General Arrangement

Legend
Plant

: Nyumba Ya Akiba-Cement Plant 3000 TPD

Department

: 192 Substation for Storage

Contract

: 1345327

Approved date

: 18.08.2014

Created by

: KVR-IN

Approved by

: APS-IN

Doc. No.:

50067881-1.0

General Arrangement Legend


Doc. No.

50067881-1.0

Plant:

Nyumba Ya Akiba-Cement Plant 3000 TPD

Department:

192 SUBSTATION FOR STORAGE

The following documentation is prepared for each plant department:


1. General Arrangement Drawings.
2. Outline and load drawings.
3. General arrangement legend.
1. The

purposes of the General arrangement drawings are to :


Show the general equipment arrangement.
Provide the civil designer with equipment loads for structural design.
Provide erection information.

2. Outline and load drawings are detailed drawings of the equipment


3. A legend is a text accompanying General Arrangement Drawings.
Page 3 is a key to symbols, used on the General Arrangement Drawings.
Page 4 contains the document numbers of the General Arrangement Drawings.
The next pages in the legend specify:
Ref. No.:
Document No.:
Doc vers.:
Description:

Reference numbers which refer to General Arrangement Drawings.


Document number.
Version number of document.
Designation of equipment.

Supply Key:
SSS = Seller supply on Seller Specification or documentation.
SLM = Seller supply using local manufacturing.
CSD = Contractor supply on Seller Documentation. (Contractor manufacturing).
CSS = Contractor supply on Seller Basic Specification. (Contractor Engineering).
CCS = Contractor supply on Contractor Specification.
BSD = Buyer supply on Seller Documentation (Buyer manufacturing).
BSS = Buyer supply on Seller Basic Specification (Buyer engineering).
BBS = Buyer supply on Buyer Specification.
Customer equipment No.: Equipment numbers referring to the contract and the Flow
Diagram.
Equipment No.: Equipment numbers referring to the contract and the Flow Diagram.
Drawings must be read in conjunction with instruction manual No. 749500 Structural
design and erection, General requirements, covering:
Installation dimensions, access conditions, loads, etc.
NOTE:
In order to comply with world wide recognized designations, FLSmidth has introduced new
designations for their plant documentation.
As both old and new designations may appear at the same time, below is a key for
translation.
Old designation
Foundation and Erection drawing. (F&E)
Standard F&E drawing. (Std. F&E)
Separate F&E drawing. (Sep. F&E)

New designation
General Arrangement Drawing. (GA)
Outline and Load Drawing. (OL)
Outline and Load Drawing. (OL)

The information transmitted by this document is the proprietary and confidential property of FLSmidth
and may not be duplicated, disclosed or utilized without written consent from FLSmidth.

2/5

General Arrangement Legend


Doc. No.

50067881-1.0

Plant:

Nyumba Ya Akiba-Cement Plant 3000 TPD

Department:

192 SUBSTATION FOR STORAGE


Key to symbols
Datum point/centre
of gravity

True North

ISO 7519

ISO 129

Earth

Grating

Center Line

Flow Direction

ISO 128-24

ISO 81714-1

Embossed plate

Concrete

Hole

ISO 7519

Recess

ISO 7519

Grouting-up

Railing

Stairs (arrow means


upwards)

Ramp (arrow means


upwards)

ISO 7519

Revision

Estimated

Insulation

, the loads are only specified on outline and load

, see OL drawing or erection

Levels Vertical
Steel Structure

ISO 129-1

Slope
Secondary Platform

ISO 129-1

Levels Horizontal
Concrete Structure

ISO 129-1

Interrupted line

ISO 128-23

For equipment with reference Nos. and consecutive Nos.


documentation.

ISO 129-1

Hold

ISO 7519

For equipment with reference Nos. with


drawings.

Concrete Structure

ISO 7519

ISO 7519

Steel Structure

ISO 129-1

Secondary Platform

ISO 129-1

ISO 129
Direction and %
of slope
(arrow means
descent)

ISO 7519

NOTE (Levels): Levels are either top of concrete or top of steel structure, without grating or
embossed plate. Levels marked * indicate the elevation to the top of the grating or
embossed plate.

The information transmitted by this document is the proprietary and confidential property of FLSmidth
and may not be duplicated, disclosed or utilized without written consent from FLSmidth.

3/5

General Arrangement Legend


Doc. No.

50067881-1.0

Plant:

Nyumba Ya Akiba-Cement Plant 3000 TPD

Department:

192 SUBSTATION FOR STORAGE

Document No.

Doc.
Vers.

Description

10360780

1.0

Plan No.1

10360781

1.0

Plan No.2

10361292
749500

1.0

Standard Transformer Cell.


Structural design and erection

The information transmitted by this document is the proprietary and confidential property of FLSmidth
and may not be duplicated, disclosed or utilized without written consent from FLSmidth.

4/5

General Arrangement Legend


Doc. No.

50067881-1.0

Plant:

Nyumba Ya Akiba-Cement Plant 3000 TPD

Department:

192 SUBSTATION FOR STORAGE

Ref.
No.

Document
No.

Doc.
Vers.

Description Supply Key

Customer
Ref. No.

Equipment No.

The information transmitted by this document is the proprietary and confidential property of FLSmidth
and may not be duplicated, disclosed or utilized without written consent from FLSmidth.

5/5

You might also like