Q. What is Testing
A. Testing is a process of executing a program with the intent of
finding an error.Software testing is the process of identifying the
bugs in the project/product(software).Test engineer will check
whether the developed project/product is as per the clients
requirements or not. He has to ensure for quality.
2.
3.
Requirements Phase
Analysis Phase
Design Phase
Coding/Implementation Phase
Testing Phase
4.
software
development
Working software is delivered frequently for each
sprint
developers
should be trusted
Face-to-face conversation is the best form of
communication
design
Self-organizing teams
2.
3.
4.
6.
Q. What is UAT?
A. UAT stands for User Acceptance Testing and also known as Client
Acceptance Testing.
Once the application is stable, client will provide UA Test Cases to
the testing team. The test engineer has to execute all the test cases.
If all the Test Cases are passed, then the client will accept the build
or the build will be delivered to the client.UAT is 2 types:1. Alpha
Testing: UA Test Cases will be executed in Test environment by
testing team
2.Beta Testing
11.
12.
3. High
4.Medium
5.
LowPriority describes the order to fix the bugs. It is of type P1, P2,
P3, P4 and P5.
P1 bugs are fixed initially, then P2, P3, P4, P5
We will maintain the priority for each bug based on severity.
14.
main functionality.
Priority2 (P2) The Test Case describes about the
field level.
Blocker P1
Very High P2
High P3
Medium P4
Low P5
2.
3.
Q. What is AUT?
A. AUT stands for Application Under Test. The project which we are
testing is known as AUT
4.
5.
Beta Testing
2.
4.
5.
7.
8.
9.
10.
11.