Item

Nr
1
1
1.1

Description

Unit

General
Mobilization & Demobilization
Mobilization of Contractor's resources to the work and Demobilization at the end of completion of the works

sum

ST 1- Sub toatal of General Items


2
2.1

Supply of Pipe line material


Supply of HDPE materials-All Polyethylene material shall be PE 100 ,PN 10 SDR
17 ( unless otherwise stated ) suitable for butt fusion jointing and the rate shall include for supply and delivery to the
work site of all pipes, fittings & specials including all other associated accessories such as gaskets, backing rings (to
suite PN 16flange), bolts and nuts, etc. required for complete installation.
HDPE Pipes
OD 160 ,PN 10,SDR 17 pipes ( for eastern side) OD 110 ,PN 10,SDR 17 pipes ( for eastern side) OD 110 ,PN 10,SDR
17 pipes ( for western side) OD 63 ,PN 10,SDR 17 pipes (for eastern side)
HDPE Stub flanges

OD 160 stub flange complete with DN 150 backing ring, nuts and bolts

2.1.1
2.1.2
HDPE Bends

2.1.3
2.1.4

OD 110mm ,90
OD 63mm ,90

2.1.5

HDPE Tees for Junctions


160x160 tee

Nr
Nr
Nr

160x110 tee
2.1.6
2.1.7

Nr
2.1.8
Item
2.1.9
Nr
2.1.10
2.1.11
2.1.12
2.1.13
2.1.14
2.2

Nr
Description

110x110 tee
110x63 tee
HDPE Reducers
160x110
End Caps
110mm
63mm
Supply of DI materials- Supply and delivery at site all DI pipes, fittings, specials & valves including rubber rings,
lubricant, gaskets, bolts and nuts, denso or equivalent Double flange DI gate Valves
DN 150 sluice valve for junctions
DI tapping saddles for air valves

2.1.1

To suit200 HDPE pipe with 25mm treaded To suit 160 HDPE pipe with 25mm treaded To suit 110 HDPE pipe with
25mm treaded PPR/DI tapping saddles for branches
160x 63 tapping saddle with suitable adapter to connect 63mm HDPE pipe

2.1.2

Flange Adapters suite HDPEs

2.1.3

DN 150 for suite 160 HDPE

2.1.4

Lockable Surface boxes


150x 150 for valve installation

2.1.1

To suit200 HDPE pipe with 25mm treaded To suit 160 HDPE pipe with 25mm treaded To suit 110 HDPE pipe with
25mm treaded PPR/DI tapping saddles for branches
160x 63 tapping saddle with suitable adapter to connect 63mm HDPE pipe

2.1.2

Flange Adapters suite HDPEs

2.1.3

DN 150 for suite 160 HDPE

2.1.4

Lockable Surface boxes


150x 150 for valve installation

2.1.5
2.1.6
2.1.7
ST 2- sub Total of supply items
3

Supply of machinary for pipe welding

Both welding machine and the generator shall be used during installation and should be handed over to UWA at the completion.
3.1 Supply of HDPE butt fusion welding machine to weld pipes diameter ranging from 63 mm (2') to 160mm (6").

Item

Description

Nr
3.2 Industrial type gasoline generator (minimum 3 kw)in order to operate the HPPE
welding machine above .
ST 3- sub Total of supply machinary for pipe welding
4

Construction & Installations

4.1
4.1.1

Earth Works & Pipe Laying - Earth work rate shall include for back filling, shoring, Excavation for pipe trenches for
160mm pipes in any material other than rock with a maximum depth not exceeding 1.1m.
Ditto, for depth of excavation exceeding 1.1m

4.1.2
4.1.3
4.1.4
4.1.5
4.1.6

Excavation for pipe trenches for 110mm pipes in any material other than rock with a maximum depth not exceeding
1.0m.
Ditto, for depth of excavation exceeding 1.0m
Excavation for pipe trenches for 63mm pipes in any material other than rock with a maximum depth not exceeding
0.75m.
Extra over for item Nrs. From 4.1.1 to 4.1.5 for excavation in rock (Provisional
Quantity)
Selected material for back filling & compaction of pipe trench as directed by the
Engineer (Provisional Quantity).
Laying and Jointing or Fixing in Open Trench OD 160mm HDPE pipes with Butt
Fusion Welded Joints - in all depth with Type "A" bedding as depicted in drawings

4.1.7
4.1.8
4.1.9
4.1.10
4.1.11
4.1.12
4.1.13
4.2
4.2.1

Ditto, for 110 HDPE pipes


Ditto, for 63 HDPE pipes
Extraover to 4.1.8,4.1.9 & 4.1.10 with provision of Type" B"bedding where required
(Provisional Quantity).
Ditto, for Type "C" Bedding (Provisional Quantity). Ditto, for Type "D" Bedding (Provisional Quantity). Installation of
HDPE Fittings
Installation of HDPE stub flanges, The rate shall include for additional ,butt fusion
Installation of OD 160 stub flange complete with backing ring, nuts and bolts in
Installation of HDPE bends, The rate shall include for additional ,butt fusion

Installation of OD 160 stub flange complete with backing ring, nuts and bolts in
4.1.12

Installation of HDPE bends, The rate shall include for additional ,butt fusion

4.1.13
4.2
Item
4.2.1
Nr
4.2.2

Description

OD 315mm ,45

4.2.3

OD 250mm ,45

4.2.4

OD 160mm ,90

4.2.5

OD 160mm ,45

4.2.6
4.2.7

OD 110mm ,90
OD 110mm ,45
Installation of HDPE Tees, The rate shall include for additional ,butt fusion welding, excavation, shoring,
dewatering, etc. necessary for the complete installation. HDPE Tees in Junctions
160x160 tee

4.2.8

160x110 tee

4.2.9

110x110 tee

4.2.10

Installation of HDPE Reducers, The rate shall include for additional ,butt fusion welding, excavation, shoring,
dewatering, etc. necessary for the complete installation.

4.2.11
4.2.12
4.2.13
4.3
4.3.1
4.3.2
4.4
4.4.1

160x110
Installation of end caps
63mm
110mm
Installation of Valves
Installation of DN 150Sluice Valve in HDPE pipe junctions including flange adapters Installation of 25 mm dia sigle
orifice air valve with isolation cock including tapping Connecting to exsting pipe lines
Installation of tapping saddle in existing 160 HDPE line to make 63mm barnch including exposing the pipe.
Extraover to the installation of Valves,Falnge adaptors ,and HDPE fittings ,expose the existing pipe line and cut the
required length and making connction at J22A & J22 tank premises.
Extraover to the installation of Valves,Falnge adaptors ,and HDPE fittings ,expose

4.4.2
Item
4.4.3Nr
4.4.4
4.4.5

Description

Chamber construction and concrete works


Construction of air valve chamber with brick work as depicted in drawings for single orifice air valves . Rate shall be
included supply and installation of galvanized chequerd plate cover with locking arrangement.
installation of 150 surface box with Grade 25 concrete for sluice valves as depicted in the drawing. Rate shall include
for supplying and fixing 150mm heave duty GS protective pipe and concrete for the valve support.

4.4.6
ST4 -sub total of installations

Testing & Commissioning hand-over

5.1.1

Hydraulic pressure testing and disinfection of OD 160mm dia. PE pipeline. The rate shall include for supply of water
and provision of necessary equipment to complete the hydraulic pressure testing in the presence of state Water
Corporation representative & the preparation of hydraulic pressure testing report
Ditto, for 110 HDPE pipes

5.1.2
Ditto, for 63 HDPE pipes
5.1.3
ST5-sub total ofTesting & Commissioning hand-over
A
B
C

Total cost (Total of ST1,ST2,ST3,ST4 & ST5)


Contingency (5%) (Ax5%)
Grand Total (A+B)

Please insert the currency


Unit

Quantity

sum

Unit Rate

Amount

(currency)

(currency)

520

1300

300

2200

m
Nr

Nr
Nr

3
2

Nr

Nr

Unit

Quantity

Unit Rate

Amount

(currency)

(currency)

Nr

Nr

Nr

Nr
Nr

1
12

Nr

Nr

Nr

Nr

10

Nr

Nr

Nr

Nr

Unit

Quantity

Nr

Unit Rate

Amount

(currency)

(currency)
-

500

20

1500

100

2200

m3

10

m3

100

520

m
m
m

1600
2200
20

20

20

Nr
Unit

2
Quantity

Unit Rate

Amount

(currency)

(currency)

Nr

Nr

Nr

Nr

Nr
Nr

16
6

Nr

Nr

Nr

Nr

Nr
Nr

12
1

Nr

Nr

10

Nr

sum

sum

Unit

Quantity

Unit Rate

Amount

(currency)

(currency)

Nr

Nr

520

1600

2200