LABC Log

1/4/2015 Sunday

No operations occurred

1/5/2015 Monday

Well
LABC S7H
From
To
Hrs
6:00
7:00
7:00
7:15
7:15
10:15
10:15
11:30
11:30
13:15
13:15
13:45
13:45
16:15
16:15
16:45

1
0.3
3
1.3
1.8
0.5
2.5
0.5

Description
N/A
Safety Meeting
MIRU IPS 2" CT unit and TNT crane // PU inj head and 60' lube // MU BHA- CTC, BPV, Jar, Disc, XO, XO, 3.88" OS loaded w/ 3 1/8 grapple (TL-17.50')
RIH w/ IPS 2" CT and BHA
Tag TOF at 8087' // Latched on, could not move up or down hole, had to shear off plug // POOH
OOH // No fish // Replace grapple
RIH w/ IPS 2" CT and BHA // Tag fish at 8089', stack down and PU several times // POOH
OOH w/fish Wford WL disarm and break off guns // ND BOP and MO to South 6H

LABC S6H
16:30
17:00
22:15

17:00
22:15
0:00

0.5
5.3
1.8

MORU from South 7H


RIH w/ IPS 2" CT and BHA- CTC, BPV, Jar, Disc, XO, XO, 3.88" OS loaded w/ 3 1/8 grapple (TL-17.50') // Pushed fish to bottom, stacked out and PU multiple times // POOH // P
OOH w/ fish // Wford WL disarm and breakdown guns // Set down lube and inj head // RDMO TNT crane MIRU IPS crane

6:00

7:00
11:45
12:45
17:30
18:45
23:45
2:00

1
4.8
1
4.8
1.3
5
2.3

6:00

8:15
12:15
13:30
17:45
6:00

2.3
4
1.3
4.3
12.3

3:15
4:30
6:00

5
1.3
1.5

1/6/2015 Tuesday

LABC S6H
0:00
6:00
LABC S7H
6:00
7:00
11:45
12:45
17:30
18:45
23:45

1/7/2015 WednesdayLABC S7H


2:00
6:00
LABC S6H
6:00
8:15
12:15
13:30
17:45
LABC S10H
22:15
3:15
4:30

Code

RIH w/ IPS 2" CT and motor, 4 5/8 bit //n Tagged plug at 3767' drilled 15 min // RIH to bottom // CWC // POOH
OOH // RDMO to South 7H
MORU from South 6H
RIH w/ 4 5/8 bit // Tag CBP at 8117' drill 5 min // RIH to 13413' // CWC // POOH
OOH // Break off tools // PU HES setting tool and CBP
RIH w/ IPS 2" CT, CTC, Jar, XO, HES setting tool and CBP // Tag PBTD 13418' PU to 13413' and launch ball // Set CBP at 13413' tag to confirm // POOH
OOH // Pressure test CBP and casing to 8500 psi held for two minutes and broke straight to 1650 psi // No surface leaks // Decision was made to RIH another CBP
RIH CBP // PBTD 13420' // Dropped ball and set CBP at 13417' tag to confirm // POOH
OOH // Pressure test CBP and casing to 8500 psi held 5 minutes, good test // MU TCP guns

RIH w/ TCP guns // Perf stage 1 per design // All shots appeared to fire // POOH
OOH // ALL shots fired // ND BOP MO to South 6H
MORU from South 7H // PU HES Setting tool and CBP
RIH HES setting tool and CBP on IPS 2" CT // Tag PBTD at 13156' (CT depth wrong) launch ball set CBP 13129' // POOH
OOH // Test CBP and casing to 8500 psi held 5 minutes, good test // PU Wford TCP guns
RIH w/ Wford TCP guns on IPS 2" CT // Tag CBP, TCP stage 1 per design, All shots appeared to fire // POOH
OOH // SWI // Confirm ALL shots fired // RDMO to North 10H
RIH w/ 4 5/8 bit // Tag CBP 12792' CT depth // CWC // POOH
OOH // Break off tools // MU BHA (CTC, XO, PU unloader, XO, CT compression set packer TL- 15.4')
RIH w/ packer to 8575' at report time

1/8/2015 Thursday LABC S 10H


6:00
6:30
8:00
13:00
14:00
18:15
20:30
1/9/2015 Friday
1/10/2015 Saturday

6:30
8:00
13:00
14:00
18:15
20:30
6:00

0.5
1.5
5
1
4.3
2.3
9.5

RIH w/ CT packer to 8575' (125' below est TOC) // Set packer


WO Otex to thaw out pump and iron
Test above packer to 5000 psi and held, took pressure to 8500 psi held 5 minutes, good test // Released packer and RIH to 8850' ( 100' above top perf) tested to 5000 psi ab
OOH // Break off tools, release Wford packer hands // PU Wford TCP guns
RIH w/ Wford TCP guns on IPS 2" CT // Tag CBP 12788' CT depth // PU to bottom perf and TCP stage 1 per design // All shots appeared to fire // POOH
OOH // SWI // Confirm ALL shots fired // RDMO IPS CT
SDFN

Mobilize and rig up Sand Silos - Shut in all existing production


Mobilize and rig up Sand Silos

Plug set at 3767'

ove packer, good test // Released packer and RIH to 10675', tested to 5000 psi above packer, good test // Released packer and RIH to 12500' (middle of stage 1) tested to 5000 psi above packer, good test // POOH