You are on page 1of 10

KCP-GNS-IFS-DPR-0001

Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 1 of 10

Document Title: Offshore Infrastructure Project Data

Offshore Infrastructure Project Data


Table of Contents
1

SCOPE AND FUNCTIONAL REQUIREMENTS ................................................. 3


1.1
1.2
1.3
1.4

CODES AND STANDARDS ............................................................................... 5


2.1

SCOPE OF DOCUMENT....................................................................................3
DEFINITIONS ..................................................................................................3
ABBREVIATIONS .............................................................................................3
SYSTEM OF UNITS AND CONSTANTS ...............................................................4
GENERAL .......................................................................................................5

DESIGN REQUIREMENTS................................................................................. 6
3.1
DESCRIPTION OF THE OFFSHORE INSTALLATION FACILITIES .............................6
3.2
DESIGN LIFE ..................................................................................................7
3.3
DECK ELEVATIONS .........................................................................................7
3.4
ENVIRONMENTAL DATA (PRELIMINARY HOLD 1)...........................................7
3.4.1
General .................................................................................................. 7
3.4.2
Water Depths......................................................................................... 7
3.4.3
Current Profile ....................................................................................... 7
3.4.4
Wave Data ............................................................................................. 7
3.4.5
Marine Growth ....................................................................................... 7
3.4.6
Soil Conditions....................................................................................... 7
3.4.7
Material .................................................................................................. 7
3.4.8
Corrosion Allowance.............................................................................. 8
3.4.9
Corrosion Protection .............................................................................. 8

MANDATORY REFERENCES ........................................................................... 9


4.1
4.2

REGULATIONS AND STATUTES ........................................................................9


DESIGN CODES ..............................................................................................9

SUPPORTING REFERENCES ......................................................................... 10


5.1

PROJECT DOCUMENTATION ..........................................................................10

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 2 of 10

Document Title: Offshore Infrastructure Project Data

Table of Holds
HOLD No.

Description

Section

Site-specific environmental data

3.4

Water depth and seabed bathymetry

3.4.2

Marine growth profile

3.4.5

Site-specific foundation soil conditions

3.4.6

Project specification for carbon steel

3.4.7

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Kingsnorth Carbon Capture & Storage Project

Project Title:

Page 3 of 10

Document Title: Offshore Infrastructure Project Data

SCOPE AND FUNCTIONAL REQUIREMENTS

1.1

Scope of Document

This document outlines the design data for the offshore infrastructure at the Hewett gas reservoir
and collates all of the design data to be used and the assumptions to be made in undertaking the
design activities.
The offshore infrastructure for this document is assumed to include the following:

Platform foundations;
Platform substructure;
Platform topsides structure.

This document will be reviewed and updated as necessary during the course of the design to reflect
changes necessary to meet E-ON requirements.

1.2

Definitions

COMPANY

E.ON UK or its nominated representative.

CONTRACTOR

The companies designated on the purchase order form


as being the selected Contractor of materials and
services.

WORK

The task, process or operation being conducted by the


CONTRACTOR on any tier on behalf of COMPANY.

Shall

Indicates mandatory requirement

Should

Indicates preferred course of action

May

Indicates optional course of action

1.3

Abbreviations

BS
CO2
COS
CP
FEED
HAT
HSE
ISO
LAT
MMscmd
MSL
MHWS
MHWN
MLWN
MLWS
Mt
MPa
N/A
OD
Omni-dir

British Standard
Carbon Dioxide
Carbonyl Sulphide
Cathodic Protection
Front End Engineering Design
Highest Astronomical Tide
Health and Safety Executive
International Standardisation Organisation
Lowest Astronomical Tide
Million Standard Cubic Metre per Day
Mean Sea Level
Mean High Water Springs
Mean High Water Neaps
Mean Low Water Neaps
Mean Low Water Springs
Million Tonnes
Mega Pascals
Not Applicable
Outside Diameter
Omni-directional

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 4 of 10

Document Title: Offshore Infrastructure Project Data


SI
SMYS
SMTS
SWL
W
WHP
Yr

1.4

System International
Specified Minimum Yield Strength
Specified Minimum Tensile Strength
Static Water Level
West
Wellhead Platform
Year

System of Units and Constants

System International (S.I.) units shall be used throughout the FEED design. The following
consistent set of units will be used to describe the offshore infrastructure:

Mass

metric tonne, te (kg x 103);

Force

kiloNewton, kN (N x 103)

Length

metre, m

The following constants will be adopted for the offshore infrastructure FEED designs:

Youngs Modulus for steel, E

2.1 x 108 kN/m2;

Poissons ratio,

0.3

Density of steel, steel

7.85 tonne/m3;

Density of seawater, sea

1.025 tonne/m3

Coefficient of Thermal Expansion for steel,

12 x 10-6/C

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 5 of 10

Document Title: Offshore Infrastructure Project Data

CODES AND STANDARDS

2.1

General

The topsides, substructure and the foundations shall be designed in accordance with the working
stress design methods given in API RP2A WSD [Ref. M6], and AISC ASD [Ref. M7]

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 8
03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 6 of 10

Document Title: Offshore Infrastructure Project Data

DESIGN REQUIREMENTS

3.1

Description of the Offshore Installation Facilities

The base-case offshore facility design selected is a new build steel jacket structure supporting
a normally unattended integrated deck topsides; the geographical co-ordinates of the offshore
injection facilities will be confirmed during the FEED 2 study.
It is envisaged that the base case offshore platform will incorporate the following:

A riser bringing the carbon dioxide (CO2) from the pipeline onto the platform. We
currently expect to install an emergency shutdown (ESD) valve to isolate the pipeline
CO2 volumes from the platform. This ESD will be installed above the waterline for ease
of maintenance;

A pig receiver to receive pigs used to clean or inspect the pipeline, and also to push out
CO2 volumes from the pipeline into the reservoir before the pipeline can be
depressurised;

A distribution header to distribute the CO2 to the separate wells;

Individual flow lines to the Christmas tree on top of each well;

Each individual well flowline will incorporate a choke to regulate and adjust the
pressure of the CO2 prior to injection into the reservoir;

Sufficient space to accommodate the equipment necessary for well intervention work,
including slickline, electric line and coiled tubing interventions. Note that for coiled
tubing operations the coil and personnel will be accommodated on a separate work
vessel;

Individual electrical start-up heaters on each of the 4 flowlines. The size of each heater
is expected to be less than 1 MW each. The electrical heaters will also require
switchgear, transformers and thyristors, which may be of substantial weight and size;

Each well will have a Christmas tree on top of it, including two separate valves capable
of completely shutting in the well, and valves allowing access to the wellbore annulus.

A wellhead area able to accommodate four wells with surface Christmas trees. (Note
that the four wells are required for injection of the planned initial volumes of CO2 the
Base Case. Eight additional slots would be required to enable the platform to be used
to inject the full Kingsnorth and potential Thames Cluster CCS volumes in the future);

A crane capable of lifting an electric line unit onto the platform (currently believed to be
the heaviest lift onto the platform);

An instrumentation system able to gather temperature and pressure data and video
(CCTV) images from various points on the platform and from the in-well data
acquisition system, and transmit the data onshore;

A Temporary Safe Refuge (TSR) with helideck, able to accommodate ~15 people for
unplanned overnight stays;

Fire and CO2 leakage detection system able to shut the platform down in the event of a
CO2 leakage or a fire;

Lifeboat and fire fighting equipment.

Diesel fuelled emergency power generation equipment. The normal electrical loads for
the facility will be drawn from shore via a subsea electrical cable.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Kingsnorth Carbon Capture & Storage Project

Project Title:

Page 7 of 10

Document Title: Offshore Infrastructure Project Data

3.2

Design Life

It is assumed that the offshore facilities will have a design life of 40 years.

3.3

Deck Elevations

The cellar deck elevation will be set such that the lowest part of the framing members is
above the predicted 10,000-year return wave crest elevation. Other deck elevations will be set
to allow sufficient space for accommodating the required equipment and utilities and for
routing pipework.

3.4

Environmental Data (Preliminary HOLD 1)


3.4.1

General

The data presented in this Section were obtained from ref. [S1]. These data are
generic in nature and are not known to be specific to the Kingsnorth offshore platform
location. The following project-specific studies and surveys should be commissioned
and carried out during early FEED 2 in order to provide the required specific data:

Metocean Study;

Platform location Geotechnical Survey and seabed bathymetry.

Regional metocean data is presented below

3.4.2

Water Depths

The water depth at the offshore platform location is 34m ref. [S1]. Detailed
bathymetric profiles will be produced by the offshore survey HOLD 2.

3.4.3

Current Profile

Regional current profiles are presented in the Basis of Design for Studies document,
ref. [S8]

3.4.4

Wave Data

Regional wave heights and periods are presented in the Basis of Design for Studies
document, ref. [S8]

3.4.5

Marine Growth

HOLD 3.

3.4.6

Soil Conditions

A site-specific geotechnical survey will be conducted as part of the FEED 2 work. However in
the absence of design geotechnical design parameters, the piles may be only partially
modelled up to an effective point of fixity, located at a depth of six diameters below the
mudline HOLD 4.

3.4.7

Material

Primary, special primary and secondary steel materials (Grades S275, S355, and S450)
shall comply with BS EN 10225: 2001 - Specification for Weldable Structural Steels for Fixed
Offshore Structures, [Ref M8], supplemented by the project specification for carbon steel
HOLD 5.
Tertiary steel (Grades S355) shall comply with the following:

BS EN 10025: 1993 - Specification for Hot Rolled Products of Non-Alloy


Structural Steels and their Technical Delivery Conditions , [Ref M9];

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 8 of 10

Document Title: Offshore Infrastructure Project Data

3.4.8

BS EN 10210: Parts 1 and 2 - Specification for Hot-Finished Structural Hollow


Sections, [Ref M11].

Corrosion Allowance

A corrosion allowance, i.e. additional steel thickness to compensate for the effect of metal
loss by corrosion on structural members, shall be applied to the substructure members in the
splash and atmospheric zones. Elsewhere on the substructure, corrosion protection will be
provided by appropriate cathodic protection suitable for the 40 year target design life. The
corrosion allowance will be determined during FEED 2.

3.4.9

Corrosion Protection

All permanent topsides steelwork shall be protected against corrosion as specified in the
project specification for Protective Coatings. Hand-railing, stair treads and open grill floor
grating shall be hot dip galvanised. In addition, handrailing shall be painted after galvanizing.
No corrosion allowances shall be applied to the thickness of topsides steel sections. Suitable
isolation shall be provided at interfaces between mild steel and aluminium or stainless steel
to prevent bi-metallic corrosion (for example wall cladding systems).

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 9 of 10

Document Title: Offshore Infrastructure Project Data

MANDATORY REFERENCES

4.1

Regulations and Statutes

The following acts and regulations shall be complied with:


[M1]

Construction (Design & Management) Regulations 2007;

[M2]

Environmental Protection Act 1990;

[M3]

Health and Safety at Work Act 1974;

[M4]

Offshore Installations (Safety Case) Regulations 2005;

[M5]

Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996.

4.2

Design Codes

[M6]

American Petroleum Institute, Recommended Practice for Planning, Designing and


Constructing Fixed Offshore Platforms Working Stress Design,API RP2A - WSD, 20th
Edition, July 1993;

[M7]

American Institute of Steel Construction, Manual of Steel Construction Allowable Stress


Design, AISC - ASD, 9th Edition, 1989;

[M8]

British Standards Institution, BS EN 10225: 2001 - Specification for Weldable Structural


Steels for Fixed Offshore Structures

[M9]

British Standards Institution, BS EN 10025 1-6: 2004 - Hot Rolled Products of Structural
Steels

[M10]

British Standards Institution, BS4: Part 1: 1993, Structural Steel Sections: Hot-rolled
Sections

[M11]

British Standards Institution, BS EN 10210-1:2006, Specification for Hot-Finished Structural


Hollow Sections of Non0alloy and Fine Grain Steels Part 1: Technical Delivery
Requirements

[M12]

British Standards Institution, BS EN 10056-1: 1999, Specification for Structural Steel Equal
and Unequal Angles.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.

KCP-GNS-IFS-DPR-0001
Rev.: 03
Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 10 of 10

Document Title: Offshore Infrastructure Project Data

SUPPORTING REFERENCES

5.1

Project Documentation

[S1]

Kingsnorth Phase II CO2 Pipeline Project, Pipeline Design Basis, 80011-BOD-PL-001;

[S2]

Submission D159, Description of the Offshore Installation facilities;

[S3]

Submission D161, Offshore Installation Equipment to be used ;

[S4] Submission D168, Basis of Design for the Offshore Installation;


[S5] Submission D170, Access and accommodation on the platform;
[S6] Submission D171, Configuration of proposed offshore infrastructure ;
[S7] Submission D176, Offshore Installation construction methodology;
[S8] Basis of Design for Studies, Document No KCP-GNS-PCD-STU-0001

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no
representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors,
subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the
Information by any party.