CONTRACT NO :
HT 003 SS 11
MSS/15/407
DATE: 16/05/2015
PROJECT : INSTALLATION OF INTERCONNECTING WALKWAY WITH STAIRS BETWEEN INLET SEPERATORS V-0701 A/B/C AT FDP-1
Sl No.
1
Activity Description
Drawings.
1.2
1.3
2.1
3
Acceptence Criteria
Extent of Insp.
Responsibility
SAES-A-202
Review
INSTALLATION PROCEDURE
AL-JALHAMI
INSPECTION
Ref Doc
Verify Doc
Jalhami
KJO/OIS
Engineering Manager
Project Specification
Drawings
Review
QA/QC Engineer
Project Specification
Drawings
ASME Sec- IX
Review
QA/QC Engineer
Project Specification
Drawings
SAES-A-202 Approved
Drawings & 12-SAMSS-007
100%
QCI
Project Specification
Documents Approval
1.1
TITLE:
Materials
3.1
100%
QCI
Project Specification
Drawings
3.2
100%
QCI
Project Specification
Drawings
3.3
100%
QCI
Project Specification
Drawings
100%
QCI
Project Specification
Drawings
4.1
4.4
100%
QCI
Project Specification
Drawings
4.3
100%
QCI
Project Specification
Drawings
4.5
100%
QCI
Project Specification
Drawings
Galvanization
AL JALHAMI
Page 1 of 2
HT 003 SS 11
MSS/15/407
DATE: 16/05/2015
PROJECT : INSTALLATION OF INTERCONNECTING WALKWAY WITH STAIRS BETWEEN INLET SEPERATORS V-0701 A/B/C AT FDP-1
Sl No.
5.1
6
Activity Description
Inspection of galvanized structures.
TITLE:
Acceptence Criteria
Extent of Insp.
Responsibility
100%
INSTALLATION PROCEDURE
AL-JALHAMI
INSPECTION
Ref Doc
Verify Doc
Jalhami
KJO/OIS
QCI
Project Specification
Drawings
Civil Foundations
5.1
100%
QCI
Project Specification
Drawings
5.2
100%
QCI
Project Specification
Drawings
5.3
100%
QCI
Project Specification
Drawings
100%
QCI
Project Specification
Drawings
SAES-A-202 Approved
Drawings & 12-SAMSS-007
100%
QCI
Project Specification
Drawings
7.3
Erection
LEGENDS:
AL JALHAMI
Page 2 of 2