This document contains a basic maintenance program for a cement mill. It lists various pieces of mechanical equipment in the mill such as belt conveyors, gearboxes, pulleys, and chutes. For each item, it describes maintenance activities to be performed at regular intervals including daily, weekly, monthly, and yearly. The activities include checking for wear, leaks, proper operation, and lubricating or changing fluids. The goal is to maintain the equipment in good working condition through regularly scheduled inspections and servicing.
This document contains a basic maintenance program for a cement mill. It lists various pieces of mechanical equipment in the mill such as belt conveyors, gearboxes, pulleys, and chutes. For each item, it describes maintenance activities to be performed at regular intervals including daily, weekly, monthly, and yearly. The activities include checking for wear, leaks, proper operation, and lubricating or changing fluids. The goal is to maintain the equipment in good working condition through regularly scheduled inspections and servicing.
This document contains a basic maintenance program for a cement mill. It lists various pieces of mechanical equipment in the mill such as belt conveyors, gearboxes, pulleys, and chutes. For each item, it describes maintenance activities to be performed at regular intervals including daily, weekly, monthly, and yearly. The activities include checking for wear, leaks, proper operation, and lubricating or changing fluids. The goal is to maintain the equipment in good working condition through regularly scheduled inspections and servicing.
Basic Maintenance programme Form No:Main /ML/4/000 Issue: 1 Page: 1of3 Cement Mill Mech Eqpt. No. & Name / Description of activities S t a t u s L u b . / m a i n Frequency O t h e r s Instruction Remark Bucket elevator,
R/S L/M D W F M 3M 6M Y O * Flexible Coupling (Type: 1. Check the clearance/gap between the coupling halves R M O Std = !"mm #ctual=$$$$$$$$$$$ %. Check the plastic &le'ibles &or wear (Circum&erential backlash) S M O Std = 1*mm #ctual=$$$$$$$$$$$ . Check all &asteners (&or tightness) S M O * Fluid coupling (Westcar) 30/P a. Check &or abnormal sound R M O b. Check oil leakage R M O c. Check oil level S M O Mobil D+, %- d. Check oil temperature R M O Ma'. . "/ o c e. Change oil S 0 O /1earl12 Oil grade3 Mobil D+, %- &. Retighten all bolts S M O g. Check circum&erential backlash on the attached &le'ible coupling S M O 4ear limit (5 Sv)3 ".*mm #ctual = $$$$$$$$ h. Check coupling gap (b/n &lude' 6 &le'ible) S M O Std = %7.-mm #ctual = $$$$$$$$ * Main drive gear box Type: a. Check &or oil leakage R M O b. Check oil level S M O Mobil gear 8% c. Check &or abnormal sound R M O d. Check temperature R M O Ma'. 9* o C e. Check vent (breather) S M O Clean2 i& re:uired &. Change oil S 0 O Ma'. 1" months Oil grade3 Mobil gear 8%2 :t13 1;.8lit g. Check oil :ualit1 S M O Legend: R = Running S = Stop Planning cell Entered in Record Sign. D = Daily W = Weekly F = Fortnightly Sign. Name M = Monthly Y = Yearly Name Prepared by Checked by Date Section Depart. CIMENTO NACIONAL LDA Basic Maintenance programme Form No:Main /ML/4/000 Issue: 1 Page: 2of3 Cement Mill Mech Eqpt. No. & Name / Description of activities S t a t u s L u b . / m a i n Frequency O t h e r s Instruction Remark R/S L/M D W F M 3M 6M Y O h. Check all bolts S M O i. Carr1 out complete inspection o& gear unit S M O * Inching (creep) gearbox Type: a. Check all bolts S M O b. Check the geared motor R M O c. Check oil level S M O Oil grade3 Mobil gear 8* d. +he &unction o& over running coupling. S M O e. Change oil S 0 O Ma'.1" months Oil grade3 Mobil gear 8*2 <t13 .*lit * Drive pulley (Drum) a. Check slippage o& belt R M O b. Check cleanliness o& drum S M O c. Rubber lagging wear/ tear S M O d. Check bearing temperature R M O +ma'. . 8* o C e. Check sealing o& bearing R M O &. 0ubricate the bearings R 0 O *% =ts2 >rease3 ,=!% g. Change grease o& bearings S 0 O *% =ts2 >rease3 ,=!% <t131.%8kg h. Check bearing condition S M O i. Check &or abnormal sound R M O * Belt a. Check straight run o& belt R M O b. Check belt both sides 6 ends &or damage / cuts / cracks R M O c. Check temperature o& belt R M O d. Check tightening tor:ue o& belt clamps S M O +or:ue . /** ?m e. Check all bolts o& buckets S M O &. Check buckets &or wear / tear S M O Legend: R = Running S = Stop Planning cell Entered in Record Sign. D = Daily W = Weekly F = Fortnightly Sign. Name M = Monthly Y = Yearly Name Prepared by Checked by Date Section Depart. CIMENTO NACIONAL LDA Basic Maintenance programme Form No:Main /ML/4/000 Issue: 1 Page: 3of3 Cement Mill Mech Eqpt. No. & Name / Description of activities S t a t u s L u b . / m a i n Frequency O t h e r s Instruction Remark R/S L/M D W F M 3M 6M Y O g. Check buckets &or dirt accumulation S M O * Material discharge chute a. =osition o& discharge plate2 wear2 tear S M O >ap . 1* mm b. 4ear / tear o& discharge chute S M O c. Suction at discharge chute S M O ?o dust in area * Back stop a. Check temperature R M O b. Check &or abnormal sound R M O * Casing a. +he &oundation bolts 6 other casing bolts S M O b. Check &or wear / tear / dirt accumulation S M O c. Check all doors / windows S M O @or proper sealing/ wear d. Check bottom &eed chute &or wear S M O * Return pulley a. Check slippage o& belt S M O b. Cleanliness o& drum / area S M O c. Check bearing temperature R M O +ma' . 8* o C d. Check sealing o& bearing R M O e. Check oil level in the bearings R M O Oil grade3 Mobil gear 8* &. Check tension device R M O Clearance / movement g. Check tension rods / bush wear R M O h. 0ubricate pillow blocks 6 roller &or tension device R 0 O 0ub3 ,=!% i. Change oil o& bearings S 0 O Oil grade3 Mobil gear 8*2 :t13 1lit A. Check bearing condition S M O k. Check &or abnormal sound R M O Legend: R = Running S = Stop Planning cell Entered in Record Sign. D = Daily W = Weekly F = Fortnightly Sign. Name M = Monthly Y = Yearly Name Prepared by Checked by