You are on page 1of 3

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Galvanic Cathodic Protection

APPROVED DATE

WBS/BI/JO/NO.

ITEM
NO.

PROJECT PHASE

1.0

DOCUMENT REVIEW

31-Aug-11

SATIP-X-400-01

PROJECT TITLE:

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

Electrical

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

Not Applicable
2.0

RECEIVING
INSPECTION

2.1

Storage, Handling, and Preservation


Visual Inspection

SAIC-P-3002 SAIC-P-3002

Weekly Inspection by Contractor QC

2.2

Material Receiving
Exothermic Welding Tools & Materials
Visual Inspection

SAIC-X-3001 SAIC-X-3001

SA PID shall be notified on initial receipt of each listed


accessory (by type and/or manufacturer).

2.3

CP Accessories
Material Receiving
Visual Inspection

SAIC-X-3002 SAIC-X-3002

See GENERAL NOTES.


SA PID shall be notified on initial receipt of each listed
accessory (by type and/or manufacturer).

2.4

Material Receiving
Galvanic Anodes for CP
Visual Inspection

SAIC-X-3101 SAIC-X-3101

SA PID shall be notified on initial receipt of each anode


type (by material and/or manufacturer).

2.5

Material Receiving
CP Test Stations / Junction Boxes
Visual Inspection

SAIC-X-3102 SAIC-X-3102

SA PID shall be notified on initial receipt of each listed


accessory (by type and/or manufacturer).

3.1

Galvanic CP Anode Installation


Visual Inspection

SAIC-X-3103 SAIC-X-3103

Notify SA on start of installation for each anode.

3.2

Below Grade Exothermic Welding


(Prior to taping, coating, and backfilling)
Visual Inspection

SAIC-X-3003 SAIC-X-3003

Notify SA on start of installation for each anode.

3.0

INSTALLATION

Page 1 of 3
2/14/2012 3:17 PM

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Galvanic Cathodic Protection

PROJECT PHASE

1.0
3.3

DOCUMENT REVIEW

WBS/BI/JO/NO.

TASK / ACTIVITY

CP Test Station Installation

QUALITY
PROCEDURE

QUALITY
RECORD

See
Remarks

REMARKS

CNTRCTR

SAUDI
ARAMCO

SA PID shall be notified on start of this activity for each


process system, and plant area.

SATIP-P-104-05 A/G Conduit


SATIP-P-104-07 B/G Conduit

3.4

Raceway Installation
Visual Inspection

3.5

Below Grade CP Cable


Pulling, Taping & Coating Installation
Visual Inspection

SAIC-X-3105 SAIC-X-3105

See SATIP-P-104-01 LV Cable


Hold points prior to backfilling of cable and safety warning
markers. SA PID shall be notified on start of this activity
for each process system, and plant area.

3.6

Above Grade CP Cable Pulling,


Cable Dressing, Cable Identification
and Termination
Visual Inspection

SAIC-X-3105 SAIC-X-3105

See SATIP-P-104-01 LV Cable


SA PID shall be notified on start of this activity for each
process system and plant area.

4.1

Galvanic CP Anode Precommissioning


Visual Inspection

SAIC-X-3103 SAIC-X-3103

Notify SA on start of installation for each anode.

4.2

CP Test Station Installation

SAIC-X-3104 SAIC-X-3104

SA PID shall be notified on start of this activity for each


process system, and plant area.

4.3

Galvanic CP Circuit
Potential Testing

SATR-X-3101

SATR-X3101

SA PID shall be notified on start of this activity for each


process system and plant area.

4.4

Galvanic CP Circuit
Quality Document Review

See
Remarks

EIL

RH

RH

Review all associated Quality Records

4.5

Galvanic CP Circuit
Final Visual Inspection

FEIL

PMCC
MCC

4.0

See
Remarks

Electrical

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS

SAIC-X-3104 SAIC-X-3104

DISCIPLINE:

31-Aug-11

SATIP-X-400-01

PROJECT TITLE:

ITEM
NO.

APPROVED DATE

PRE-COMMISSIONING

Page 2 of 3
2/14/2012 3:17 PM

Review FEIL and all associated Quality Records.


Hold point for certification of mechanical completion of
each galvanic circuit. [After backfilling and final grading
of terrain.]

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Galvanic Cathodic Protection

APPROVED DATE

WBS/BI/JO/NO.

ITEM
NO.

PROJECT PHASE

1.0

DOCUMENT REVIEW

31-Aug-11

SATIP-X-400-01

PROJECT TITLE:

TASK / ACTIVITY

QUALITY
PROCEDURE

Electrical

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS

QUALITY
RECORD

DISCIPLINE:

CNTRCTR

REMARKS

SAUDI
ARAMCO

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness:

QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
representative is not present.

Hold:

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
in attendance.

Accessories include test stations, junction boxes, conductors, split bolts, mechanical fasteners, rubber tape, vinyl tape, crimp connectors, crimp tools, exothermic (thermite) welding materials,
exothermic welding molds & tools, conductive lubricating grease, and coatings (epoxy, aluminum alkyd, zinc chromate, and bituminous coatings, ID tags, and warning tape.

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Hold Point for QC Inspection/ Test

Witness Inspection/Test

Surveillance

LEGEND
R
RH
I

Review of Documents
Review and Approval of Documents
100% Contractor Inspection

Page 3 of 3
2/14/2012 3:17 PM

You might also like