Professional Documents
Culture Documents
Y COUNCILMANINTRODUCED ~
Carr
ORDINANCE NO ~~
ORDINANCE
C.M.S.
wrro~
r
N~
PERMIT
THE
Till be
the
and
WHEREAS, Section 301 ( a)of said Oakland Building Code prohibits any person,
firm, or corporation from erecting, constructing, enlarging, altering, repairing,
improving, moving, or demolishing any building or structure without first obtaining a separate building permit for each building or structure from the Chief
Building Inspector of the City of Oakland; and
WHEREAS, the Office of Public Works of the City of Oakland must examine all
plans and specifications for. the proposed construction when an application is
made for a building permit; and
WIiEREAS,
said Oakland
Building Code
WHEREAS,
No. 56!82
p
t``
1'
the
and
the
Municipal
C.
S,
M. assuring
its
positive interest
enacted
in
WHEREAS,
Flood
the
City
of Oakland ~~~
ishes
continue
to
Insurance
1910.3
(
b)of
The
Council of
the
City
of
Oakland does
ordain
its
qualifying
Code of
the
and
its
con-
Council Resolution
said City for
ith
compliance ~.~
eligibility
meet
City of
or
in
the
National
the
requirements of
regulations; now, therefore,
as
follows:
The follo~,
Ting measures shall be required within Zone A of the Flood Hazard
irance Administration for this
Boundary Map issued by the Federal Ins~
community:
SECTION
GENERAL
1.
1
PROVISIONS
ordinance
aithin
1.
2
1.
0
the
The
the
Office
of Public
D
E001
242- foie ~) / ~~~
to
specified
3.
3
1-
above
or
the
on
the
as
part of
air
base
the
such
structure,
conditioner, etc.,shall
flood elevation
as
be
depth number
or
FIRM.
1)
New construction
shall have
elevated
to
and
the
above
or
the
base
flood elevation
basement,
depth number
or
community's
FIRM.
Nonresidential structures may meet the
Section 3(
3.
1).
2
-Upon completion of the structure the elevation of the lowest
habitable floor including
basement shall be certified by a
on
standards
in
gineer
surveyor
or
verified
or
Notification of
Section 3(
2.
3),
1
-
in
2) Nonresidential
formance
utility
with
and
the
to
passage of water;
c)
be
certified
architect
satisfied,
the
by
that
3.
2
Section
STANDARDS
The
forth
set
as
3.
3
the
meet
shall be
or
are
provided
to
Section 3(
2.
3),
-
above
standards
and
also
the
standards
or
plant life
is
or
could be
are
in
time
injurious
to
prohibited.
of
flooding
human, animal,
be
new
and
designed
the
replacement
to
system and
minimize
discharge
water
supply
eliminate
3.
1
4-
preliminary
and
area
Final
All
and
or
3.
4
the
identify
the
flood hazard
Subdivision Plans
final
and pads.
structure(s)
If
the
engineer
Section
3.
3
4-
in
subsection
storage
All
3.
2
4-
this
3.
5.
of
Such certifications
official
the
Minimize
or
surveyor
and
site
is
certified by
provided
to
the elevation of
filled above
the
proposed
the base
flood,
the
registered professional
official
as
set
forth
in
2.
3(
3).
Flood Damage
5-
consistent with
the
need
to
minimize
r ~ _ _
or
foundation.
subdivision,
For mobile
homes
not
within
mobile home
the
affixing
its
park
of
the
or
mobile
home
mobile home
to
utilities.is completed.
Structure" means
above
walled
Substantial Improvement"
structure, the
of
and
roofed
building
or
mobile home
that
is
ground.
the
cost
structure
means
of which
any
equals
if
50 percent
improvement of
the market value
or
of
or
repair is started,
or
the
mences, whether or
of the structure.
This
exceeds
either:
2)
repair, reconstruction,
or
principally
term
does
not,
not
however,
include
the
external dimensions
either:
living conditions,
2)
any alteration
of Historic
of
or
structure
Places
or
State
listed
on
Inventory
the
National Register
of Historic Places.
NOV
IN
19$
2
19
NOES ABSENT -
SPEES, CANNQN
PRESIDENT WILSON ~
NONE
RTTFFS .. ~
Cp~
R~
Irm~
t
ABSTENTION -
Np~ / /'
ATTEST:
ARRECEJ~ESOIV