Professional Documents
Culture Documents
Company Name
Supervising Architect
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
DC Architects
Student
Stu.No
Ar. Wong Chee Kin
2 storey 'Townhouse' 20' x 70'
Taman Dato' Chellam-RMMJ
Semi D S4
Taman Adda Heights
Wed
DAY
Thurs
Fri
7.5
7.5
7.5
7.5
7.5
7.5
Stages
Mon
Tues
Schematic Design
Sketching, 3D modeling and
Rendering
Sat
Sun
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
8.0
7.5
8.0
7.5
OTHER:
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
0.0
38.0
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architects
Student Tan Woan Tyng
Stu.No
Ar. Wong Chee Kin
0312725
Phase 7-3 storey semi-detached house (S1 & S2)
Taman Adda
CCM & SM
Taman Nusa Duta & Taman Skudai Indah
Phase 7- 2 storey cluster house
Taman Adda
Mon
Tues
Wed
DAY
Thurs
8.0
8.0
4.0
1.0
Stages
Schematic Design
Sketching, 3D modeling and
Rendering
Fri
Sat
Sun
5.0
2.0
1.5
3.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
1.0
4.0
OTHER:
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
1.0
8.0
8.0
7.5
8.0
7.5
0.0
39.0
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architects
Ar. Wong Chee Kin
Senibong Cove Clubhouse
Senibong Cove
Senibong B5B6
Senibong Cove
Stages
Mon
Tues
7.5
7.5
Wed
Student
Stu.No
DAY
Thurs
Fri
Sat
Sun
Schematic Design
Sketching, 3D modeling and
Rendering
Prepare presentation drawings
4.5
3.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
4.5
7.5
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
3.5
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
7.5
7.5
8.0
7.5
8.0
0.0
38.5
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architects
Ar. Wong Chee Kin
Senibong Cove Clubhouse
Senibong Cove
Type A-Cluster
Skudai Indah 2
Tues
Wed
DAY
Thurs
3.5
4.0
6.0
1.5
3.5
2.0
Stages
Mon
Schematic Design
Sketching, 3D modeling and
Rendering
Student
Stu.No
Fri
Sat
Sun
7.5
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER: Planning of spaces
and producing practical plans.
7.5
Permit Application
Aware of different local
authorities
1.5
1.5
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
7.5
8.0
0.5
0.5
8.0
8.5
7.5
0.0
39.5
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architects
Ar. Wong Chee Kin
IJM Sales Office
Mount Austin
Student
Stu.No
Stages
Mon
Schematic Design
Sketching, 3D modeling and
Rendering
Tues
Wed
DAY
Thurs
PH
Fri
Sat
Sun
4.0
PH
Aware of site conditions: Site
Visit, Study and Measure
PH
3.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
PH
0.5
PH
7.5
4.5
3.5
PH
4.0
PH
PH
PH
OTHER:
PH
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
PH
PH
PH
PH
3.5
OTHER:
PH
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
PH
PH
Total:
7.5
0.0
8.0
8.0
7.5
0.0
31.0
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architects
Student
Stu.No
Ar. Wong Chee Kin
Type S-Park View, Type S1, Type S2
Taman Adda
IJM Sales Gallery
Taman Mount Austin
Stages
Mon
Tues
Schematic Design
Sketching, 3D modeling and
Rendering
Wed
DAY
Thurs
4.0
Fri
Sat
Sun
3.0
6.5
4.0
7.5
4.5
7.5
7.5
1.0
3.5
3.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
0.5
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
7.5
8.0
7.5
0.0
38.0
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architect
Student
Stu.No
Ar. Wong Chee Kin
Type S1-Type S2-Type S-Type LG
Taman Adda (Phase 7)
Stages
Mon
Tues
Schematic Design
Sketching, 3D modeling and
Rendering
Wed
DAY
Thurs
Fri
7.5
6.5
Sat
Sun
0.5
6.5
7.5
6.5
0.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
1.5
0.5
1.0
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
8.5
7.5
7.5
7.5
7.5
0.0
38.5
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11
DC Architect
Student
Stu.No
Ar. Wong Chee Kin
Type S1-Type S2-Type S-Type LG
Taman Adda (Phase 7)
Stages
Mon
Tues
7.5
4.5
Wed
DAY
Thurs
Fri
7.5
7.5
7.5
7.5
Sat
Sun
Schematic Design
Sketching, 3D modeling and
Rendering
Prepare presentation drawings
0.5
3.5
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
3.5
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
3.5
0.5
8.0
7.5
Contract Administration
Aware of OR observe a
standard form of construction
contract
OTHER:
Total:
8.0
0.0
38.5
NOTE:
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Lunch Break should be excluded from this Log Sheets file.
Public Holiday please insert 'PH' in the 'grey box'.
A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.
Remark:
Page 11