(ECC)
A risk is a negative event that may occur during an activity that hinders its continuation.
Any project undertaken will have several risks involved. Projects to the level of innovative
design will have risks from the personal level to the planning level to the implementation level.
There are many tools one can use to organize and mitigate these risks before they become an
issue.
Salta Engineering decided to use the USAA Risk Card format to help label the potential
risks that are possible in their project. This system provides a way for one to quickly decipher
what the risks are, the level of impact and probability they have, and how the team plans to
mitigate the risk. This system is of a high value to help one both see and solve the risk to the
highest degree possible.
The risks are summarized within a Risk Evaluation Matrix (Fig 1). The summery is of
the probability and impact of the various risks. With this matrix you can quickly see the overall
riskiness of the project as well as quickly know which specific risks need the most attention.
Project ECC may have a high number of risks but none of them are both high probability and
impact so as long as care is taken at all steps there should be little to no effect by them.
The risks are also listed and prioritized within a Risk Prioritization Matrix (Table 1).
This matrix shows the risks that will receive the highest attention from the team if it comes to
pass. It compares each risk to all others to gauge which one takes more precedence. Project
ECCs highest risk is a structural failure of the test model. If that is to collapse after all
components have been added, then it is possible that all the sensors, motor, and electronics
would break in the process as well. Therefore Salta must be vigilant in safety and care when it
pertains to this unit.
High
1,5
Probability
9,10
6,11
7,12
2,8
Low
Low
Impact
High
Fig 1. Risk Evaluation Matrix
Total
Risk
12
Comparison
11
10
10
11
Increase of scope
Sensor failure
Faulty Motor
Fault in Circuitry
10
10
10
10
10
10
10
10
10
10
11
10
Structural failure
11
11
11
11
11
11
11
11
11
11
12
10
11
12
12
12
12
12
12
12
12
12
12
12
Risk # ___1_____
Identify
Description
Risk Category
WBS #
_All_____
Evaluate
High
Probability
Low
Low
Impact
High
Response
Eliminate ______ Reduce Likelihood ______ Reduce Impact __X____
Accept ______ Transfer ______
Resources Needed ___Medication_______________________
Impact Horizon
Phase(s) __All___________ Expected Date __Spring 2012______
Assigned Risk Person___Alec_________________________
Notes: Safety precautions will be taken while building test
model.
Risk # ____2____
Identify
Description
Risk Category
WBS #
__All___
Evaluate
High
Probability
Low
Response
X
Low
Impact
High
Risk # ____3____
Identify
Description
Risk Category
WBS #
__2.0____
Evaluate
High
Probability
Low
Response
X
Low
Impact
High
Risk # _____4___
Identify
__3.0___
Description
Risk Category
WBS #
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # ___5_____
Identify
Description
Risk Category
WBS #
__6.0____
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # ___6_____
Identify
Description
Risk Category
Advisor or sponsor
increases the overall
scope.
WBS #
__2.0,3.0_
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # _____7___
Identify
Description
Risk Category
WBS #
_3.0____
Evaluate
High
Probability
Low
Response
X
Low
Impact
High
Risk # ____8____
Identify
Description
Risk Category
WBS #
__3.0___
Evaluate
High
Probability
Low
Response
X
Low
Impact
High
Risk # ___9_____
Identify
Description
Risk Category
WBS #
__3.0____
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # ____10____
Identify
Description
Risk Category
WBS #
__All____
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # ____11____
Identify
Description
Risk Category
WBS #
__3.0____
Evaluate
High
Probability
Low
Response
Low
Impact
High
Risk # ___12_____
Identify
Description
Risk Category
WBS #
__5.0,6.0___
Evaluate
High
Probability
Low
Response
X
Low
Impact
High