Construction Planning, Scheduling, Estimating
Friday/ 6-9 PM
March 25,
contract conditions and meticulous examination of the site of the work by the
estimating engineers, by the chief engineer, if advisable, and very possibly by the
VP-operations and perhaps the president, unless one of them has had previous
experience in the immediate area and has clearly in his mind any difficulties to look
for and how it may be possible to avoid them.
A sound understanding of the abilities of the owners engineers, their general
attitude and policies, and the general practices of a federal, state, or regional
agency or public commission is a must. The contractor who is deciding whether to
bid or, if he decides to bid, what to add on or subtract from his bid for the
engineer is exercising one of the most important elements of bid strategy.
Influence of the Owners Engineer
If the work to be bid on is complicated but within the capabilities of the contractor
and the time is short for construction, the contractor must decide whether the
engineer can be trusted to avoid engineer-caused delays and cooperate toward
expediting the work to permit construction on time and within bid cost. If the
contractor decides that the engineer is competent, will make prompt decision, and
will render fair rulings in gray areas then subject to his decision on his ability to
beat the competition he will bid the job on a basis to win , and with minimum
contingency money to cover only direct physical hazards.
Influence of Competition
A shrewd analysis of the probable competition and its potentials in deciding whether
to submit a proposal on a given project, and prior to bidding if the decision is
affirmative, is most essential. A simple rather straight forward project in a familiar
area with average to good climate and an ample supply of competent labor,
supervised by capable and reasonable engineers, may nevertheless offer little or no
possibility for profit.
Over caution
Not frequently an excess of caution can cause a contractor to pass up a very good
job. The contractor who had wisely chosen to pass up the dam in favor of the more
complicated and less attractive subway work had been most successful
Influence of Experience
The decision having been made to submit a proposal on a given contract and
adequate study having been made to ascertain the fundamentals affecting cost, the
final decision on bid price, target price, or guaranteed max hinges on who the
competition is and how each one is likely to approach the particular job.
Influence on Propaganda
Bidding propaganda between competitors sometimes take the form of elaborate
planning and skillful execution. When proposals are called for on major projects
away format the population centers or bids are scheduled to be opened away from
the site of the work, a t engineer district or division head quarters , naval districts or
perhaps state capitols, competing contractors tend to gather at one or more leading
hotels to finalize their proposals and pick up any available gossip.