You are on page 1of 12

FREQUENCIES VARIABLES=Q1 Q2 Q3 Q4

/STATISTICS=VARIANCE MINIMUM MAXIMUM MEAN MEDIAN MODE SKEWNESS SESKEW


/PIECHART FREQ
/ORDER=ANALYSIS.


Frequencies


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Statistics

Gender Age Marital Status Income
N Valid 360 360 360 360
Missing 8 8 8 8
Mean 1.3028 1.1417 1.0861 1.7833
Median 1.0000 1.0000 1.0000 1.0000
Mode 1.00 1.00 1.00 1.00
Variance .212 .122 .079 2.036
Skewness .862 2.064 2.963 1.641
Std. Error of Skewness .129 .129 .129 .129
Minimum 1.00 1.00 1.00 1.00
Maximum 2.00 2.00 2.00 6.00


Frequency Table


Gender

Frequency Percent Valid Percent Cumulative Percent
Valid Male 251 68.2 69.7 69.7
Female 109 29.6 30.3 100.0
Total 360 97.8 100.0

Missing System 8 2.2

Total 368 100.0



Age

Frequency Percent Valid Percent Cumulative Percent
Valid 18-25 309 84.0 85.8 85.8
26-35 51 13.9 14.2 100.0
Total 360 97.8 100.0

Missing System 8 2.2

Total 368 100.0



Marital Status

Frequency Percent Valid Percent Cumulative Percent
Valid Single 329 89.4 91.4 91.4
Married 31 8.4 8.6 100.0
Total 360 97.8 100.0

Missing System 8 2.2

Total 368 100.0



Income

Frequency Percent Valid Percent Cumulative Percent
Valid Less than 5k 262 71.2 72.8 72.8
5k-10k 15 4.1 4.2 76.9
11k-25k 16 4.3 4.4 81.4
26k-35k 49 13.3 13.6 95.0
36k-60k 2 .5 .6 95.6
Above 60 k 16 4.3 4.4 100.0
Total 360 97.8 100.0

Missing System 8 2.2

Total 368 100.0






Pie Chart



Descriptives

DESCRIPTIVES VARIABLES=Q32 Q33 Q34 Q35 /STATISTICS=MEAN STDDEV VARIANCE MIN MAX KURTOSIS SKEWNESS.


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Descriptive Statistics

N Minimum Maximum Mean Std. Deviation Variance Skewness Kurtosis

Statistic Statistic Statistic Statistic Statistic Statistic Statistic Std. Error Statistic Std. Error
Intangible dimensions 360 2.63 5.00 3.9833 .70863 .502 -.204 .129 -.970 .256
Tangible Dimensions 360 2.00 5.00 3.9944 .60405 .365 -1.824 .129 -1.366 .256
Moderator 360 2.25 5.00 4.1667 .82611 .682 -.766 .129 -.302 .256
CPB 360 2.67 4.89 3.9481 .57294 .328 -.384 .129 -.588 .256
Valid N (listwise) 360



CORRELATIONS /VARIABLES=Q32 Q33 Q34 Q35 /PRINT=TWOTAIL NOSIG /MISSING=PAIRWISE.


CORRELATIONS /VARIABLES=Q32 Q33 Q34 Q35 /PRINT=TWOTAIL NOSIG /MISSING=PAIRWISE.




















Correlations


[DataSet1] C:\Users\Compaq\Desktop\new.sav
Correlations

Intangible
dimensions
Tangible
Dimensions Moderator CPB
Intangible dimensions Pearson Correlation 1 -.267
**
.915
**
-.336
**

Sig. (2-tailed)

.000 .000 .000
N 360 360 360 360
Tangible Dimensions Pearson Correlation -.267
**
1 -.199
**
.319
**

Sig. (2-tailed) .000

.000 .000
N 360 360 360 360
Moderator Pearson Correlation .915
**
-.199
**
1 -.258
**

Sig. (2-tailed) .000 .000

.000
N 360 360 360 360
CPB Pearson Correlation -.336
**
.319
**
-.258
**
1
Sig. (2-tailed) .000 .000 .000

N 360 360 360 360
**. Correlation is significant at the 0.01 level (2-tailed).


REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05) POUT(.10) /NOORIGIN /DEPENDENT Q35
/METHOD=ENTER Q32.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 Intangible
dimensions
a

. Enter
a. All requested variables entered.
b. Dependent Variable: CPB


Model Summary
Model R R Square Adjusted R Square
Std. Error of the
Estimate
Change Statistics
R Square Change F Change df1 df2 Sig. F Change
1 .336
a
.113 .110 .54038 .113 45.568 1 358 .000
a. Predictors: (Constant), Intangible dimensions


ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression 13.306 1 13.306 45.568 .000
a

Residual 104.540 358 .292

Total 117.847 359

a. Predictors: (Constant), Intangible dimensions
b. Dependent Variable: CPB


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 5.030 .163

30.894 .000
Intangible dimensions -.272 .040 -.336 -6.750 .000
a. Dependent Variable: CPB


REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05) POUT(.10) /NOORIGIN /DEPENDENT Q34
/METHOD=ENTER Q32.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 Intangible
dimensions
a

. Enter
a. All requested variables entered.
b. Dependent Variable: Moderator


Model Summary
Model R R Square Adjusted R Square
Std. Error of the
Estimate
Change Statistics
R Square Change F Change df1 df2 Sig. F Change
1 .915
a
.837 .836 .33418 .837 1835.872 1 358 .000
a. Predictors: (Constant), Intangible dimensions


ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression 205.020 1 205.020 1835.872 .000
a

Residual 39.980 358 .112

Total 245.000 359

a. Predictors: (Constant), Intangible dimensions
b. Dependent Variable: Moderator


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) -.081 .101

-.807 .420
Intangible dimensions 1.066 .025 .915 42.847 .000
a. Dependent Variable: Moderator


COMPUTE IntangIPT=(Q32 * Q34). EXECUTE. REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05)
POUT(.10) /NOORIGIN /DEPENDENT Q35 /METHOD=ENTER IntangIPT.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 IntangIPT
a
. Enter
a. All requested variables entered.
b. Dependent Variable: CPB


Model Summary
Model R R Square Adjusted R Square
Std. Error of the
Estimate
Change Statistics
R Square Change F Change df1 df2 Sig. F Change
1 .308
a
.095 .092 .54587 .095 37.488 1 358 .000
a. Predictors: (Constant), IntangIPT


ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression 11.171 1 11.171 37.488 .000
a

Residual 106.676 358 .298

Total 117.847 359

a. Predictors: (Constant), IntangIPT
b. Dependent Variable: CPB


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 4.465 .089

50.035 .000
IntangIPT -.030 .005 -.308 -6.123 .000
Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 4.465 .089

50.035 .000
IntangIPT -.030 .005 -.308 -6.123 .000
a. Dependent Variable: CPB


REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05) POUT(.10) /NOORIGIN /DEPENDENT Q35
/METHOD=ENTER Q33.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 Tangible
Dimensions
a

. Enter
a. All requested variables entered.
b. Dependent Variable: CPB


Model Summary
Model R R Square Adjusted R Square
Std. Error of the
Estimate
Change Statistics
R Square Change F Change df1 df2 Sig. F Change
1 .319
a
.102 .099 .54371 .102 40.649 1 358 .000
a. Predictors: (Constant), Tangible Dimensions





ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression 12.017 1 12.017 40.649 .000
a

Residual 105.830 358 .296

Total 117.847 359

a. Predictors: (Constant), Tangible Dimensions
b. Dependent Variable: CPB


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 2.738 .192

14.269 .000
Tangible Dimensions .303 .048 .319 6.376 .000
a. Dependent Variable: CPB



REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05) POUT(.10) /NOORIGIN /DEPENDENT Q34
/METHOD=ENTER Q33.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 Tangible
Dimensions
a

. Enter
a. All requested variables entered.
b. Dependent Variable: Moderator


Model Summary
Model R R Square Adjusted R Square
Std. Error of the
Estimate
Change Statistics
R Square Change F Change df1 df2 Sig. F Change
1 .199
a
.040 .037 .81070 .040 14.777 1 358 .000
a. Predictors: (Constant), Tangible Dimensions


ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression 9.712 1 9.712 14.777 .000
a

Residual 235.288 358 .657

Total 245.000 359

a. Predictors: (Constant), Tangible Dimensions
b. Dependent Variable: Moderator


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 5.254 .286

18.362 .000
Tangible Dimensions -.272 .071 -.199 -3.844 .000
a. Dependent Variable: Moderator


COMPUTE TangIPT=(Q33 * Q34). EXECUTE. REGRESSION /MISSING LISTWISE /STATISTICS COEFF OUTS R ANOVA CHANGE /CRITERIA=PIN(.05)
POUT(.10) /NOORIGIN /DEPENDENT Q35 /METHOD=ENTER TangIPT.


Regression


[DataSet1] C:\Users\Compaq\Desktop\new.sav


Variables Entered/Removed
b

Model Variables Entered Variables Removed Method
1 TangIPT
a
. Enter
a. All requested variables entered.
b. Dependent Variable: CPB


Model Summary
Model R R Square
Adjusted R
Square
Std. Error of the
Estimate
Change Statistics
R Square
Change F Change df1 df2 Sig. F Change
1 .009
a
.000 -.003 .57372 .000 .029 1 358 .866
a. Predictors: (Constant), TangIPT


ANOVA
b

Model Sum of Squares df Mean Square F Sig.
1 Regression .009 1 .009 .029 .866
a

Residual 117.837 358 .329

Total 117.847 359

a. Predictors: (Constant), TangIPT
b. Dependent Variable: CPB


Coefficients
a

Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig. B Std. Error Beta
1 (Constant) 3.926 .134

29.230 .000
TangIPT .001 .008 .009 .169 .866
a. Dependent Variable: CPB

You might also like