You are on page 1of 108

projects:

YOUR
WISH

OUR
FULFILLMENT

Turning Vision into Value.

Transportation infrastructure

Energy infrastructure

Social and urban infrastructure

Contract mining

Our Company at a Glance

HOCHTIEF Aktiengesellschaft Corporate Headquarters (management holding company)

HOCHTIEF Americas Division

HOCHTIEF Asia Pacific Division

HOCHTIEF Europe Division

The HOCHTIEF Americas division

Through its majority share in the Leighton

The HOCHTIEF Europe division over-

coordinates the activities of HOCHTIEFs

Group, HOCHTIEF holds the leading

sees the Groups business in Europe

companies in the USA and Canada.

position in the infrastructure construction

and selected growth regions around the

market in the Asia-Pacific region. Its ac-

world. This division operates under the

Through our subsidiary Turner, we are

tivities are pooled within the HOCHTIEF

leadership of HOCHTIEF Solutions AG,

the number one general builder in the

Asia Pacific division.

which provides services primarily for infrastructure, building construction, public-

USA. The same goes for sustainable


green building, where the company

Leightons product and service spectrum

private partnerships, and engineering

ranks among the pioneers and drivers in

includes construction, contract mining,

services. Its focus is on the transportation,

this country. With our majority stake in

operation and maintenance, and services

energy as well as social and urban infra-

the Canadian company Clark Builders,

in the raw materials segment. Leighton

structure segments.

HOCHTIEF has now stepped up activi-

also has a strong presence in energy and

ties in the Canadian construction market.

transportation infrastructure, real estate

For public infrastructure measures,

construction and development, and serv-

HOCHTIEF Solutions acts as a partner

ices.

in PPP projects to deliver services such

The services provided by civil contract-

as financing, design, and operation in

ing company Flatiron complement our

addition to construction services.

portfolio in North America perfectly. The

The Leighton Groups main operating

company numbers among the top pro-

units are Leighton Contractors, Thiess,

viders in US transportation infrastructure

John Holland, and Leighton Properties

A market and innovation leader in many

construction and has operations in both

in Australia, Leighton Asia, India and

regions, HOCHTIEF Solutions offers a

the USA and Canada. With E.E. Cruz and

Offshore in Hong Kong and Southeast

well-rounded portfolio for infrastructure

Company, HOCHTIEF has enhanced its

Asia, and the Habtoor Leighton Group in

projects, real estate, and facilities. Its

position in the civil engineering market in

the Arab countries.

outstanding technical expertise and


engineering services count among the

the New York metropolitan area.


Ranking among the leading players in

companys top strengths and have earned

their sectors, the Leighton companies

it an excellent international reputation.

enjoy excellent reputations.

Leighton Holdings

For further information and the addresses of our operational units, please visit our website at www.hochtief.com.

Contents

8 Our profile

Transportation infrastructure
12 Bridges, Roads, Tunnels
26 Stations, Airports, Ports, Locks/Dams

Energy infrastructure
40 Renewable energies, Grid expansion
48 Power plants, Wastewater treatment plants, Gas

Social and urban infrastructure


56 Public buildings, Educational facilities, Healthcare properties
68 Office properties, Commercial properties
78 Skyscrapers, Mixed use properties
82 Residential real estate, Urban district development, Hotels
90 Sports and event facilities, Cultural facilities

Mining business
98 Contract mining

Indexes
104 Index, Further information, Publication details and credits

Legend
The following symbols appear throughout the brochure. They indicate various additional information about our
projects and services.

[ ]

Additional and Quotes and


expert
background
opinions
information

( )
Facts and
figures

BM
Information
about BIM and
ViCon

RD
&
Innovations
(R&D projects)

P
P
P
Information about
public-private partnerships
(PPP projects)

Electricity at the touch of a button is something people have come to expect. At the
same time, more and more people want

energy from renewable sources. To


meet this demand, HOCHTIEF is pursuing
efforts to expand sustainable and reliable

Mobility is part of our quality of life

energy infrastructure.

and a driver of economic growth. The


number of transportation routes is rising
steadily. HOCHTIEF builds modern transportation infrastructure worldwide that
connects people and regions and allows

Social and urban infrastructure must adapt

goods to arrive safely at their destinations.

to the way people want to live and work.


HOCHTIEF builds contemporary properties
and public administration buildings that let
people get the best out of

living.

urban

The global demand for resources


continues to be high. As the worlds largest
contract miner, the HOCHTIEF Group helps
supply industries in modern societies with
resources such as coal, ore, and copper.

Your wish. Our fulfillment.


As a global construction group, HOCHTIEF is the right
partner for your sophisticated infrastructure projects. In
the course of our company history, which stretches back
over 140 years, we have established the foundations for
rewarding collaboration: Excellence, quality, expertise,
and innovation are the hallmarks of HOCHTIEFs work
worldwide. Thats something you, our clients, can rely
onand its what makes the results of our collaborations
so beneficial to the people who use them.
The challenges are always unique and are shaped by the
demands of todays societies. That makes each project
one-of-a-kind. HOCHTIEF embraces these challenges. In
addition to our core competency, building, our capabilities
also include development and operation. We focus on
complex projects in the energy, transportation, and social
and urban infrastructure segments as well as in contract mining.

Our profile

Who we are,

HOCHTIEFs 140-year history has

how we work, and

made us experts in infrastructure.

what we can do for you.

It is chiefly our clients, who are


always the focus of everything we
do, who reap the rewardsand
thats not just a clich or lip service!
My main goal is to deliver projects
on time, with the highest possible
quality, and at a fair pricein other

Global infrastructure provider

unique as each one is, HOCHTIEF proj-

words, to optimally fulfill clients

HOCHTIEF is firmly focused on its goal,

ects all share one key element: Our

needs.

and has expressed that goal in its vision:

unwavering conviction that close, trust-

Marcelino Fernndez Verdes,

ful collaboration with the clientwith

Chairman of the Executive

HOCHTIEF is building the future.

youfrom the outset is the best basis for

Board of HOCHTIEF

Along with our partners, we expand

our work. With our partnership-based

Aktiengesellschaft

horizons, link people and organiza-

contracting models, you can depend on

tions, create new ways to think and

transparency, on-schedule delivery,

act, and continually enhance the

and quality. We work with you to turn

values entrusted to our care.

your visions into reality.


Creating sustainable value

The Group turns this vision into reality

360-degree approach

Thanks to its worldwide network and

all over the globewith technical excel-

The high quality of our work is the result

broad international presence, H


OCHTIEF

lence, a highly skilled workforce, and

of HOCHTIEFs commitment to holistic

can deliver networked services and the

the experience amassed during a com-

solutions. Even if our involvement is limited

advantages of in-Group know-how trans-

pany history of over 140 years. To you,

to just a certain phase in a projects life

fer, which also work to your advantage.

our clients, we deliver unique, custom-

cycle, we nonetheless keep our eye on

tailored solutions. Thus we work to-

the big picture.

As a global construction group, we


create value that endures and touches

gether to help master the challenges


Public-private partnership projects

many peoples living space. This brings

reap the biggest rewards from our

with it an enormous responsibility, which

International partner with a

360-degree approach. In such proj-

HOCHTIEF consciously embraces; we

local presence

ects, we can optimize the overall

always seek integrated solutions that

HOCHTIEF and its subsidiaries and

total cost of ownership, thereby achiev-

encompass ecological and social

associated companies have completed

ing significant gains in efficiency.

factors as well as financial aspects.

projects all over the world for both pri-

That benefits our clients, HOCHTIEF,

vate investors and the public sector. As

and users alike.

modern societies face.

HOCHTIEF committed long ago to the


principles of sustainability, and is considered a pioneer in the industry on this
front. We are confident that sustainability

Blazing new trails

Compelling competence

holds great potential for our business.

HOCHTIEF enjoys a worldwide reputa-

HOCHTIEFwith over 140 years of

tion for technical excellence and inno-

experience in our core competency.

The best teams for our clients

vation. In order to maintain and further

That is the foundation of a company

Our employees are the face of

advance these strengths, we are con-

that e
njoys dynamic growth and always

HOCHTIEFthe face that greets you,

stantly working on new ideas and prod-

seeks fresh challenges. Together with

the client. It is our employees knowl-

ucts. We pursue our research and

our clients and partners, we will continue

edge and skills that have made us an

d evelopment projects with the aim of

to tap into new markets and set new

industry leader. That is why at HOCHTIEF

creating innovations. And, since most

benchmarks.

we employ people who understand

of what we build is one-of-a-kind, even

their business and their craft. Around

the conditions and challenges we face

With projects: you can discover

the globe, over 86,000 people work

every day in the course of our regular

the whole spectrum of our services

in strong teams to carry out your proj-

work on site frequently yield innovative

and competencies.

ects. Occupational safety and health

solutions.

are among our highest priorities throughout the Group.


Our employees enjoy opportunities to
develop their hard and soft skills. That
allows HOCHTIEF to develop the dynamic performance we need to meet
our challenges and fulfill your needs.

Transportation infrastructure

your
business

11

our
connections

Efficient transportation routesat a regional, national, and international level


are a cornerstone of mobile societies. People and goods need to reach their
destinations quickly and safely, whether its by car, rail, plane, or ship. HOCHTIEF
is one of the worlds leaders in the construction of transportation infrastructure.
Our wide range of services and contract models make us ideal partners for the
most sophisticated projects.

Transportation infrastructure

Bridges
Roads
Tunnels

13

HOCHTIEFgetting projects on the


road quickly and smoothly.
Studies and our own experience have
shown: There is a great need for transportation infrastructure spending. Roads,
bridges, and tunnelsthey all need to
be readied to meet societies growing
demands for mobility. The required expenditures will run to trillions worldwide.

Bridge across the Great Belt


Denmark

HOCHTIEF contributes to keeping traffic

HOCHTIEF and its joint venture partners

flowing swiftly and smoothly: Our Group

built bridges of the superlative variety

is among the worlds leading providers for

in Scandinavia: The construction of the

sophisticated transportation infrastruc-

resund Bridge is considered a mile-

ture projects. We possess the skills and

stone. Over 16 kilometers long, the struc-

experience to get your projects done.

ture linking the cities of Copenhagen

Efficiency, safety, and cost-effectiveness

and Malm opened in 2000. Prior to that,

are at the core of our integrated approach.

HOCHTIEF had been part of a joint


venture that built the Great Belt East

Whether you just need construction

Bridge, which is the centerpiece of the

services or are looking for a public-private

structure with a total overall length of

partnershipwith HOCHTIEF at your

20 kilometers between the Danish islands

side, you can always rely on a partner

of Funen and Zealand. With a free span

who stands for outstanding design ex-

of 1,624 meters and a vertical clearance

pertise, high-quality projects, and optimal

of 65 meters, it is not only among the

overall costs. Wherever you want to go,

longest but is also one of the most awe-

lets travel together!

inspiring suspension bridges in the


world. Its pylons extend 27 meters below
and 254 meters above sea levelalmost
as high as the Eiffel Tower. The bridge
has speeded up the crossing dramatically: Instead of a two-hour ferry journey,
it now takes drivers a mere 15 minutes.
(see also photo at left)

working
days

Thats the average time German


drivers spent in traffic jams in 2012.
The jams totaled 595,000 kilometers
in lengthequivalent to about 15
times the Earths diameter.
Source: ADAC 2013

Transportation infrastructure Bridges Roads Tunnels

In 2011, Flatiron completed the longest


cable-stayed bridge in North America,

John James Audubon Bridge


USA

which spans a good 480 meters in length


and is located near New Orleans. One
special challenge in building the John
James Audubon Bridge was the Mississippi River flood season. To enable the
main span pier foundations to be poured,
Lake Champlain Bridge
USA

the HOCHTIEF company used a purposebuilt 2,300-metric-ton cofferdam construction. This saved both time and re-

Flatiron constructed the new Lake Cham-

sources.

plain Bridge in northern New York State.


The new two-lane steel arch-span structure replaces a structurally deficient twolane bridge demolished in December
2009. Spanning Lake Champlain, the
new 670-meter-long bridge reconnects
Essex County, N.Y. and Addison County,
Vt. For two years, those travelling between
the two counties relied either on a 160kilometer detour around the lake or a
ferry system initiated after the old structure was closed. Now that construction
is complete, motorists can enjoy a delayfree crossing. The impact to the local
community was the driving factor for
the aggressive 490-day completion
schedule.

Port Mann Bridge


Canada
HOCHTIEF US subsidiary Flatiron was

ten lanes and reduces average travel

part of a joint venture team that built the

times by 30 percent. In addition to the

new Port Mann Bridge in Vancouver

bridge itself, work also included up-

between 2009 and 2013. The cable-

grading a good 37 kilometers of High-

stayed bridge increases the Fraser

way 1 on each side of the river. The

River crossings capacity from five to

new bridge will be financed by tolls.

15

Occupational safety and health

DrillsIn case the worst comes to the worst

To make sure their reactions are just right in a

potential emergency situation in bridge building,


the employees of our US subsidiary Flatiron conduct drills like rescues in ice-cold water. Exercises

Queensferry Crossing
Scotland

such as this one tailored to reflect real-world


conditions are HOCHTIEFs way of keeping its

As leader of a consortium, HOCHTIEF

workforce well prepared for their tasks. This builds

Solutions is building the approximately

trust and a sense of securityallowing workers

2.7-kilometer-long cable-stayed bridge

to concentrate fully on their challenging jobs.

dubbed Queensferry Crossing by the

Throughout the Group, it is our goal to provide the

publicover the Firth of Forth near

highest standards in occupational safety and the

Edinburgh in Scotland. Including the

best possible health protection.

necessary connecting structures,


almost seven kilometers of road infra-

Film: HOCHTIEF offshore


crew emergency rescue drill

structure will be created here between


2011 and 2016. The bridge features a
cutting-edge wind shielding system to
protect traffic even in high winds.
HOCHTIEF is thus building one of the

Bosphorus Bridge
Turkey

A milestone in bridge building: In the

largest infrastructure projects in Europe

early 1970s, HOCHTIEF was involved in

and one of the worlds longest cable-

constructing the first bridge over the

stayed bridgesand demonstrating

Bosphorus. The six-lane link was com-

how cost-effectively it works even on

pleted in 1973. Today, this suspension

technically sophisticated, large-scale

bridge measuring over 1.5 kilometers in

projects.

length still connects the European and


Asian halves of Istanbulbridging gaps
in every sense of the word. For us, its
a nice reminder that our business is
about more than constructing according to blueprints. Its about building
bridges.

Transportation infrastructure Bridges Roads Tunnels

Twin Sails Bridge


UK

Compass Photography

Seaford Rail Extension


South Australia

Between 2010 and 2012, Leighton sub-

park-and-ride facilities, the project also

The Twin Sails Bridge, a lifting bridge

sidiary Thiess worked as part of a joint

included a bus station, three road bridges,

with unique, triangular leaves that recall

venture to significantly improve transport

and a 1.2-kilometer-long bridge over the

sails, opened in Poole in southern Eng-

rail services to residents of Adelaides

Onkaparinga Valley. The long span tech-

land in 2012. The project carried out by

southern suburbs. The 5.7-kilometer

nique helped Thiess minimize the con-

the UKs HOCHTIEF Solutions experts

Seaford Rail Extension will save them

struction footprint on the southern na-

included complex civil and marine engi-

about ten minutes on their way to the

ture reserve.

neering work as well as the operating

city. In addition to rail lines, stations, and

equipment for the bridge structure. The


bridge not only unlocks regeneration
sites within the city but, thanks to its
striking nighttime illumination, has
become a local icon.

17

Sir Leo Hielscher Bridges


Australia

57 tn

US dollars in global infrastructure spending


will be needed from 2013 to 2030.
Source: McKinsey Global Institute, Infrastructure
Productivity, 2013

In 2006, Leighton Contractors in joint


venture was awarded the contract for
the Gateway Duplication in Queensland,
Australia. The project included refurbishment of an existing bridge and construction of a second bridge (south) across
the Brisbane River incorporating six lanes
and a shared pedestrian and cycle path.
Twenty-four kilometers of the existing
Gateway Motorway was upgraded and
new sections of the motorway north of
the bridges were constructed. The contract also included maintenance of the
asset over a 10-year period. In 2010 the
bridges were renamed the Sir Leo Hielscher Bridges.

West Gate Bridge


Australia
John Holland as part of a joint venture

of the refurbishment that improved the

was appointed to strengthen Melbournes

structures long-term sustainability. At

iconic and heavily-trafficked West Gate

rush hour, this major artery carries five

Bridge, a project that ran from 2008 to

lanes of traffic in each direction.

2011. The Leighton company was involved


in both the design and the construction

DB AG

Transportation infrastructure Bridges Roads Tunnels

Saale-Elster Viaduct
Germany
The construction of the Saale-Elster Viaduct near Halle, the shell construction of
which was finalized by HOCHTIEF Solu-

RD
&

tions as part of a joint venture in mid-2013,


was a complex challenge. Forming part of
the express rail link between Nuremberg
and Berlin, it is the longest bridge structure
in Germany, at 8.6 kilometers. Not only the
sheer length of the bridge but also the
limited space and the sensitive surround-

The assembly line: Back in 2007, our US subsidi

ings called for superbly coordinated, well-

ary Flatiron developed a new bridge building technique for

organized procedures and construction

use in its Highway 17 Bypass project in North Carolina. Its

site logistics. The viaduct crosses nature

goal was to minimize environmental disturbance. A gantry

reserves in the Saale floodplains. So as not

was built from which piles can be driven into the ground,

to interfere with the floodplain environ-

precast road segments laid in place, and girders erected.

ment, our bridge building experts made

As soon as one span is done, the gantry moves forward. It

effective use of the low-impact top-down

eliminates the need for heavy construction vehicles, minimiz-

construction technique, in which work is

ing environmental impacts. This assembly line technique

carried out from scaffolding. Work was also

makes it possible to build bridges from above.

regularly suspended on sections of the


bridge during the bird breeding season.

19

Northeast Anthony
Henday Drive
Canada

Newmarket Viaduct
New Zealand

HOCHTIEF Solutions brings its expertise

Starting in 2008, Leighton Contractors

stages, which minimized the impact on

in transportation infrastructure to the

worked on the expansion and replace-

traffic throughout the four-year construc-

Northeast Anthony Henday Drive project

ment of the Newmarket Viaduct on State

tion period. A key feature was replacing

in Edmonton, Canada. In a public-private

Highway 1, considered the most heavily

the 700- meter- long Newmarket Viaduct

partnership model, we are designing,

trafficked section of motorway in New

with a balanced cantilever structure.

building, operating, and partially financing

Zealand. In the Newmarket Viaduct Re-

Motorists have been using the com-

this project together with partners. The

placement Project, the deconstruction

pleted section since 2012.

project will run for 34 years. Group

and construction were accomplished in

subsidiary Flatiron will be responsible for


the execution as part of a joint venture.
The Northeast Anthony Henday Drive
project includes the construction of a
27-kilometer stretch of six- and eightlane highway, nine interchanges, two
road flyovers, eight rail flyovers, and two
bridges across the North Saskatchewan
River, for a total of 46 bridge structures.
Work began in June 2012 and is scheduled for completion in fall of 2016. P
P
P

Western Highway
Australia
John Holland has been working on the

tion of a new interchange, various road

new Western Highway west of Melbourne

flyovers, and several bridges, such as

as part of a joint venture since August

the one over the Djerriwarrh Creek. The

2009. The contract includes construc-

project was opened to traffic in 2012.

Transportation infrastructure Bridges Roads Tunnels

HOCHTIEF Solutions and a partner are


designing and building a section of

Highway A8
Germany

Highway A 8 some 58 kilometers long


between Ulm and Augsburg, and will
also operate and maintain it for 30 years.
The A 8 is the first project in the second
phase of road-widening known as the
A Model program, put out to tender by
Presidio Parkway
USA

the Federal Ministry of Transport, Building


and Urban Development. During the
course of the work, a 41-kilometer sec-

In 2012 a consortium led by HOCHTIEF

tion of the A 8 will be widened from four

Solutions was awarded the Groups

lanes to six while still in use. P


P
P

first-ever PPP project in the US: Presidio


Parkway is the new southern approach
to the iconic Golden Gate Bridge in San
Francisco. In a contract from Californias
traffic authority, the company is responsible for designing and constructing the
highway and will operate it for over 33
years. The Groups US subsidiary Flatiron is the lead in the construction joint
venture. Completion of the 2.5-kilometer stretch including two short tunnels is

77%

of all goods transported in Germany are


moved on German roads: A good 3.3 billion
of the 4.3 billion metric tons that were
transported in 2012 went by truck.
Source: Destatis, 2013

scheduled for 2015. P


P
P

Highway A4
Germany

In September 2010a year ahead of

operate and maintain a section of the

schedulethe final sections of the

A4 in Thuringia some 45 kilometers in

24.5-kilometer stretch of Highway 4 that

length. The financing, design, and con-

had been newly built and expanded in

struction of the new section were also

Thuringia were opened for traffic. We

part of the contract. Before the building

carried out the Hrselberge Bypass as

phase was complete, a great deal of

a PPP project together with a partner.

planting along the new section and its

HOCHTIEF Solutions holds 50 percent

surroundings had already begun. P


P
P

of the concession company. The consortium also has a 30-year contract to

21

RD
&

Highway A1/A6
Netherlands
In 2014 HOCHTIEF Solutions and partner

Every problem has a solution: Like all concrete,

companies will start work on the ex-

the concrete used in roadwork pavement can experience shrink

pansion of Highways A 1 and A 6 in the

age, meaning it can be prone to cracking and, often costly

Netherlands between Amsterdam and

replacement. To help prevent this, a curing compound is applied

Almere, HOCHTIEF Solutions first PPP

to freshly poured concrete. Until now there has been environ-

concession project in that country. The

mental impacts associated with curing compound products

over 20-kilometer stretch is part of one

being used. Leighton Contractors Pty Ltd has worked with a

of the key roads to the major Dutch city.

partner to develop an industry first environmentally-friendly

This is one of four PPP projects designed

mix made from wax, which is sprayed on the green concrete

to enhance traffic capacity between

and which then forms a durable protective coating. The prod-

Amsterdam, Schiphol Airport, and the

uctalready being used with successful resultsis called

young, dynamically growing city of

Secure 33.

Almere from 2020. P


P
P
Brisbanes new AirportlinkM7 has been
in operation since 2012. The centerpiece 6.7-kilometer toll road runs largely
through tunnels and was designed to
ease the bottleneck between the city of
Brisbane and the airport. Leighton subsidi
aries Thiess and John Holland secured
Brisbane AirportlinkM7
Australia

this contract for what was Australias


largest ever road infrastructure project.

Transportation infrastructure Bridges Roads Tunnels

Epping to Chatswood Rail Line


Australia
Between 2002 and 2008, HOCHTIEF
and Leighton subsidiary Thiess worked
in a joint venture to build two tunnels

RD
&

each 13 kilometers long as well as four


railway stations north of Sydney. The
contract was part of the Parramatta Rail
Link, at the time the largest publiclyfunded infrastructure project in Australia.
In addition to the tunnel work, the joint
venture was also responsible for designing, building, and commissioning the

Innovations for tunnel construction: The

track, signal, and communications

Leighton companies use an innovative blasting technique in

systems.

tunnel construction that minimizes vibrations and facilitates the


removal of overburden.
For a 2012 tunnel construction project in Hamburg, HOCHTIEF
Solutions used a newly developed steel construction for the
first time which allows the tunnel boring machine to be moved
with greater ease. The faster pace of the project translated
into savings of EUR 600,000.

23

Clem Jones Tunnel


Australia

Gotthard Base Tunnel


Switzerland

Leighton Contractors, along with its

HOCHTIEF Solutions and four partner

kilometers of tunneling will be built here

consortium partners was responsible

companies have been working in Swit-

to allow trains to simply pass under four

for the finance, design, building and

zerland for more than ten years to build

reservoirs and the Saint-Gotthard Massif.

operating of Brisbanes first privately

the worlds longest rail tunnel, the

High-speed trains will be able to travel

financed toll road, the Clem Jones

Gotthard Base Tunnel. The 57-kilometer

through the tunnel in just 20 minutes,

Tunnel. CLEM7 links five existing major

structure is expected to open in 2016.

which cuts the trip from Zurich to Milan

motorways and arterial roads on the

Including all the connection, ventilation,

nearly in half.

north and south sides of the Brisbane

and emergency exit tunnels, over 150

River. The 6.8-kilometer tollway includes


twin, 2lane, 4.8-kilometer tunnels. The
project also includes a state of-the-art
fully electronic tolling system and unique
urban design and landscaping concepts
that complement the subtropical lifestyle and liveability of Brisbane.The tunnel was opened in March 2010, some
seven months earlier than the contracted
date, and Leighton Contractors in joint
venture is the Operations and Mainte-

Edmonton Tunnels
Canada

nance (O&M) contractor.


The North Light Rail Transit Project is a

months of the 15-month project con-

3.3-kilometer extension of the existing

sisted of tunnel excavation and removal

light rail network in Edmonton, Alberta.

of earth. The phase delivered by the US

Flatiron built 875 meters of the stretch

HOCHTIEF subsidiary was completed

under the city, in tunnels each about six

and handed over in June 2013.

meters in diameter. The first eleven

Transportation infrastructure Bridges Roads Tunnels

U4 HafenCity
Hamburg, Germany
The connection between the HafenCity
urban development project and downtown Hamburgs major transportation

Thames Tunnel
London, UK

hubs, subway line U4, has been running


since December 2012. HOCHTIEF
Solutions was the technical leader of a
joint venture that built the subways two
tunnels, each with a diameter of 5.5
meters. The three-kilometer-long stretch
was constructed using the shield tunneling method. We pooled and deployed
our full spectrum of expertise in port,
marine, civil engineering, and tunnel con-

As partner in a joint venture, HOCHTIEF

a new rail link will connect the west and

struction to deliver this transportation

Solutions has been responsible since

east of the British capital. With an over-

infrastructure project in five years. Some

2011 for constructing two tunnels with

all length of 118 kilometers, 21 of which

35,000 passengers now use the new

a total length of about 5.5 kilometers

will consist of tunnels, this link will, ac-

line between the HafenCity district and

beneath the River Thames in London.

cording to estimates, benefit some 1.5

downtown Hamburg every day.

Our contract lot is part of a huge infra-

million people.

structure project: From 2018 onwards,

25

Lai Chi Kok Tunnel


Hong Kong

Leighton Asia, India and Offshore de-

contract. A tunnel boring machine (TBM)

signed and built two underground drain-

and blasting were the methods used to

age tunnels in Hong Kong. They are part

build the tunnels.

of a drainage system that captures rainwater in the north and discharges it into
Victoria Harbour, with the aim of alleviating flooding in the low-lying, densely
populated areas of Kowloon. The total
length of the two tunnels is 3.7 kilometers, and each one measures nearly five
meters in diameter. Construction of various intake shafts and connection adits, a
stilling basin, and an outfall structure were
also included in the Leighton subsidiarys

city that stretches across 14 islands.


The HOCHTIEF contracts comprise the
construction of two tunnels, each 1.2
kilometers long and two lanes wide; a
section of road about one kilometer
long, including ramps and turnoffs; and
the construction of a new bridge with
three lanes in each direction, including
cycle and pedestrian paths plus an

Norra Lnken
Stockholm, Sweden

optional tram lane.

In Stockholm, the transportation infra-

experts possess all the know-how this

structure is being revamped to meet

demanding project requires and are re-

growing demands. This includes Norra

sponsible for three packages of work.

Lnken, the Swedish capitals northern

Challenges include the extremely hard

bypass, part of the ring highway sys-

ground, the high density of construction

tem, which is slated to open for traffic at

sites, the heavy traffic, and the logistics

the end of 2015. HOCHTIEF Solutions

involved in working in a densely built-up

Transportation infrastructure

Stations
Airports
Ports
Locks/Dams

27

HOCHTIEFmastering complex
infrastructure challenges flexibly.
Railway stations, airports, and marine
ports serve as hubs for transporting
people as well as goods. They are often
microcosms in and of themselves, with
rigorously regulated procedures and a
highly complex infrastructure geared to
precisely fulfilling specific functions. This

Prague Metro
Czech Republic

infrastructure also has to meet changing needs: Increasing numbers of pas-

As member of a joint venture, HOCHTIEF

sengers, growing international trade, and

Solutions has been awarded the con-

ever larger aircraft and freighters call for

tract to extend Pragues metro by a total

upgrades and expansions to existing

of 6.2 kilometers. While our tunnel con-

facilities as well as the construction of

struction specialists will carry out drill-

new ones.

and-blast tunneling works, we will also


build two of the four underground sta-

If mobility is to continue to drive

These are the very challenges HOCHTIEF

tions and provide the adjoining above-

is best equipped to meet. We have de-

ground infrastructure, such as a bus

livered state-of-the-art airports, stations

terminal and the exterior facilities. This

that fulfill the needs of their many users,

is a follow-on contract; in work performed

that investments in the upkeep,

and gigantic ports all over the world.

between 2004 and 2007, HOCHTIEF

expansion, and refurbishment of

With all the technical skills required and

built the architecturally impressive Prosek

transportation infrastructure are

a wealth of experience under our belts,

metro station in the Czech capital.

vital. We need to maintain and ex-

structure is essential. This means

tend transportation networks that

we can respond flexibly to the individual


challenges involved in these highly so-

economic growth, adequate infra-

(see also photo at left)

will meet our needs, and we need to

phisticated projects. We keep things

use them intelligently. The corpo-

moving!

rate sector and industry associations are prepared to support the


government in solving these challenges.
Thomas Hailer,
CEO, Deutsches
Verkehrsforum

Transportation infrastructure Stations Airports Ports Locks/Dams

Salzburg Main Station


Austria
Serving 25,000 passengers a day, Salzburgs Main Station is one of the largest of
its kind in Austria. Since 2009, HOCHTIEF

Ostkreuz Station Berlin


Germany

bished while operations continued at


full steam, without disrupting regular

Solutions has been transforming the build-

regional and commuter services. Ele-

ing, parts of which were designed as an

ments added include two new platforms

island station, converting it into a through

and several rail bridges. This central

stationwhile train services remain fully

regional transportation hub has now

operational. The result will be one of the

been thoroughly refurbished and up-

countrys most advanced railway stations,

gradedand the flow of over 110,000

with an architectural concept that also

passengers who use it every day has

integrates the landmarked historical roof

been greatly eased.

structure. HOCHTIEFs chief role in this


demanding project is conducting foun-

The specialists at HOCHTIEF Solutions

dation engineering, roadworks, and

used 1,400 metric tons of steel in the

structural engineering. Comprising over

new orbital railway hall at Berlins Ost-

100 individual construction phases, the

kreuz Station. Completed in 2012, it

project calls for building a 100-meter

now defines the look of the station, which

underground crossing, an underground

is over 140 years old. But the hall is not

pedestrian walkway, and nine platforms

the only impressive feature here: The

with a total length of 3,200 meters.

stations inner workings were also refur-

29

Reading Station
UK

TrackStar Alliance

TrackStar Alliance
Queensland, Australia

The British university town of Reading

TrackStar Alliance was established in

various rail and road projects. TrackStar

with its population of 150,000 cannot

2006 in response to the South East

Alliance provided innovative architectur-

really be called a metropolis. It is, how-

Queensland governments infrastructure

ally-designed stations, delivered inno-

ever, a veritable transportation hub

investment program. Leighton company

vative solutions to reduce construction

serving London and boasts some im-

Thiess formed the Alliance to deliver

time and delivered quality infrastructure.

pressive numbers: 800 trains pass


through the town every day, with 17 million commuters a year. A challenge for
the urban infrastructure, and one
HOCHTIEF Solutions is currently tackling by expanding the station to accommodate the growing numbers of travelers. Two new station entrances to the
north and south, new connecting levels
between them, and five additional platforms are part of this contract. Thanks
to sophisticated construction logistics,

West Kowloon
Hong Kong

the work will not interfere with regular


train services.

The West Kowloon Terminus Station

Leighton Asia, India and Offshore is

North is the largest civil contract awarded

one of the contractors constructing a

for the Hong Kong Section of the Guang

380,000-square-meter underground

zhou-Shenzhen-Hong Kong Express

terminus that includes 15 platforms,

Rail Link. Located in the heart of Kow-

custom and immigration facilities, de-

loon, the terminus will serve as Hong

parture lounges, duty free and retail

Kongs international gateway to China

outlets as well as a number of subway

for over 100,000 passengers a day.

and footbridge connections.

Transportation infrastructure Stations Airports Ports Locks/Dams

Wrocaw Airport
Poland

Sleek, modern, and spacious: Thats the

in 2011. We also built access roads and

more passengers per year than the

new face of the airport in Wrocaw, Po-

peripheral areas as well as 1,000 addi-

old facility.

land. HOCHTIEF Solutions completed

tional parking spaces. The expanded

the new 40,000-square-meter terminal

airport can handle two and a half times

Warsaw Airport
Poland

Were always pleased when satisfied


clients return with requests for more of
our servicesas was the case with the
operator of the Polish capitals airport.
HOCHTIEF built the terminal building at
Frederic Chopin Airport in the early
1990s. Now we have been awarded the
contract for upgrades and refurbishments. We will also deliver a new baggage handling system and build a
tunnel linking the check-in hall with a
railway station. The work is scheduled
for completion by the end of 2014.

31

San Francisco Airport


USA

Flatiron is heading a joint venture to


build the column structure for the new

Oakland Airport Connector


USA

elevated people mover serving the


Oakland, California, International Airport,
a project scheduled for completion in
summer 2014. Turner is also part of the
team as a subcontractor. Over five kilometers long, the railway will link the airport with the closest train station, replacing the existing bus service. The fully
automated people mover will run above
street level away from the traffic, making it a swift, reliable means of transport
even at rush hour.

Our US subsidiary Turner performed


renovation and expansion works at San
Francisco Airports Terminal 2 in a project phase that ran from 2008 to 2010.
The boarding area was significantly upgraded, redesigned, and expanded,
and new passenger loading bridges
and baggage handling systems were installed. The work also included technical upgrades. Critical to the construction was maintaining the airports

Riga Airport
Latvia

emergency communications center and


air traffic control tower located above

The upgrades HOCHTIEF Solutions has

apron lighting. Rigas is already the

and adjacent to the work area. The pur-

been contracted to perform at Riga Air-

most vital airport in the Baltic region;

chasing experts at Turner Logistics pro-

port between May 2013 and August

the upgrade will increase its capacity

vided supply chain management serv

2014 are quite extensive: two new halls,

and improve safety standards to make

ices for this renovation. This project is

new taxiways and de-icing platforms,

Riga a hub for Northern European air

the first airport terminal in the United

refurbishment and drainage of the take-

traffic in the long term. Operations will

States to receive the U.S. Green Build-

off and landing strips and the runways,

continue uninterrupted during the

ing Councils LEED Gold certification.

extension of the apron, runway and

16-month construction period.

Transportation infrastructure Stations Airports Ports Locks/Dams

Jeddah Airport
Saudi Arabia
Of all the legendary projects that
HOCHTIEF has completed, the interna-

Pooling expertise: Between 2008 and

tional airport at Jeddah in Saudi Arabia,

2012, HOCHTIEF subsidiary Streif

built between 1974 and 1981, stands out

Baulogistik was responsible for site

among the rest. The entire fenced-off site

management and logistics during the

is 105 square kilometers in size, with four

extension work at Frankfurt Airports

terminals forming the core of the complex.

Terminal 1. The new A-West concourse

One of these is the Pilgrims Terminal,

was created there, for which HOCHTIEF

whose signature tent-shaped roof consti-

Solutions built part of the shell. It can

tuted the largest roofed-in area in the world

now accommodate seven A380 super-

when it was built. The turnkey airport project was also the biggest contract ever
placed with a single construction company. And a new chapter is currently being
added to our companys association with
Jeddah: Our Australian subsidiary Leighton, through its 45%-owned company
Habtoor Leighton Group, has secured
the contract to expand the airport maintenance area. This will involve building
eleven hangars by 2014, as well as upgrading the apron.

A-West concourse
Frankfurt, Germany

jumbos.

13,764

construction site access permits were issued by S treif


Baulogistik altogether during expansion of Frankfurt
Airports Terminal 1 (20082012). The airport maintained operations while the work was carried out.
Source: Streif Baulogistik

33

Between 2006 and 2012, Flatiron and

San Diego Airport

USA

Turner worked to equip San Diego Airport to meet the demands of the future.
In various stages they added ten new
gates, expanded a terminal, and extended and resurfaced a runwayall incorporating sustainable design principles.
Many small, regional companies were
involved in the project as subcontractors.

Sacramento Airport
USA
Even large projects can be models of
sustainability. Take Sacramento Interna-

BM

A crystal ball as a project tool

tional Airport, for example, which our

We at HOCHTIEF arent actually clairvoyant.

US subsidiaries Turner and Flatiron ex-

On the other hand, in a way we can see the fu-

panded between 2008 and 2011. This

turebecause when we build something, we

project used recycled materials and im-

also do it virtually, using the Building Informa-

plemented measures to save energy,

tion Modeling (BIM) system. Before any struc-

earning it the U.S. Green Building Coun-

ture is erected, it already exists in virtual form,

cils LEED Silver certification. Our con-

such as San Diego Airport. This technology

tract included a new concourse build-

a llows us to simulate each individual step

ing, improvements to the taxiway/apron,

beforehand, check it, and estimate the costs.

and the columns for the new automated

Right down to the last wall lamp.

people mover viaduct structure at the


special gates and extra-long runways for

airport.

takeoff and landing. Since 2011, Melbourne Airport has been among those
able to meet these needs. Leighton
subsidiary John Holland was appointed
managing contractor to design and
build the necessary upgrades. The airport now boasts double-story aircraft
gates as well as additional retail, customs,
Melbourne Airport
Australia

and baggage handling facilities. The


project was completed while the existing facilities continued their 24-hour-a-

The new superjumbos entail many


structural changes at airports, requiring

day operations.

Transportation infrastructure Stations Airports Ports Locks/Dams

deepwater harbor in the Indian Ocean

VFRphoto

Ngqura deepwater harbor

South Africa

near Port Elizabeth, South Africa. Completed in 2012, it was an impressive


project in which 13.8 million cubic meters of earth were excavated after an
area measuring 300,000 square meters
had been dewatered down to 20 meters below sea level. The newly constructed breakwaters alone are nearly

Container Terminal Gdansk


Poland

four kilometers long. In 2008,


HOCHTIEF was awarded the follow-on

In Poland, HOCHTIEF Solutions con-

In the space of four years, HOCHTIEF

contract to expand the harbor by add-

structed the largest privately-financed

Solutions, working as technical leader

ing two berths for a container terminal.

container terminal in the Baltic Sea re-

of a joint venture, constructed a new

gion, a turnkey project built in the immediate vicinity of the northern port of
Gdansk. The first phase provides ca-

Hamburg. HOCHTIEF Solutions experts

pacity for 500,000 standard containers.

renewed berths 3 and 4 by building a

In addition to building the terminal itself

670-meter-long quay wall for large con-

with two berths and 700 meters of quay

tainer ships. Ground conditions shaped

wall, the project also included the entire

by the Ice Agegravel and extremely

infrastructure links to the hinterland. The


port has already earned its place as a

hard layers of mica clay and marlposed

Burchard Quay
Hamburg, Germany

a real construction challenge. But, with


our special concept and construction

cutting-edge commercial hub in the


Baltic Sea.

In the port of Hamburg alone, HOCHTIEF

know-how, we created a stable founda-

has completed more than 20 quay wall

tion here for the Hamburg Port Authority

construction projects. Just one example:

and the terminal operator.

the Burchard Quay container terminal.


Its location and size make it extremely

important for the transhipment port of

450

Over

engineers at HOCHTIEF Solutions Engineering work as planners,


experts, and design managers for all types of construction projects
as well as for PPP projects. They develop innovative, cost-effective
solutions for the complex challenges our clients bring to us.
Source: HOCHTIEF Solutions AG.

Wolfhard Scheer

35

Kaiserschleuse lock

Bremerhaven, Germany
An international port dating from 1897
cannot possibly be operated efficiently
today without a few changes. Thats
why HOCHTIEF Solutions, as technical
leader, was commissioned to build the
new Kaiserschleuse lock in Bremerhaven.
It can accommodate todays large ships
and is hence well-equipped to master
the challenges of the future. Since mid2011, big automobile transport ships
have again had direct access to the port.
The new, innovative vertical sliding/roll-

winoujcie breakwater

Poland

ing gate has fewer moving parts and is


thus easier to maintain. This goes hand

winoujcie, Poland, is the site of an LNG

structure. The construction of a fairway

in hand with a reduction in the operating

terminal which is to be protected by a

1,800 meters in length and a turning

costs of the lock and the locking times

new breakwater. HOCHTIEF Solutions

basin for the LNG vessels means smooth

for the ships. HOCHTIEF secured the

pooled its specialist and regional skills

sailing into a safe port.

contract in what is known as the com-

to build this breakwater with an integrated

petitive dialogue awarding procedure

quay wall. Besides execution of piling

used for the first time in Germany for a

works and equipping the facility, our so-

lock construction project by the public

lution included construction planning

entity responsible.

for the 3,000-meter-long maritime

Calaveras Dam
California, USA

San Francisco public utilities commission

Transportation infrastructure Stations Airports Ports Locks/Dams

Leighton subsidiary Thiess worked in a

upgraded the facilitys technical and

consortium to raise the wall of the Hinze

s ecurity systems and adapted the

Dam in Queensland by 15 meters to

recreational areas and road infrastruc-

108 meters above sea level. This was

ture to the sites new design.

designed to reduce flooding while increasing the water supply from the dam
to 225 million liters per day. Thiess also

The Calaveras Dam is part of a system


that provides drinking water to 2.5 million people in the greater San Francisco
area. In 2001 the existing dam was
deemed seismically unsafe and has been
operating at less than full capacity ever
since. HOCHTIEF subsidiary Flatiron has
been working since 2011 to replace it
with a stronger structure. During the
course of the work, a total of 5.5 million

Hinze Dam Stage 3


Queensland, Australia

cubic meters of rock and earth will be


moved in order to construct the new dam,
which will measure a good 64 meters

capable of producing 150 billion liters of

high. The project also includes the con-

water annually if required and provides

struction of approaches and tunnels.

a rainfall-independent water source for

When the replacement is complete, the

Melbourne. The plant can increase its

old dam will be submerged underwater.

capacity to 200 billion liters a year in the

Flatiron pursued a series of measures

future. Featuring advanced environmen-

to minimize the environmental footprint,

tally-sustainable design, it includes a

such as fish passages and constant

two-pass reverse osmosis desalination

monitoring of the air quality to prevent


asbestos contamination.

Victorian Desalination Plant


Victoria, Australia

process plant, marine structures and tunnels, 84 kilometers water transfer pipeline, 87 kilometers underground power

Victoria is now home to the Southern

supply and 225 hectares ecological re-

Hemispheres largest desalination plant

serveall delivered by TDJV. Renewable

a state-of-the-art facility built by the Thiess

energy certificates offset the plant and

Degrmont Joint Venture (TDJV). It is

pipelines operating power requirements.

37

St. Petersburg Dam


Russia
A joint venture comprising HOCHTIEF

storm flooding. Inside the dam, a

was completed in 2011, about a year

Solutions and a partner closed a 2.6-kilo

730-meter-long tunnel and ramp struc-

earlier than originally planned.

meter gap in a dam designed to protect

ture was built for road traffic. The work

the greater St. Petersburg area from

plant. In the first phase, the Leighton


company excavated 800,000 cubic meters of contaminated soil from the river
bedenough to fill 300 Olympic-sized
swimming pools. They then decontaminated and disposed of the sediment
professionally. Thanks to the revitalization, the former industrial site in Newcastle can now be put to good use.
This revitalization project, the largest of

Hunter River Remediation Project


New South Wales, Australia

its kind ever undertaken in Australia,


received the United Nations Association

In a project that ran from May 2009 to

revitalize the Hunter River bed, which

of Australia World Environment Day

February 2012, the specialists at Thiess

for over 70 years was contaminated by

2011 Award in the Environmental Best

Services were awarded the contract to

pollutants deposited there by a steel

Practice Program category.

Energy infrastructure

your
energy

39

our
supply

Demand for energy is high in modern industrial nations and emerging economies. Whats more, many countries have committed to increase their use of
renewable energy sources. To achieve this, infrastructure needs to be expanded and upgraded, for instance, with new power plants, expanded grids, and
innovative storage facilities. With its portfolio, HOCHTIEF is in an ideal position
to take on such energy infrastructure projects.

Energy infrastructure

Renewable
energies
Grid expansion

41

HOCHTIEFbuilding sustainable
energy infrastructure.
Many countries have made a commitment: They aim to generate an increasing portion of the energy they consume
using renewable resources. Ambitious
climate protection goals have been set,
some of them binding. Offshore wind
power, decentralized storage, and HVDC

Lillgrund Wind Farm


Sweden

transmission systems are vital factors in


the major infrastructure projects now

The largest offshore wind farm in Swe-

being implemented. In building them, grid

den, and one of the largest in all of

stability, security of supply, and economic

Europe, is located seven kilometers off

viability are key issues.

Malms coast. At Lillgrund, HOCHTIEF


Solutions built the foundations for the

The shift to renewables:

Project of the century.

HOCHTIEFs product and service port-

48 large wind plants and one transformer.

folio makes it excellently placed to help

A special technical challenge inherent in

expand and convert the grid. We rank

this project was the precision placement

among the leading providers of offshore

of the massive foundation elements.

wind energy and have established our

With an output of 110 megawatts, the

position as a strong partner for the de-

wind farm generates some 350 gigawatt-

velopment and construction of offshore

hours of electricityenough to power

wind farms. We design and build modern

about 60,000 Swedish homes. The fa-

not be accomplished in the short

pumped storage plants to store the

cility saves 300,000 metric tons of car-

term. It will simply take time to build

power generated from renewables. And

bon dioxide emissions each year as

the grids, storage systems, and

our Group has the skills to build power

compared with traditional energy sources.

plants that will serve us well into

do mean a very long time: The


switch to new energy sources will

the future.

lines many kilometers long. Lets work


together to build energy supply systems

I believe in long transitions, and I

(see also photo at left)

Prof. Dr.-Ing.

that will keep going strong for a long

Wolfgang Mauch,

time to come!

CEO of the independent


Research Center for Energy
Economics, Munich

Energy infrastructure Renewable energies Grid expansion

Global Tech I Wind Farm


North Sea, Germany

HOCHTIEF Solutions began building


the Global Tech I offshore wind farm in
the summer of 2012. The HOCHTIEF
specialists are tasked with anchoring
80 bases, each weighing 900 metric
tons, to the sea floor 40 meters down.
The five-megawatt, 150-meter-high
wind turbines each base supports will
deliver a total output of 400 megawatts.
The wind farm is located some 180 kilometers northwest of Cuxhaven, which
is outside protected marine areas.

Vidar jack-up vessel


Maiden voyage in 2013

Vidar is the latest addition to HOCHTIEFs

metric tons. Its 24-megawatt engine en-

fleet. The new, latest-generation heavy-

ables speeds of up to twelve knots. These

lift jack-up vessel for the installation and

properties make the Vidar one of the most

maintenance of offshore wind farms can

powerful and effective lifting vessels in the

work at water depths of up to 50 meters.

offshore market, and particularly well

With an overall length of 136.5 meters, it is

suited to take on challenging, large-scale

equipped with a 1,200-metric-ton crane

projects in the North and Baltic Seas.

and boasts a loading capacity of 6,500

BM

A new wind is blowing:


Thanks to Building Information Modeling (BIM), we always have 3D models on

board with us when we build on the high seas. This


gives all the workers access to virtual models of
the complex processes involved in constructing
wind farms whenever they need it. For our work,
its a sea change.

43

130 bn

is to be invested globally in offshore wind energy by 2020.


Source: Offshore Wind Toward 2020On the Pathway to Cost Competitiveness
Roland Berger, 04/2013

Innovation jack-up vessel


Christened in 2012
September 2012 marked the christening of HOCHTIEFs first

meters. Its 3,400-square-meter loading area can accommo-

jack-up vessel in Bremerhaven. The Innovation is 147.5 me-

date up to seven of the gigantic six-megawatt turbines or up

ters long and 42 meters wide. Its 90-meter-long legs provide

to twelve three-megawatt turbines. Its top speed is twelve

stability during the installation of wind farms on the high seas.

knots. The Innovation and its dedicated, specially-trained

The high-performance crane can lift up to 1,500 metric tons

HOCHTIEF offshore crew have their first assignment at the

and erect wind turbines with overall heights of more than 120

Global Tech I wind farm in the North Sea.

Energy infrastructure Renewable energies Grid expansion

Macarthur Wind Farm


Australia
Australian HOCHTIEF subsidiary Leighton completed the

Principle Contractor, in addition to its responsibility for the logis-

Macarthur Wind Farm at the beginning of 2013, after a good

tics and construction of the wind farm facility, the construction

two years of construction. The largest wind farm in the south-

of substations as well as the overhead transmission lines and

ern hemisphere, Macarthur generates up to 420 megawatt-

underground cable collector systems measuring 35 kilometers

hours of electricityenough to power 220,000 of the regions

in all.

homes each year. In this project, Leighton Contractors was

RD
&

Wind farms on land: Towers with a hub height of around 140 meters
are ideal for harnessing wind power in forested areas. To make it cheaper and
logistically easier to erect these towers in forests where passage is difficult,
HOCHTIEF is developing slipform tower foundations. The benefits of the slipform technique: The compact site setup minimizes disturbance to the surrounding natural environment, the method is tried and tested, it requires only
brief crane operation times, it is resistant to poor weather and low temperatures during setup, and it is easy to dismantle.

45

Leinetal pumped storage power plant


Germany
HOCHTIEF has gained expertise through

are considered important facilities for

output of some 200 megawatts.

decades of work on the expansion and

storing energy generated from renew-

HOCHTIEF Solutions plans to start the

conversion of energy infrastructure. We

able sources, and as vital in ensuring

work in 2016, in which case operations

are using that know-how, for example,

stable grids. In light of this, we are de-

would commence in 2020. P


P
P

in the development and construction of

veloping the Leinetal pumped storage

pumped storage power plants. These

power plant in Freden, which has an

La Confluencia hydroelectric power station


Chile

HOCHTIEF Solutions designed and built

ing services, the steel construction for

a turnkey run-of-river power station

the isolated water catchment vessels,

around 220 kilometers southeast of

and connecting the system to the grid.

Santiago de Chile. The contract included

La Confluencias watershed has a ca-

an above-ground power plant, several

pacity of 1.2 million cubic meters. The

tunnels, and a pressure shaft driven some

new hydroelectric power station will cut

360 meters vertically into the ground.

annual CO2 emissions in Chile by more

HOCHTIEF was also responsible for the

than 400,000 metric tons.

construction of the access roads, all


the concrete work for the catchment system, the turbines/generators, all build-

Energy infrastructure Renewable energies Grid expansion

Ruskin Dam
British Columbia, Canada

Flatiron has been working since 2012 to


retrofit the Ruskin Dam and Powerhouse.
Originally built in 1930, the powerhouse
was cleared of asbestos and equipped
with new windows and concrete walls.
Flatiron will also install a new elevator
and an overhead crane before the job is

Cheves hydroelectric power station


Peru

completed at the end of 2013. On the


dam itself, the HOCHTIEF subsidiary is

The Cheves hydroelectric power station

dam. The 168-megawatt plant is de-

to replace the existing gates,piers, and

is being built in the Peruvian Andes at a

signed to generate enough energy to

road deck. When finished, the facility

height of 2,000 meters. In addition to the

cover the maximum requirements in the

will generate power for 33,000 homes

underground power plant, the HOCHTIEF

Lima area after handover in late 2013.

in the region.

Solutions contract includes building


17 kilometers of tunnel, two weirs, and a

15%

of all the electricity in the world is generated by


hydropower. That makes water the most significant
of all renewable sources of energy.
Source: UNESCO World Water Development Report 2012

47

City East Cable Tunnel


Sydney, Australia

ILM Transmission Lines


Canada

Power tunnels are an intelligent way to

run through the city at a depth of 25 to

Our US subsidiary Flatiron has been

lay cable safely in large cities while en-

45 meters below ground. In addition to

working since March 2011 to build a new

suring easy maintenance. Leighton sub-

construction of the tunnel, this contract

255-kilometer transmission line in

sidiary Thiess is currently building such

also includes building two concrete lined

C anada. The 500-kilovolt line will run

a tunnel in Sydney. The 132-kilovolt tun-

connectors, extending another c


able

between Merritt and Vancouver, cross-

nel with a diameter of 3.5 meters will

tunnel as well as installing and commis-

ing topography that includes mountains,

connect two substations. With a total

sioning all tunnel mechanical and elec-

ravines, thickly-forested areas, and

length of 3.2 kilometers, the tunnel will

trical services.

stretches of coast. Flatiron is building on


a total of 620 sites along the route. The
new overhead line is the first 500-kilovolt

Kirchstockach geothermal power plant


Germany

under a public-private partnership. The

line in Western Canada in more than

plant draws energy from hot water un-

25 years. Most of the countrys grid dates

derground via two boreholes. A heat

back to the 1970s and now requires re-

exchanger extracts heat from the water,

furbishment and upgrading.

which is then used to produce electricity


or harnessed for heating purposes. A
second shaft returns the water back
underground. The Kirchstockach power
plant has an output of five megawatts
and, like a second plant in the nearby
community of Drrnhaar, has been
In the Bavarian town of Kirchstockach,
HOCHTIEF Solutions built and now
o perates a geothermal power plant

generating power since 2013. P


P
P

Energy infrastructure

Power plants
Wastewater
treatment plants
Gas

49

HOCHTIEFwith the special


knowledge power plant projects
require.
In addition to renewable energies, there
are many other ways to generate energy
that are essential for reliable power
supplies.

Walsum power plant


Germany

HOCHTIEF is the partner of choice for


all these types of plants and facilities.

HOCHTIEF carried out several construc-

Across the globe, we design and build

tion activities at the Walsum coal-fired

efficient fossil-fuel plants and advanced

power plant in Duisburg. We built the

energy-from-waste and wastewater treat-

shell of the new Block Ten, for example,

ment plants. Whats more, HOCHTIEF

as well as the 180-meter-high natural

specializes in building the infrastructure

draft cooling tower by means of a spe-

needed to drill and transport gas and oil

cial climbing formwork. All eight revolv-

in the Asia-Pacific region. Whatever a

ing tower cranes we used were placed

project or task calls for, we pool the wealth

at our disposal by our subsidiary Streif

of expertise our Group has amassed,

Baulogistik. Thanks to the optimized

from design to finished construction, and

cooling tower, more electricity can be

reliably see our clients plans through to

generated from the same amount of

completion. Let our specialists join your

coal.

Engineering services

As a technical service provider,


HOCHTIEF Solutions Engineering
stands for decades of experience
in all areas of turnkey building con-

team!
Reinforced concrete cooling towers

struction, civil and structural engi-

present an engineering challengefrom

neering as well as energy and

statics, surveying, and concrete technol-

transportation infrastructure. Thanks

ogy through to execution. HOCHTIEFs

to our highly qualified staff, we can

experts have in-depth knowledge of

offer our clients a broad range of

this field.

professional expertise in virtually


all technical fields.

(see also photo at left)

Dr. Hansgeorg Balthaus,


General Manager,
HOCHTIEF Solutions
Engineering

Energy infrastructure Power plants Wastewater treatment plants Gas

Newhaven energy recovery facility


UK

Several HOCHTIEF units collabo-

design, we served as the general

struction process to minimize the

rated to build a waste incinerator

contractor for the construction

impact on groundwater levels,

in southeast England. It generates

pit, earthwork operations, shell

and managed the entire design

electricity for some 16,000 house-

and interior work, facade, heat-

and approval process. The plant

holds from 210,000 metric tons

ing system, air conditioning, and

officially commenced operations

of domestic waste each year.

ventilation. Our engineering units

in mid-2012.

Besides developing the plants

also developed a special con-

Pozna energy-
from-waste facility

Poland

A premiere in Poland: For the

plant in Pozna comprises

first time, private companies

two incineration lines with a

are building an energy-from-

total capacity of 210,000

waste plant for a municipality

metric tons per year. From

using the PPP model. The

2016, the heat generated will

consortium includes the power

be used as district heating

plant and energy specialists

and to generate enough

as well as the Polish con-

electricity to supply 20,000

struction professionals at

households. P
P
P

HOCHTIEF Solutions. The

51

Professional decontamination and decommissioning

Safe and efficient

In past decades, HOCHTIEF designed, built, and operated numerous nuclear power
plants. This in-depth experience now makes us the right partner when it comes to their
safe and innovative decommissioning. Services include concept, approval, and execution planning for decommissioning projects. We also coordinate and perform decommissioning work. All work is carried out by our own in-house team of highly knowledgeable professionals. HOCHTIEF Solutions in Germany draws on the expertise of over
150 employees approved under Paragraph 12b of the German Atomic Energy Act, who
come from all walks of the construction profession.
In addition, we have developed our own products for decommissioning nuclear facilities
and decontaminating surfaces. The DECON decontamination system can be used to
treat virtually any surface. It ensures a high removal rate and surface quality as well as
easy, dust-free handling. HOCHTIEF has been using this system successfully for years
to remove concrete including decontamination coating as well as to remove brickwork
and plaster. And its not just suitable for decommissioning purposes: With a special
sanding procedure, DECON is also ideal for processing large concrete surfaces. It can
be used to produce a fine finish, clean concrete efficiently with lasting results, and correct imperfections in formwork.

As part of a consortium, Leighton subsidiary Thiess delivered an enhancement and upgrade of three metropolitan
wastewater treatment plants in Perth.
The benefits of this project, which ran
from 2007 until 2011, included a capacity increase at the Beenyup plant of at
least 15 million liters a day and upMetro Alliance wastewater treatment plants
Perth, Australia

grades to the Woodman Point Plant


(left).

Energy infrastructure Power plants Wastewater treatment plants Gas

Ashley Valley
water treatment plant
Utah, USA

Rousse wastewater treatment plant


Bulgaria

In a project spanning two years from

Between 2008 and 2010, HOCHTIEF

2010 to 2012, HOCHTIEFs US subsidiary

Solutions designed and built a waste-

The HOCHTIEF Solutions experts upgrad-

Flatiron performed significant renova-

water treatment plant for the city of

ed the wastewater treatment plant at

tions to a surface water treatment plant

Rousse in Bulgaria. The municipal facility

Leibnitz, Austria, to create a state-of-the-

with a capacity of some 57,000 cubic

near the Romanian border has a capacity

art facility meeting environmental legis-

meters per day. A new pretreatment build-

of 52,500 cubic meters a day, enough

lation requirements. We also increased its

ing was erected, existing filters were

to treat the wastewater of 240,000 peo-

capacity to 50,000 population equivalent

refitted, and existing facilities for adding

ple. The water is first roughly cleaned

(PE). Our contract included the supply

chemicals were renovated. The con-

mechanically, before being treated chemi-

and installation of all mechanical equip-

tract also included the construction of a

cally and finally biologically. The energy

ment for the treatment plant as well as

new backwash water clarifier and the

from any biogas produced is recovered.

the construction work for the plants

refurbishment of an existing steel water

Due to the facilitys location on the

refurbishment and modernization.

tank, among other improvements.

Danube, HOCHTIEF took precautions


to protect the site from flooding while
the work was in progress.

Leibnitz wastewater
treatment plant
Austria

53

The civil engineering specialists at our US


subsidiary E.E. Cruz carried out significant improvements and capacity-boosting measures at New Jerseys Rahway
Valley Wastewater Treatment Plantall
while maintaining the existing operations.
The work included the construction of
various clarifiers, return sludge and waste
pump stations, and aeration facilities
as well as modifications to the existing
plant utilities.
South West Jordan
Valley groundwater
treatment plant
USA

RVSA wastewater
treatment plant
USA

Over 100 years of mining in the region left


the ground and groundwater in Utahs
South West Jordan Valley contaminated.

Queensland Curtis LNG


Australia

The revitalization of the valley has been


in progress since 2005. Our US subsidi
ary Flatiron was in charge of building an
advanced groundwater treatment plant
that operates using a special process
called reverse osmosis. Exceptionally
friendly to the environment and resources
because it uses no chemical substances,
this method uses pressure to force water
through a semi-permeable membrane,
filtering out impurities. The plant pro-

Between 2010 and 2012, Thiess took

for additional work. The Thiess contract

cesses 26 million liters of water per day

charge of a package of work that fell

was part of a major network of facilities

with this method.

within the scope of the Queensland

for transporting and storing LNG (liquid

Curtis LNG project. The Leighton sub-

natural gas). LNG is a relatively clean and

sidiary built various compressor sta-

efficient source of energy, with about

tions, pipelines as well as water storage

40% lower carbon dioxide emissions than

ponds and completed site preparation

coal for the same amount of energy.

Social and urban infrastructure

your
city

55

our
block

Everyone needs an environment where they feel perfectly at easewhether its


where they live, work, study, or spend their free time. HOCHTIEF has decades
of expertise to its name in shaping social and urban infrastructure. We deliver
contemporary office and residential properties as well as public facilities dedicated to education, administration, healthcare, and culture that consistently
respond to users needs and the conditions under which the buildings operate.

Social and urban infrastructure

Public buildings
Educational
facilities
Healthcare
properties

57

HOCHTIEFbuilding public facilities


that serve people.
Facilities like city halls and community
centers, schools, universities, and hospitals are part of public life. Their quality
is a key factor in the overall growth of
our society. And they also contribute
significantly to the quality of lifewhich

Moers city hall


Germany

makes them a decisive factor for cities,


municipalities, and towns.

Under a public-private partnership (PPP)


contract, HOCHTIEF Solutions planned,

HOCHTIEF supports the public sector

financed, and built the new Moers city

as a private partner in building social

hall, an ensemble of the landmark city

and urban infrastructure to meet local

hall, the new city hall building, and the

needseven where budgets are tight.

adjacent cultural and education center.

Working under public-private partner-

The company will now operate the

ships (PPP), we design, finance, build,

buildings until 2033/2035. The city is to

refurbish, and operate public buildings.

pay a fixed monthly usage fee for the

HOCHTIEF stands for integrated, intelli-

entire duration of the contractwith the

gent, innovative solutions. Our holistic

benefit of knowing exactly how much

approach lets us deliver construction

they have to budget. HOCHTIEF provides

projects quickly and cost-efficiently.

all utility, waste management, and


cleaning services.

As far as our administrative building went, quick action was desper-

Of course, this is just as true even when

ately needed in Moers. The PPP

we are not working under a public-private

And HOCHTIEFs skills came with a

partnership. HOCHTIEFs US subsidiary

b onus for Moers: We cut construction

project has given us affordable

Turner, for example, is a leading provider

time by three months. Today, the build-

new buildings at a calculable cost.

of educational facilities and has success-

ing in the center of the town is an attrac-

I am glad we found a reliable part-

fully delivered projects to hundreds of

tive magnet featuring a library, adult edu-

ner in HOCHTIEF PPP Solutions to

cities and communities. Work with

cation facility, and the town archive. P


P
P

deliver our project. The benefits


are obvious: We have achieved a

HOCHTIEF and youre working for the


public good!

(see also photo at left)

workable, cost-efficient, and sustainable solution.


Norbert Ballhaus,
Mayor
City of Moers

Social and urban infrastructure Public buildings Educational facilities Healthcare properties

Australian Embassy
Jakarta, Indonesia
As part of a joint venture, Leighton
Asia, India and Offshore is building
Australias new embassy complex in

Wigan Life Centre

UK

ing, HOCHTIEF Solutions constructed


two new wings flanking the existing town

Jakarta. This is a follow-on contract;

hall. Now there are not just city employ-

the Leighton Group constructed the

ees offices but also a wellness and

present Australian embassy two dec

learning space, a fitness studio, a library,

ades ago. When complete, the new

town council offices, and service bu-

embassy complex will comprise a

reaus. A piazza features open-air events.

fivestory office building plus a sepa-

HOCHTIEF is to operate the building

rate residence for the Ambassador,

throughout the 25-year concession period

housing for embassy staff, four guard

for a fixed monthly usage fee, which

posts, and leisure facilities spread

Everything the town of Wigan offers its

makes budget planning more reliable

across a total area of 40,500 square

residents in terms of municipal services

for the town. P


P
P

meters. Leighton Asia, India and Off-

as well as administration, healthcare,

shore will also provide the necessary

and fitness is housed in the Wigan Life

infrastructure and landscaping. P


P
P

Centre. For the multi-purpose town build-

59

P
P
P
Frst Wrede Military Base
Munich, Germany
The Frst Wrede Military Base is the first

Public-private partnerships
Public
sector

Private
sector

PPP building construction project commissioned by the German government,


and also the first PPP project in the defense sector in Germany. Following a very

Benefits through collaboration

brief refurbishment and construction


phase carried out by HOCHTIEF Solu-

Public-private partnerships are modern, efficient procure-

tions while the facility continued to op-

ment methods for real estate and infrastructure services. A

erate, the Federal Ministry of Defense now

private partner such as HOCHTIEF takes on the financial

has a contemporary location that can be

and operational risk the public sector would otherwise have

used by up to 1,600 people. HOCHTIEF

to bear, and uses the efficient dovetailing of design, con-

will operate the facility for a total of 20

struction, and operation to generate profit for both sides.

years. The military base comprises 25

This type of collaboration allows many projects to be car-

buildings on grounds measuring some

ried out that would otherwise fall victim to spending back-

32 hectares. The 70,000-square-meter

logs. PPP projects also deliver a wealth of other benefits,

space houses accommodations, office

such as quality-focused implementation, streamlined refur-

and training buildings, vehicle depots, and

bishment and construction schedules, performance-based

gymnasiums. HOCHTIEFs work here

compensation, optimized life cycle costs, long-term main-

included optimizing the energy concept

tenance strategy, balanced transfer of risk, and end-to-end

to ensure sustainable, efficient energy

management.

use for a long time to come. P


P
P

Social and urban infrastructure Public buildings Educational facilities Healthcare properties

HOCHTIEF Solutions built ten schools


in Alberta designed to serve students

Alberta schools II

Canada

needs for a long time to come. The


schools are based on what is called
Core School Design, which provides
not only traditional classrooms but also
focuses on sports, music, art, and
technology studies as group activities.
Provincial police
Ontario, Canada

A project company in which HOCHTIEF


holds a 50 percent stake won the con-

equipped rooms for special subjects,

tract to design, finance, build, and sub-

flexible classrooms, and libraries help

A project company in which HOCHTIEF

sequently maintain the buildings for 30

students develop their own skillsand

Solutions has a 50 percent sharehold-

years. A total of 8,000 students benefit

grow as unique individuals. P


P
P

ing won the contract to design and build

from the schools holistic design: Well-

18 police facilities distributed across


16 locations in Ontario as part of a PPP
project. The facilities include seven
police stations, eight forensic labs, and

South-East Queensland Schools

Queensland, Australia

East Queensland Public Private Partnership (PPP) Schools Project. The Leighton

three regional control centers. In order

Contractors led Aspire Schools consor-

to meet the LEED Silver standard, the

tium partly financed, designed, built and

new buildings were erected using eco-

will continue to maintain the schools in

logically sustainable construction methods

the rapidly-growing Sunshine Coast,

and feature an energy-efficient design.

Western Corridor, Gold Coast and Red-

The HOCHTIEF project company will op-

lands regions during the 30-year con-

erate and maintain the facilities for 30

cession period. All seven schools were

years. P
P
P

Seven state schools have been built in

built in two stages, and were designed

high-growth areas of South-East Queens

including innovative energy efficient meas

land following the awarding of a AUD

ures that achieve a four-star Green Star

1.1 billion contract to the Aspire School

rating from the Green Building Council

consortium which is delivering the South-

of Australia. P
P
P

61

Flexible space in day care centers, schools, and universities

Containers with class

When schools and day care centers need renovation and


conversion, the children dont get extra vacations. Classes
and day care groups have to go on as usual. And the growing numbers of university students indicate a considerable
demand for more space. For all these needs, HOCHTIEF

Braunschweig
educational buildings
Germany

subsidiary Streif Baulogistik has the perfect solution: containers that provide a fully functional, pleasant, and comfortable setting. The systems can be configured flexibly for
any purposeand they can even be ordered fully fitted out

The refurbishment of nine schools, three

for use as classrooms, lecture rooms, computer rooms,

day care centers, and two gymnasiums

libraries, playrooms, relaxation rooms, or dining facilities. At

as well as a new building addition in

the same time, administrators can carry on with their work

Braunschweig are on the agenda at

in modern office containers. Safety is also part of the pack-

HOCHTIEF Solutions until 2014. We will

age: Streif Baulogistik container systems comply with all

subsequently operate the buildings for

fire and lightning protection standards, feature emergency

25 years. This is yet another PPP project

lighting, and are secured against break-ins. We deliver the

that benefits the local economy, with

system fully operational to you, take care of all the installation,

the majority of the construction contracts

and hook up water, drainage, and electricity. We create

awarded to small and mid-sized local

temporary spaces for learning, teaching, and playingand

companies. Of course, the users will also

theyre so comfortable you may even wish you could stay.

reap the rewards: 11,000 students and


200 preschoolers attend these educational facilities, which will soon be completely modernized. P
P
P

Social and urban infrastructure Public buildings Educational facilities Healthcare properties

Knight Management Center,


Stanford University
Palo Alto, USA

Recreation Center, Drexel University

The new campus of the Knight Manage-

The Daskalakis Athletic Center at Phila-

ment rooms. There is also administration,

ment Center is designed to give the sense

delphias Drexel University was expanded

conference, and retail space. The facility

of being in a small village. HOCHTIEF

in 2010 with a new Recreation Center to

was designed and built according to

subsidiary Turner replaced the old Gradu-

accommodate recreation, intramural,

sustainability criteria.

ate School of Business facilities at Stan-

and club sports. Constructed by Turner,

ford University with eight new buildings.

the three-story building with an area of

These include a 600-seat auditorium, a

some 7,700 square meters includes a

student center with a library and lounge,

multi-purpose gym, a jogging track, a

a career management center, dining

fitness area, a climbing wall, squash

facilities, and faculty and staff offices. In

courts, and various locker and equip-

Philadelphia, USA

addition to constructing the actual university buildings, the contract also included an underground garage, infrastruc-

ters and are used by 1,800 students. In

ture such as exterior arcades, porches,

a project company formed for this PPP

bridges, and pathways as well as land-

venture, HOCHTIEF Solutions developed,

scaping. The Knight Management Cen-

financed, and built the schools and has

ter was awarded the LEED Platinum rat-

been operating them since they opened

ing, with installations such as photovoltaic

in 2008, under a 25-year contract.

arrays on the roofs that make the cam-

HOCHTIEF managed all the financial

pus as sustainable as it is attractive.

aspects of the transaction, including


Salford schools
UK

the project agreement with the client,


and took care of all the other project
documentation. P
P
P

It took less than two years to build Harrop


Fold High School and Buile Hill High
School in Salford. The two schools cover
a total area of some 18,000 square me-

63

Colonel Smith Middle School


Fort Huachuca, USA

RD
&

Built by our US subsidiary Turner, the

Innovation with hanging stories: The

Colonel Smith Middle School in Fort

presence of train tracks under part of the John Jay

Huachuca, Arizona, is the first net-zero-

College of Criminal Justice in New York led Turner to

energy building in the state. With fea-

build the complex using an innovative structural sys-

tures such as photovoltaic panels, it has

tem: The top nine floors of the building are hung from

been generating more energy than it

steel outrigger trusses that are supported by the stair-

consumes on an annual basis since 2012.

well, which is the buildings structural core. Innovation

In building the 350-student school,

happens when you see every building as unique.

Turner implemented an innovative design


that supports a project-based learning
model, with flexible common and collabo
ration spaces that facilitate learning
both indoors and outdoors. The architecture brings plenty of natural light into
the rooms throughout the day.

The BiKuZ educational and cultural

the BiKuZ is a completely new building

center is one of four schools HOCHTIEF

and also houses an adult education fa-

Solutions handed over to the city of

cility, a city-owned company, and the

Frankfurt in summer 2009. We designed,

district library. P
P
P

financed, refurbished, or newly built the


schools and will operate them through
2029 under a public-private partnership.
Apart from the gymnasium and cafeteria,
BiKuZ

Frankfurt, Germany

Social and urban infrastructure Public buildings Educational facilities Healthcare properties

New Royal Adelaide Hospital


Australia
As part of a joint venture under a public-

the facility will include 800 beds includ-

guided vehicles will move supplies around

private partnership model, Leighton Con-

ing 700 single roomswith opening

the hospital. A commercial precinct in-

tractors is currently designing and build-

windows, natural light and ready access

cluding a childcare facility for staff, cafs,

ing Australias largest, most advanced

to outdoor areas and green space, and

gymnasium and a bank will also form

hospital for the South Australian Govern-

100 same day beds. Its integrated tech-

part of the precinct. On completion in

ment. Central to the design is the clients

nology system will include patient weigh-

2016, the new Royal Adelaide Hospital

patient centric Model of Carefocusing

ing beds, wireless technology, equipment

will accommodate 85,000 inpatients

on the well-being aspects of patients as

tracking and intelligent information sys-

per year. P
P
P

well as clinical and operational efficien-

tems such as bedside entertainment and

cy. Set in parklands in Adelaides CBD

meal ordering for patients. Automated

Olivia Newton-John Cancer and Wellness Centre


Melbourne, Australia

Built by Leighton between 2010 and 2013,


the Olivia Newton-John Cancer and
Wellness Centre in Melbourne provides
a range of specialist cancer services including cancer treatment, education,
training, and research, all at one facility.
The clinic provides inpatient accommodation for acute and palliative care patients. It also incorporates a wellness
center that brings together a range of
complementary therapies focused on
treating the whole person; these often
work in tandem with patients clinical
therapies.

65

Joondalup Health Campus


Redevelopment
Perth, Australia
Leighton subsidiary John Holland has
delivered the Joondalup Health Campus

Procurement for healthcare and research facilities

Tailor-made service

Our US subsidiary Turner Logistics provides procurement

Redevelopment in 2013 as part of the

services for healthcare and research facilities. These in-

continued delivery of healthcare facilities

clude complete patients rooms, operating rooms, and

within Western Australia. John Holland

laboratory equipment. The experts in interior fittings for

secured the AUD 270 million contract for

hospitals deliver tailor-made service to give clients exactly

the redevelopment of the Joondalup

what they needfrom consulting to purchasing through

Health Campus in Perth in 2009. The

to installation of the interior fittings, Turner Logistics is there.

redevelopment is jointly funded by the

One facility that turned to Turner for such support was

West Australian Government and Ram-

Provena Saint Joseph Hospital in Illinois. The company

say Health Care. Undertaken across

took over the planning and procurement of the medical

seven key phases and beginning with

equipment on behalf of the client.

an upgrade to access roads and car


parking facilities, the redevelopment in-

And clients in Germany also draw on this expertise: The

cluded the construction of a new central

Federal Research Institute for Animal Health near Greifs

plant building, three-level public ward

wald, which was built by HOCHTIEF Solutions, tasked

block, emergency department, private

Turner with purchasing highly specialized technical instru-

ward block, a St John Ambulance cen-

ments. This not only saved on costs, but also enabled

ter, parking for 1,500 cars and a new

significantly more favorable terms and a customized risk

childcare facility. Recently, Joondalup

management concept arranged with the manufacturer.

Health Campus was awarded 2013 John


Holland Annual Achievement Award for
projects greater than AUD 100 million;
2013 Australian Institute of Buildings Professional Excellence Award for projects
worth AUD 50AUD 100 million at state
level and then went on to win the national award.

Social and urban infrastructure Public buildings Educational facilities Healthcare properties

Helen DeVos Childrens Hospital


Grand Rapids, USA
Turner completed the Helen DeVos
Childrens Hospital in Grand Rapids,
Michigan, in 2011. The 14-story, 43,100-

Fort Irwin Hospital


San Bernardino, USA

Turner is building the new Fort Irwin


Hospital in San Bernardino, California,

square-meter healthcare facility

for the US military and their families. In

features space for 142 bedsand a

progress since 2012, the project is

child-friendly environment. Numerous

seeking LEED Platinum certification. For

play areas throughout the building and

example, its own photovoltaic farm pro-

more than 1,500 pieces of artwork cre-

vides the building with sustainable en-

ated by children help make the space

ergy. The contract also includes the reno

welcoming. The exterior plaza serves

vation of the associated Mary Walker

as both a vegetated roofing system to

clinic. Once completed, the hospital

reduce urban heat effects and an inter-

complex will offer patients world-class

active park playground. The hospital re-

healthcare on over 20,000 square me-

ceived LEED Gold certification in 2012

ters of space.

in part for its heat recovery system and


its highly efficient building shell, both
factors that make a key contribution to
the energy efficiency of the property.

67

University Medical Center


Eppendorf
Hamburg, Germany

RD
&

The Lunder Building: up-down


Buildings arent always built from the ground up. To
streamline the construction process, our US subsidiary
Turner built this 14-story extension to Massachusetts
HOCHTIEF Solutions constructed a

General Hospital working from the bottom and the top

new clinic building with a capacity of

simultaneouslyusing a technical innovation called

around 740 beds on the grounds of

up-down construction.

University Medical Center Eppendorf in


Hamburg, which is considered one of
the most modern in Europe. Among the
facilities located in the new building are
the general and trauma surgery departments. A total of 18 high-tech operating
rooms are also housed in the pavilionlike patient buildings, whose numerous
inner courtyards reflect the historical
architectural style of older buildings on
the grounds. The construction work,
which was performed without interrupting the operation of the hospital, required

Fort Belvoir Community Hospital


USA

detailed construction logistics. HOCHTIEF


handed over the new clinic in Decem-

Fort Belvoir Community Hospital in Vir-

it consumes nearly 30 percent less en-

ber 2008, right on schedule, after a three-

ginia, which Turner completed in 2011,

ergy than conventional hospitals. The

year construction period.

is yet another certified green building. It

seven-story building with state-of-the-

achieved LEED Gold certification with

art equipment offers space for 120

key features such as its highly efficient

beds, cancer and emergency wards,

energy plant along with the landscaped

numerous operating rooms as well as

areas and roofs as well as natural wa-

diagnostics and treatment rooms.

tering using retained rainwater. Thanks


to the design of the structure measuring
approximately 110,000 square meters,

Social and urban infrastructure

Office properties
Commercial
properties

69

HOCHTIEFcreating contemporary
working environments.
Todays commercial and office properties
have numerous roles to play. They must
be modern, flexible, and cost-efficient
as well as providing their users with an
inspiring, feel-good setting in which to
work productively.

Business Garden
Warsaw, Poland

Across the globe, HOCHTIEF has built

Reminiscent of a spaceship, the futuristic

commercial and office properties that

Business Garden office complex built

meet these very expectations. In plan-

by HOCHTIEF in Warsaw features two

ning and constructing them, we rely on

buildings. The company was also re-

innovative technologies such as Build-

sponsible for the complexs transporta-

ing Information Modeling (BIM), our

tion infrastructure and landscaping. The

longstanding expertise as well as our

properties have two underground levels

close interaction with you, our clients.

housing utility rooms and parking facilities


as well as five floors above ground.

The fact that more and more buildings

While one of the buildings is exclusively

comply with sustainability standards is

devoted to office space, the other ad-

also having a positive impact on their

ditionally accommodates conference

performance curve as well as sale and

rooms, a business hotel, and restaurants.

letting opportunities. HOCHTIEF ranks

Completed in December 2012, the proj-

among the pioneers in green building

ect has been registered for certification

and, together with its US subsidiary

with the LEED green building label.

segment for years. With HOCHTIEF,


theres simply more in store for your
projects!

Leighton Properties vision is to de-

Turner, has spearheaded this market


(see also photo at left)

velop thriving, sustainable buildings


in CBD areas. It demonstrates the

depth of our capabilities in planning,


structuring, and delivery.
Mark Gray,
Managing Director,
Leighton Propertiess

Social and urban infrastructure Office properties Commercial properties

When HOCHTIEF completed the maxCologne office complex in early 2013,

maxCologne
Cologne, Germany

the property was already fully leased. It


was also the recipient of Gold precertification as a green building by the German Sustainable Building Council (DGNB)
as well as garnering an award in the
Existing Project Developments category from industry publication Immobi
lienmanager. After complete renovation,
the office buildings, which were originally constructed in the 1970s, feature a
double-skin glass facade, boast aboveaverage energy efficiency, and use renewEclipse Tower
Sydney, Australia
Eclipse Tower is an iconic and uniquely

able sources of energy. Direct views of

A base building between the office

Cologne Cathedral are afforded both by

blocks was dismantled and replaced

the floors overlooking the Rhine at the

with a wide, open square.

front of the building and the towers.

designed landmark building arrayed over


19 levels with large 1,320-square-meter
floor plates and a side core. The building
offers secure basement parking for 144
cars and 193 bicycle racks and shower
facilities. Eclipse Tower has achieved a
5 Star Green Star Office Design v2 Rating and a 5 Star Green Star As Built v2
Rating by the Green Building Council of
Australia. The development has also

Green building certificates

Award-winning sustainability

Certification systems rate the sustainability of buildings

achieved a 5 Star NABERS Energy rat-

and provide a holistic view of green building. They are a

ing. In July 2013, Eclipse Tower was

tool for planning and implementing sustainability in build-

awarded Best Commercial Develop-

ings. Since national and regional differences must be

ment at the Urban Taskforce 2013 De-

accommodated, a variety of certification systems have

velopment Excellence Awards, presented

become established worldwide. And they differ, some-

by the Governor of NSW, Marie Bashir.

times considerably, in the selection and weighting of the

The development also received a High

parameters to be tested. But this is not a problem:

Commendation at the 2013 UDIA NSW

HOCHTIEF is fully conversant with the most prestigious

Awards for Excellence in the category

quality labels and seals!

of Commercial and Retail.

71

No.1

ENR has ranked Turner the leading green


building contractor in the United States
in 2013. The HOCHTIEF subsidiary employs 1,400 LEED auditors.

Great American Tower


Cincinnati, USA
Great American Tower holds a number
of records simultaneously: It is the largest, tallest, and greenest office building
in downtown Cincinnati. A particular
highlight of the 41-story building is its
distinctive domed roof inspired by a
royal crown. Employees of two law
firms and the citys largest insurance
company work in the towers offices.
The base of the building supports a
1,600-car parking garage, while at the
street level, the lobby with a fountain

HQ Development
Brisbane, Australia

and retail space offers visitors a pleasant


way to spend an hour or two. Great

Developed by Leighton Properties and

building and was awarded a Six Star

American Tower is a green building and

constructed by Leighton Contractors,

Green Star accreditation. In addition,

has received Gold LEED certification.

HQ Development is located in Brisbanes

the property won the 2011 National

Fortitude Valley business district. Com-

Urban Taskforce Development of the

prising a north tower and a south tower,

Year Award. Along with financial suc-

the office property offers 41,200 square

cess, the criteria evaluated were the

meters of commercial space, supporting

projects benefits to the community,

retail and a 2,500-square-meter central

user satisfaction, and environmental

public plaza. HQ Development is a green

friendliness.

Social and urban infrastructure Office properties Commercial properties

Nordex Forum
Hamburg, Germany
The Nordex Forum clearly demonstrates
the added value of a 360-degree approach: As early as the planning phase,
our experts in various disciplines were
involved in the project. This meant
HOCHTIEF was able to minimize energy
usage and the burden on the environment, while improving the profitability of

Occupational safety and health

High-rise emergency drills

The HOCHTIEF competence center for occupational safety,

the building. Flexible floorplans coupled

health, and environmental protection (OSHEP) ensures that

with the opportunity to upgrade to state-

occupational safety and health are given a high priority across

of-the-art technologies make the build-

the entire Group. The main tasks of the OSHEP Center in-

ing future-proof and ensure stable value.

clude improving the integrated Group-wide environment and

The participation of our green building

occupational safety management systems on an ongoing

management experts from the outset

basis. It also monitors implementation of regulations in the

culminated in the Nordex Forum being

individual HOCHTIEF units. The goal is to continually de-

awarded Gold certification by the Ger-

crease the frequency of accidents, including during construc-

man Sustainable Building Council

tion at great heights such as at Tower 185 in Frankfurt

(DGNB).

(see photo at right). Emergency drills were regularly conducted here.

73

Completed in November 2012, King


George Central Office Tower in Brisbane
focuses very much on the health of its
occupants, with user friendly stairwells
running to all floors from the ground
level and bicycle racks. The Heart Foundation has backed this effort. King George
Centrals environmental friendliness has
also been documented: The project received a Six Star Green Star rating and

TD Bank
Florida, USA

Five Star Energy NABERS rating. Developed by Leighton Properties and con-

TD Bank in Fort Lauderdale, Florida is the

structed by Thiess, the property features

first net-zero energy bank in the USA.

28,000 square meters of office space.

This is made possible by photovoltaic


panels that supply the building with

King George Central


Office Tower
Brisbane, Australia

energy as well as numerous energy-efficient technical features. The Platinum


LEED-certified property produces more
than 100,000 kilowatt-hours of electricity
Its name is attributable to its height:

each year, even though it only uses

Tower 185 stretches 185 meters sky-

around 97,000 kilowatt-hours itself. In

ward in the center of Frankfurt.

April 2012, the U.S. Green Building

HOCHTIEF was responsible for the shell

Council Florida also presented the for-

construction of the office building fea-

ward-looking Turner-constructed project

turing 100,000 square meters of space.

with the Outstanding LEED New Con-

The building sits on a horseshoe-shaped

struction Award.

base structure from which the two halves


of the high-rise extend. They wrap around
the oval middle section and form the
actual skyscraper. Besides office space,
the 50-story Tower 185 also houses
conference rooms and restaurants.
Tower 185
Frankfurt, Germany

Social and urban infrastructure Office properties Commercial properties

smarthouse, which is also home to all


of HOCHTIEFs units in Munich, is more
than purely an office property. Various
services, restaurants, retail establishments, and a day care center play a key
part in making daily life easier and less
stressful for the people who work here.
An energy-efficient facade and daylightcontrolled lighting are just a couple of
BASF Headquarters
New Jersey, USA

the buildings green features. The property has received Gold precertification

smarthouse
Munich, Germany

from the DGNB.


Five stories, more than 30,000 square
meters of office space, a two-story lobby,
and an extensive outdoor plaza space:
Some 1,200 employees of the BASF head
office in New Jersey work in this prop-

Unilever-Haus
Hamburg, Germany

ing and is criss-crossed by numerous


walkways. The ground floor accessible

erty. HOCHTIEFs subsidiary Turner was

to the public features a variety of test

responsible for construction of the build-

kitchens, shops, cafs, and restaurants.

ing distinguished by its environmentally

Visitors can reach the Elbe directly via

friendly and feel-good design features,

a passage. Unilever-Haus was the first

which is currently undergoing the LEED

building to be Gold precertified for the

Platinum certification process. The ac-

HafenCity environmental seal. In addition,

tions taken range from using recycled

it received the Architecture Festival

and recyclable construction materials

Award recognizing it as the worlds best

as well as rainwater to installing smart

office building and was presented the

windows that shield employees from

prestigious BEX Award for its outstand-

the glare of incoming sunlight. An air fil-

ing contribution to the built environment

tration system ensures good indoor air

in Hamburg.

quality.
Developed by HOCHTIEF, Unilever-Haus
has long since become a hallmark of
Hamburgs HafenCity district. The futuristic building located directly on the
Elbe River delights employees and visitors alike with its light-spangled architecture. The atrium is as tall as the build-

75

HOCHTIEF subsidiary Turner built the


33-story office tower 555 Mission

555 Mission Street


San Francisco, USA

Street in the heart of San Franciscos financial district. Completed in 2008, the
property features nearly 52,000 square
meters of leasable space and, at 147
meters, it is the tallest building to be
constructed in San Francisco since the
1980s. 555 Mission Street was the first
Berlins Grosse Freiheit
Germany

LEED Gold-certified green office tower


in the city.

As of 2013, Coca-Cola Erfrischungs


getrnke has a new Germany head office

A 57-level building, including 44 typical

in Berlin. HOCHTIEF Solutions developed

office floors, with Brisbane River views

and built Berlins Grosse Freiheit, an

in the heart of the Australian citys

office building designed as a transparent

Golden Triangle precinct, One One

cube in the Osthafen district, with 4,460

One Eagle Street is a premium-grade

square meters of usable space and room

property. Leighton Contractors designed

for 550 workstations. The ground floor

and constructed the high-rise which of-

that features a spacious terrace facing

fers more than 63,000 square meters

the Spree River on the south side com-

of office space, along with retail stores,

prises a reception area, conference

and 115 car parking spaces. The proj-

rooms, and a company restaurant. Each

ect achieved a Premium Grade Rating

story has floor-to-ceiling windows and

through the Property Council of Austra-

offers an unobstructed view of the water.

lia, and a Six Star Green Star Rating as

The property is LEED Gold certified. Its


sustainable features include concrete
core activation for heating and cooling,
exterior motorized sun shades, and the
use of regional construction materials.

One One One Eagle Street


Brisbane, Australia

a sustainable building.

Social and urban infrastructure Office properties Commercial properties

BM

Setting standards
Virtual product development is standard in many industries today. HOCHTIEF was the first to provide the
construction industry with a virtual planning and control solution: BIM (Building Information Modeling). The
system is based on a digital 3D model that can be expanded into a 4D model by adding any type of information (scheduling, costs, use, etc.). Thanks to this tech-

BASF plant
Ludwigshafen, Germany

nology, the specialists at HOCHTIEF ViCon (Virtual


Design and Construction) can identify inconsistencies
in project planning early on and save time and money

In Ludwigshafen, BASF is building a new

for their clients. This approach also significantly mini-

plant for manufacturing TDI, a precursor

mizes risks. In the USA, HOCHTIEFs subsidiary Turner

for the specialty plastic polyurethane. The

is a leading supplier of BIM.

HOCHTIEF Solutions subsidiary Streif


Baulogistik is providing more than 300
container systems for expansion of the
plant. These are being used as offices,
employee lounges, cafeterias, and

Cutting-edge research and technology

smoking areas. In addition, Streif Bau-

is at home on the tiny island of Riems

logistik is also setting up and operating

near Greifswald, where virus experts

several temporary warehouses and as-

from the Friedrich-Loeffler-Institut,

sembly halls as well as installing plumb-

founded in 1910, do their work. The fa-

ing and electrical systems for the proj-

cilities they use were built by HOCHTIEF

ect. Apart from this job, HOCHTIEF

Solutions in a joint venture between

Solutions is also involved as a planner

2008 and 2012. The research facility re-

in several other projects and in con-

ceived new high-security laboratories

struction activities. Our core and shell

Friedrich-Loeffler-Institut
Insel Riems, Germany

and animal pens during the expansion.

specialists are acting as the general

At the time, the project was the largest

contractor for building an administrative

construction project undertaken by the

facility in which the control center for the

federal government in eastern Germany.

new TDI plant will be located.

77

Amcor glass bottle factory


South Australia, Australia
The first of its kind in Australia, Amcors
glass bottle factory is dedicated solely

HOCHTIEF subsidiary Turner planned

to producing various types of bottles for

and built a new industrial facility for

the wine industry. Just one year after its

construction equipment manufacturer

completion, the facility doubled its pro-

Caterpillar in Schertz, Texas. The nearly

duction capacity from 200 million to 400

25,000-square-meter facility has just

million bottles per year. Both construc-

under 1,000 square meters of office

tion stages were planned and executed

space and a 560-square-meter central

by Leighton, HOCHTIEFs Australian


Group company. The factory in the state
of South Australia is located directly
adjacent to the Barossa Valley, Australias
largest wine growing region, and uses
state-of-the-art production and packaging technology.

Caterpillar Engine Heads


Machining Facility
Texas, USA

plant. The office space is configured


such that it can be expanded to include
a second story area if the need arises.

Social and urban infrastructure

Emaar

Skyscrapers
Mixed use properties

79

HOCHTIEFgiving cities a face.


Skyscrapers make city skylines unique.
And given their extreme height, unusual
architecture, multitude of uses, and
central location, they pose special construction and engineering challenges.
Fortunately, HOCHTIEF possesses all of
the expertise required to successfully
erect these structures. In numerous major
cities worldwide, our building construction experts have built striking skyscrapersas both construction managers and
contractorsand have not infrequently

Burj Khalifa
Dubai

broken new ground in the process. Height


records have been set and exceeded,

Its a skyscraper in the truest sense of

and truly innovative technologies have

the word: The Burj Khalifa in Dubai is

been developed and applied. If you want

currently the worlds tallest building and

to reach new heights, then HOCHTIEF

HOCHTIEFs subsidiary Turner provided

is the right choice!

construction management for the project. Hotels, apartments, offices, and retail outlets are all housed there under one
roof across 162 stories. At peak times,
12,000 people from more than 100 countries simultaneously helped in its construction. After 22 million man-hours of
work, the building was completed in
January 2010.
(see also photo at left)

( )
828

metersthe height of Burj


Khalifa in Dubai, the tallest
building in the world.
Source: www.burjkhalifa.ae

Foster + Partners

Social and urban infrastructure Skyscrapers Mixed use properties

VietinBank Tower
Hanoi, Vietnam
The design of VietinBank Tower in Vietnams capital city of Hanoi is the work of

Between 2010 and 2012, Leighton Asia,

Sir Norman Fosters architectural team.

India and Offshore built the Zuellig Build-

During building of the tower, Turner will

ing, an architectural landmark in the Phil-

provide project management and con-

ippinesand the countrys first building

struction supervision services. The com-

awarded Platinum status by the LEED

plex consists of two towers 68 and 48

green building label. Its green features

stories high. They will be home to the

include a design that allows natural light

headquarters of VietinBank as well as

to reach 90 percent of the space on the

a five-star hotel and serviced apartments.

office propertys 33 floors, air quality

The seven-story podium will include

management using CO2 sensors as well

conference facilities, a retail center, res-

as the capture of moisture and conden-

taurants, and cafs. Lastly, a green

sation and their return to the water cycle.

spine concept will ensure innovative

This property is just another example of

ventilation and energy supply for the

the HOCHTIEF Groups sustainable con-

building.

struction successes around the globe.

Zuellig Building

Makati City, Philippines

81

Capital Gate
Abu Dhabi, UAE

194-room Hyatt hotel. The 35-story,


160-meter tower is tilted at an angle of
18 degrees westwards thanks to the
base of the tower, which sits on a distribution of 490 piles that are drilled approxi
mately 30 meters underground. The
skyscrapers slant is thus four times
that of the Leaning Tower of Pisa.

Taipei 101
Taiwan
An interesting angle: The Capital Gate is
HOCHTIEF subsidiary Turner, experts in

the heart of Abu Dhabis exhibition center.

constructing the worlds tallest buildings,

Constructed by the Habtoor Leighton

also had a hand in building Taipei 101.

Group in 2011 for the exhibition center

Open since 2004, the tower in the Tai-

operator according to plans by architec-

wanese metropolis is now only the worlds

tural firm RMJM, the buildings lower part

fifth tallest building, but at 508 meters

houses offices while its upper part is a

high, it is still the second tallest office


building on earth. Turner provided project and construction management

Commerzbank Tower in Frankfurt is

services for fast-track construction of

one of Germanys highlights. As general

the project despite its complexity.

contractor, HOCHTIEF built the corporate headquarters for Commerzbank,


which was designed by star architect
Sir Norman Foster, in the heart of Germanys banking hub within the space of
three years. Since its completion in 1997,
the 56-story, 259-meter-high office
property has been the tallest building in
Germany and a hallmark of Frankfurts
skyline.

Commerzbank Tower
Frankfurt, Germany

Social and urban infrastructure

Residential real estate


Urban district
development
Hotels

83

HOCHTIEFmore beautiful living.


Home is a place where people feel comfortable, where they can be themselves,
where ideally everything is in order, now
and in the future. There is a trend toward
more and more people wanting a place
to live that is centrally located in an urban
area, at the heart of the action, without

Quartier 21
Hamburg, Germany

having to sacrifice personal and green


space.

Since 2007, HOCHTIEF along with consortium partners has been constructing

HOCHTIEF creates attractive living spaces

Quartier 21 on the site of the former

for a wide variety of lifestyles and age

Barmbek Hospitala district designed

groups. Our approach extends beyond

to meet the needs of all age groups for

individual projects. When plans are made

multiple uses. The pavilion-style units of

to build a new urban quarter or an entire

the former hospital were expanded into

city district to function as a center link-

modern apartment buildings and supple-

ing housing, work, and leisure for young

mented with new construction.Quartier 21

tablet PCs called OBIS (Online Build-

and old, we are an experienced and

combines rentals and condominiums

ing Information System). It combines

reliable partner to cities and private in-

for families with attractive offices, seniors

3D building models with a wealth of

vestors alike. Even travelers dont have

apartments, and a nursing home. Whats

additional information, functions,

to give up their home comforts should

more, the former water tower now houses

and photos of the construction proj-

they choose to stay overnight in one of

a day care center and wellness oasis.

ectand puts this at the fingertips

the many hotels built by HOCHTIEF.

Residents benefit from a broad range of

of all of the projects participants

We have developed a production


system based on Building Information Modeling (BIM) and the use of

health facilities, services, and various

online, clearly and directly. This ap-

Residential real estate from HOCHTIEF

local businesses. The urban development

proach greatly facilitates structured

always promises to be something special:

also offers plenty of opportunities for

and efficient working at construction

a quality valued not only by occupants,

leisure with a varied selection of restau-

sites such as the Katharinenquartier

but by investors as well. Lets bring space

rantsa successful mix that meets all

project in Hamburg.

to lifetogether!

the needs of daily life.

Kai Brandt,
project manager,

(see also photo at left)

HOCHTIEF ViCon

Social and urban infrastructure Residential real estate Urban district development Hotels

In 2004, Turner was awarded the contract


to manage construction of the Shoreline

Shoreline Apartments
Dubai

Apartments in Dubai. Located on the


right-hand side of the trunk of The Palm,
a man-made island, the luxury Shoreline
Apartments include a total of 20 apartment buildings, each ten to twelve stories
tall, featuring magnificent views of the
Arabian Gulf. Residents have access to
private clubhouses with health, fitness,
and recreational facilities as well as
restaurants.

BelVista
Frankfurt, Germany
The Europaviertel, a new city district, is
being built in the heart of Frankfurt on the
land formerly occupied by a rail yard.

RD
&

projects here, one of which is the BelVista


residential project comprising 122 rental
apartments and 97 condominiums as well
as a day care center. These state-of-theart urban buildings meet the highest architectural and environmental standards.

TU Darmstadt, FGee based on the


urban planning design by
> BLFP Frielinghaus Architekten

HOCHTIEF Solutions is involved in several

Flexible floorplans allow scope for residents to personalize their homes. In ad-

Energy-Plus: Even more is possible. An urban

dition, all of the buildings are suitable

quarter that produces more energy than it uses? This is the vision

for use by older people and those with

HOCHTIEF is currently researching with the Technical University

disabilities thanks to ground-level ac-

of Darmstadt at Oberursel in the German state of Hesse. The aim

cess and elevators. A positive carbon

is for the 150 apartments and commercial premises to meet

footprint is also ensured: The properties

their energy needs from their own renewable sources while also

were built according to the passive house

supplying any surplus energy to the surrounding area. Our

concept or level 55 of the German KfW

objective is to develop and test a sustainable concept for plus-

Efficiency House Standard.

energy districts.

85

74%

of Germans live in cities, while in the


USA the urbanization rate is even
higher at 82 percent. The urban
population is growing worldwide.
Sources: Statista/World Bank, 2013

WRAP
Melbourne, Australia

Studio Eins
Frankfurt, Germany

SunVilich
Bonn, Germany

In Melbourne, Leighton Properties is

In Frankfurts centrally located Gallusviertel

At SunVilich in Bonn Vilich-Mlbach,

developing WRAP, a high-rise apartment

neighborhood, HOCHTIEF Solutions is

HOCHTIEF is making a residential con-

building with 294 residential units. The

building Studio Eins, a development

cept that combines the dream of home

towers design takes inspiration from

comprising studio apartments for uni-

ownership with excellent affordability a

Beijings Birds Nest Olympic Stadium

versity students and young professionals.

reality. The complex comprising 33

and features a striking exterior frame

The apartments provide investors with an

townhouses in a top-notch location with

wrapped around the building. A heritage

interesting opportunity: First, the amount

superb infrastructure is the winner of

warehouse at the base of the site will

of capital required to invest in the prop-

the city of Bonns Europe-wide Solar

become the grand entrance to the resi-

erty, which is in a central, high-priced

Villages competition. Its energy plan

dential development. Future residents

area of Germanys financial capital, is

stipulates that all houses be fitted with

of the tower scheduled for completion

relatively low. Second, great demand is

photovoltaic systems for generating

in mid-2014 will be able to choose

virtually assuredthe desire for afford-

electricity. With optimal capacity utiliza-

b etween studio apartments or units

able downtown living space on a tempo-

tion and dimensioning, up to roughly 60

with one or two bedrooms.

rary basis is fueled by the mega-trend of

percent of the warm water supply can

urbanization. Featuring modern design,

be obtained from the solar thermal sys-

the full-service apartments in the complex

tem. A SunVilich house has four rooms

are supplemented with spacious com-

covering around 140 square meters of

mon areas. Investors acquire this service

living space with a well-designed floor

package along with the investment, thus

plan and variable room layout.

minimizing their administrative expenses.

Social and urban infrastructure Residential real estate Urban district development Hotels

Erskineville
Sydney, Australia

Leighton Properties is currently building a


residential development on a 1.6-hectare
site in Erskineville, Sydney, featuring 16
townhouses and 302 apartments. Heights
across the site range from three to eight
stories, and the buildings are arranged
to ensure light-filled view corridors within
the site. In constructing this project, the
Leighton subsidiarys developers bring

Mosaic
Brisbane, Australia

together the best elements of sustainable and architectural design.

Leighton Properties has been working


since 2012 on the luxurious Mosaic
apartment tower at the heart of a plethora
of stores, bars, and restaurants in Brisbanes vibrant Fortitude Valley precinct.
The height of the building alone provides
for some unique features: The apartment
balconies afford panoramic views, and
there is a private garden on the roof. In
addition, the property was designed with
sustainability in mind and draws on green
technologies.

grne mitte Essen, P.West


Germany
P.West by HOCHTIEF Solutions is part of

The recessed attic story houses spacious

the grne mitte Essen project, a large,

penthouse apartments. Compliance

completely new and intelligently designed

with the KfW Efficiency House 70 Stand

development. Situated at the heart of

ard considerably reduces the projects

Essen, P.West aims to combine resi

primary energy requirements and heat-

dences, workplaces, and leisure activities

ing loss. In addition, environmentally

in a single location. The HOCHTIEF build-

friendly district heating provides hot

ings will include apartments affording

water and creates a pleasant indoor

between 63 and 184 square meters of

climate.

space, all with balconies or terraces.

87

Katharinenquartier
Hamburg, Germany
Since 2011, HOCHTIEF Solutions has
been building a lively mixed use urban
quarter located on former school grounds
in the old town center of Hamburg, incorporating the old trees in the area and
ensuring unrestricted views of St.
Catherines Church tower. Six- and sevenstory buildings with around 130 rental

Urban living

Urban living is popular again

Living in urban areas is popular again. This trend resonates

apartments are being constructed at

primarily with older adults, but attractive infrastructure along

the back of the site adjacent to the

with short access routes, cultural diversity, and proximity to

church. Recessed loggias and roof ter-

healthcare services are also good arguments in favor of urban

races as well as varying window sizes

living for young families. Demographic and societal changes

differentiate the individual buildings and

are fueling demand for completely new housing models:

give the structures a small-scale look.

Neighborhood-oriented and integrated housing that provides

On the side that faces Willy-Brandt-

an alternative to conventional home ownership or purely rent-

Strasse, Katharinenquartier culminates

ing is an attractive proposition. Experts believe that housing

in a multi-story building for office and

types and lifestyles that not only promote social networks

commercial use that also has the func-

but are also adapted to meet individual needs will become

tion of shielding the residential buildings

increasingly important in the future. As a result, urban quar-

from traffic noise.

ters and urban multigenerational housing such as that constructed by HOCHTIEF are becoming more significant.

Carlos Zapata Studios

Social and urban infrastructure Residential real estate Urban district development Hotels

Terranea Resort
California, USA

JW Marriott Hotel Hanoi


Vietnam

The protected Rancho Palos Verdes

Opened in 2013, the JW Marriott Hanoi

business center as well as a rooftop

peninsula in Southern California is home

is a 450-room, five-plus-star hotel situ-

swimming pool with adjacent health

to the luxurious Terranea Resort.

ated on a lake within the Vietnam National

and fitness club. The impressive form of

HOCHTIEF subsidiary Turner provided

Convention Center Complex. This

the building complex takes its inspiration

construction management services for

75,000-square-meter property includes

from the imagery of the dragon in Asian

this complex hotel facility with a 360-

a luxury hotel as well as various publicly

mythology. HOCHTIEFs subsidiary

room hotel tower, 13 casitas, ten villas,

accessible shopping areas, three res-

Turner provided construction manage-

five bungalows as well as a large con-

taurants, two ballrooms, a meeting and

ment services for the project.

ference facility and spacious spa. The


project site included around a mile of
coastline, so preserving natural habitat

HOCHTIEF Solutions was responsible for

zones was the Turner teams main

core and shell construction of a 19-story

concern. The project was completed in

hotel tower for the Hyatt Group on one

summer 2009.

of the most coveted pieces of land in


Dsseldorfs Media Harbor district. The
65-meter-high building located on a spit
of land and a twin tower built in parallel
have comprised a new Hafenspitze landmark since 2010. Guests staying at the
elegant hotel have an impressive view
of the Media Harbor, the old town cenHyatt Regency Dsseldorf
Germany

ter, the Rhine Tower, and Dsseldorfs


skyline.

89

Right on time for Munichs famous


Oktoberfest in 2011, HOCHTIEF Solutions

Marriott Hotel Munich


Germany

completed the Marriott Hotel which is


located at the heart of the Bavarian capital. Combining two hotel types within a
single building complex, the Marriott
features the three-star Courtyard Hotel
with 227 rooms and the Resident Inn
with 125 rooms, the latter catering mainly
to guests staying several weeks.

Kempinski Hotel and


Residences Palm Jumeirah
Dubai
Two HOCHTIEF Group companies were
involved in the contract to construct the
opulent Kempinski Hotel and Residences
Palm Jumeirah in Dubai: Our US subsidiary Turner served as construction
manager, and the Habtoor Leighton
Group handled execution. This project
comprised construction of 20 villas, an
apartment building, and a five-star hotel
on Dubais man-made island, the Palm
Jumeirah, on a site measuring around
206,000 square meters.
The St. Regis Saadiyat Island Resort
Abu Dhabi
From 2009 to 2012, the Habtoor Leighton

and the Louvre Abu Dhabi, offers its

Group participated in a joint venture to

guests 380 rooms, 259 residential

build the St. Regis Saadiyat Island Resort

apartments, and 33 villas. Of course, the

in Abu Dhabi. The exclusive five-star is-

project also features various shopping

land hotel, which is in close proximity to

options, a large spa, quiet zones, and an

the cultural district with the Zayed Na-

entertainment component.

tional Museum, Guggenheim Abu Dhabi,

Social and urban infrastructure

Sports and event


facilities
Cultural facilities

91

HOCHTIEFproviding a stage for


sporting and cultural excellence.
Sports, entertainment, culture, and adventure all mesh together in todays event
facilities. They offer the best surroundings for top performers and open the way
for pure enjoyment of artistic and cultural endeavors. In many cases, these

Arrowhead Stadium
Kansas City, USA

facilities are a calling card for major cities,


and attract hundreds of thousands of

From 2008 to 2011, HOCHTIEFs US

spectators and visitors each year.

subsidiary Turner, a specialist in sports


facility construction, expanded and ex-

The HOCHTIEF Group has built world-

tensively upgraded Arrowhead Stadium

class sports stadiums, multi-purpose

in Kansas City. The team locker rooms

arenas, museums, theaters, and con-

were renovated, restroom facilities for fans

cert halls in numerous countries. We

were added, and the press booths and

have the special expertise to design

all-inclusive suite level were modernized.

these properties, whether large or

Retail and entertainment options were

small, to provide the desired functionality

more than doubled, and open concourse

and flexibility. As early as the planning

areas were added. Exterior infrastructure

phase, we contribute all of our know-how

upgrades were made to the ticket offices,

and make alternative proposals for im-

entrance areas, museum, and adminis-

proving efficiency and lowering costs

trative offices. The lighting, sound, video,

over the long term. If you expect only

and security systems were updated. The

people in it. Phew. It really brings

the best performance for your project,

result: A state-of-the-art football stadium

home the impact on everybody. Its

then make HOCHTIEF part of your

that provides players and fans alike with

a cultural piece.

team!

a great all-around experience while en-

Gus Sestrap,

joying their favorite sport.

Turner Construction

Husky Stadium, Seattle

You use your sense of awe while


you are building it, until you show
up the first time and it has 65,000

Operations Manager
(see also photo at left)

in Seattle

Social and urban infrastructure Sports and event facilities Cultural facilities

The New York Yankees moved into their


new home in the Bronx built by Turner,
our US building construction subsidiary,
in 2009. Fifty-two thousand fans can
now cheer for their favorite baseball team
at home games and enjoy luxurious
private loges, a Hard Rock Caf, and a
screen six times the size of the previous
one. Turner provided both preconstruction and construction services and was
also responsible for demolition of the
Husky Stadium
Seattle, USA

original stadium located only one block


north. Yankee Stadium won McGraw

Yankee Stadium
New York, USA

Hill Publications Project of the Year


Turner renovated Husky Stadium in

Award for New York Construction in

Seattle for the University of Washington

2009.

in time for the start of the 2013 football


season. The work included demolition
and reconstruction of the lower bowl,
lowering of the playing field to improve

Madison Square Garden


New York, USA

Having built the iconic Madison Square


Garden in 1962, Turner began providing

visibility, and construction of a club level,

construction management services in

press box, and football operations sup-

2010 for the full-scale renovation of this

port building, which houses the locker

multi-purpose arena in a fast-track proc

rooms, weight rooms, team meeting and

ess to be completed within 41 months.

event rooms, player lounge, and coaches

The more than four million guests who

offices. The facility also includes a sports

visit the arena each year will now enjoy

medicine clinic. Turner additionally built

a dramatic new entrance area, additional

a 200-spot underground parking garage.

new seats and loges with improved

The renovated football stadium now has

sight lines, more spacious public con-

70,000 seats, 2,500 club seats, and 28

courses, and numerous new food and

new suites.

entertainment amenities. In addition, a


new scoreboard as well as state-of-theart lighting, sound, and video technology
were installed.

93

Partnership-based contract model

PreFairEveryone benefits

Collaborative, secure, and fast: Plan early, succeed together,


and create value. Thats our PreFair concept in a nutshell.
We begin working closely with our clients as early as we can,
New Central Library
San Diego, USA

because only in the planning phase can 80 to 90 percent


of costs be influenced. This enables us to reduce construction
costs, mitigate the risk of supplemental work, and accelerate

In 2010 Turner secured the contract for

completion. Clients enjoy maximum transparency and open-

the New Central Library in San Diego.

ness in project controlling from the very start of the process.

With floor space of 45,700 square meters


spread over nine stories, the library includes a technology center, a 350-seat
auditorium, a 400-seat multi-purpose
room, reading rooms, a childrens library,
an outdoor plaza and caf, and underground parking. Carried out to meet sustainability standards, the project is registered for LEED Silver certification from
the U.S. Green Building Council.

Musical Theater Hamburg


Germany
True partnersa perfect description of

model allowed us to reduce construc-

HOCHTIEF and Stage Entertainment.

tion costs by 31 percent. With the stage

We are currently building our fourth proj-

expected to open for productions in

ect in a row for the theater operator, an

2014 after only a two-and-a-half-year

en suite musical theater with 1,800 seats

construction period, the curtain rises

in the port of Hamburg. The intensive

for state-of-the-art entertainment by

three-year planning phase in collabora-

HOCHTIEF Hamburg!

tion with the client under our PreFair

Social and urban infrastructure Sports and event facilities Cultural facilities

Elbe Philharmonic Hall


Hamburg, Germany
In Hamburg, a new landmark is being
created: Elbe Philharmonic Hall. Located

BM

A powerful information model

mid-port with its footing on a historical

Before it was built, Elbe Philharmonic Hall was already planned

quayside warehouse, the highly com-

and constructed virtually in the bid phase. HOCHTIEFs ViCon

plex construction project is being carried

experts created a 4D model and video animation which are

out by HOCHTIEF Solutions. A striking

updated continually as construction proceeds. Features such

feature is the buildings tall glass wave

as the technical building systems can be mapped down to

crest. One of the best concert halls in

the smallest detailand clashes between the individual com-

the world, a luxury 250-bed hotel, and

ponents and work by the various construction trades instantly

exclusive condominiums will be located

displayed. This allows quick,

under its roof. At 37 meters high, a plaza

cross-disciplinary adjustments

will provide a stunning panoramic view

to the designs to be made and

of Germanys largest port. It is a center-

coordinated. Clash detectiona

piece of the project and designed as a

highly practical solution.

place for the public to meet and interact.

Louvre Abu Dhabi


Abu Dhabi

Courtesy of Ateliers Jean Nouvel

95

The Louvre in Abu Dhabi, which is being


built by Turner, is described as an island on an island. The HOCHTIEF subsidiary is responsible for project and
construction management. Several connected buildings will be constructed on
Saadiyat Island to total 64,000 square
meters of space covered by a dome. A
partnership with the Louvre in Paris
will enable first-rate exhibitions displaying the work of arts great masters.
The complex is scheduled for completion

Art Institute of Chicago


USA

in 2015.

Designed by prize-winning architect


Renzo Piano, the Modern Wing provides
a new home for the Art Institute of Chicagos collection of 20th and 21st century art. With 24,500 square meters of
floor space, it made the Art Institute the
second largest art museum in the USA.
HOCHTIEF subsidiary Turner served as
construction manager on this project.
The building is a light glass, steel, and
limestone wall structure, designed to fit
into the 19th century identity of the existing historic buildings. Turners contract

Whitney Museum
New York, USA

also comprised various improvements


to the technical infrastructure and equip-

At more than 18,600 square meters, the

spaces, a restaurant, special events

ment throughout the museum campus.

Whitney Museum of American Arts new

a reas, and a museum shop. A large

location in New Yorks Meatpacking

terrace affording fantastic views of the

District will more than double its previous

Hudson River and Manhattan skyline

space. Spread over six floors above

will be used for exhibitions and events.

ground and two below ground, the new

Turner is handling construction man-

building includes gallery space, educa-

agement for the project.

tion and studio facilities, art-handling

Mining business

your
treasures

97

our
trove

Raw materials such as coal, ore, and copper are in demand globally for the
manufacture of industrial and consumer goods. As the worlds biggest contract
miner, the HOCHTIEF Group makes a key contribution to meeting that demand
with its cutting-edge excavation and mining methods as well as optimized infrastructure. Our extensive experience and close working relationships with clients
are the key factors that drive our success.

Mining business

Contract mining

99

HOCHTIEFyour seasoned
c ontract mining partner.
Global demand is high for natural resources used to produce industrial and
consumer goods.
HOCHTIEFs subsidiary Leighton is the
largest contract mining company in the

Lake Vermont Mine


Queensland, Australia

world. Leighton operates both strip and


open-pit mines on behalf of mining com-

The Leighton subsidiary Thiess has been

panies, particularly in the Asia-Pacific

responsible for contract mining at the

region. Millions of metric tons of coal,

Lake Vermont Mine since 2008. Coal is

iron ore, gold, silver, copper, nickel, zinc,

mined at this facility located in the Aus-

and magnesium are mined there annu-

tralian state of Queensland. Thiess is

ally. High priority is put on efficient and

responsible for planning mining opera-

environmentally friendly excavation.

tions, blasting and drilling, removing


overburden, excavating and processing

The Leighton Groups mining capabilities

coal as well as maintaining all systems

include the design, planning, and con-

and the equipment fleet. The contract

struction of mines and their infrastructure;

was extended by client Lake Vermont

construction management; operation

Resources for another eight years.

and maintenance of mines; extraction of


raw materials, logistics, and technical
support. In most cases, Leighton additionally handles subsequent site rehabilitation. Contract mining calls for close
cooperation over many years, so choose
a partner with more than 60 years experience in the business!

No.1

The Leighton Group is the largest contract mining company in the world.
Source: Leighton Holdings Limited

Mining business Contract mining

Prominent Hill Mine


South Australia

At the Prominent Hill Mine in South


Australia, Leightons subsidiary Thiess
obtains copper and gold from an open-

Tamtama Perkasa Coal Mine


Indonesia

pit mine. In 2006, Thiess was first awarded a contract to set up mine infrastructure
including construction of the workshops,
offices, and fuel facilities. Client Oz Minerals extended the contract with Thiess
for another six years until 2018.

In 2012, Thiess Indonesia was awarded

metric tons of coal each year in Central

a mining contract at Tamtama Perkasa

Kalimantan. The contract with client PT

Mining Services. The Leighton Group

Tamtama Perkasa runs for five years.

company will extract some 7.5 million

101

Solomon Hub
Western Australia

Cosmo Deeps Gold Mine


Northern Territory, Australia
Leighton Contractors has been operating

Since 2012, Leighton Contractors has

mine planning, grade control, drill and

at the Cosmo Deeps Gold Mine in the

been contract mining for Fortescue

blast, and mining, as well as the opera-

Pine Creek region of the Northern Terri-

Metals Group at the Solomon Hub in

tion and maintenance of the processing

tory in Australia since 2011. The com-

Western Australia, where iron ore is

facilities, equipment fleet, and the asso-

pany provides complete underground

mined, blended and processed, and

ciated infrastructure, such as the airport

mining services to client Crocodile Gold,

ultimately put onto trains for transport

and employee village. Once the Solomon

including short-term scheduling, dia-

to Port Hedland. The contract, which

Hub is fully operational, it will produce

mond drilling, and decline and level devel-

became the largest single contract award

60 million metric tons of iron ore per

opment and production stoping, includ-

in Leighton Contractors history after

annum, and employ more than 1,000

ing the necessary construction, blasting,

the inclusion of an additional compo-

people.

and haulage and ground support.

nent in the first half of 2013, comprises

Drilling and blasting operations

Wind and weather always on our radar

In large-scale mining projects, noise and dust are an important considera


tion that Leightons experts always bear in mind during drilling and blasting operations. Computer models can predict the extent of the noise and
vibrations produced. If the conditions are not right, blasting is delayed. In
the same way, supervisors always have the wind and weather on their
radar so that if at all possible nearby communities and neighboring properties are not adversely affected by the dust created by explosions.

Mining business Contract mining

Burton Coal Mine


Queensland, Australia
In 1996, Leightons subsidiary Thiess
began operating at the Burton Coal
Mine, the first to be set up in the Bowen
Basin. Thiess was responsible for the
design and construction of all mine infrastructure and still handles operations,
including mining, coal processing, and
loading on site. When the mine was
constructed, Thiess also built the nec-

Sustainability

Site rehabilitationJust part of the job

Leighton takes care of many mines throughout their life cycle,

essary infrastructure, including an ac-

even after mining operations have ended. These services

commodation village for employees,

include restoring the ecology of the sites. For instance, the

mine offices, a water supply dam and

Leighton companies reforest mining sites as part of their

distribution system as well as mine

rehabilitation efforts. They landscape the area, ensuring

access and product coal haul roads.

proper drainage, bring in topsoil, and replant the property

The Burton pit depth is now up to 120

with native flora. Environmental protection is a key factor

meters for a distance of more than 28

even earlier, during mining operations, and is an integral

kilometers. Some 5.5 million metric tons

part of all work methods. This approach includes active

of coal are mined each year at Burton

emission protection against dust and noise as well as the

Coal Mine and exported to customers in

use of solar energy for operating machines to minimize the

Europe, Asia, India, and South America.

environmental effects of mining operations.

103

Senakin Coal Mine


Indonesia

Cape Lambert Port B


Western Australia
In Cape Lambert, Leighton subsidiary

struction of a jetty 900-plus meters long

In 2000, Thiess secured a mining con-

John Holland is participating in a joint

and a wharf measuring more than 400

tract at the Senakin Coal Mine in South

venture to expand the existing port fa-

meters, including the required piping and

Kalimantan, Indonesia. The work Thiess

cility for mining company Rio Tinto. The

works as well as shiploading infrastruc-

does at Senakin includes planning mine

iron ore extracted in the Pilbara region

ture. John Holland possesses the nec-

operations, extracting the coal itself, re-

is shipped from this location amongst

essary expertise to deliver complex,

moving the overburden, and transport-

others. The project involves the con-

multidiscipline construction projects.

ing product to two river ports, where it


loads the barges. In 2003, the contract
was extended by the client to cover the
life of the mine.

80,000
More than

HOCHTIEF employees are there for you all over


the world to lend their knowledge and skills to
your sophisticated projects.

Indexes

Index

Airports...........................................................30

Marine engineering (ports, locks/dams).........34

Tunnels...........................................................23

Bridges...........................................................13

Mining business............................................. 96

Universities.....................................................62

Building Information Modeling

Mission statement............................................7

Urban district development..................... 83, 86

(BIM)...................................... 33, 43, 76, 83, 94

Mixed use properties......................................79

Urban quarter development..................... 83, 86

Commercial properties...................................76

Museums........................................................95

Urbanization.............................................85, 87

Company history .....................................8, 107

Occupational safety and health............9, 15, 72

Virtual Design and Construction

Construction logistics......................... 32, 61, 76

Office properties.............................................69

(ViCon)................................... 33, 43, 76, 83, 94

Containers/container systems.................. 61, 76

Plant decommissioning .................................51

Vision................................................................8

Contract mining............................................. 96

Ports...............................................................34

Wastewater treatment plants..........................51

Cultural facilities..............................................93

Power plants...................................................49

Water treatment..............................................51

Educational facilities.......................................62

PreFair............................................................93

Wind farms, offshore/onshore........................41

Employees .........................................9, 34, 103

Procurement...................................................65

Energy-from-waste plants...............................50

Profile ...............................................................8

Energy infrastructure......................................38

Public buildings...............................................57

Engineering services..........................34, 49, 51

Public-private partnerships

Event facilities.................................................91

(PPP)..............................8, 19, 45, 47, 50, 57, 59

Gas.........................................................53, 103

Pumped storage power plants.......................45

Geothermal energy.........................................47

Railway stations..............................................27

German Sustainable Building Council

Renewable energies.......................................41

(DGNB)............................................... 70, 72, 74

Research and development

Green building.31, 33, 60, 63, 66, 69, 73, 80, 93

(R&D)........................... 19, 21, 42, 44, 63, 67, 84

Green Star..........................................60, 70, 75

Residential real estate.....................................83

Grid expansion.........................................45, 47

Revitalization...................................................37

Healthcare properties.....................................64

Roads.............................................................19

High-rise buildings..................70, 73, 79, 85, 88

Schools.................................................... 60, 63

Hospitals.........................................................64

Site rehabilitation..........................................102

Hotels.............................................................89

Skyscrapers....................................................79

Hydroelectric power stations..........................45

Social and urban infrastructure.......................55

Innovations............. 9, 19, 21, 42, 44, 63, 67, 84

Sports facilities...............................................91

Jack-up vessels..............................................43

Sustainability.............. 8, 18, 42, 69, 70, 84, 102

LEED.........31, 33, 60, 63, 66, 69, 70, 73, 80, 93

Transportation infrastructure..........................10

Further Information
HOCHTIEF Group companies:
HOCHTIEF Solutions AG
Corporate Headquarters
Opernplatz 2
45128 Essen, Germany
Tel.: +49 201 824-0
info-solutions@hochtief.de
Turner Construction Company
Headquarters
375 Hudson Street
New York, NY 10014
Tel.: +1 212 229-6000
turner@tcco.com
Flatiron Construction Corp.
Headquarters
10188 E. I-25 Frontage Road
Firestone, CO 80504
Tel.: +1 303 485-4050
press@flatironcorp.com
E.E. Cruz & Company, Inc.
32 Avenue of the Americas
13th Floor
New York, NY 10013
Tel.: +1 212 431-3993
info@eecruz.com
Leighton Holdings Ltd.
472 Pacific Highway
St Leonards NSW 2065
Tel.: +61 2 99256666
leighton@leighton.com.au

Contacts for:
&
Research and Development RD
HOCHTIEF Aktiengesellschaft
Corporate Development
Wolfgang Katzer
Tel.: +49 201 824-2470
wolfgang.katzer@hochtief.de

For further information about HOCHTIEF and our service portfolio, please see our website at
www.hochtief.com/clientportal

Sustainability at HOCHTIEF:
HOCHTIEF made a commitment to sustainability very early on. We joined the United
Nations Global Compact in 2008. Our shares
are listed on the renowned Dow Jones Sustainability Indices in 2013/2014.

For information on our sustainability activities,


please see www.hochtief.com/sustainability.
Sustainability:
HOCHTIEF Aktiengesellschaft
CR coordination
Barbara Hansen
Tel.: +49 201 824-2162
barbara.hansen@hochtief.de

Public-private partnerships
HOCHTIEF Solutions AG
PPP Solutions
Peter Coenen
Tel.: +49 201 824-2071
peter.coenen@hochtief.de

P
P
P

Fascinating background reports and information about the HOCHTIEF Group can also be
found in our concepts by HOCHTIEF magazine
published twice yearly.
The latest edition is available as e-book online:
www.hochtief.com/concepts

Building Information Modeling BM


HOCHTIEF ViCon GmbH
Dirk Schaper
Tel.: +49 201 824-1179
dirk.schaper@hochtief.de

Turner Construction Company


Jim Barrett
Tel.: +1 212 229-6000
jbarrett@tcco.com

Publication Details and Credits


Published by:
HOCHTIEF Aktiengesellschaft
Opernplatz 2, 45128 Essen, Germany
Tel.: +49 0201 824-0
info@hochtief.de www.hochtief.com

Imaging work, typesetting, and prepress:


Creafix GmbH, Solingen
Printed by:
Druckpartner, Essen

Concept, copy, design, and editing:


HOCHTIEF Corporate Communications and
TafelmitKollegen, Dsseldorf
Photography:
Christoph Schroll, HOCHTIEF

This brochure was printed on eco-friendly Maxi Silk coated paper certified in
accordance with the rules of the Forest Stewardship Council (FSC).

English adaptation:
Burton, Mnch & Partner, Dsseldorf

projects: also available in German.

Photo credits:
Cover: top left: plainpicture/OJO; right:
HOCHTIEF
P. 02: from top to bottom: iStockphoto/
Lord Runar, thinkstock, HOCHTIEF,
Thiess
P. 06: iStockphoto/Tammy616
P. 08: and p. 9: HOCHTIEF
P. 10: plainpicture/amanaimages
P. 11: HOCHTIEF ViCon
P. 12: iStockphoto/Lord Runar
P. 13: Hans Genthe
P. 14: top left: Flatiron; top right: Flatiron/
Joel Strayer; bottom right: Flatiron/
Roger Marble
P. 15: top left: Flatiron; top right: Transport
Scotland; bottom left: HOCHTIEF
P. 16: left: Leighton Holdings; right:
HOCHTIEF UK/David Orchard
P. 17: all photos: Leighton Holdings
P. 18: top: DB AG; bottom: Flatiron
P. 19: top right and bottom: Leighton
Holdings; top left: Flatiron/Alberto
Alvarez-Rea
P. 20: top left: Duwayne Bahnsen; bottom
left: Mike Christian; top right:
HOCHTIEF
P. 21: top left: zja.nl and okra.nl; right:
Leighton Holdings
P. 22: all photos: Leighton Holdings
P. 23: top left: Leighton Holdings; top right:
HOCHTIEF; bottom right: Flatiron/
Jessica Wiggins
P. 24: top: HOCHTIEF; bottom: HOCHTIEF
UK Construction
P. 25: top: Leighton Holdings; bottom:
HOCHTIEF
P. 26 and 27: HOCHTIEF CZ a. s.
P. 28: all photos: HOCHTIEF
P. 29: top left: HOCHTIEF UK; top right:
TrackStar Alliance; bottom right:
Leighton Holdings
P. 30: top: Studio Photosynteza; bottom:
Sebastian Oleksik
P. 31: left: Turner; top right: Flatiron/Joel
Strayer; bottom: Vladislavs Punculus
P. 32: top: HOCHTIEF; bottom: Foto Gauls
P. 33: top left: Turner; top right: Flatiron;
bottom right: Leighton Holdings
P. 34: top left: VFRphoto; top right: Transnet SOC.Ltd.; bottom right: Falcon
Crest
P. 35: top: Wolfhard Scheer; bottom:
FOT.4DFoto

P. 36: top left: San Francisco Public Utilities


Commission; right: Leighton Holdings
P. 37: top: HOCHTIEF Russia; bottom:
Leighton Holdings
P. 38: plainpicture/Westend 61
P. 39: Jrg Tarrach
P. 40: thinkstock/Eugene Suslo
P. 41: top: Udo Thomas; bottom: Thomas
Dashuber
P. 42: top: Wolfhard Scheer; bottom right:
Solvin Zankl; center and left:
HOCHTIEF
P. 43: top: HHVision; bottom: HOCHTIEF
P. 44: top: Leighton Holdings; bottom:
HOCHTIEF ViCon
P. 45: top: Jrg Tarrach; bottom: Felix Blow
P. 46: left: Oscar Durand; right: Flatiron/
Larry Gill
P. 47: top left: Leighton Holdings; top right:
Flatiron/Larry Gill; bottom: Ingo E.
Fischer
P. 48: Thomas Ernsting
P. 49: top: Thomas Ernsting; bottom:
HOCHTIEF
P. 50: top: HOCHTIEF UK/Ackermann;
bottom: Sita Polska
P. 51: top left: iStockphoto/Holgart; top
right: HOCHTIEF/Imhof; bottom:
Leighton Holdings
P. 52: top left: Flatiron; top right: Ivan Laskov;
bottom right: HOCHTIEF Austria
P. 53: top left: Flatiron; top right: E. E. Cruz;
bottom right: Leighton Holdings
P. 54: plainpicture/OJO
P. 55-57: HOCHTIEF
P. 58: top: Leighton Holdings; bottom:
HOCHTIEF UK
P. 59: HOCHTIEF
P. 60: top left: Martin Reader; top right:
HOCHTIEF PPP North America;
bottom: Leighton Holdings
P. 61: top right, center: Christian Bruch;
all others: HOCHTIEF
P. 62: top: Turner; bottom: Nick Harrison
P. 63: top: Turner; bottom: HOCHTIEF
P. 64: all photos: Leighton Holdings
P. 65: left: Leighton Holdings; center:
Benjamin Benschneider; right:
James DAddio
P. 66: all photos: Turner
P. 67: top left: Michael Bogumil; right:
Turner
P. 68 and 69: Swedecenter
P. 70: left: Leighton Holdings; right: Michael
Claushallmann

Date: December 2013

P. 71: left: Turner; right: Leighton Holdings


P. 72: HOCHTIEF
P. 73: top left: Leighton Holdings; top right:
Turner; bottom left: HOCHTIEF
P. 74: top left: Turner; right and bottom:
HOCHTIEF
P. 75: top left: Markus Bachmann; top right:
Turner; bottom right: Leighton Holdings
P. 76: top: Claus Graubner; bottom:
iStockphoto/Skynesher
P. 77: top: Leighton Holdings; bottom:
Turner
P. 78: Emaar
P. 79: Turner
P. 80: top: Foster+Partners; bottom:
Leighton Asia, India and Offshore
P. 81: top left: Turner; top right: Leighton
Holdings; bottom: HOCHTIEF
P. 82: Carsten Brgmann
P. 83: HOCHTIEF
P. 84: top left: HHVision; top right: Turner;
bottom right: TU Darmstadt
P. 85: left: Leighton Holdings; center and
right: HHVision
P. 86: top: Leighton Holdings; bottom:
HOCHTIEF
P. 87: top: Sabine Vielmo; bottom:
HOCHTIEF
P. 88: top left: Turner; top right: Carlos
Zapata Studios; bottom: HOCHTIEF
P. 89: top left: Turner; top right: Thomas
Haberland; bottom: Leighton Holdings
P. 90 and 91: Turner
P. 92: top left: Matthew Williams; center
and right: Turner
P. 93: left: Turner; top right: HOCHTIEF;
bottom right: Ekkehard Viefhaus
P. 94: top: Robert Schymalla; bottom:
ViCon
P. 95: top right: Courtesy of ateliers; Jean
Nouvel; other photos: Turner
P. 96: plainpicture/Nitrox21
P. 97: Leighton Holdings
P. 98: thinkstock/Miloslav78
P. 99: Leighton Holdings
P. 100: top: Thiess;
bottom: Leighton Holdings
P. 101: bottom: Tobias Titz; all others:
Leighton Holdings
P. 102 and 103: bottom: Tobias Titz;
all others: Leighton Holdings

MY
COMPANY

OUR
HISTORY

OCHTIEF
YEARS

HOCHTIEF stands for over 140 years of building excellence. If you would like to learn more about our
company history, please watch the short film from our anniversary year 2013.

Film: 140 Years of HOCHTIEF

HOCHTIEF projects:
HOCHTIEF Aktiengesellschaft
Opernplatz 2, 45128 Essen, Germany

You might also like