HOME > BASICS > SIZING GENGEN-SETS FOR LARGE MOTOR STARTING

Sizing Gen-Sets For Large Motor Starting


Larry A. Bey, Cummins Onan Corp. | Electrical Construction and Maintenance
TWEET

Recommend

EC&M Le
Feb 1, 2000
COMMENTS 3

Remember, an on-site engine-generator set is a limited source of power, both in horsepower available
from the engine, and kVA available from the generator. As such, it must be large enough to start as well as
run connected motor loads. You've lost normal power. Your engine-generator set (gen-set) starts up and
reaches speed. Now, you want to start some large motors key to your operation. Suddenly,

2014 Changes to the


Library
Don't let the scale of the

intimidate you, this library


to speed on the most

Changes to The NEC


Advertisement

Sizing Gen-Sets For Large Motor


Starting
Feb 1, 2008 12:00 PM, By Larry A. Bey, Cummins Onan
Corp.

Don't let the scale of the


intimidate you, this book

to speed on the most ess

The Electrician's Trad


Demystified
Written in a step-

Remember, an on-site engine-generator set is a limited


source of power, both in horsepower available from the
engine, and kVA available from the generator. As such, it
must be large enough to start as well as run connected motor loads.
You've lost normal power. Your engine-generator set (gen-set) starts up and reaches
speed. Now, you want to start some large motors key to your operation. Suddenly, starter
holding coils drop out, starter contacts chatter, and a few motors stall due to insufficient
torque for acceleration. Can this happen to you? It sure can, if you haven't sized your genset properly.

practical guide describes


licensing process, which
region, and...

BROWS

Advertisement

We all know that motors draw a high inrush current during starting:typically six times full
load current. But, inrush currents for the high-efficient motors specified today are almost
double that amount. Motors with high inertia loads can also require up to three times
rated power during starting.
Yes, it's common for motor starting kVA requirements to determine the size of the set.
However, the following factors also play a key role in sizing gen-sets:
Harmonics caused by variable frequency drives.
Use of high-efficiency motors.
Sequential starting of motors.

What's involved. When starting motors, large voltage and frequency dips may occur if
the generator set isn't sized properly. Other loads connected to the generator output may
be more sensitive to voltage and frequency dips than the motor or motor starter, and this
may cause problems. For example, a rate of change greater than 1 Hz/sec in generator
frequency may cause some static UPS units to malfunction.
If the load on the generator set is a single large motor, particularly one requiring high
starting torque, a number of problems can occur. They include: sustained low-voltage
operation that can cause overheating; extended load acceleration times; opening of circuit
breakers or motor protective devices; engine-generator protection shutdowns; and more.

EC&M Webinars

2014

The 2014 National Electr

options to provide Arc Fa

VIEW MO

Your gen-set's ability to start large motors without excessive voltage and frequency dip is
a function of the complete system. This includes:
Advertisement

The engine power available;


The generator's capacity;
The response of the generator excitation system;
The energy stored in the rotating inertia of the gen-set; and
The acceleration of the motor and its load.

You must consider all these factors for proper gen-set sizing. Here's a simple rule for
estimating the size of an engine-generator set for motor starting: 1kW of generator set
rating per each 3/4 to 1 hp of motor nameplate.
Let's look more closely at a motor start. Induction motors have typical starting
characteristics. The curve of motor current versus speed shows that during starting, the
motor draws approximately six times its full load current; this current remains high until
the motor reaches about 80% of speed. This high inrush current causes a dip in generator
voltage. The electric power initially required by the motor (with the motor at standstill) is
about 150% of rated power. The power required by the motor peaks at about 300% of
rated power and 80% of speed with full voltage applied. But, the generator set supplies
less than 300% power because starting voltage is lower than full voltage during

EC&M TV

consistent results and im

acceleration, and because the generator set's rotating inertia transfers energy to the
motor.

hand tools. Productivity.


You Covered....

BROWSE

The motor must develop greater torque than required by the load. The motor's torque
curve at full voltage is above the load's torque curve. The difference between the torque
developed by motor and the torque required by the load determines the rate of
acceleration. Since torque is proportional to voltage, any reduction in voltage means a
proportional reduction in torque.
A properly sized generator set will support the high starting kVA requirements of the
motor, and maintain sufficient output voltage for the motor, so it can develop adequate
torque to accelerate the load to rated speed.

Newsle

Sign-up to receiv

E-MAIL:
COUNTRY:

All standby gen-sets use synchronous generators with exciters. Many are available with
permanent magnet generator (PMG) excitation systems. The PMG provides excitation
power independent of the generator terminal voltage. As such, it can maintain full
excitation:even during transient loading, such as motor starting. Full excitation power
results in a less extensive voltage dip and improved recovery times.
Using reduced-voltage starting. Though a voltage dip often causes various problems,
a controlled reduction in voltage at motor terminals can be beneficial, but only when
reduction in motor torque is acceptable. Reducing motor starting kVA can reduce the
required size of the gen-set, reduce the voltage dip, and provide a softer start for the
motor loads. When sizing gen-sets, you must first determine the acceptable level of motor
torque required during starting, or the loads will accelerate slowly, or even fail to reach
full speed:ultimately causing motor damage.
Using solid-state starters. Solid-state starters can adjust the starting torque,
acceleration ramp time, and current limit for controlled acceleration of a motor when it
starts. For the purpose of sizing a gen-set, the current limit adjustment reduces the inrush
current and may be used to reduce the starting kW and kVA requirement on the
generator. The range of available current limit settings is typically from 150% to 600% of
full-load current. A 600% current limit setting on the solid-state starter results in a genset sizing that's the same as an across-the-line starting. A 300% current limit setting
reduces starting kVA by 50%.
Use of the current limit setting also reduces motor torque available to the load. From a
gen-set sizing perspective, an extended acceleration ramp time and low current limit
setting (if appropriate for the motor and the mechanical load) would result in the least
voltage and frequency excursions.
One downside to using solid-state motor starters is their integral SCRs (silicon-controlled
rectifiers) will cause voltage distortion. To compensate, you'll have to oversize the
generator. The recommendation: two times the running kW load, except where you're
using an automatic bypass. If the solid-state starter does have an automatic bypass, the
SCRs are only in the circuit during starting. Once the motor is running, the bypass

By clicking below, I
Terms of Service
information to communi
its third-party partners' p
research opportunities. P
provide will be consisten

Conne

contactor closes and shunts the SCRs. In this case, you can ignore the voltage distortion
during starting, and you don't have to add generator capacity.
VFDs require larger generators. All versions of variable frequency drives (VFDs) are
current limiting and reduce starting kW and kVA. The current drawn by these drives is
nonlinear (having harmonics), which causes a distorted voltage drop across the reactance
of the generator. Since VFDs are nonlinear, you must include an additional generator
capacity sizing factor to keep voltage distortion to a reasonable level of approximately 15%
total harmonic distortion (THD) or less. The larger the generator, the greater the
reduction in impedance of the power source (generator), which in turn, reduces the
effects caused by harmonic current distortion.
For six-pulse VFDs, a typical generator sizing factor would be twice the running kW of the
drive. This offsets any reduction in starting kW and kVA. If it is the pulse width
modulated (PWM) type (or includes an input filter to limit current distortion to less than
10%), then you can reduce the sizing factor down to 1.4 times the running kW of the drive.
Using a step starting sequence. The starting sequence of loads can have a significant
effect on the size of a gen-set. One commonly used approach is to assume all connected
loads will start in a single step. This results in the largest gen-set selection. Unless you do
something to add load incrementally (such as multiple transfer switches with staggered
time delays, or a step load controller), then you should use a single-step load for sizing
purposes.
In multiple step applications, you start the largest motor first, to minimize the gen-set
size. Once placing all loads on line with the gen-set, you can stop and start load
equipment with automatic controls. Here, you'll have to size the gen-set by assuming the
largest motor starts last, with all other connected loads already on line.
Examples of sizing gen-sets. You can size a gen-set with manual calculations (using a
worksheet) or with PC software available from most major gen-set manufacturers. The
basic process is the same. It's always best to use actual data (if known).
If this information isn't available, using PC software is the best option, since much of the
required information on typical load characteristics is available as default information. If
you use the manual sizing procedure, it should result in a recovery voltage of at least 90%
of rated voltage and a starting instantaneous voltage dip of approximately 20% to 40%.
The instantaneous voltage dip and frequency dip will likely vary from manufacturer to
manufacturer, based on equal ratings of gen-sets. For a closer estimation of transient
(starting instantaneous voltage) performance, use the manufacturer's sizing software.
Using the manual sizing procedure.
Step 1: Gather information. You'll need to know the following for each motor load:
Nameplate hp,

Running kilowatts (RkW),


Running kilovolt-amperes (RkVA),
Running motor power factor (PF),
Starting motor PF, and
Locked rotor kVA/hp.

You can use the following equation to calculate RkW and RkVA for motors: RkW =
[(Nameplate hp) x (0.746kW/hp)] / Efficiency (eq. 1)
RkVA = RkW / Running motor PF (eq. 2)
To calculate starting kilovolt-amperes (SkVA) and starting kilowatts (SkW) for motors,
use these equations:
SkVA = (Nameplate hp) x (Locked rotor kVA/hp) (eq. 3)
SkW = (SkVA) x (Starting motor PF) (eq. 4)
Step 2: Total the RkW, RkVA, SkW, and SkVA numbers for all the loads.
Step 3: Select the gen-set by comparing the RkW, RkVA, SkW, and SkVA to the ratings on
the manufacturer's specification sheets (after appropriate derating for ambient
temperature and altitude).
Example One calculation. Determine gen-set size for three loads started across-theline in a single step. Here's pertinent information:
Two 200 hp motors, Code G, 92% running efficiency, 0.25 starting PF, 0.91 running PF.
Total 100kVA of fluorescent lighting, starting PF of 0.95, and running PF of 0.95 (Note:
We're using the terms starting and running PF for the lighting load here for clarification
when adding the motor loads. Actually, the ballast for the lighting load has a constant PF
of 0.95.)

Step 1: Information gathering and calculations. 200 HP motor:


RkW = (200 hp x 0.746 kW/hp) / 0.92 = 162.2kW
RkVA = 162.2kW / 0.91 PF = 178.2kVA
SkVA = 200 hp x 5.9 kVA/hp41180kVA
SkW = 1180kVA x 0.25 PF = 295kW
Florescent Lighting:
RkW = 100kVA x 0.95 PF = 95kW
RkVA = 100kVA

SkVA = 100kVA
SkW = 100kVA x 0.95 PF = 95kW
Step 2: Totals.
Load.......... | RkW | RkVA | SkW | SkVA
200hp Motor | 162.2 | 178.2 | 295 | 1180
200hp Motor | 162.2 | 178.2 | 295 | 1180
Lighting....... | 95.... | 100... | 95. | 100
Totals (kVA). | 420... | 457.. | 685 | 2460
Step 3: Selection. At a minimum, you'll have to size the gen-set to supply the maximum
starting (surge) demands and the steady-state running loads of the connected load
equipment. In this example (using one manufacturer's published data), you would select a
750kW generator set with 2944 SkVA available at 90% recovery voltage to supply the total
load SkVA of 2460. The load totals for RkW, RkVA, and SkW are well within the rating of
the 750kW (938kVA) gen-set you selected. The running kilowatt load of 420kW is 56% of
the 750kW gen-set standby rating.
Example Two calculation. Assume you have the same three loads as in Example One,
but now you're using an autotransformer type reduced voltage starter that is set at the
65% starting voltage to start the two motors. This tap setting will reduce the starting kVA
by the square of the voltage (0.65)squared, or 0.42 times the starting kVA.
Step 1: Calculations
200 HP motor:
RkW = (200 hp x 0.746 kW/hp) / 0.92 = 162.2kW
RkVA = 162.2kW / 0.91 PF = 178.2kVA
SkVA = 200 hp x 5.9 kVA/hp = 1180 x (0.65)squared = 495kVA
SkW = 495kVA x 0.25 PF = 124kW
Florescent Lighting:
RkW = 100kVA x 0.95 PF = 95kW
RkVA = 100kVA
SkVA = 100kVA
SkW = 100kVA x 0.95 PF = 95kW

Step 2: Totals
Load.......... | RkW.. | RkVA | SkW | SkVA
200hp Motor | 162.2 | 178.2. | 124. | 495
200hp Motor | 162.2 | 178.2. | 124. | 495
Lighting...... | 95..... | 100... | 95... | 100
Totals (kVA) | 420... | 457... | 343. | 1090
Step 3: Selection. Using one manufacturer's published data, you would select a 450kW
gen-set to supply the required starting kVA. The running kilowatt load of 420kW is 93%
of the gen-set's standby rating. So, if you want a margin for future load additions, you
would select a 500kW gen-set running at 84% of rated standby power.

Sidebar: Here's What Causes Dip in Starting Voltage


When you start a motor across-the-line with a gen-set, the motor represents a low
impedance load while at locked rotor or stalled condition. This causes a high inrush
current. The high motor inrush current (I ms) flows through the generator armature
windings and is affected by the reactance. This causes a drop in generator voltage.
Impedance controls the flow of current in AC circuits. But, the generator armature
reactance is such a large part of its total impedance that resistance is ignored.
The generator terminal voltage drops instantaneously when the motor starter contacts
close at time t40, as a function of the subtransient reactance (X"d). Generally, the larger
the generator, the lower its reactance. So, one way to minimize the instantaneous voltage
dip is to increase the generator size.
The generator terminal voltage may drop further, depending on response of the
generator's automatic voltage regulator and the power capability of the excitation system.
(Most gen-set automatic voltage regulators include underfrequency protection.)
During momentary overloads, the engine speed may also dip. If it does, the automatic
voltage regulator reduces excitation power to the main field, which lowers the generator
terminal voltage. This, in turn, reduces the load on the engine, allowing it to recover to
rated speed. Typically, a maximum generator terminal voltage dip of 30% will not cause
coils to drop out. (This allows for approximately 5% additional voltage drop in the
conductors between the generator and the motor).
Although the voltage dip, due to under frequency protection, may extend the voltage
recovery time, it also allows the engine to be sized closer to the steady-state running load

rather than starting load. This is particularly important with diesel engines, which should
not run for an extended duration at less than 30% of rated load. (Extended light-load
operation of a diesel engine can result in the accumulation of unburned fuel in the
exhaust system, due to incomplete combustion from low combustion temperatures, called
wet stacking. Light load operation can also result in engine damage from fuel and water
contaminating lubricating oil.)
After the initial voltage dip, it's important the generator restore voltage to a minimum of
90%-rated value while supplying the motor starting kVA. At least 90% recovery voltage is
necessary for the motor to develop adequate torque to accelerate its load to rated speed.
A motor starting a high starting torque load, such as a loaded compressor, requires higher
recovery voltage than one starting an unloaded compressor. As the motor comes up to
speed, the voltage will rise, as the starting kVA input decreases. Once the motor is up to
speed, the voltage should return to rated value, if the gen-set is sized properly.

Sidebar: How Inertia Affects Gen-Set Sizing


The moment of inertia of a rotating mass offers resistance to acceleration. The load
connected to the motor shaft has its moment of inertia, and in practical situations for
specific equipment, this may or may not be available information.
Fortunately, for the purpose of sizing a gen-set, or more specifically to determine the
engine power needed to start and accelerate a rotating motor load, the motor load's
moment of inertia need only be broadly categorized as low or high inertia.
High inertia loads are characterized by high breakaway torque requiring prolonged
acceleration. Low inertia loads are characterized by low starting torque at standstill, with
increasing torque as motor speed increases resulting in rapid acceleration to rated speed.
Starting low inertia loads will reduce the normal starting kW needed. Look for more
information on this is in the sample calculations within this article.

Sidebar: Examples of High and Low Inertia


High inertia loads include:
Single- and multi-cylinder pumps
Single -and multi-cylinder compressors without unloading valves
Crushers

Hydraulic elevators without unloading valves

Low inertia loads include:


Fans, centrifugal and blower
Compressors starting unloaded
Centrifugal pumps
Motor-generator elevators

Note: Pumps starting into high head pressure and large diameter fans or fans starting
into high restriction areas should be classified as high inertia loads.

TWEET

Discuss this Article

Recommend

on Jul 4, 2012

Lee Chee Seng (not verified)

Dear Sirs, I appreciate if someone could enlighten me by providing a recommendation of a


suitable genset size for an exercise as follows:- What would be the right size of genset for
starting a 220KW water pump motor by auto-trans method with a voltage dip limitation of not
more than 15%. Thank you for assisting. Best regards / Lee Chee Seng
Log In or Register to post comments

on Jul 19, 2012

Anonymous (not verified)

very helpfull Many diesel Generator Sales people are blank about the start up power of motors.
And am battling to select the correct size of generator.
Log In or Register to post comments

on Nov 26, 2013

Anonymous (not verified)

I did it with an Woodward easygen-3500 controller using the ramp up feature


Log In or Register to post comments

Please Log In or Register to post comments.

Related Articles
Gen-Set Article Generates Reader Feedback
The Basics of PF Correction on Single Induction Motors
Critical data for sizing gen-sets

Minimizing UPS and Gen-Set Incompatibility


Ensuring Power Quality and Reliability with Gen-Sets

Ecmweb.com
NEC Design Ops & Maintenance Contractor Safety Power Quality Training Basics Products

Site Features

EC&M Corporate

Author Guidelines

Privacy Policy

RSS

Terms of Service

Sitemap

About Us

Site Archive

Advertise

Subscribe

Contact Us

View Mobile Site

Follow Us

Related EC&M Sites


Electrical Wholesaling Electrical Marketing Transmission & Distribution World

Copyright 2014 Penton

Search ecmweb.com

Subscribe to the print ma

You might also like