You are on page 1of 15

BOAZ NVERSTES

STAJ PROGRAM DEFTER


TRAINING PROGRAM DIARY

















RENCNN
STUDENTS


SOYADI, ADI :
SURNAME, NAME: HANDERE, Sefa

BLM :
DEPARTMENT: Civil Engineering

RENM YILI :
TRAINING YEAR: 2014

SUBMISSION RULES
Of
TRAINING PROGRAM DIARY


Companys or authorized engineers signature and seal have to be placed on every pages of training diary.
Trainee must attach his/her own photograph to first page of training diary.
Evaluation Form (Employer Report on Internship) must be approved by companys seal and signature. And it
has to be submitted in an envelope which is closed and again sealed by company.
Evaluation Letter (Assessment of Internship), differently from General Report, contains positive and negative
opinions of trainee about the company. This letter must take place in Training Program Diary.
Training diary and documents (photographs, drawings, forms, and letters) related with training must be delivered
in an envelope (A4 A3). The documents which are not submitted in envelope (with mail, late submission of
some documents) certainly will not be evaluated.
Training diary has to be printed out or written with a pen in English.
Late Submissions may result with losing points. 7 and over - day delays will not be accepted.
Training diary must be submitted to the authorized assistant. Training diary which is submitted to other assistants
or secretary will not be evaluated.
In addition to signatures, IMO NUMBER and PHONE NUMBER of ENGINEER also must be written
under the week report of training.












Staj program
Training Program

Defter No:
Diary book No : 1 .


Soyad, Ad :
Surname, Name : HANDERE, Sefa
Blm :
Department : Civil Engineering



YAPILAN PRATK [*]
ACCOMPLISHMENTS


Messese ve i yeri
Name and place of company

Ksm
Department

e balama
tarihi
Starting date

Ayrld tarih
Completion
date

almad
Gnler
Nonworking
days

alt
Gnler
Working
days
TEKFEN Real Estate Development
The Sales Office For HEP flats

Construction

11.08.2014

13.09.2014



30

















Resim
Picture

11.08.2014 Tarihinden 16.08.2014 tarihine kadar bir haftalk alma
From 11.08.2014 to 16.08.2014 weekly service

GN
DAYS
YAPILAN LER
WORK ACCOMPLISHED
Sayfa No.
Page Nr.
ALIILAN SAAT
WORKING HOURS
Pazartesi
Monday
Orientation 8
Sal
Tuesday
Health & Safety introduction
8
Information about construction site and status
aramba
Wednesday
Dimension control for members
8
Applying of front main columns
Perembe
Tuesday
Applying front main columns

8
Applying main and minor beams between front
main columns and intermediate columns

Making suitable path for cranes
Cuma
Friday
Determining stiffener plates locations 8
Welding stiffener plates on weld connection
Cumartesi
Saturday
Completing bolts
8 Bolts torqueing
Welding stiffener plates on weld connection
Toplam (Total) 48

rencinin imzas :........................................................................................................................
Signature of trainee
alt i yeri ve ksm :........................................................................................................................
Work place
Kontrol edenin nvan, soyad, ad :........................................................................................................................
Name and title of the controlling superior
mza ve kae :........................................................................................................................
Signature and stamp


18.08.2014 Tarihinden 23.08.2014 tarihine kadar bir haftalk alma
From 18.08.2014 to 23.08.2014 weekly service

GN
DAYS
YAPILAN LER
WORK ACCOMPLISHED
Sayfa No.
Page Nr.
ALIILAN SAAT
WORKING HOURS
Pazartesi
Monday
Pouring with grout to main columns anchorage
8
Placing first floor stairs
Welding
Sal
Tuesday
Placing deck sheet for the first floor
8 Preparing cantilever beams for welding
Welding cantilever beams
aramba
Wednesday
Bolt changing
8
Cantilever beam welding
Placing deck sheet
Perembe
Tuesday
Bolt changing
8 Cantilever beam welding
Working on standards
Cuma
Friday
Bolt changing
8 Placing steel mesh reinforcement
Cumartesi
Saturday
Placing steel mesh reinforcement

14
Determining level for concrete
Concrete pouring to the first floor
Toplam (Total) 54

rencinin imzas :........................................................................................................................
Signature of trainee
alt i yeri ve ksm :........................................................................................................................
Work place
Kontrol edenin nvan, soyad, ad :........................................................................................................................
Name and title of the controlling superior
mza ve kae :........................................................................................................................
Signature and stamp




25.08.2014 Tarihinden 30.08.2014 tarihine kadar bir haftalk alma
From 25.08.2014 to 30.08.2014 weekly service

GN
DAYS
YAPILAN LER
WORK ACCOMPLISHED
Sayfa No.
Page Nr.
ALIILAN SAAT
WORKING HOURS
Pazartesi
Monday
Determining axes on the first floor
8
Placing backside stair
Cantilever beam welding
Sal
Tuesday
Making frames for drywall
8 Making path for electrical cables
Placing air conditioners
aramba
Wednesday
Roof works
8 Suspended ceiling preparation
Drywall application
Perembe
Tuesday
Roof works
8
Siding with boardex
Suspended ceiling application
Cuma
Friday
Roof works
8
Drywall application
Making frames for glass wall
Insulation in boardex
Plastering works
Cumartesi
Saturday
Roof works
8 Drywall and boardex application
Making frames for glass wall
Toplam (Total) 48

rencinin imzas :........................................................................................................................
Signature of trainee
alt i yeri ve ksm :........................................................................................................................
Work place
Kontrol edenin nvan, soyad, ad :........................................................................................................................
Name and title of the controlling superior
mza ve kae :........................................................................................................................
Signature and stamp



01.09.2014 Tarihinden 06.09.2014 tarihine kadar bir haftalk alma
From 01.09.2014 to 06.09.2014 weekly service

GN
DAYS
YAPILAN LER
WORK ACCOMPLISHED
Sayfa No.
Page Nr.
ALIILAN SAAT
WORKING HOURS
Pazartesi
Monday
Roof works
8
Plastering works
Drywall and boardex application
Sal
Tuesday
Roof works
8
Decorative pool and wall
Drywall and boardex application
aramba
Wednesday
Roof works

8
Road way preparations
Decorative pool and wall
Drywall and boardex application
Perembe
Tuesday
Roof works
8
Road way preparations
Drywall and boardex application
Decorative pool and wall
Cuma
Friday
Roof works
8 Preparations for spot light
Road way preparations
Cumartesi
Saturday
Roof insulation
8 Inspection holes
Insulation in chamber walls
Toplam (Total) 48

rencinin imzas :........................................................................................................................
Signature of trainee
alt i yeri ve ksm :........................................................................................................................
Work place
Kontrol edenin nvan, soyad, ad :........................................................................................................................
Name and title of the controlling superior
mza ve kae :........................................................................................................................
Signature and stamp


NDEKLER
TABLE OF CONTENTS
Yaprak No:
Page Nr.1







I. TABLE OF CONTENTS 1
II. GENERAL REPORT 2
III. DESCRIPTION OF COMPANY 3
IV. INTERNSHIP ACTIVITIES 4 33
V. ASSESMENT OF THE INTERNSHIP 34
VI. CONCLUSION 35
VII. SUPPLEMENTARY DOCUMENTS 36 - 37



08.09.2014 Tarihinden 13.09.2014 tarihine kadar bir haftalk alma
From 08.09.2014 to 13.09.2014 weekly service

GN
DAYS
YAPILAN LER
WORK ACCOMPLISHED
Sayfa No.
Page Nr.
ALIILAN SAAT
WORKING HOURS
Pazartesi
Monday
Roof insulation
8 Preparations for spot light
Insulation in chamber walls
Sal
Tuesday
Roof insulation 8
Road way contruction
aramba
Wednesday
Roof insulation

8
Road way construction
Cement finish
Main Column painting
Perembe
Tuesday
Glass wall application

8
Landscaping
Painting job
Road way construction
Cuma
Friday
Landscaping -
8 Glass wall application

Cumartesi
Saturday
Landscaping
8 Glass wall application
Controls
Toplam (Total) 48

rencinin imzas :........................................................................................................................
Signature of trainee
alt i yeri ve ksm :........................................................................................................................
Work place
Kontrol edenin nvan, soyad, ad :........................................................................................................................
Name and title of the controlling superior
mza ve kae :........................................................................................................................
Signature and stamp




GENEL RAPOR
GENERAL REPORT
Yaprak No:
Page Nr.2


During my training program at The Sales Office project for HEP flats, I have learned lots of things about
construction, applications of design projects, management of a construction project and departments. I believe in it,
that this experience will help me by my future courses and lectures. Moreover, I gained a wider vision about the
construction sector.
I had to chance to learn and observe reinforcement concrete works and steel assembly. Understanding the
reinforcement, steel structure design projects; observing the applications of these works was main parts of my
training..
Nowadays the quality management has an important role in the construction business. Before and after
production the quality has to be checked. Laboratory and experiments are one of the important indicators. All
works done in the project are in accordance with the international standards. This is a deterministic factor for
clients also. I have learned the processes and operation of quality management department in the training program.
On the other hand, safety is another significant issue at a construction site. Preventing accidents, protecting
environment from bad effects of the work and keeping all workers healthy are the responsibilities of the firm. HSE
department deals with these subjects. There are several dangerous jobs at the site and every worker is trained, as
well as me. I have learned the precautions and possible incidents and accidents which can occur at the site.
Besides the construction work, for me the most important things are planning and cost control. If we look at the
job as the management of a project, these two divisions are the guide lights of the project. Management of workers,
staff, materials, equipment, machines, money and time are the major factors that affect whole project. Daily,
monthly, quarterly plans and reports are prepared by the departments.
To conclude, there are lots of different works and different departments in such an organization. I could have the
chance to see how these departments and works are done and also related to each other. To my opinion, this
training program helped me by improving myself.


RKET TANITIMI
DESCRIPTION OF COMPANY
Yaprak No:
Page Nr.3




In 2000, Tekfen Holding established Tekfen Real Estate Development Group with the goal of
developing high quality and innovative projects needed throughout the country in the real estate industry. The
projects completed by the Group since 2000, such as Akmerkez, Taksim Residences, Tekfen Tower, Tekfen
Yalkavak Residences, Bodrum Mklm iftlii and Levent Ofis projects are good examples of this
approach.
Tekfen Real Estate Development Group carries out efforts to provide the highest standards from
design to operation in the Kathane Bomonti, Izmir and Konya projects, for which investments are currently
underway
In addition to Tekfen Real Estate Developments current portfolio (including the Kathane Ofispark,
Levent Ofis, and Bodrum Mklm iftlii projects), the Tekfen Bomonti Apartments, zmir Mixed-Use
and Konya Kozaa Residences projects currently underway stand out as projects that are integrated within
their surrounding environments, making a difference with their concepts, and adopting a sustainability
policy, from design to operation.
Capitalizing on its experience and vision Tekfen Real Estate Development has stepped forward to
develop unique housing and commercial real estate projects and continues to be a reference point in the
sector.



RKETN DEERLENDRLMES
ASSESMENT OF THE INTERNSHIP
Yaprak No:
Page Nr.34


1. What skills and qualifications you think that you have gained from internship?

I learned to understand the projects and how they are going to be applied. I have learned how to communicate
with workers on the site and the most importantly I learned how to follow up work process in the site.

2. What kind of responsibilities you have undertaken during the internship period?

I was responsible of doing controls whether applications were right or wrong in the project.

3. How do you think the internship will influence your future career plans?

It is an important experience to me to see and work on a site.

4. How do you think the internship activities that you carried out are correlated with your classroom knowledge?

Unfortunately I did not take steel structure courses at Boazii University yet but this internship gave me some
ideas for next semester courses. On the other hand material sciences and strength of materials courses which I
took in Boazii University helped me in the construction site.

5. Did you face any problem related with communication, application to training and acceptation by company during
training?
No
Yes , Explain.

6. In the first day of training, do you think that orientation of the company and meeting with employee procedure is adequate?
Very Bad Very well
1 2 3 4 5 6 7 8 9 10

7. Was the company meet the need of your application demands related with training place and department?
Yes Partially No

8. Whats the contribution level of this training on your skill and knowledge?
Zero Contribution So Much
1 2 3 4 5 6 7 8 9 10


9. How is the attitude of the employees against you?
Negative Positive
1 2 3 4 5 6 7 8 9 10


10. What are your suggestions about training?
-

11. Do you want to complete remaining days of training in same company?
Yes.

SONU
CONCLUSION
Yaprak No:
Page Nr.35

:

I have learned so many things about the construction and its management. I had to chance to put the theory
into practice and gain a realistic opinion about the working conditions for engineers in such companies. I
observed the living and working conditions, personal relations as well as the technical aspects of the work.
Considering the future of the construction sector, it is obvious that, there will be lots of jobs in foreign
countries, especially in the developing countries. I think I can work at sites for a long time



EK DOKUMANLAR
APPENDICES AND SUPPLEMENTARY DOCUMENTS
Yaprak No:
Page Nr.36

Finished Structure Photos




Front side



Back side

EK DOKUMANLAR
APPENDICES AND SUPPLEMENTARY DOCUMENTS
Yaprak No:
Page Nr.37



Left Side


Right Side

You might also like