You are on page 1of 7

QCS

Q
2010

Con
ntents

Page 1

CONTENTS

SECTION
S
2 ------------------- BUILDING DEMOLITIO
D
ON
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Building Dem
molition
Part
P 3 --------------------------- Hazardous Materials
M
SECTION
S
3 ------------------- GROUND IN
NVESTIGAT
TION
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Boreholes
Part
P 3 --------------------------- Pits and Tre
enches
Part
P 4 --------------------------- Soil Samplin
ng
Part
P 5 --------------------------- in-Situ Testiing, Instrume
entation and Monitoring
Part
P 6 --------------------------- Laboratory Testing
T
SECTION
S
4 ------------------- PILING
Part
P 1 --------------------------- General Req
quirements for
f Piling Wo
ork
Part
P 2 --------------------------- General Req
quirements for
f Concrete Piles
Part
P 3 --------------------------- Precast Reinforced and Prestressed
d Concrete Piles
Part
P 4 --------------------------- Precast Reinforced Concrete Segme
ental Piles
Part
P 5 --------------------------- Bored Cast--In-Place Pile
es
Part
P 6 --------------------------- Bored Piles Constructed
d Using Conttinuous Fligh
ht Augers and
d Concrete or
o Grout
Injection thro
ough Hollow
w Auger Stem
ms

QCS
S 2010

Seashore-Sanathan

SECTION
S
1 ------------------- GENERAL
Part
P 1 --------------------------- Introduction
Part
P 2 --------------------------- Use and Ma
aintenance off the Site
Part
P 3 --------------------------- Site Access and Entry onto
o
the Site
Part
P 4 --------------------------- Protection
Part
P 5 --------------------------- Interference
e
Part
P 6 --------------------------- Project Mee
etings
Part
P 7 --------------------------- Submittals
Part
P 8 --------------------------- Quality Assu
urance
Part
P 9 --------------------------- Materials
Part
P 10 -------------------------- Health and Safety
S
Part
P 11 -------------------------- Engineers Site
S Facilitiess
Part
P 12 -------------------------- Contractorss Site Facilitie
es
Part
P 13 -------------------------- Setting Out of the Workss
Part
P 14 -------------------------- Temporary Works
W
and Equipment
E
Part
P 15 -------------------------- Temporary Controls
C
Part
P 16 -------------------------- Traffic Diverrsions
Part
P 17 -------------------------- Project Co-o
ordination
Part
P 18 -------------------------- Other Contrractors
Part
P 19 -------------------------- Regulatory Requirement
R
ts
Part
P 20 -------------------------- Clearance of
o the Site
Part
P 21 -------------------------- Inspection and
a Handove
er Procedure
es
Part
P 22 -------------------------- New Techno
ologies and Innovations
I

QCS
Q
2010

Con
ntents

Page 2

Part
P 7 --------------------------- Driven Castt-In-Place Piles
Part
P 8 --------------------------- Steel Piles
Part
P 9 --------------------------- Steel Sheet Piling
Part
P 10 -------------------------- Static Load Testing Of Piles
P
Part
P 11 -------------------------- Alternative Methods
M
for Testing Piless
Part
P 12 -------------------------- Reduction of
o Friction on Piles
Part
P 12 -------------------------- Reduction of
o Friction on Piles

SECTION
S
6 ------------------- ROADWOR
RKS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Site Clearan
nce
Part
P 3 --------------------------- Earthworks
Part
P 4 --------------------------- Unbound Pa
avement Matterials
Part
P 5 --------------------------- Asphalt Worrks
Part
P 6 --------------------------- Concrete Ro
oad Paveme
ents
Part
P 7 --------------------------- Vehicle Crassh Barriers
Part
P 8 --------------------------- Kerbs, Footw
ways and Pa
aved Areas
Part
P 9 --------------------------- Fencing
Part
P 10 -------------------------- Traffic Signss, Markings and
a Studs
Part
P 11 -------------------------- Works in Re
elation To Se
ervices
Part
P 12 -------------------------- Road Lightin
ng
Part
P 13 -------------------------- Traffic Signa
als
Part
P 14 -------------------------- Road Draina
age
Part
P 15 -------------------------- Geosynthetiics
Part
P 16 -------------------------- Miscellaneo
ous
SECTION
S
7 ------------------- GREEN CO
ONSTRUCTIO
ON
Part
P 1 --------------------------- Introduction
Part
P 2 --------------------------- Qatar Susta
ainability Assessment Sysstem - QSAS
S

QCS
S 2010

Seashore-Sanathan

SECTION
S
5 ------------------- CONCRETE
E
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Aggregates
Part
P 3 --------------------------- Cement
Part
P 4 --------------------------- Water
Part
P 5 --------------------------- Admixtures
Part
P 6 --------------------------- Property Re
equirements
Part
P 7 --------------------------- Batching an
nd Mixing
Part
P 8 --------------------------- Transportatiion and Plac
cing Of Concrete
Part
P 9 --------------------------- Formwork
Part
P 10 -------------------------- Curing
Part
P 11 -------------------------- Reinforceme
ent
Part
P 12 -------------------------- Joints
Part
P 13 -------------------------- Inspection and
a Testing Of
O Hardened
d Concrete
Part
P 14 -------------------------- Protective Treatments
T
fo
or Concrete
Part
P 15 -------------------------- Hot Weathe
er Concreting
g
Part
P 16 -------------------------- Miscellaneo
ous
Part
P 17 -------------------------- Structural Precast Concrete
Part
P 18 -------------------------- Prestressed
d Concrete
Part
P 19 -------------------------- Testing of Water
W
Retainiing Structure
es

QCS
Q
2010

Con
ntents

Page 3

Part
P 3 --------------------------- Energy
Part
P 4 --------------------------- Water [W]
Part
P 5 --------------------------- Indoor Envirronment
Part
P 6 --------------------------- Cultural and
d Economic Value
V

SECTION
S
9 ------------------- MECHANIC
CAL AND EL
LECTRICAL EQUIPMENT
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Submersible
e Pumps
Part
P 3 --------------------------- Centrifugal Sewage
S
Pum
mps (Dry-We
et Well)
Part
P 4 --------------------------- Centrifugal Pumps
P
(Splitt Casing Typ
pe)
Part
P 5 --------------------------- Archimedian
n Screw Pum
mps
Part
P 6 --------------------------- Surge Contrrol System
Part
P 7 --------------------------- Lifting Equip
pment
Part
P 8 --------------------------- Electric and Pneumatic Actuators
A
Part
P 9 --------------------------- Odour Control Equipmen
nt-Carbon Tyype
Part
P 10 -------------------------- Odour Control Equipmen
nt-Scrubber Type
Part
P 11 -------------------------- Screening Equipment
E
Part
P 12 -------------------------- Grit Remova
al Equipment
Part
P 13 -------------------------- Aeration Equipment
Part
P 14 -------------------------- Air Blowers and Compre
essors
Part
P 15 -------------------------- Settlement Tank
T
Equipm
ment
Part
P 16 -------------------------- Tertiary Trea
atment Gran
nular Filters
Part
P 17 -------------------------- Sludge Thicckening and Dewatering
D
E
Equipment
Part
P 18 -------------------------- Mixers and Stirrers
Part
P 19 -------------------------- Chlorination
n Plant Equip
pment
Part
P 20 -------------------------- Washwater Systems
Part
P 21 -------------------------- Miscellaneo
ous Equipment
Part
P 22 -------------------------- Ventilation Systems
S
SECTION
S
10
0 ---------------- INSTRUMENTATION, CONTROL
C
A
AND
AUTOM
MATION
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Telemetry/S
Scada
Part
P 3 --------------------------- Primary Elements
Part
P 4 --------------------------- Panel Moun
nted and Misc
cellaneous In
nstruments
Part
P 5 --------------------------- Control Pan
nels and Control Room Hardware

QCS
S 2010

Seashore-Sanathan

SECTION
S
8 ------------------- SEWERAGE
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Earthworks
Part
P 3 --------------------------- Pipes and Fittings
F
Materrials
Part
P 4 --------------------------- Pipeline Insttallation
Part
P 5 --------------------------- Valves, Pen
nstocks and Appurtenanc
A
ces
Part
P 6 --------------------------- Miscellaneo
ous Metal Wo
orks
Part
P 7 --------------------------- Miscellaneo
ous GRP Works
Part
P 8 --------------------------- Protective Coatings
C
and Painting
Part
P 9 --------------------------- Trenchless Pipeline Con
nstruction
Part
P 10 -------------------------- Pipelines Clleaning and Inspection Survey
S
Part
P 11 -------------------------- Sewer Reha
abilitation
Part
P 12 -------------------------- Vacuum Sew
werage Systtem

QCS
Q
2010

Con
ntents

Page 4

SECTION
S
11 ---------------- HEALTH & SAFETY
Part
P 1 --------------------------- Regulatory Document
D
Part
P 2 --------------------------- Safety and Accident
A
Pre
evention Man
nagement / Administration
A
System (SAMAS)
SECTION
S
12
2 ---------------- EARTHWORKS RELAT
TED TO BUILDINGS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Excavationss
Part
P 3 --------------------------- Filling
Part
P 4 --------------------------- Utility Trencches
Part
P 5 --------------------------- Installation of
o Protective
e Membraness

SECTION
S
14
4 ---------------- ROOFING
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Membrane Roofing
R
Part
P 3 --------------------------- Metal and Plastic
P
Roofin
ng
Part
P 4 --------------------------- Roof and De
eck Insulatio
on
Part
P 5 --------------------------- Roofing Tile
es
SECTION
S
15
5 ---------------- THERMAL INSULATION OF BUILD
DINGS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Building Insulation
Part
P 3 --------------------------- Cold Stores
SECTION
S
16
6 ---------------- STRUCTUR
RAL STEELW
WORKS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Materials
Part
P 3 --------------------------- Drawings
Part
P 4 --------------------------- Fabrication
Part
P 5 --------------------------- Welding
Part
P 6 --------------------------- Bolting
Part
P 7 --------------------------- Accuracy off Fabrication
Part
P 8 --------------------------- Erection
Part
P 9 --------------------------- Accuracy off Erected Ste
eelwork
Part
P 10 -------------------------- Protective Treatment
T
SECTION
S
17
7 ---------------- METALWORK
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Materials Cllassification
Part
P 3 --------------------------- Metal Doorss and Window
ws
Part
P 4 --------------------------- Architectura
al Metal Workk
Part
P 5 --------------------------- Light Metal Support and Cladding Su
upport
Part
P 6 --------------------------- Workmansh
hip

QCS
S 2010

Seashore-Sanathan

SECTION
S
13
3 ---------------- MASONRY
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Mortar and Grout
G
Part
P 3 --------------------------- Accessoriess
Part
P 4 --------------------------- Unit Masonrry
Part
P 5 --------------------------- Masonry Laying

QCS
Q
2010

Con
ntents

Page 5

SECTION
S
18
8 ---------------- CARPENTR
RY, JOINERY
Y AND IRON
NMONGERY
Y
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Wood Treattment
Part
P 3 --------------------------- Structural Timber (Roug
gh Carpentry))
Part
P 4 --------------------------- Architectura
al Timber (Fin
nished Carpe
entry, Millwork)
Part
P 5 --------------------------- Joinery
Part
P 6 --------------------------- Fasteners and
a Adhesive
es
Part
P 7 --------------------------- Ironmongeryy (Hardware)

SECTION
S
20
0 ---------------- DRAINAGE
E WORKS FO
OR BUILDIN
NGS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Internal Drainage Workss
Part
P 3 --------------------------- External Dra
ainage Work
ks
Part
P 4 --------------------------- Drainage Pipes in Trenc
ches
Part
P 5 --------------------------- Structures Related
R
To Drainage
D
Worrk
Part
P 6 --------------------------- Surface Water Drainage
e
Part
P 7 --------------------------- Commission
ning Of Syste
ems
SECTION
S
21 ---------------- ELECTRICA
AL WORKS
Part
P 1 --------------------------- General Pro
ovisions for Electrical
E
Insttallation
Part
P 2 --------------------------- MV Factory Built Assem
mblies (FBAss)
Part
P 3 --------------------------- Protective Devices
D
Part
P 4 --------------------------- Motor Starte
ers
Part
P 5 --------------------------- Variable Spe
eed Controllers
Part
P 6 --------------------------- Cables and Small Wiring
g
Part
P 7 --------------------------- Conduits an
nd Conduit Boxes
Part
P 8 --------------------------- Trunking
Part
P 9 --------------------------- Cable Trayss
Part
P 10 -------------------------- Wiring Acce
essories and General Pow
wer
Part
P 11 -------------------------- Light Fittingss
Part
P 12 -------------------------- Emergency Lighting
Part
P 13 -------------------------- Telephone Installations
Part
P 14 -------------------------- Structured Cabling
C
Syste
ems
Part
P 15 -------------------------- Electric Mottors
Part
P 16 -------------------------- Power Facto
ory Correctio
on Capacitorss
Part
P 17 -------------------------- Standby Die
esel Generattor Set
Part
P 18 -------------------------- Uninterruptible Power Supply System
ms
Part
P 19 -------------------------- Sound and Call
C Systemss
Part
P 20 -------------------------- Elevators/Esscalators
Part
P 21 -------------------------- Lightning Prrotection
Part
P 22 -------------------------- Earthing and
d Bonding

QCS
S 2010

Seashore-Sanathan

SECTION
S
19
9 ---------------- PLUMBING
G WORK
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Water Distribution
Part
P 3 --------------------------- Plumbing Piipework in Trrenches
Part
P 4 --------------------------- Cold Water Storage
Part
P 5 --------------------------- Hot Water Storage
S
Part
P 6 --------------------------- Commission
ning of Syste
ems
Part
P 7 --------------------------- Plumbing fo
or Gases

QCS
Q
2010

Con
ntents

SECTION
S
22
2 ---------------- AIR CONDITIONING, REFRIGERAT
R
TION AND VENTILATIO
V
ON
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Central Refrrigeration and Air Conditiioning Equipment
Part
P 3 --------------------------- Unitary Equipment
Part
P 4 --------------------------- Air Handling
g Equipment
Part
P 5 --------------------------- Chilled Wate
er Pipework
Part
P 6 --------------------------- Ductwork an
nd Air-Side Equipment
E
Part
P 7 --------------------------- Thermal Inssulation
Part
P 8 --------------------------- Exhaust Fan
ns
Part
P 9 --------------------------- Accessoriess
SECTION
S
23
3 ---------------- FIRE FIGHT
TING AND FIRE
F
FIGHTING SYSTEM
MS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Fire Alarm and
a Detection
n Systems
Part
P 3 --------------------------- Analogue Addressable Fire
F Alarm Syystems
Part
P 4 --------------------------- Fire Fighting
g System
Part
P 5 --------------------------- Testing and Commission
ning
SECTION
S
24
4 ---------------- FINISHES TO
T BUILDINGS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Lath and Pla
aster
Part
P 3 --------------------------- Dry Lining (W
Wall Board)
Part
P 4 --------------------------- Special Walll Surfaces
Part
P 5 --------------------------- Tiles
Part
P 6 --------------------------- Terrazzo
Part
P 7 --------------------------- Stone Flooring
Part
P 8 --------------------------- Unit Masonrry Flooring
Part
P 9 --------------------------- Floor Screed
ds and Treattments
Part
P 10 -------------------------- Joints, Caulking and Sea
alants
Part
P 11 -------------------------- Recessed Duct
D
Covers
Part
P 12 -------------------------- Carpeting
Part
P 13 -------------------------- Other Floor Coverings
Part
P 14 ------------------------- Ceilings
SECTION
S
25
5 ---------------- GLASS AND GLAZING
G
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Glass
Part
P 3 --------------------------- Workmansh
hip

QCS
S 2010

Seashore-Sanathan

Part
P 23 -------------------------- Inspection and
a Testing
Part
P 24 -------------------------- Documentattion Format
Part
P 25 -------------------------- Electrical Identification
Part
P 26 -------------------------- Electromagn
netic Compa
atibility
Part
P 27 -------------------------- Battery and Battery Cha
arger
Part
P 28 -------------------------- Small Enclo
osures
Part
P 29 -------------------------- Underfloor Ducts
D
Part
P 30 ------------------------- Duct Bank and
a Manhole
es
Part
P 31 -------------------------- Power Distribution Transsformers
Part
P 32 -------------------------- 11 kv Switch
hgear
Part
P 33 -------------------------- Actuators

Page 6

QCS
Q
2010

Con
ntents

Page 7

Part
P 4 --------------------------- Glazed Curttain Wall and
d Other Itemss
SECTION
S
26
6 ---------------- PAINTING AND
A
DECOR
RATING
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Surface Pre
eparation for Painting
Part
P 3 --------------------------- Primers, Paints and Coa
atings
Part
P 4 --------------------------- Wall Coverin
ngs of Decorrative Paperss/Fabrics

SECTION
S
28
8 ---------------- LANDSCAP
PING
Part
P 1 --------------------------- Landscape Planting
Part
P 2 --------------------------- Landscape Irrigation Sysstem
Part
P 3 --------------------------- Play Equipm
ment General Specificatio
on

QCS
S 2010

Seashore-Sanathan

SECTION
S
27
7 ---------------- EXTERNAL
L WORKS
Part
P 1 --------------------------- General
Part
P 2 --------------------------- Block Paved
d Areas
Part
P 3 --------------------------- Fences and Gates
Part
P 4 --------------------------- Fountains and Aquatic Features
F
Part
P 5 --------------------------- Site Furniturre
Part
P 6 --------------------------- Flag Poles
Part
P 7 --------------------------- Protective or
o Shade Cov
ver Systems
Part
P 8 --------------------------- Play Field and Park Equ
uipment
Part
P 9 --------------------------- Miscellaneo
ous Other External Workss

You might also like