley
33 DG Room (Unit-3)
34
Condenser Vacuum
Pump (Unit-3)
38 CW reservior tank
39
Raw water open
reservior Pump house
41
Cooling water pump
suction open tank
42 Work shop 02 Area
46 Boiler #3
47 Near PA Fan 3B
48
Flap gate platform of
every ESP duct.
53 Conveyor 8A & 8B
55 Transfer tower 08
57
Conveyor 11 A&B
Boiler 01 Side top floor
approx 41 Mtr.
58
11 A&B, 8A&B,
10A&B Conveyor
60
(CHP) conveyor-
2A,2B,2C,2D
62
(CHP) conveyor-
2A,2B,2C,2D
64 Coal complex Buildind
65 BC -6ABCD tail end
67 BC-7A Tail end
69 Crusher House(o mtr)
71
Crusher House 2 and
tail end conv 3A,B,C
72
Conv 3A,B,C (Tunnel
area)
73 Conv 3A
75 TT4 near (MCC room)
77 TT4 staitair case
79 BCN- 4A,B,C,D
80 BCN 01 EF
81 BCN 02 A
82
Track hopper 01
Unloading floor
83 BCN 01
84
BCN 01 head end
cross over
86 BCN 01 A ,2A
87 BCN 2A tail end
88 BCN 02 A
89
Switch
Yard(MCC/PCC room)
90
Switch
Yard(MCC/PCC room)
92
Switch Yard
entrance(PLCC room)
93 Cable celler room
95
Switch yard control
panel room
96
Switch yard control
panel room
97 TG#3 cable Gallery
100
Cable gallery TG
area(14.4 mtr)
101
TG area stair side
near CCR
104
Swas room(6.9 mtr)
TG area
105
Swas room(6.9 mtr)
TG area
106
TG#3 cable
gallery(10.4 mtr)
108
Swas room(6.9 mtr) TG
area
109
TG#3 area(LP/HP
dozzing room)
110
TG#3(0 mtr) seal oil
control device
111
TG#3(0 mtr) Hyrogen
and CO2 filling area.
112 DM plant control room
114 DM Plant
115
DM plant (Multigrate
filter area)
116
DM plant near High
pressure pump local
electrical cabinet
117
TG#3 area(LP/HP dozzing
room)
118
Stacker & Reclaimer
No 1
119
Boiler 39 Mtr LHS
Unit 03 Staircase
landing platform
120 Mill 3C
121 AHP control room
122
Unit #3 clarrifier and
Buffer tank area.
124 Track Hopper(0 mtr)
126 AHP(Cable gallery)
127
AHP Building(2nd floor
& 4th floor)
128
AHP Building(2nd floor
& 4th floor)
130
Auxilary Boiler and ID
fan#3
131 Stacker 1st
132
Stacker 1st(PLC
room)
133
Switch Yard Control
Room and Cable
Gallery area
136 TT-6(3rd floor)
137 TT-6(3rd floor)
143
Conveyor 10 A,10B
Tail end(TT-8)
144 Conveyor 10 A,10B
145 Near Boiler#3
146 Near Boiler#3
147 ETP Tank (HRSCC)
152 Boiler #3
153 MCC Room DX1
154
MCC Room DX2 Zero
Meter
Civil
Punch points
Scope of
work
Target
date
No proper access near long
retrable sootblower.
Sepco
Scope
Foam extiguisher 50 ltr capacity
empty.
Sepco
Scope
No jumpering provided on some
flanges of LDO & HFO line.
Sepco
Scope
Licence no. and capacity should
be displayed at all tanks.
Sepco
Scope
DV charging required of station
transformer #2 to minimise the
loss during fire.
Sepco
Scope
Rubber mat required in front of
electrical pannels to avoid the
electrocution.
Sepco
Scope
In front of control panel proper
cover are required on cable
trench near 3abcd conveyors
minus level.
Sepco
Scope
WAITING
FOR
MATERIAL
PA system required in CHP
area.
Sepco
Scope
Toe guard required in all four
corners in coal mill 3A to 3G.
Sepco
Scope CLOSED
Safety
Barricading near sump pit
required in condenser pit of
unit#3 to avoid the person slip
and fall in the pit.
Sepco
Scope
NEED U3
SHUTDOWN
Proper base support is required
at base of hanging ladder in
condenser pit of Unit #3.
Sepco
Scope
NEED U3
SHUTDOWN
The treads of stair, leading to
condenser pit, are small. Its
dimention should be 25 cm
minimum.
Sepco
Scope
NEED U3
SHUTDOWN
No jumpering provided on some
flanges of HFO line.
Sepco
Scope
MVWS are required surounding
of oil storage tank.
Sepco
Scope
Covering of open trench with
Grating required to avoid trip
hazard
Sepco
Scope
CLOSED
Storage and process tank
nomenclature to be displayed
on each vessel.
Sepco
Scope
Safety shower should be
operational and working
condition provision of spray
nozzle required.
Sepco
Scope
Strengthening of staircase
(Fibre Plastic) required
Sepco
Scope
MSDS is required for specific
chemical area.
Sepco
Scope
Barricading near sump pit
required near 4c&d conveyors
tail pulley at minus level to
avoid the person slip and fall in
the pit.
Sepco
Scope
CLOSED
Cover required on cable pit.
Sepco
Scope CLOSED
Cover required on drain in
condenser vacum pump area.
Sepco
Scope CLOSED
Manhole opening are covered
with chequered plate without
handle and fix hing. Provision
of hinge and locking
arrangement to be provide.
Sepco
Scope
CLOSED
Operational Raw water Pump
01,02 &03 motor and pump
coupling to be guarded with
mesh/net guard. To restrict the
contact with body part.
Sepco
Scope
CLOSED
Chemical can/container kept on
uneven soil ground and open to
atmosphere. Need to be kept
on concrete level firmed with
designated area. Chemical
container/ can must be kept in
side the shed.
Sepco
Scope
CLOSED
Inside MCC room of PC
transformer noticed open cutout
in operational area.Need to
cover with firmed level cover.
Sepco
Scope
2014.2.20
Hand railing required near
economisor (north side)
Sepco
Scope
Structure support missing near
PA Fan #3A
Sepco
Scope
CLOSED
Toe guard required in flap gate
platform of every ESP duct.
Sepco
Scope
Dust extraction system not
connected with conwayor box
and water suppresion system
work in progress. While
operating the conwayor Dust
extraction and water
suppression system must be in
operation to reduce dust in
working area.
Sepco
Scope
CLOSED
Handrailing required on 8A &
8B conveyor head end floor
Sepco
Scope CLOSED
Handrail misssing and floor
open edge.Single Horrizontal
Wire rope sling not sufficient for
operational area as fall
prevention. Provision of fall
protection as hand rail to be
provide or enclose area with
brick wall metal sheet.
Sepco
Scope
CLOSED
Fixed fire fighting installation
not in operation mode.
Sepco
Scope
Open sprinkler must be
arranged in spray pipe line to
avoid the fire hazard.And
system must be charged with
water.
Sepco
Scope
LHS cable wire,detectors must
be provided.Systems are not
there.
Sepco
Scope
Detector and alarm system
installed in coal complex
cabinet.But still not in service.
Sepco
Scope
Fire fighting installation not
available for readily use.
Sepco
Scope
Fire fighting installation not
available for readily use.
Sepco
Scope
Sprinkler system installed but
not charge with water
Sepco
Scope
Stair case area to be
illumunated.
Sepco
Scope
Extinguisher required for
clamping to avoid the
rusting.Exttinguisher kept in
contact with water.
Sepco
Scope
Sprinkler to be arranged in
spray line.
Sepco
Scope
Hydrants leveling and proper
approach to be provided.
Sepco
Scope
Operating wheel to be provided
in riser landing valve.
Sepco
Scope
Sprinkler to be installed in spray
line.
Sepco
Scope
Fixed fire fighting equipment not
available.
Fixed fire fighting equipment not
available.
Open cut out on floor for piping
may cause for material fall in
tunnel walkway area.
Sepco
Scope
CLOSED
Fire fighting installation is not
done
Sepco
Scope
Cable tray structure may hit to
the head while ascending on
cross over ladder.
Sepco
Scope
Pull cord rope not provided
Sepco
Scope
Water logging in working area
due to failure of dewatering
pump
Sepco
Scope
CLOSED
Fire Fighting installation not
available
Sepco
Scope
Exhaust fan was found without
guard
Sepco
Scope CLOSED
Open cut out found near
MCC/PCC room.
Sepco
Scope
CLOSED
Cable trench open.The chances
of fall hazars may be possible
on opening.
Sepco
Scope
CLOSED
Exhaust fan was found without
guard
Sepco
Scope
CLOSED
Detectors installed but not in
operation mode.
Sepco
Scope
Rubber mat not available
Sepco
Scope
Spray system installed but not
in service.
Sepco
Scope
Fire system erected but not in
service.
Sepco
Scope
Landing valve installed in riser
but water not available.
Sepco
Scope
Detection and alarm system
installed but not in service.
Sepco
Scope
Area visibility with proper
nomenclature missing.
Sepco
Scope
Existing of LHS cable was
missing.
Sepco
Scope
Detection system not available.
Sepco
Scope
Detection system erected but
not in service
Sepco
Scope
Fire system is not in operative
condition.
Sepco
Scope
Cylinders carry on was not in
proper way.
Sepco
Scope
Detector system erected but not
in service.
Sepco
Scope
Cable trench open.The chances
of fall hazars may be possible
on opening.
Sepco
Scope
CLOSED
Drainage open near multigrate
filter area.
Sepco
Scope CLOSED
Cable trench open covering
required.
Sepco
Scope
CLOSED
Area visibility with proper
nomenclature missing.
Sepco
Scope
Stacker & reclaimer unit
structural stairacse hand rail not
available.
Sepco
Scope
Fire fighting riser landing valve
and line not in operational mode
Sepco
Scope
Open cut out back side of mill
3C.
Sepco
Scope
Detection system erected but
not in operative condition
Sepco
Scope
Construction of Treads of stair
case not a proper way.There is
gap.consquently may be
chances of fall hazards.
Sepco
Scope
Open cut out was found near
sump pump.
Sepco
Scope CLOSED
Detection system erected but
not in operative condition.
Sepco
Scope
Open cut out found.There may
be chancess of fall hazard.
Sepco
Scope
2014.2.28
Existing of nomenclature was
missing.
Sepco
Scope
There is not proper
approach.Due to lake of
identification and Monitor is not
in operative condition.
Sepco
Scope

2014.2.28
Hand railing missing on stair
case (west side) and toe guard
to be provided in first
tread,there is chances of fall
hazards.
Sepco
Scope
Detection system available but
not in service.
Sepco
Scope
Fire detection and protection
like Deluge valve , Sprinkler,
smoke detector etc. not in
operational mode.
Sepco
Scope
Detector and alarm system not
available.
Sepco
Scope
Fire system is not in operative
condition.
Sepco
Scope
Near tail end side was found
open area.There are missing of
railing/perling
Sepco
Scope
CLOSED
Fire system is not in operative
condition.
Sepco
Scope
One side hand railing of stair
case was detached of shield air
fan .
Sepco
Scope
Shoft of shield air fan was
unguarded. It is violation of
factory act 1948.
Sepco
Scope
Staircase consistency need to
be improve. 150 mm treads is
not safe for ascending or
decsending on tank.
Sepco
Scope
CLOSED
One channel foul with head
during climbing on the staircase
(temporary lift side) in between
7.7 mtr to 17.5 mtr.
Sepco
Scope
Rubber mat is miissing infront
of some pannel.
Sepco
Scope
Smoke detector system
installed but not in operation.
Sepco
Scope
Boiler Turbine E&I AI
Target
date
Target
date
Target
date
Target dateRemarks
CLOSED
CLOSED
CLOSED
CLOSED

2014.2.2
0
no
design)
(clo
sed)
Safety
CLOSED
2014.2.20
NO DESIGN
CLOSED
CLOSED
NO DESIGN
CLOSED
CLOSED
2014.2.22
2014.2.22
CLOSED
CLOSED
CLOSED
CLOSED
2014.2.22
(clo
sed)
CLOSED
2014.2.22
2014.2.15
2014.2.10
2014.2.20
2014.2.22
2014.2.22
2014.2.22
2014.3.2
0

2014.2.28
2014.2.22
CLOSED
NO
DESIGN
CLOSED
CLOSED
CLOSED
CLOSED

SWAS

2014.02.25

2014.02.25

2014.02.25

CLOSED
NO
PROBLEM
CLOSED
CLOSED
CLOSED
CLOSED
2014.2.28
CLOSED
NO DESIGN
CLOSED

C
LOSED
CLOSED
WAITING
FOR
VENDOR
28/2/201
4

CLOSED
CLOSED
CLOSED
20.02.20
14
CLOSED
CLOSED
CLOSED
(no
design)
CLOSED
KMPCL O & M
Remarks
SEPCO KMPCL
Required Attended Not attended
Not
installed,SEPCO to
provide the
installation date.
Attended Not attended
Provide finsh date Attended Not attended
Provide finsh date Attended
Provide finsh date

2014.2.20
Not attended
Please write in
english
Provide finish date
no
design)
Required
Provide finsh date
WAITING
FOR
MATERIAL
Not attended
Attended Not attended
Not completed Attended Not attended
NEED U3
SHUTDOWN
Not attended
NEED U3
SHUTDOWN
Not attended
NEED U3
SHUTDOWN
Not attended
Provide finsh date Attended Not attended
Not completed 2014.2.20 Not attended
Attended Not Attended
Pending NO DESIGN Required
Attended Not attended
Attended Not attended
Required NO DESIGN Required
Pending Attended Not Attended
Attended Not attended
Attended Not attended
Attended Not attended
Required Attended Not attended
Not completed Attended Not attended
2014.2.20
not attended
Attended not attended
Attended not attended
Provide finsh date Attended not attended
Attended Not attended
Attended Not attended
Attended Not attended
2014.2.22 Not attended
2014.2.22 Not attended
Attended Not attended
Attended Not attended
Attended Not attended
Attended Not attended
2014.2.22 Not attended
Not completed Attended Not attended
Required Attended Not attended
2014.2.22 Not attended
Provide finish date 2014.2.15 Not attended
Required 2014.2.10 Not attended
2014.2.20 Not attended
2014.2.22 Not attended
2014.2.22 Not attended
Attended Not attended
2014.2.22 Not attended
2014.3.20

Not attended
2A completed,01 A
some missing
2014.2.28 Not attended
Attended Not attended
pending for
installion of
nozzles
Attended Not attended
Attended Not attended
Attended Not attended
Attended Not attended
Attended Not attended
System not in
operational
Attended Not attended
Required Attended Not attended
Attended Not attended
Attended Not attended
Provide finish date Attended Not attended
Not completed Attended Not attended
Provide finish date Not attended
Provide finish date 2014.02.25 Not attended
Not completed 2014.02.25 Not attended
Provide finish date 2014.02.25 Not attended
Attended Not attended
Provide finish date NO PROBLEM
trolly is
required
Attended Not attended
Attended Not Attended
Attended Not Attended
Total Trench
covered with
Concrete slab but
1.5 mtrX1 meter
cut out pending
near 01G HP
pump local
electrical cabinet
Attended Not Attended
Provide finish date No design Required
Provide finish date Attended Not Attended
Provide finish date Attended Not attended
Provide finish date 2014.2.28 Not attended
Attended Not attended
Not completed NO DESIGN reruired
Attended Not attended
Attended Not attended
2014.2.28
Not attended
Pending NO DESIGN Required
Required

2014.2.28
Not attended
Provide finish date Attended Not attended
WAITING
FOR
VENDOR
28/2/2014
Not attended
Not completed Attended Not attended
Available but not in
operational
Attended Not attended
Attended Not attended
Attended Not attended
20.02.2014 Not attended
Provide finish date Attended Not attended
Provide finish date Attended Not attended
Pending(HRSCC)T
ank
Attended Not attended
Required Attended Not attended
Provide finish date No design Not attended
Attended Not attended
CR
cr
cr
Cr
vc
VC
Standard
requirement
cr
vr
cr
CR Front available
CR Front available
CR Front available
Cr
VC
Cr
Design
VC
VC
Design
Cr
Cr
ot
Ot
Ot
Cr
Cr
oth
cr
oth
Cr
oth
cr
VC
VC
VC
VC
VC
VC
VC
Cot
Oth
VC
Cr
oth
VC
VC
VC
Oth
VC
VC
Cr
Cr
VC
Cr
Cr
Cr
Cr
VC
Cr
VC
VC
Cr
Leakage is
there
VC
Oth
VC
VC
VC
VC
VC
Cr
Cr
Cr
oth
Cr
Cr
Cr
VC
Oth
oth
VC
VC
oth
Cr
oth
VC
VC
VC
VC
oth
VC
oth
VC
Cr
Cr
CR
Cr

You might also like