You are on page 1of 13

DATOS METEREOLOGICOS

Cuadro N 03.- ESTACION MALLARES


Latitud Sur:
Longitud Oeste
Altitud

0451'53''
8043'53''

S
W

45

Enero

Feb.

Marzo

Abril

Mayo

Junio

Julio

Agost.

Set.

Oct.

Nov.

Dic.

Temperatura Media
(C)

26.15

27.32

27.41

28.20

23.49

21.54

21.23

20.90

13.54

20.89

21.90

23.47

Temperatura
Maxima (C)

26.43

27.60

27.71

28.58

23.78

21.80

21.49

21.17

13.73

21.17

22.19

23.77

Temperatura Minima
(C)

25.88

27.04

27.12

27.82

23.21

21.27

20.97

20.64

13.35

20.61

21.62

23.17

Humedad Relativa
(%)

62.93

62.87

62.66

57.59

67.39

70.05

68.93

69.21

46.46

69.90

69.14

66.01

Velocidad Media
(Km/dia)

1.06

1.03

1.01

0.89

0.57

0.87

1.24

1.33

0.77

0.90

0.82

0.93

Velocidad Media
(m/seg)

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.01

0.01

0.01

Horas Sol Media


(Horas)

8.30

10.03

11.55

11.55

9.43

7.65

7.72

8.06

6.21

8.79

9.09

8.67

Precipitacin prom.
(mm)

0.05

0.14

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Variable

Fuente: Estacin Metereologica:Mallares

ESTACION: MALLARES-SULLANA
Cuadro N 09.- Evapotranspiracin potencial de los cultivos (Eto)

Latitud: 0451'53'' S
Enero
Feb.
Marzo
Eto
4.11
4.75
5.13
mm/da
127.41
133
159.03
mm/mes
1274
1330
1590
m3/mes/ha
Fuente: Estacin Metereologica:Mallares/cropwat

Abril
4.76
142.8
1428

Longitud: 8043'53''W
Mayo
Junio
Julio
3.54
2.89
2.93
109.74
86.7
90.83
1097
867
908

Agost.
3.28
101.68
1017

Set.
2.52
75.6
756

Altitud : 45 m.s.n.m.
Oct.
Nov.
Dic.
3.86
3.97
3.94
119.66
119.1
122.14
1197
1191
1221

CUADRO N 07.- COEFICIENTE DE RIEGO o Kc DE LOS CULTIVOS SIN PROYECTO

CULTIVO

Area
(Has)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

Banano Orgnico

Principal

31.0 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

Banano
comvencional

Principal

20.0 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

Area cultivada

50.95

Kc. Ponderado

0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

Fuente. FAO

CUADRO N 8.- COEFICIENTE DE RIEGO o Kc DE LOS CULTIVOS CON PROYECTO

CULTIVO
Banano Orgnico

Area
(Has)
Principal

Area cultivada

Kc. Ponderado
Fuente. FAO

ENE FEB MAR ABR MAY JUN

JUL AGO SET OCT NOV DIC

50.95 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70
50.95
0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

CUADRO N 10.- PRECIPITACION EFECTIVA (mm)


ESTACION: MALLARES
Latitud: 0451'53'' S

Longitud:8043'53''W

Altitud : 45 m.s.n.m.

Prec. efec.

Enero

Feb.

Marzo

Abril

Mayo Junio Julio Agost. Set.

mm

0.03

0.06

0.00

0.00

0.00

das
mm/da

31
0.00

28
0.00

31
0.00

30
0.00

31
0.00

0.00
30
0.00

0.00

0.00

31
0.00

31
0.00

Oct.

Nov.

Dic.

0.00 0.00

0.00

0.00

30

31

0.00 0.00

30

31

0.00

0.00

Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov.

Dic.

PRECIPITACION MENSUAL : (mm)

Pe %
ao/mes
2005
2006
2007
2008
Prom.
Max.
Min.

75

Enero Feb.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.14
0.42
0.01
0.04
0.084
0.006
0.14
0.42
0.02
0.00
22.20
1.60
0.03
0.06
0.00
Pe
Pe: factor de precipitacin efectiva 70%.

0.00
0.00
0.00
0.00
0.00
0.00
4.50
0.00

Fuente: Estacin Metereologica:Mallares

0.00
0.00
0.00
0.00
0.00
0.00
0.20
0.00

0.00
0.00
0.00
0.00
0
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0
0.00
0.30
0.00

MUNICIPALIDAD PROVINCIAL DE SULLANA


Asociacin de microproductores de banano organico - margen izquierda del rio chira
CUADRO N 08.-CULTIVOS - CRONOGRAMA MENSUALCON PROYECTO
AREAS (Has)
CULTIVO DE
REFERENCIA

Banano Orgnico

CAMPAA

Principal

Area cultivada 100%

50.00%

Area a atender % (*)

Total
Area
(Has)

ENE

50.95 50.95

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

(*) Debido a que la frecuencia de riego es interdiaria, es que el analisis de rea para el balance se har en funcin al porcentaje de rea que se atender en el dia.
Fuente. Comisn de Regantes Poechos Pelados - AMPBAO

CUADRO N 07.-CULTIVOS - CRONOGRAMA MENSUAL SIN PROYECTO


AREAS (Has)
CULTIVO DE
REFERENCIA
Banano Orgnico
Banano convencional
Arroz

CAMPAA
Principal
Principal
Rotacin

Area Total (ha)

Total
Area
(Has)

30.95
20.00

0.0
50.95

ENE

FEB

31.0
20.0

0.0

31.0
20.0

0.0

50.95

Fuente. Comisn de Regantes Poechos Pelados - AMPBAO

50.95

MAR
31.0
20.0

0.0
50.95

ABR
31.0
20.0

0.0
50.95

MAY
31.0
20.0

0.0
50.95

JUN
31.0
20.0

0.0
50.95

JUL
31.0
20.0

0.0
50.95

AGO
31.0
20.0

0.0
50.95

SET
31.0
20.0

0.0
50.95

OCT
31.0
20.0

0.0
50.95

NOV
31.0
20.0

0.0
50.95

DIC
31.0
20.0

0.0
50.95

CUADRO N10. DEMANDA DE AGUA SIN PROYECTO


PARAMETRO

UNIDAD

1. Evotransp. Potencial

(mm/dia)

2. Kc ponderado

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

TOTAL

4.11

4.75

5.13

4.76

3.54

2.89

2.93

3.28

2.52

3.86

3.97

3.94

0.50

0.70

0.80

1.00

1.10

1.10

1.00

1.00

0.85

0.85

0.80

0.70

3. Evotranp. Real o Uso consuntivo (1*2)

(mm/dia)

2.06

3.33

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

4. Precip. Efect.

(mm/dia)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(mm/dia)

2.05

3.32

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

(%)

0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

(dias)

31.00

28.00

31.00

30.00

31.00

30.00

31.00

31.00

30.00

31.00

30.00

31.00

(mm/dia)

5.87

9.49

11.73

13.60

11.13

9.08

8.37

9.37

6.12

9.37

9.07

7.88

5. Dficit de Humedad

(3-4)

6. Eficiencia de riego
7. N dias del mes
8. Requerimiento de agua (5/6)

9.-Area total
10. Volumen demandado

(m3/ha/dia)

58.69

94.94

117.25

136.00

111.26

90.83

83.71

93.71

61.20

93.74

90.74

78.80

(m3/ha/mes)

1,819.39

2,658.20

3,634.84

4,080.00

3,448.97

2,724.86

2,595.14

2,905.14

1,836.00

2,906.03

2,722.29

2,442.80

has

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

m3/mes

92,698.07

135,435.29

185,195.24 207,876.00

175,725.09

138,831.47

132,222.53

148,017.03

93,544.20 148,062.16

138,700.46

365.00

33,773.66

124,460.66 1,720,768.20

La mayor demanda sin proyecto se observa en el mes de abril


CUADRO N15. DEMANDA DE AGUA CON PROYECTO
PARAMETRO

UNIDAD

1. Evotransp. Potencial

(mm/dia)

2. Kc ponderado

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

TOTAL

4.11

4.75

5.13

4.76

3.54

2.89

2.93

3.28

2.52

3.86

3.97

3.94

0.50

0.70

0.80

1.00

1.10

1.10

1.00

1.00

0.85

0.85

0.80

0.70

3. Evotranp. Real o Uso consuntivo (1*2)

(mm/dia)

2.06

3.33

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

4. Precip. Efect.

(mm/dia)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(mm/dia)

2.05

3.32

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

(%)

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

(dias)

31.00

28.00

31.00

30.00

31.00

30.00

31.00

31.00

30.00

31.00

30.00

31.00

(mm/dia)

2.74

4.43

5.47

6.35

5.19

4.24

3.91

4.37

2.86

4.37

4.23

3.68

5. Dficit de Humedad

(3-4)

6. Eficiencia de riego
7. N dias del mes
8. Requerimiento de agua (5/6)

(m3/ha/dia)

27.39

44.30

54.72

63.47

51.92

42.39

39.07

43.73

28.56

43.75

42.35

36.77

(m3/ha/mes)

849.05

1,240.49

1,696.26

1,904.00

1,609.52

1,271.60

1,211.07

1,355.73

856.80

1,356.15

1,270.40

1,139.97

has

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

10. Volumen demandado

m3/mes

43,259.10

63,203.14

86,424.45

97,008.80

82,005.04

64,788.02

61,703.85

69,074.61

43,653.96

69,095.67

64,726.88

58,081.64

11. Caudal requerido

l/seg

21.53

34.83

43.02

49.90

40.82

33.33

30.72

34.39

22.46

34.40

33.30

28.91

9.-Area total

Fuente. Elaboracin propia

La mayor demanda con proyecto se observa en el mes de abril

365.00

15,761.04
803,025.16

Demanda maxima

63.47 m3/ha/dia

Demanda minima

27.39 m3/ha/dia

Demanda promedio

43.20 m3/ha/dia

CUADRO N15-A. DEMANDA DE AGUA CON PROYECTO


PARAMETRO

UNIDAD

1. Evotransp. Potencial

(mm/dia)

2. Kc ponderado

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

TOTAL

4.11

4.75

5.13

4.76

3.54

2.89

2.93

3.28

2.52

3.86

3.97

3.94

0.50

0.70

0.80

1.00

1.10

1.10

1.00

1.00

0.85

0.85

0.80

0.70

3. Evotranp. Real o Uso consuntivo (1*2)

(mm/dia)

2.06

3.33

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

4. Precip. Efect.

(mm/dia)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(mm/dia)

2.05

3.32

4.10

4.76

3.89

3.18

2.93

3.28

2.14

3.28

3.18

2.76

(%)

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

0.75

(dias)

31.00

28.00

31.00

30.00

31.00

30.00

31.00

31.00

30.00

31.00

30.00

31.00

(mm/dia)

2.74

4.43

5.47

6.35

5.19

4.24

3.91

4.37

2.86

4.37

4.23

3.68

5. Dficit de Humedad

(3-4)

6. Eficiencia de riego
7. N dias del mes
8. Requerimiento de agua (5/6)

(m3/ha/dia)

27.39

44.30

54.72

63.47

51.92

42.39

39.07

43.73

28.56

43.75

42.35

36.77

(m3/ha/mes)

849.05

1,240.49

1,696.26

1,904.00

1,609.52

1,271.60

1,211.07

1,355.73

856.80

1,356.15

1,270.40

1,139.97

has

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

25.48

10. Volumen demandado atender segn % (*)

m3/mes

21,629.55

31,601.57

43,212.22

48,504.40

41,002.52

32,394.01

30,851.92

34,537.31

21,826.98

34,547.84

32,363.44

29,040.82

11. Caudal requerido (*)

l/seg

10.77

17.42

21.51

24.95

20.41

16.66

15.36

17.19

11.23

17.20

16.65

14.46

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

9.-Area atendida diaria (*)

12.-Area total a atender del Proy.

365.00

15,761.04
401,512.58

(*) Debido a que la frecuencia de riego es interdiaria, es que el analisis de rea para el balance se har en funcin al porcentaje de rea que se atender en el dia.
Fuente. Elaboracin propia

Demanda maxima

63.47 m3/ha/dia

Demanda minima

27.39 m3/ha/dia

Demanda promedio

43.20 m3/ha/dia

CUADRO N 16: OFERTA DE AGUA DE GRAVEDAD CON Y SIN PROYECTO


AGUA DE GRAVEDAD/C.D Daniel Escobar/L1 Toma 29+080
Caudal
Nmero de riego por mes

UNID

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

lts/seg

150.0

150.0

150.0

150.0

150.0

150.0

150.0

150.0

150.0

150.0

150.0

150.0
1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Tiempo o duracin por riego.

horas/ha

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Volumen promedio

(m3/ha/mes)

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

2,160.0

Nmero de das del mes,

das

31.0

28.0

31.0

30.0

31.0

30.0

31.0

30.0

31.0

30.0

31.0

30.00

Volumen promedio

(m3/ha/da)

69.7

77.1

69.7

72.0

69.7

72.0

69.7

72.0

69.7

72.0

69.7

72.0

Has

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

Volumen Ofertado

m3/mes

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

Volumen Total Ofertado


Gravedad Con y Sin proyecto

m3/mes

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

110,052.0

Area proyecto

Fuente. Comisn de Regantes Poechos Pelados - ATDRCH

CUADRO N 16: OFERTA DE AGUA DE GRAVEDAD CON PROYECTO


AGUA DE GRAVEDAD/C.D Daniel Escobar/L1 Toma 29+080
Caudal
Nmero de riego por mes

UNID

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

lts/seg

40.0

50.0

60.0

70.0

60.0

50.0

50.0

50.0

50.0

50.0

50.0

50.0
1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Tiempo o duracin por riego.

horas/ha

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Volumen promedio

(m3/ha/mes)

576.0

720.0

864.0

1,008.0

864.0

720.0

720.0

720.0

720.0

720.0

720.0

720.0

Nmero de das del mes,

das

31.0

28.0

31.0

30.0

31.0

30.0

31.0

30.0

31.0

30.0

31.0

30.00

Volumen promedio

(m3/ha/da)

18.6

25.7

27.9

33.6

27.9

24.0

23.2

24.0

23.2

24.0

23.2

24.0

Has

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

50.95

Volumen Ofertado

m3/mes

29,347.2

36,684.0

44,020.8

51,357.6

44,020.8

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

Volumen Total Ofertado


Gravedad Con y Sin proyecto

m3/mes

29,347.2

36,684.0

44,020.8

51,357.6

44,020.8

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

36,684.0

Area proyecto

Fuente. Comisn de Regantes Poechos Pelados - ATDRCH

CUADRO N 13- BALANCE DE AGUA - SIN PROYECTO


PARAMETRO

UNIDAD

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

Demanda

(m3/mes)

92,698.07

135,435.29

185,195.24

207,876.00

175,725.09

138,831.47

132,222.53

148,017.03

93,544.20

148,062.16

138,700.46

124,460.66

OFERTA

(m3/mes)

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

110,052.00

Balance

(m3/dia)

17,353.93

-25,383.29

-75,143.24

-97,824.00

-65,673.09

-28,779.47

-22,170.53

-37,965.03

16,507.80

-38,010.16

-28,648.46

-14,408.66

Fuente. ATDR Chira. Elaboracin propia.

Figuras N 06

V o lu m e n d e a g u a (m 3 /m e s )

La oferta de agua solo es de gravedad.

250,000.00

200,000.00

150,000.00

100,000.00

50,000.00

0.00
ENE

eEn el mes de marzo y abril se tiene un deficit de agua

FEB

MAR

Oferta

ABR

MAY

JUN

JUL

AGO
SET
Dem anda

OCT

NOV

DIC

CUADRO N14 BALANCE DE AGUA - CON PROYECTO


PARAMETRO
Demanda
Oferta

UNIDAD
(m3/mes)
(m3/mes)

ENE
43,259.10
110,052.00

FEB
63,203.14
110,052.00

MAR
86,424.45
110,052.00

ABR
97,008.80
110,052.00

MAY
82,005.04
110,052.00

Balance

(m3/mes)

66,792.90

46,848.86

23,627.55

13,043.20

28,046.96

La oferta de agua solo es de gravedad.

JUN
64,788.02
110,052.00

JUL
61,703.85
110,052.00

AGO
69,074.61
110,052.00

SET
43,653.96
110,052.00

OCT
69,095.67
110,052.00

NOV
64,726.88
110,052.00

DIC
58,081.64
110,052.00

45,263.98

48,348.15

40,977.39

66,398.04

40,956.33

45,325.12

51,970.36

Debido al ahorro de agua se tiene un superavir

Fuente. ATDR Chira. Elaboracin propia.

V o lu m e n d e a g u a (m 3 /m e s )

Figuras N 07

120,000.00
100,000.00
80,000.00
60,000.00
40,000.00
20,000.00
0.00
ENE

Oferta

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

Demanda

CON PROYECTO, HEMOS INCREMENTADO LA EFICIENCIA DE APLICACIN, SOBRA AGUA TODO EL AO, PARA EFECTOS DE COMPARACION.
POR OTRO LADO, SE APRECIA QUE LA LLUVIA CUBRE COMPLETAMENTE LA DEMANDA EN LOS MESES DE ENERO A MARZO...LO CUAL SE CONFIRMA EN LA REALIDAD. OSEA, ESTAMOS BIEN.

CUADRO N14-A BALANCE DE AGUA - CON PROYECTO


PARAMETRO
Demanda
Oferta

UNIDAD
(m3/mes)
(m3/mes)

ENE
21,629.55
29,347.20

FEB
31,601.57
36,684.00

MAR
43,212.22
44,020.80

ABR
48,504.40
51,357.60

MAY
41,002.52
44,020.80

Balance

(m3/mes)

7,717.65

5,082.43

808.58

2,853.20

3,018.28

La oferta de agua solo es de gravedad.


Fuente. ATDR Chira. Elaboracin propia.

JUN
32,394.01
36,684.00

JUL
30,851.92
36,684.00

AGO
34,537.31
36,684.00

SET
21,826.98
36,684.00

OCT
34,547.84
36,684.00

NOV
32,363.44
36,684.00

DIC
29,040.82
36,684.00

4,289.99

5,832.08

2,146.69

14,857.02

2,136.16

4,320.56

7,643.18

Debido al ahorro de agua se tiene un superavir

DISEO DEL RESERVORIO REVESTIDO CON GEOMEMBRANA


CONSTRUCCION RESERVORIO AMPBAO - MONTENEGRO

RESERVORIO-PLANTA

1.- DATOS:
1

1%
0.50 m

Longitud del Anclaje Subterraneo


Tiempo de embalse

0.50 m
24.00 h

2.- DIMENSIONAMIENTO Y CAL. HIDRAULICOS


21600 m3
Volumen neto de diseo
Largo del Fondo (L)
Ancho del Fondo (A)

400.00 m

FONDO

0.5

400.00 m
200.00 m

200.00

2.00 m
Salida .

###

Area del Fondo ( b )


Area del Espejo de agua ( B )

80000.00 m2
82416.00 m2

Altura menor del agua ( h' )


Reduc.Volumen x pendiente (Vp)
Volumen Neto calculado

0.00 m
82037.60 m3
80372.41 m3

Volumen Total (con borde libre)


Tiempo de embalse (en h y min)

105151.62 m3 = (Tronco de pirmide) - Vp


9 h 0min

Tiempo mnimo de descarga


Caudal mximo de descarga

BORDE LIBRE

Pendiente transversal a L del fondo


Ancho del borde de anclaje

ESPEJO DE AGUA

250 l/s
12 Pulg

h=0.00

204.00 m

0.30 m

Caudal de entrada (Qe)


tubera de descarga

404.60 m
404.00 m
204.60 m

Borde Libre (bl)

0.5

Ingreso

0.5

204.00 m

2.00 m

200.00 m

Altura mayor del agua( h )

0.5

ZONA DE ANCLAJE

Talud (Z)

1%

PROYECTO :

(a reservorio lleno, debido al pendiente)


= Vol. Tronco de pirmide / 2
= h * ( B + b + B*b ) / 3 - Vp

Agua
Fondo

###

7 h 22min
297.09 l/s

3.- AREA DE GEOMEMBRANA


Longitud de Talud

3.25 m

Area de Taludes
Area de Anclajes

3933.15 m2
1221.40 m2

Area neta geomembrana

85154.55 m2
Autor: W. Rios E.

CALCULO DEL VOLUMEN REQUERIDO PARA ATENDER LA DEMANDA DE AGUA DEL PROYECTO
PARAMETRO

Tiempo de riego/dia (hrs)


N dias / mes
Tiempo de riego/mes (hrs)
Volumen demandado para el proyecto/mes (m3)

Caudal de descarga mensual con RTG (l/s)


N veces que requiere ser llenado
Frec. Riego/mes
Volumen demandado llenado en momentos (m3)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

18
18
18
18
18
31
28
30
31
30
558
504
540
558
540
43,259.10 63,203.14 86,424.45 97,008.80 82,005.04
21.53
34.83
44.46
48.29
42.18

18
18
31
30
558
540
64,788.02 61,703.85
32.25
31.74

18
18
31
30
558
540
69,074.61 43,653.96
34.39
22.46

18
31
558
69,095.67
34.40

18
18
30
31
540
558
64,726.88 58,081.64
33.30
28.91

3
5
6
7
7
10.3
5.6
5.0
4.4
4.3
14,419.70 12,640.63 14,404.07 13,858.40 11,715.01

5
5
6.2
6.0
12,957.60 12,340.77

5
3
6.2
10.0
13,814.92 14,551.32

5
6.2
13,819.13

5
5
6.0
6.2
12,945.38 11,616.33

Caudal de descarga mensual con RTG (l/s)

Tiempo de riego/dia (hrs)


Volumen demandado ha/dia (m3)
rea del proyecto (has)
Volumen demandado para el proyecto/dia (m3)

Caudal de descarga diario con RTG (l/s)

24
27.39
50.95
1,395.45
16.15

24
44.30
50.95
2,257.25
26.13

24
54.72
50.95
2,787.89
32.27

24
63.47
50.95
3,233.63
37.43

24
51.92
50.95
2,645.32
30.62

24
42.39
50.95
2,159.60
25.00

24
39.07
50.95
1,990.45
23.04

24
43.73
50.95
2,228.21
25.79

24
28.56
50.95
1,455.13
16.84

24
43.75
50.95
2,228.89
25.80

24
42.35
50.95
2,157.56
24.97

Fuente. Elaboracin propia

V=Q*T*3.6
T=V/Q*3.6
Q=V/T*3.6

Volumen mximo llenado en un


solo momento
Demanda maxima
97,008.80
Demanda minima
43,259.10
Demanda promedio
66,918.76
Volumen mximo llenado en 03
momentos
Demanda maxima
14,551.32
Demanda minima
11,616.33
Demanda promedio
13,256.94

24
36.77
50.95
1,873.60
21.69