TABLE OF CONTENTS
Acknowledgement
Executive Summary
2. Introduction
2.1
General
2.2
Energy Sources
2.3
Electricity Supply
2.4
2.5
2.6
10
3.1
10
3.2
11
3.3
11
11
12
3.3.3
12
15
15
15
15
4.4 Canteen
16
16
2
16
17
17
17
44
70
71
71
72
6.1Existing scenario
72
73
73
74
74
75
75
7.2 Miscellaneous
77
77
7.2.2Replacement policies
77
77
77
. Appendices
List of instruments
List of vendors
Acknowledgements
:
Dated:
Description
Potential
Electrical Savings
in units/annum
Potential
Savings in
Rs/yr
Cost of implementation
Simple payback
period in years
2052
12312
17480
1.41
1125
6750
6900
1.02
2784
16704
13760
0.82
7524
45144
56740
1.26
2226
13356
9800
0.73
546
3276
9800
2.99
1155
6930
24500
3.53
576
3456
4800
1.38
5184
31104
48000
1.54
10
11
12
26130
5592
8640
156780
33552
51840
84000
100000
Nil
0.54
3
240000
14,40,000
27,00,000
1.8
13
TOTAL
303534
1821204
3075780
1.69
Remarks - All the above recommendation have been made in isolation. When all these
are implemented, then, there will be slightly lesser total saving as many of the
recommendations are inter-related/dependent on each other.
5
2. Introduction
2.1 General
Rashtrapati Bhavan is one one of the six prestigious buildings selected by Ministry of Power for implementation of energy
efficiency measures under performance contracting.It is a prestigious monument covered under Indian heritage preservation
programme.Its contract demand as per the bill is 671 KVA ,which is supplied by NDMC(New Delhi Municipal Corporation).The average
total monthly consumption of Rashtrapati Bhavan based on typical monthly bill is about 5 lacs units.,
The block housing the cabinet secretariat office is excluded from the President house administration ,but its electrical
maintenance is being looked by the CPWD deptt. of Rashtrapati Bhavan.
Earlier a DPR was prepared for energy savings in the Rashtrapati Bhavan ,excluding this cabinet secretariat block. The
recommendations of the DPR are under process for implementation. As such it was felt necessary to carry out the energy audit of the
block also so that the energy efficiency could be improved simultaneously in totality.
The block is occupied by about 200 employees, which mainly include cabinet secretary, JS, DS, US & their supporting staff.
The details of various floors & particular of occupancy are as under:
SL.
No.
Floor
Basement
Ground
First
Second
secretaries,
Secretary & Addl. Secretary with staff,
Committee room & Sub station
Joint Secretaries & staff
a. Pre-Audit Phase:
This was done on 25th May 2010 in which the audit schedule was planned and brief discussions were held with senior
management officials and officers at working level. A walk through audit was also conducted. The main purpose of this audit
phase was to get familiarized with office
activities, get first hand information and assess the current level operation and
practices.
b. Audit Phase:
In this phase, field studies were made using audit instruments wherein primary data were collected, various load surveys were
carried out and detailed trials were conducted. This phase was carried out from 25 th to 31st May 2010. After completing field
activities, data were analyzed, Energy Conservations Opportunities (ENCON) was identified, cost benefit analysis was done and
this Detailed Project Report (DPR) has been prepared.
3.3
10
= 73 x 9 x 22
= 14,454 units
= 28 x 9 x 22
= 5,544 units
4Canteen
= 40 x 9 x 22
= 7,920 units
= 55 X 9 X 22
= 10,890 units
6Lifts (Avg.)
= 25 x 9 x 22
= 4950 units
= 1+2+3+4+5+6
= 63,558 x 0.9 UF
= 57,202 units
The main substation people have started recording secretariat readings by installing separate energy meters. But the
meters were not available on canteen and lifts. The last three months readings are as follows:
1. Basement + G. Floor
= 21,513 units
= 25,907 units
= 15,672 units
4. Canteen
= 53,133 units
6. Lifts (Avg.)
March
April
May 2010
Basement + G. Floor
F.F. + S. Floor
Bathroom Panel
Canteen
First Floor AC
Lifts
10113
7153
1840
7920
9321
4950
6664
9158
5321
7920
19385
4950
4557
9012
8087
7920
22824
4950
53,398
57,350
Total
41,297
12
13
harmonics in current (THDi) was in the range of 6.3 8.9% and in voltage it was 1.8 2.4% and they are within the limit. The details of
recording are enclosed.
4.2 First Floor & Second Floor:
The voltage level was quite on higher side i.e. 430 V and subsequent single Phase voltage was 248 V.Current was varying in the
range of 80- 92 A in R- Phase, 87-89 A in Y- Phase and 126- 138 A in B phase. Phase to Phase current unbalancing was quite on higher
side i.e. around 30%. Total load in KW was varying in the range of 68 73 Kw. Power factor was maintained around 0.93. The harmonics
in current (THDi) was in the range of 13 17% and in voltage it was 1.5 1.9% current harmonics were on higher side and requires
filtration. The details of recording are enclosed.
4.3 Bath Room Panel:
The voltage level was quite on higher side i.e. 435 V and subsequent single Phase voltage was 251 V. current was varying in
the range of 41.5 A in R- Phase, 26 A in Y- Phase and 63 A in B phase. Phase to Phase current unbalancing was quite on higher side
i.e. around 45%. Total load in KW was around 27.5 Kw. Power factor was maintained around 0.78 in R-Phase, 0.88 in Y-Phase and
0.86 in B- Phase. The harmonics in current (THDi) was in the range of 7.2 12% and in voltage it was 2.1 2.4% current harmonics
were on higher side and requires filtration. The details of recording are enclosed.
4.4 Canteen:
The voltage level was quite on higher side i.e. 435 V and subsequent single Phase voltage was 251 V. Current was varying in the
range of 56- 80 A in R- Phase, 41-58 A in Y- Phase and 34- 55 A in B phase. Phase to Phase current unbalancing was quite on higher side
i.e. around 25% ( 11-32%). Total load in KW was varying in the range of 30 41 Kw. Power factor was maintained around 0.85-0.90. The
harmonics in current (THDi) was in the range of 6.2 11.7% and in voltage it was around 2.2 % .Current harmonics were on higher side
and requires filtration. The details of recording are enclosed.
4.5 First Floor AC panel:
The voltage level was quite on higher side i.e. 428 V and subsequent single Phase voltage was 247 V. Current was varying in the
range of 105 A in R- Phase, 86 A in Y- Phase and 63 A in B phase. Phase to Phase current unbalancing was quite on higher side i.e.
around 25%. Total load in KW was maintained around 54 KW. Power factor was maintained around 0.82- 0.90. The harmonics in current
15
(THDi) was in the range of 8.2-13.7% and in voltage it was 2.1 2.2 %.Current harmonics were on higher side and requires filtration. The
details of recording are enclosed.
4.6 Bigger New Lift:
The voltage level was quite on higher side i.e. 430 V. current was varying in the range of 0-21. Phase to Phase current unbalancing
was quite on higher side i.e. around 40- 150%. Total load in KW was varying in the range of 0.8 -10 Kw. Power factor was Varying in the
range of 0.20 - 0.78. The harmonics in current (THDi) was in the range of 30 120 % and in voltage it was 1.9 13.0 % current
harmonics were quite on higher side due to frequent operation and jerking load and requires filteration. The details of recording are
enclosed.
4.7 Solar water heater:
Based on 500 liter/day consumption of hot water for canteen , the replaced solar geyser of this capacity will result in the
the electricity savings of 5592 units or Rs. 0.28 lac/yr. as compared to the present electrical one as per details given
below500 lts x 1 x (60-20 ) = 20,000 kcal/hr or 23.3 kw/day.
Savings: 23.3 x 240 days = 5,592 units or Rs. 33552/Installation cost @ Rs.200/- per liter
For 500 liter will be = Rs. 1.00 lacs
Approx pay back period = 3.0 yrs.
4.8 Power saving in Kitchen by optimizing freezer operation:
It was noticed that the freezer in the kitchen runs for all the 24 hrs. independent of the fact that whether it is loaded or
empty. In day time normally it remains empty and run idle so it should stop in day time 9.0 AM to 6.0 PM and in the night
when they keep the material then it should work otherwise it should be stopped even in the night. The expected saving in
day time is as follows:
Freezer load in KW
4.0 kw
16
9 hrs.
36 kwh/day
240 x 36
8640 units
Rs.51,840/-
Investment
Nil
17
POWER SUPPLY TO CABINET SECRETRIATE BASEMENT & G.FLOOR FROM FEEDER NO.20 (MAIN POWER HOUSE)
RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
Date
Time
Hz
Hz
Urms
Phase1
V
Urms
Phase2
V
Urms
Phase3
V
Arms
Phase1
A
Arms
Phase2
A
Arms
Phase3
A
W Phase1
W
W Phase2
W
W Phase3
W
Sum of
Phases
W
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
11:52:00 AM
11:53:00 AM
11:54:00 AM
11:55:00 AM
11:56:00 AM
11:57:00 AM
11:58:00 AM
11:59:00 AM
12:00:00 PM
12:01:00 PM
12:02:00 PM
12:03:00 PM
12:04:00 PM
12:05:00 PM
12:06:00 PM
12:07:00 PM
12:08:00 PM
12:09:00 PM
12:10:00 PM
12:11:00 PM
49.85
49.88
49.87
49.86
49.85
49.8
49.75
49.76
49.76
49.82
49.86
49.9
49.94
49.93
49.9
49.83
49.81
49.78
49.73
49.69
431.9
432.8
432.6
432.5
432.7
432.5
432.3
432.3
432.3
434.4
434.6
435
434.6
434.8
434.4
433.7
433.7
433.2
432.3
431.9
431.3
432.1
432.1
431.5
431.5
431.5
431.1
431.2
430.9
433.2
433.3
433.7
433.4
433.3
433.3
432.5
432.5
431.6
431.2
430.6
432.1
433.1
433
432.6
432.5
432.5
431.8
431.8
431.8
433.9
434.2
434.9
434.5
434.4
433.7
433.4
433.1
432.7
432.2
431.7
126
127.4
123.4
116.8
116.9
119.9
128.3
126.9
125.5
109.8
107
106.2
111
113.2
113
114.5
111
118.6
117.4
119.6
205.7
207.8
193.6
188.5
191.4
199.8
209
207.4
209.1
193.9
188
190.9
193.5
195.4
192.1
185.6
184.3
200.3
198.2
203.9
141.9
142.5
138.7
132
132.4
135.8
142.5
142.1
141.4
126.1
123.2
123.2
129.6
132.1
132
132.3
127.3
132.5
133.3
138.4
27719.98
28131.37
27251.62
25875.98
25955.02
26662.32
28359.29
28002.21
27608.73
24467.48
23932.22
23692.49
24651.69
24958.93
24922.35
25293.62
24615.40
26398.41
25986.90
26247.62
44772.41
45534.56
42162.48
41213.85
41873.93
43684.56
45628.13
45153.75
45654.05
42634.88
41231.16
42146.63
42496.61
42713.64
42212.34
40347.68
40292.34
43963.16
43252.10
44519.36
30989.78
31203.71
30305.88
28841.48
28884.58
29694.31
31022.84
30914.57
30753.45
27480.98
26900.44
26877.16
28352.71
28818.35
28744.15
28797.49
27620.35
28789.95
28987.32
30147.14
103482.17
104869.63
99719.98
95931.31
96713.53
100041.19
105010.26
104070.53
104016.23
94583.34
92063.82
92716.28
95501.01
96490.93
95878.84
94438.78
92528.09
99151.53
98226.33
100914.12
Date
Time
PF
PF
PF
Athd
Athd
Athd
Vthd
Vthd
Vthd
18
Cont.
Vunb
Aunb
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
11:52:00 AM
11:53:00 AM
11:54:00 AM
11:55:00 AM
11:56:00 AM
11:57:00 AM
11:58:00 AM
11:59:00 AM
12:00:00 PM
12:01:00 PM
12:02:00 PM
12:03:00 PM
12:04:00 PM
12:05:00 PM
12:06:00 PM
12:07:00 PM
12:08:00 PM
12:09:00 PM
12:10:00 PM
12:11:00 PM
Phase
1
Phase2
Phase3
Phase1
%
Phase2
%
Phase3
%
Phase1
%
Phase2
%
Phase3
%
IEEE)
%
(IEEE)
%
0.88
0.882
0.882
0.885
0.887
0.889
0.885
0.883
0.881
0.888
0.889
0.887
0.884
0.877
0.879
0.881
0.885
0.889
0.885
0.879
0.873
0.877
0.872
0.876
0.876
0.876
0.875
0.873
0.876
0.877
0.874
0.88
0.876
0.872
0.877
0.869
0.873
0.879
0.875
0.876
0.875
0.875
0.874
0.875
0.873
0.875
0.873
0.872
0.872
0.869
0.87
0.869
0.872
0.869
0.869
0.87
0.867
0.87
0.871
0.874
6.6
6.5
6.5
6.7
6.6
6.6
6.4
6.3
6
6.3
6.6
6.6
6.5
6.4
6.4
6.4
6.4
6.1
6.3
6.3
7.5
7.4
7.8
7.8
7.7
7.6
7.3
7.4
7.3
7.8
8.1
8
7.8
7.8
7.9
8.1
8.1
7.6
7.8
7.7
8
8
8.2
8.4
8.4
8.2
7.9
7.9
7.9
8.7
8.9
8.9
8.5
8.2
8.2
8.3
8.4
8.2
8.2
7.9
2.4
2.3
2.3
2.4
2.3
2.4
2.3
2.3
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.3
2.4
2.4
1.9
1.8
1.9
1.9
1.9
1.9
1.9
1.9
1.8
1.9
1.9
1.9
2
1.9
1.9
1.9
1.9
1.8
1.9
1.9
2.1
2.1
2.1
2.2
2.1
2.2
2.1
2.1
2.1
2.2
2.2
2.2
2.2
2.2
2.2
2.1
2.1
2.1
2.1
2.1
0.1
0.1
0.1
0.2
0.2
0.2
0.1
0.1
0.2
0.1
0.2
0.2
0.2
0.2
0.1
0.2
0.1
0.2
0.2
0.2
30.3
30.5
27.5
29.3
30.3
31.6
30.7
30.6
31.8
35.3
34.9
36.3
33.7
33
31.8
28.8
30.8
33.1
32.5
32.4
19
POWER SUPPLY TO CABINET SECRETRIATE FIRST & SECOND FLOOR FROM FEEDER NO.34 (MAIN POWER
HOUSE) RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
Date
Time
Hz
Hz
Urms
Phase1
V
Urms
Phase2
V
Urms
Phase3
V
Arms
Phase1
A
Arms
Phase2
A
Arms
Phase3
A
W Phase1
W
W Phase2
W
W Phase3
W
Sum of
Phases
W
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
12:27:00 PM
12:28:00 PM
12:29:00 PM
12:30:00 PM
12:31:00 PM
12:32:00 PM
12:33:00 PM
12:34:00 PM
12:35:00 PM
12:36:00 PM
12:37:00 PM
12:38:00 PM
12:39:00 PM
12:40:00 PM
12:41:00 PM
12:42:00 PM
49.95
49.91
49.85
49.83
49.77
49.74
49.73
49.7
49.7
49.72
49.78
49.8
49.77
49.77
49.78
49.83
427.2
427.1
426.6
426
425.8
426.6
427.2
429
428.8
428.9
429.1
429.2
428.8
429.3
429.9
430
429.5
429.3
429
428.1
427.7
428.1
428.9
430.8
430.6
430.8
430.9
431.1
430.9
431.1
431.3
431.1
428.5
428.5
428.4
427.7
427.4
427.9
428.1
429.6
429.6
429.9
429.9
430.1
429.9
430.2
430.3
430.4
91.2
92.7
91
80.5
79.8
80
90.6
90.6
91.1
91.1
90.8
90.8
92.2
90.9
86.6
79.8
86.8
86.7
87
86.7
86.6
86.7
86.9
87.1
87.2
87.3
87.2
87
87
87
88.2
89.1
137.8
128.2
127.1
128.2
135.3
136.6
128
126.8
132.2
138.4
138.5
130.8
128.7
132.6
138.7
137.7
20734.74
21028.91
20622.67
18432.30
18296.13
18353.50
20546.10
20578.93
20707.28
20704.31
20653.18
20656.86
20949.96
20683.35
19769.77
18401.32
20523.95
20488.97
20540.34
20440.98
20377.58
20413.31
20475.19
20546.80
20576.25
20632.52
20613.37
20563.68
20545.94
20563.00
20898.63
21137.97
32028.31
29694.19
29353.04
29568.25
31269.79
31671.70
29574.47
29321.50
30619.19
32181.32
32278.29
30418.23
29853.29
30757.21
32343.07
32146.25
73287.00
71212.07
70516.05
68441.53
69943.50
70438.51
70595.75
70447.23
71902.72
73518.15
73544.84
71638.76
71349.18
72003.56
73011.48
71685.54
20
Date
Time
PF
Phase
1
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
12:27:00 PM
12:28:00 PM
12:29:00 PM
12:30:00 PM
12:31:00 PM
12:32:00 PM
12:33:00 PM
12:34:00 PM
12:35:00 PM
12:36:00 PM
12:37:00 PM
12:38:00 PM
12:39:00 PM
12:40:00 PM
12:41:00 PM
12:42:00 PM
0.925
0.924
0.924
0.934
0.935
0.934
0.923
0.922
0.922
0.922
0.922
0.923
0.922
0.923
0.926
0.933
PF
Phase2
PF
Phase3
Athd
Phase1
%
Athd
Phase2
%
Athd
Phase3
%
Vthd
Phase1
%
Vthd
Phase2
%
Vthd
Phase3
%
Vunb
(IEEE)
%
Aunb
(IEEE)
%
0.95
0.95
0.95
0.951
0.951
0.949
0.948
0.945
0.945
0.946
0.946
0.946
0.946
0.946
0.947
0.949
0.936
0.932
0.93
0.93
0.934
0.935
0.931
0.928
0.93
0.933
0.935
0.932
0.93
0.93
0.934
0.936
13.7
13.6
13.8
15.2
15.2
15.2
13.8
13.7
13.7
13.6
13.7
13.6
13.4
13.5
13.9
14.9
13.4
13.3
13.5
13.5
13.5
13.5
13.3
13.2
13.2
13.3
13.2
13.1
13.1
13.1
12.7
12.6
16.6
17.5
17.7
17.6
16.8
16.6
17.4
17.5
17.1
16.5
16.3
17
17.2
17.1
16.4
16.5
1.8
1.8
1.8
1.9
1.9
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.9
1.9
1.9
1.9
1.9
1.9
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.7
1.7
1.5
1.5
1.6
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.8
0.8
0.8
0.7
0.7
0.6
0.8
0.8
0.8
0.8
0.8
0.9
0.9
0.9
0.8
0.7
30.9
25
25
30.2
34.5
35.1
25.7
24.9
27.7
31.1
31.3
27.2
25.4
28.1
32.7
34.7
21
POWER SUPPLY TO CABINET SECRETRIATE BATH ROOM PANEL FROM FEEDER NO.54 (MAIN POWER HOUSE)
RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
1:06:00 PM
1:07:00 PM
1:08:00 PM
1:09:00 PM
1:10:00 PM
1:11:00 PM
1:12:00 PM
1:13:00 PM
1:14:00 PM
1:15:00 PM
1:16:00 PM
1:17:00 PM
1:18:00 PM
1:19:00 PM
1:20:00 PM
1:21:00 PM
Hz
Hz
49.78
49.69
49.57
49.39
49.31
49.31
49.32
49.39
49.37
49.41
49.45
49.45
49.5
49.55
49.63
49.74
Urms
Phase1
V
437.3
436.5
435.2
434.4
435.4
435.1
434.6
433.9
433.6
433.9
434.2
434.3
434.7
435.4
435.6
436.3
Urms
Phase2
V
436.9
436.2
435.3
434.5
435.8
435.5
435
434.4
434
434
434.2
434.3
434.6
435.2
435.7
436.4
Urms
Phase3
V
437.3
436.3
435.4
435
436
435.8
435
434.6
434.3
434.3
434.6
434.6
435
435.5
435.9
436.6
Arms
Phase1
A
41.2
41.2
41.1
41.3
41.5
41.5
41.4
41.2
41.2
41.1
41.3
41.3
41.5
41.4
41.2
41.1
Arms
Phase2
A
25.9
25.9
26
26.1
26.2
26.2
26.1
26
26
25.9
26
26
26
25.9
25.8
25.7
Arms
Phase3
A
63.7
63.5
63.4
63.9
64.4
64.2
63.9
63.8
63.7
63.6
63.5
63.6
63.9
63.6
63.4
63.2
W
Phase1
W
8268.83
8246.07
8202.73
8188.83
8224.90
8208.87
8195.73
8185.83
8173.78
8154.83
8224.92
8227.52
8281.24
8261.83
8237.32
8223.96
W
Phase2
W
5789.90
5793.85
5785.01
5780.55
5790.58
5784.34
5759.34
5756.43
5758.31
5753.79
5769.35
5781.46
5787.07
5777.22
5747.40
5749.73
W Phase3
W
13886.35
13804.28
13737.15
13798.43
13901.96
13811.33
13767.24
13770.56
13714.84
13698.68
13717.73
13742.58
13849.25
13771.17
13732.27
13725.11
Sum of
Phases
W
27945.08
27844.19
27724.90
27767.81
27917.45
27804.54
27722.32
27712.82
27646.94
27607.29
27711.99
27751.55
27917.56
27810.22
27716.99
27698.79
Date
Time
PF
Phase1
PF
Phase2
PF
Phase3
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
1:06:00 PM
1:07:00 PM
1:08:00 PM
1:09:00 PM
1:10:00 PM
1:11:00 PM
1:12:00 PM
1:13:00 PM
1:14:00 PM
0.793
0.794
0.792
0.79
0.787
0.786
0.787
0.79
0.791
0.884
0.884
0.884
0.881
0.875
0.876
0.877
0.882
0.883
0.863
0.862
0.861
0.859
0.856
0.855
0.856
0.859
0.858
Athd
Phase1
%
7.2
7.2
7.2
7.2
7.4
7.5
7.3
7.4
7.4
Athd
Phase2
%
12.1
12.1
11.9
11.9
12.3
12.3
12
11.9
11.9
Athd
Phase3
%
8.4
8.4
9.3
8.5
8.5
9.2
9.5
9
9.6
Vthd
Phase1
%
2.1
2.1
2.1
2.2
2.3
2.3
2.4
2.2
2.3
Vthd
Phase2
%
2.2
2.2
2.2
2.2
2.4
2.4
2.4
2.3
2.3
Vthd
Phase3
%
2.2
2.2
2.1
2.2
2.3
2.4
2.4
2.2
2.3
Vunb
(IEEE)
%
0
0.1
0
0.1
0.1
0
0
0.1
0.1
Aunb
(IEEE)
%
46.1
45.9
45.7
46
46.3
46
45.9
46.1
46
6/2/2010
6/2/2010
1:15:00 PM
1:16:00 PM
0.79
0.793
0.883
0.884
0.859
0.859
7.4
7.3
12
12.1
9
9.2
2.3
2.2
2.3
2.3
2.3
2.3
0.1
0
46.1
45.6
Date
Time
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
22
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
1:17:00 PM
1:18:00 PM
1:19:00 PM
1:20:00 PM
1:21:00 PM
0.792
0.794
0.793
0.793
0.793
0.884
0.884
0.883
0.884
0.884
0.86
0.862
0.86
0.86
0.861
7.3
7.3
7
7.2
7.3
12
12.2
12.3
11.9
12.1
9
9.5
8.4
9.3
8.8
23
2.2
2.2
2.2
2.2
2.2
2.3
2.3
2.3
2.2
2.3
2.3
2.3
2.3
2.3
2.3
0
0
0
0.1
0
45.8
45.9
45.8
45.9
45.8
POWER SUPPLY TO CABINET SECRETRIATE CANTEEN PANEL FROM FEEDER NO.46 (MAIN POWER HOUSE)
RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
1:30:00 PM
1:31:00 PM
1:32:00 PM
1:33:00 PM
1:34:00 PM
1:35:00 PM
1:36:00 PM
1:37:00 PM
1:38:00 PM
Hz
Hz
49.89
49.76
49.63
49.59
49.51
49.49
49.49
49.51
49.56
Urms
Phase1
V
436.5
435.3
434.3
434
433.3
432.8
433
432.9
433.2
Urms
Phase2
V
436.3
435.1
434.4
433.8
433.2
432.9
432.9
432.9
432.9
Urms
Phase3
V
436.6
435
433.9
433.5
433
433
433.3
432.9
433
Arms
Phase1
A
57.1
55.9
61.2
62.7
64.8
81
72.9
70.7
71.1
Arms
Phase2
A
41.1
42.2
44.2
53.1
54.9
57.4
54.2
54.3
58.1
Arms
Phase3
A
34
39.3
42.7
53.1
49
45.8
46.9
51.2
55.7
W Phase1
W
13820.00
12520.63
13593.49
14004.79
14551.13
18892.35
16244.57
15422.54
15582.20
W Phase2
W
9247.88
8895.58
9443.53
11973.27
12462.30
13046.34
11536.53
11530.04
12786.74
W Phase3
W
7419.12
8308.14
9209.43
12132.69
10950.12
10039.19
9865.38
10796.87
12091.35
Sum of
Phases
W
30486.99
29724.36
32246.45
38110.75
37963.54
41977.88
37646.48
37749.46
40460.29
Date
Time
PF
Phase1
PF
Phase2
PF
Phase3
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
1:30:00 PM
1:31:00 PM
1:32:00 PM
1:33:00 PM
1:34:00 PM
1:35:00 PM
1:36:00 PM
1:37:00 PM
1:38:00 PM
0.957
0.893
0.886
0.891
0.897
0.934
0.89
0.873
0.877
0.887
0.836
0.849
0.898
0.906
0.906
0.85
0.848
0.876
0.865
0.84
0.856
0.912
0.89
0.875
0.84
0.842
0.865
Athd
Phase1
%
7.1
7
7.1
7.2
7.4
6.5
6.2
6.5
6.5
Athd
Phase2
%
10.9
10.1
10.4
9.3
9.5
9.3
8.6
8.8
8.3
Athd
Phase3
%
11.7
9.4
9.8
8.2
9.5
10.4
8.5
8.1
7.6
Vthd
Phase1
%
2.2
2.2
2.2
2.2
2.2
2.2
2.2
2.2
2.2
Vthd
Phase2
%
2.3
2.3
2.2
2.3
2.2
2.2
2.3
2.2
2.2
Vthd
Phase3
%
2.2
2.3
2.2
2.2
2.2
2.2
2.2
2.2
2.2
Vunb
(IEEE)
%
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.2
Aunb
(IEEE)
%
29.6
22.1
24
11.4
15.2
31.9
25.7
20.4
15.4
Date
Time
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
24
POWER SUPPLY TO CABINET SECRETRIATE FIRST FLOOR A.C. PANEL FROM FEEDER NO.14B (MAIN POWER HOUSE)
RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
25
2:17:00 PM
2:17:20 PM
2:17:40 PM
2:18:00 PM
2:18:20 PM
2:18:40 PM
2:19:00 PM
2:19:20 PM
2:19:40 PM
2:20:00 PM
2:20:20 PM
2:20:40 PM
2:21:00 PM
2:21:20 PM
2:21:40 PM
Hz
Hz
49.42
49.43
49.43
49.42
49.41
49.39
49.39
49.4
49.45
49.45
49.45
49.46
49.47
49.51
49.54
Urms
Phase1
V
425.4
425.4
425.2
424.8
425.8
427.2
427.4
427.4
427.8
427.7
427.4
427.5
427.4
427.4
427.8
Urms
Phase2
V
426
426
425.7
425.4
426.5
427.9
428.2
428.2
428.3
428.1
428.2
428
428.2
428.2
428.1
Urms
Phase3
V
426.3
426.4
426.2
425.9
426.9
428.5
428.5
428.5
428.8
428.7
428.7
428.7
428.6
428.7
429
Arms
Phase1
A
104.9
105.2
105.2
105.4
105.6
105.4
105.3
105.1
104.9
104.7
104.4
104.4
104.3
104.3
104.5
Arms
Phase2
A
87
86.7
86.3
86.2
86.8
87.3
87.2
86.6
86.3
86.3
87
87
87.1
86.4
85.9
Arms
Phase3
A
63.4
63.3
63.3
63.5
64.2
63.6
63.6
63.6
63.4
63.3
63.4
63.4
63.4
63.4
63.1
W Phase1
W
23318.30
23377.31
23379.96
23440.18
23489.05
23427.08
23376.59
23320.00
23300.89
23224.91
23146.89
23158.25
23144.29
23150.42
23232.44
W Phase2
W
17721.18
17615.49
17438.39
17406.84
17607.18
17760.96
17707.33
17445.49
17390.61
17409.60
17678.46
17709.29
17726.18
17479.77
17330.61
W Phase3
W
13677.77
13686.32
13690.40
13722.18
13890.25
13722.52
13705.52
13720.07
13694.04
13674.67
13681.10
13692.94
13690.75
13696.49
13636.49
Sum of
Phases
W
54717.25
54679.13
54508.75
54569.19
54986.48
54910.56
54789.45
54485.56
54385.54
54309.17
54506.45
54560.48
54561.21
54326.68
54199.54
Time
PF
Phase1
PF
Phase2
PF
Phase3
Athd
Phase1
%
Athd
Phase2
%
Athd
Phase3
%
Vthd
Phase1
%
Vthd
Phase2
%
Vthd
Phase3
%
Vunb
(IEEE)
%
Aunb
(IEEE)
%
Date
Time
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
Date
26
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
2:17:00 PM
2:17:20 PM
2:17:40 PM
2:18:00 PM
2:18:20 PM
2:18:40 PM
2:19:00 PM
2:19:20 PM
2:19:40 PM
2:20:00 PM
2:20:20 PM
2:20:40 PM
2:21:00 PM
2:21:20 PM
2:21:40 PM
0.905
0.905
0.905
0.907
0.905
0.901
0.9
0.899
0.899
0.898
0.898
0.898
0.899
0.9
0.899
0.827
0.825
0.82
0.821
0.822
0.822
0.82
0.814
0.813
0.815
0.821
0.822
0.822
0.818
0.815
0.875
0.876
0.877
0.878
0.876
0.87
0.87
0.871
0.871
0.871
0.87
0.871
0.871
0.872
0.872
8.6
8.8
9.1
8.6
8.4
8.4
8.4
8.5
8.2
8.4
8.5
8.5
8.5
8.4
8.5
13.5
13.5
13.2
13.1
13.1
12.9
13
12.6
12.7
12.7
13
13.1
13.2
13
12.8
13.7
13.7
13.7
13.5
13.4
13.3
13.4
13.4
13.4
13.3
13.4
13.4
13.4
13.4
13.3
27
2.2
2.2
2.2
2.2
2.2
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.3
2.2
2.2
2.2
2.2
2.1
2.2
2.1
2.1
2.1
2.2
2.2
2.2
2.2
2.2
2.4
2.4
2.3
2.3
2.3
2.2
2.3
2.2
2.2
2.2
2.2
2.2
2.2
2.3
2.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.3
0.2
0.1
25.5
25.6
25.5
25.3
24.9
25.6
25.5
25.3
25.3
25.3
25.4
25.4
25.4
25.1
25.3
POWER SUPPLY TO CABINET SECRETRIATE LIFT (BIG SIZE) PANEL FROM FEEDER NO.7B (MAIN POWER HOUSE)
RECORDING OF ALL IMPORTANT ELECTRICAL & POWER QUALITY PARAMETERS
28
Date
Time
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:07:05 PM
3:07:10 PM
3:07:15 PM
3:07:20 PM
3:07:25 PM
3:07:30 PM
3:07:35 PM
3:07:40 PM
3:07:45 PM
3:07:50 PM
3:07:55 PM
3:08:00 PM
3:08:05 PM
3:08:10 PM
3:08:15 PM
3:08:20 PM
3:08:25 PM
3:08:30 PM
3:08:35 PM
3:08:40 PM
3:08:45 PM
3:08:50 PM
3:08:55 PM
3:09:00 PM
3:09:05 PM
3:09:10 PM
3:09:15 PM
3:09:20 PM
3:09:25 PM
3:09:30 PM
3:09:35 PM
3:09:40 PM
3:09:45 PM
Hz
Hz
49.82
49.81
49.79
49.78
49.77
49.77
49.76
49.76
49.76
49.76
49.76
49.76
49.76
49.75
49.75
49.75
49.75
49.74
49.73
49.72
49.71
49.7
49.69
49.68
49.68
49.68
49.67
49.66
49.66
49.65
49.65
49.64
49.64
Urms
Phase1
V
431.7
431.1
431.1
431.3
431.5
431.1
431
430.8
430.5
430.5
431.1
430.6
430.3
430.1
430
429.6
430.3
430.4
430.2
429.9
430
430.1
430.5
429.8
430.1
430
429.8
430
429.7
430
429.6
429.4
429.6
Urms
Phase2
V
430.4
430.2
429.9
430
430.1
429.7
429.6
429.4
429.3
429.5
430.1
429.9
429.6
429.8
429.7
429.3
429.6
429.6
429.5
429.1
429.2
429.4
429.4
429
429
428.9
428.5
428.7
428.5
428.8
428.4
428.2
428.4
Urms
Phase3
V
430.9
430.4
430.5
430.5
430.2
430.1
429.9
429.6
429.6
430.2
429.7
429.4
429.4
429.6
429.2
429.7
429.9
429.6
429.4
429.5
429.4
429.5
428.8
429.1
429
428.8
428.9
428.6
429
428.4
428.2
428.3
Arms
Phase2
A
0.4
17.5
18.8
16.7
2.1
0.6
0
0
0
0
0
0.2
14
5.6
0.8
0
0
0.6
9.4
2.3
0.2
0
0.2
5.7
0.4
1.1
0
0
0
1
18.5
14.5
0.8
Arms
Phase3
A
1.1
9.8
10.4
9.3
1.8
1.1
0.9
0.9
0.9
0.9
0.9
1
7.8
3.5
1.2
0.9
0.9
1.1
5.4
1.8
0.9
0.9
0.9
3.5
1
1.3
0.9
0.9
0.9
1.3
9.9
7.9
1.1
29
Arms
Neutral
A
4.6
12.2
12.3
11.4
6.3
5
3.9
3.8
3.7
3.9
3.8
4.1
10.8
7.5
5
3.9
3.7
4.6
8.6
6.2
4.1
3.8
3.9
7.4
5.9
5.8
4.1
3.8
3.7
5.2
12.1
10.4
5.7
W
Phase1
W
1014.32
4430.58
4695.53
4315.82
1528.93
1116.00
764.37
735.91
698.93
772.17
728.15
850.27
3776.43
2165.45
1144.37
761.65
715.41
1017.12
2869.83
1562.20
848.31
727.68
800.06
2208.30
1269.48
1374.66
818.15
738.28
696.35
1235.35
4603.55
3850.07
1290.84
W Phase2
W
64.44
3083.11
3308.72
2900.39
234.79
80.81
0.00
0.00
0.00
0.00
0.00
33.73
2432.96
848.26
109.16
0.00
0.00
75.49
1473.65
296.91
24.25
0.00
26.17
884.64
34.68
149.96
0.00
0.00
0.00
132.87
3184.91
2411.93
103.60
W
Phase3
W
191.46
1736.45
1837.25
1618.11
261.18
193.39
161.15
161.17
161.01
160.85
161.87
176.64
1368.16
567.06
203.51
160.03
160.28
188.59
875.62
288.37
168.75
161.13
171.06
578.97
170.15
217.15
161.49
159.70
158.49
212.64
1716.77
1323.01
196.26
Sum of
Phases
W
1270.23
9250.14
9841.50
8834.32
2024.90
1390.19
925.52
897.08
859.93
933.01
890.02
1060.64
7577.56
3580.78
1457.05
921.68
875.69
1281.20
5219.10
2147.48
1041.31
888.80
997.30
3671.92
1474.31
1741.77
979.64
897.98
854.84
1580.86
9505.23
7585.01
1590.70
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:09:50 PM
3:09:55 PM
3:10:00 PM
3:10:05 PM
3:10:10 PM
3:10:15 PM
3:10:20 PM
3:10:25 PM
3:10:30 PM
3:10:35 PM
3:10:40 PM
3:10:45 PM
3:10:50 PM
3:10:55 PM
3:11:00 PM
3:11:05 PM
3:11:10 PM
3:11:15 PM
3:11:20 PM
3:11:25 PM
3:11:30 PM
3:11:35 PM
3:11:40 PM
3:11:45 PM
3:11:50 PM
3:11:55 PM
3:12:00 PM
3:12:05 PM
3:12:10 PM
3:12:15 PM
3:12:20 PM
3:12:25 PM
3:12:30 PM
3:12:35 PM
3:12:40 PM
3:12:45 PM
49.63
49.63
49.62
49.62
49.61
49.61
49.6
49.59
49.59
49.59
49.58
49.57
49.57
49.57
49.57
49.56
49.57
49.58
49.58
49.59
49.59
49.58
49.58
49.57
49.57
49.56
49.56
49.55
49.56
49.56
49.56
49.56
49.57
49.56
49.56
49.57
429.5
429.4
429.5
429.3
429.5
429.4
429.3
428.8
428.8
428.8
428.8
428.6
428.4
427.9
428
427.2
427.5
427.5
427
427
427.3
427.2
427
426.9
426.4
426.4
426.2
426.3
426.4
425.9
425.7
425.8
426.1
426.1
425.9
426.1
428.2
428.3
428.4
428.2
428.6
428.7
428.6
428.1
428
428
427.9
427.7
427.6
427.2
426.8
425.9
426
426
425.6
425.8
426.4
426.4
426.4
426.3
425.9
425.6
425.3
425.2
425.2
424.8
424.9
424.9
424.8
424.6
424.7
425
428.3
428.6
428.6
428.7
429.1
429
428.8
428.3
428.2
428.1
428.1
428
427.9
427.3
427.3
426.4
426.7
426.7
426.3
426.3
426.5
426.4
426.2
426
425.5
425.4
425.1
425.1
425.3
424.9
424.9
425.1
425.2
425
424.9
425.1
0
0
0
0
5.8
10.6
0.5
0
0
0
2.3
8.6
0.8
0.3
0
0
0
0.9
21
2.5
0.4
0
0
1.6
21.3
1.2
0.1
0
0
7.3
17
2.5
0
0
0
1.1
0.9
0.9
0.9
0.9
3.8
6.1
1.1
0.9
0.9
0.9
1.9
5.1
1.2
1
0.9
0.9
0.9
1.2
10.5
1.7
0.9
0.8
0.8
1.3
10.9
1.1
0.8
0.8
0.8
4
8.4
1.5
0.8
0.8
0.8
1
30
4
3.7
3.7
3.7
7.5
9.2
5.1
3.9
3.8
3.7
5.9
8.6
6.1
4.4
3.8
3.8
3.7
5.1
12.7
6.2
4.2
3.8
3.6
5.3
12.9
5.7
4
3.7
3.7
7.6
11.6
6.1
4
3.8
3.6
5
799.50
723.25
710.05
728.04
2262.57
3093.16
1125.93
761.19
718.65
708.84
1523.67
2754.64
1394.66
919.18
734.70
730.94
694.52
1178.95
4895.39
1509.78
874.74
742.19
683.10
1303.27
4861.49
1325.58
809.86
716.34
712.61
2340.41
4295.18
1582.10
813.23
737.44
689.37
1174.06
0.00
0.00
0.00
0.00
938.52
1689.07
75.72
0.00
0.00
0.00
304.82
1361.01
113.26
47.47
0.00
0.00
0.00
114.18
3644.87
265.53
49.96
0.00
0.00
202.47
3686.34
150.58
13.32
0.00
0.00
1165.85
3006.61
301.69
0.00
0.00
0.00
131.86
158.96
160.37
160.84
161.76
628.31
1003.99
193.43
161.11
161.18
161.18
301.10
838.39
208.71
177.93
158.96
158.80
159.59
206.44
1824.54
247.93
164.50
153.24
153.37
219.37
1875.66
191.81
152.41
152.08
152.57
662.39
1511.22
239.31
150.66
151.12
151.39
185.04
958.47
883.61
870.89
889.80
3829.40
5786.22
1395.08
922.30
879.83
870.01
2129.60
4954.05
1716.63
1144.57
893.66
889.73
854.10
1499.57
10364.80
2023.24
1089.21
895.44
836.47
1725.11
10423.50
1667.97
975.59
868.42
865.18
4168.66
8813.01
2123.10
963.89
888.56
840.76
1490.96
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:12:50 PM
3:12:55 PM
3:13:00 PM
3:13:05 PM
3:13:10 PM
3:13:15 PM
3:13:20 PM
3:13:25 PM
3:13:30 PM
49.57
49.57
49.56
49.57
49.58
49.57
49.58
49.58
49.57
425.9
425.8
425.7
426.2
426.6
426.5
426.2
426
425.9
424.8
424.6
424.2
424.4
424.8
424.9
424.7
424.6
424.5
425.2
425
424.7
425.1
425.4
425.4
425.2
424.9
424.8
5.7
1
0.3
0
0
0.7
13.1
3.8
0.2
3.1
1
0.8
0.8
0.8
1
6.4
2.1
0.8
7.1
5.9
4.1
3.8
3.6
4.6
9.4
6.5
4.2
2097.76
1351.59
861.20
737.04
702.88
1018.10
3462.70
1754.53
847.76
808.86
125.20
38.10
0.00
0.00
90.67
2116.20
507.67
33.95
484.81
183.00
159.35
150.53
151.76
174.08
1062.71
332.65
136.51
3391.43
1659.79
1058.65
887.58
854.63
1282.85
6641.62
2594.85
1018.22
Date
Time
PF
Phase
1
PF
Phase2
PF
Phase3
Athd
Phase1
%
Athd
Phase2
%
Athd
Phase3
%
Vthd
Phase1
%
Vthd
Phase2
%
Vthd
Phase3
%
Vunb
(IEEE)
%
Aunb
(IEEE)
%
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:07:05 PM
3:07:10 PM
3:07:15 PM
3:07:20 PM
3:07:25 PM
3:07:30 PM
3:07:35 PM
3:07:40 PM
3:07:45 PM
3:07:50 PM
3:07:55 PM
3:08:00 PM
3:08:05 PM
3:08:10 PM
3:08:15 PM
3:08:20 PM
3:08:25 PM
3:08:30 PM
3:08:35 PM
3:08:40 PM
3:08:45 PM
0.718
0.784
0.788
0.786
0.762
0.73
0.669
0.658
0.647
0.673
0.654
0.688
0.784
0.76
0.74
0.671
0.652
0.72
0.779
0.76
0.692
0.227
0.66
0.709
0.695
0.387
0.206
0
0
0
0
0
0.113
0.627
0.431
0.314
0
0
0.298
0.581
0.378
0.098
0.699
0.683
0.705
0.693
0.627
0.69
0.722
0.724
0.728
0.727
0.729
0.718
0.68
0.652
0.683
0.723
0.727
0.697
0.638
0.642
0.71
30.8
57.4
69
69.2
40.9
38.3
36.3
30.3
26.9
32.9
28.5
28.9
47.4
49.6
38.1
32.5
28
30.8
50.8
43.1
35.3
25.1
105.6
95
97.5
92.1
69.1
0
0
0
0
0
0
111.4
79
92.9
0
0
53.8
120.5
81.1
40.3
38.2
90.2
97.9
100.1
58.4
41.5
23.7
23.7
23.2
23.4
24
30.7
79.2
62.8
46.1
23.2
23.9
38
86.5
43.3
30.8
3
2.8
2.7
2.9
3
3
3.1
3
2.8
2.8
3
3
2.9
2.9
2.9
2.9
3
3
3
3
3
2
1.9
1.9
1.9
2
2
2
1.9
1.9
1.9
2
2
2
1.9
2
1.9
2
2
2
2
1.9
2.5
2.4
2.3
2.4
2.5
2.6
2.5
2.5
2.4
2.4
2.5
2.5
2.4
2.5
2.4
2.4
2.4
2.5
2.4
2.5
2.5
0.5
0.5
0.6
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.5
0.5
0.5
0.5
0.5
0.5
136.6
41.3
41.4
42
102.5
134.6
150.9
150
149.1
150.9
150
141
43.3
67.5
125.9
150.9
149.1
130.1
51
100.8
145
31
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:08:50 PM
3:08:55 PM
3:09:00 PM
3:09:05 PM
3:09:10 PM
3:09:15 PM
3:09:20 PM
3:09:25 PM
3:09:30 PM
3:09:35 PM
3:09:40 PM
3:09:45 PM
3:09:50 PM
3:09:55 PM
3:10:00 PM
3:10:05 PM
3:10:10 PM
3:10:15 PM
3:10:20 PM
3:10:25 PM
3:10:30 PM
3:10:35 PM
3:10:40 PM
3:10:45 PM
3:10:50 PM
3:10:55 PM
3:11:00 PM
3:11:05 PM
3:11:10 PM
3:11:15 PM
3:11:20 PM
3:11:25 PM
3:11:30 PM
3:11:35 PM
3:11:40 PM
3:11:45 PM
0.656
0.674
0.79
0.745
0.781
0.686
0.66
0.646
0.759
0.78
0.782
0.764
0.681
0.656
0.651
0.657
0.786
0.76
0.738
0.668
0.653
0.651
0.776
0.769
0.777
0.705
0.662
0.662
0.648
0.755
0.786
0.764
0.703
0.67
0.65
0.775
0
0.099
0.574
0.06
0.536
0
0
0
0.408
0.677
0.668
0.314
0
0
0
0
0.565
0.485
0.312
0
0
0
0.526
0.466
0.433
0.197
0
0
0
0.412
0.683
0.366
0.186
0
0
0.403
0.725
0.716
0.66
0.683
0.674
0.716
0.725
0.725
0.669
0.678
0.669
0.683
0.722
0.726
0.728
0.728
0.645
0.645
0.685
0.722
0.724
0.727
0.645
0.638
0.673
0.698
0.721
0.722
0.725
0.672
0.684
0.64
0.713
0.726
0.729
0.683
31.1
29.8
41.5
37.3
33.9
36.2
31
27.1
33.1
68
68.7
36.5
35.6
28.8
27.7
29.6
41.7
54.3
37
35.2
28.8
27.5
36.2
53.5
32.9
36.1
29.4
31.3
25.7
30.7
67.9
37
35.8
33.2
27.5
35.7
0
0
120.5
31.3
102.6
14.7
0
0
80.2
98.3
101.5
65.2
15.2
0
0
0
98.3
85.4
62.4
0
0
0
100.4
105.9
75
46.6
0
0
0
77.6
94.5
81.3
68.2
0
0
84.2
24.4
33.1
73
19.5
54.4
23.6
23.3
23.8
47.9
100.3
102.4
42.9
24
24.2
24.4
25.2
77.3
69.4
38.3
24.6
25.2
25.6
62.9
82.2
51.5
31.4
25
24.8
25.6
48.8
97.9
42.1
26.3
20.9
21.1
52.5
32
3
2.9
2.8
3
3
2.9
3
2.9
3
2.8
2.9
3
3
2.9
2.9
3
3
2.9
2.9
2.8
2.9
2.9
3
2.9
2.9
3
3
3.1
3
2.9
2.8
3
3.1
3
3
3
1.9
1.9
1.8
1.9
2
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
2
1.9
1.8
1.9
1.8
1.9
1.9
1.8
1.9
1.9
1.9
1.9
1.9
1.8
2
1.9
1.9
1.9
1.9
2.5
2.5
2.4
2.5
2.5
2.5
2.5
2.5
2.6
2.5
2.5
2.5
2.6
2.5
2.5
2.6
2.5
2.5
2.5
2.4
2.5
2.4
2.5
2.5
2.6
2.5
2.6
2.6
2.6
2.5
2.4
2.6
2.6
2.6
2.5
2.5
0.5
0.5
0.6
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.6
0.6
0.6
0.6
0.5
0.6
0.6
0.6
0.6
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.5
150
143.1
65.4
149.4
124.2
152.6
150
148.1
121.6
43.1
44
134.5
151.8
149.1
149.1
150
64.8
48.2
137.7
150.9
149.1
149.1
95.9
53.7
135.5
140
150
149.1
148.1
124.1
44.4
97.6
138.1
154.7
152
110.3
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
6/2/2010
3:11:50 PM
3:11:55 PM
3:12:00 PM
3:12:05 PM
3:12:10 PM
3:12:15 PM
3:12:20 PM
3:12:25 PM
3:12:30 PM
3:12:35 PM
3:12:40 PM
3:12:45 PM
3:12:50 PM
3:12:55 PM
3:13:00 PM
3:13:05 PM
3:13:10 PM
3:13:15 PM
3:13:20 PM
3:13:25 PM
3:13:30 PM
0.78
0.776
0.691
0.663
0.661
0.79
0.781
0.795
0.691
0.671
0.655
0.763
0.755
0.779
0.705
0.671
0.658
0.73
0.787
0.766
0.703
0.689
0.378
0.084
0
0
0.548
0.553
0.475
0
0
0
0.378
0.313
0.386
0.098
0
0
0.277
0.601
0.371
0.095
0.685
0.693
0.718
0.725
0.727
0.672
0.684
0.638
0.722
0.725
0.729
0.695
0.639
0.701
0.715
0.725
0.729
0.706
0.653
0.636
0.68
69.6
35.9
36.7
30.2
28.5
42.3
56.2
41
37.9
33.5
26.9
32.5
49.8
35
37.9
32.9
28.2
31.4
57.3
42.7
36.9
91.9
97.6
41.1
0
0
102.8
75.3
145.2
21.8
0
0
87.1
87.9
84.5
52.1
0
0
58.1
117.9
78.4
50.4
97.5
38.1
20.3
20.7
20.6
69.2
62.8
66.7
20.3
20.5
20.4
37.1
62
32.5
25.1
20.4
20.5
32.8
89.1
48.3
31.9
33
2.8
2.8
2.9
3
3.1
3
2.9
3
3
3
3
3
3
2.8
2.9
3
3.1
3.1
2.9
2.9
2.9
1.8
1.8
1.9
2
2
2
1.9
2
2
2
2
2
2
1.9
1.9
2
2
2
1.9
1.9
1.9
2.3
2.3
2.4
2.5
2.6
2.5
2.4
2.5
2.5
2.6
2.6
2.6
2.5
2.5
2.5
2.6
2.6
2.6
2.5
2.5
2.5
0.6
0.6
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.6
0.6
0.6
0.5
0.5
0.5
0.5
0.6
0.6
43.2
125
151.8
153.8
153.8
55.7
46.8
100.8
156.4
154.7
152.9
124.1
68
134.1
145
154.7
152.9
130.1
48.8
83.6
149.2
54.00
52.00
Hz 50.00
48.00
46.00
6/2/2010
11:52:00.000 AM
19:00.000 (min:s)
3 min/Div
6/2/2010
12:11:00.000 PM
19:00.000 (min:s)
3 min/Div
6/2/2010
12:11:00.000 PM
TRENDS OF VOLTAGE
475.0
470.0
465.0
460.0
455.0
450.0
445.0
440.0
V
435.0
430.0
425.0
420.0
415.0
410.0
405.0
400.0
395.0
390.0
6/2/2010
11:52:00.000 AM
34
140.0
120.0
100.0
80.00
6/2/2010
11:52:00.000 AM
19:00.000 (min:s)
3 min/Div
6/2/2010
12:11:00.000 PM
19:00.000 (min:s)
3 min/Div
6/2/2010
12:11:00.000 PM
35
7.500
7.000
6.500
6.000
5.500
6/2/2010
11:52:00.000 AM
19:00.000 (min:s)
3 min/Div
6/2/2010
12:11:00.000 PM
2.400
2.200
%
2.000
1.800
6/2/2010
11:52:00.000 AM
19:00.000 (min:s)
3 min/Div
36
6/2/2010
12:11:00.000 PM
19:00.000 (min:s )
3 min/Div
6/2/2010
12:11:00.000 PM
0.20
0.18
0.16
0.14
0.12
0.10
6/2/2010
11:52:00.000 AM
19:00.000 (m in:s )
3 m in/Div
6/2/2010
12:11:00.000 PM
36.00
34.00
%
32.00
30.00
28.00
26.00
6/2/2010
11:52:00.000 AM
19:00.000 (m in:s )
3 m in/Div
37
6/2/2010
12:11:00.000 PM
54.00
52.00
Hz 50.00
48.00
46.00
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
TRENDS OF VOLTAGE
470.0
465.0
460.0
455.0
450.0
445.0
440.0
435.0
V 430.0
425.0
420.0
415.0
410.0
405.0
400.0
395.0
390.0
385.0
6/2/2010
12:27:00.000 PM
38
140.0
120.0
100.0
A
80.00
60.00
40.00
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
50.00E+3
45.00E+3
40.00E+3
35.00E+3
30.00E+3
25.00E+3
20.00E+3
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
39
19.00
18.50
18.00
17.50
17.00
16.50
16.00
% 15.50
15.00
14.50
14.00
13.50
13.00
12.50
12.00
11.50
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
2.050
2.000
1.950
1.900
1.850
1.800
1.750
%
1.700
1.650
1.600
1.550
1.500
1.450
1.400
1.350
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
40
6/2/2010
12:42:00.000 PM
1.000
0.95
0.90
0.85
6/2/2010
12:27:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
12:42:00.000 PM
15:00.000 (m in:s )
3 m in/Div
6/2/2010
12:42:00.000 PM
0.75
0.70
0.65
0.60
0.55
6/2/2010
12:27:00.000 PM
30.00
28.00
26.00
24.00
6/2/2010
12:27:00.000 PM
15:00.000 (min:s )
3 min/Div
41
6/2/2010
12:42:00.000 PM
54.00
52.00
50.00
Hz
48.00
46.00
6/2/2010
1:06:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
TRENDS OF VOLTAGE
480.0
475.0
470.0
465.0
460.0
455.0
450.0
445.0
440.0
V 435.0
430.0
425.0
420.0
415.0
410.0
405.0
400.0
395.0
390.0
6/2/2010
1:06:00.000 PM
42
70.00
65.00
60.00
55.00
50.00
A
45.00
40.00
35.00
30.00
25.00
6/2/2010
1:06:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
25.00E+3
20.00E+3
W
15.00E+3
10.00E+3
6/2/2010
1:06:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
43
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
2.250
2.200
2.150
2.100
2.050
2.000
1.950
1.900
6/2/2010
1:06:00.000 PM
15:00.000 (min:s)
3 min/Div
44
6/2/2010
1:21:00.000 PM
0.90
0.85
0.80
0.75
6/2/2010
1:06:00.000 PM
15:00.000 (min:s )
3 min/Div
6/2/2010
1:21:00.000 PM
80.00E-3
60.00E-3
%
40.00E-3
20.00E-3
0.000
6/2/2010
1:06:00.000 PM
15:00.000 (min:s)
3 min/Div
6/2/2010
1:21:00.000 PM
15:00.000 (m in:s )
3 m in/Div
45
6/2/2010
1:21:00.000 PM
Recommendation No.1
Existing Lighting
Description
Recommendation
Replace all the 40W FTL with T5 (28W) having the consumption
of 30 watt( Including the consumption of electronic choke i.e. 2W)
10 Hours
300 days/year
55W
30W
15 Nos.
Rs. 6750/-
Rs.460/-
Rs. 6900/-
1.02 years.
46
Recommendation No. 2
Existing Lighting
Description
Recommendation
Replace all the 36W FTL with T5 (28W) having the consumption
of 30 watt( Including the consumption of electronic choke i.e. 2W)
10 Hours
300 days/year
48W
30W
38 Nos.
Rs. 12,312/-
Rs.460/-
Rs. 17,480/-
1.41 years.
47
Recommendation No. 3
Existing Lighting
Description
Recommendation
Replace all the 2x36W FTL with 1x36W with polymer reflector
having the consumption of 38 watt (Including the consumption of
electronic choke i.e. 2W)
10 Hours
300 days/year
96W
38W
58W
16 Nos.
Rs. 16,704/-
Rs.860/-
Rs. 13,760/-
0.82 years.
48
Recommendation No. 4
Existing Lighting
Description
Recommendation
Replace all the 2x36W FTL with 1x36W with polymer reflector
having the consumption of 38 watt( Including the consumption of
electronic choke i.e. 2W)
10 Hours
300 days/year
76W
38W
38W
66 Nos.
Rs. 45,144/-
Rs.860/-
Rs. 56740/-
1.26 years.
49
Recommendation No. 5
Existing Lighting
Description
Recommendation
10 Hours
300 days/year
60W
7W
53W
14 Nos.
Rs. 13,356/-
Rs.700/-
Rs. 9,800/-
0.73 years.
50
Recommendation No. 6
Existing Lighting
Description
In cabinet secretariat block there are few numbers of 20W CFL are
installed having consumption of 20W of each lamp
Recommendation
10 Hours
300 days/year
20W
7W
13W
14 Nos.
Rs. 3,276/-
Rs.700/-
Rs. 9,800/-
2.99 years.
51
Recommendation No. 7
Existing Lighting
Description
In cabinet secretariat block there are few numbers of 18W CFL are
installed having consumption of 18W of each lamp
Recommendation
10 Hours
300 days/year
18W
7W
11W
35 Nos.
Rs. 6,930/-
Rs.700/-
Rs. 24500/-
3.53 years.
52
Recommendation No. 8
Existing Lighting
Description
Recommendation
10 Hours
300 days/year
15W
3W
12W
16 Nos.
Rs. 3,456/-
Rs.300/-
Rs. 4,800/-
1.38 years.
53
Recommendation No. 9
Existing Lighting
Description
Recommendation
10 Hours
300 days/year
114W
60W
54W
32 Nos.
Rs. 31,104/-
Rs.1500 /-
Rs.48000 /-
1.54 years.
54
Recommendation No. 10
Existing Lighting
Description
Recommendation
Replace all the 2x36W, 2x40W, T5 & 1x40W tube fixture with
LED strips which consumes 5 watts.
10 Hours
300 days/year
90W
69
6,210W
110W
880W
30W
13
390
55W
30
1650
55
9130W
5W per fitting
Average Power saving after replacement of all the fitting with LED strip
(9310 600)
= 8710 watts
Approximate No. of fitting use for Cornish light use at Cabinet secretariat :
120 Nos.
(10X300X8710) / 1000
= 26,130 units.
Rs. 1,56,780/-
Rs. 84,000/-
0.54 years.
56
57
Appendix-A
S.
No.
Floor
Room details
Inventory details
Quantit
y
Basement
CCTV Room
T5 Mirror Optics(1*2)
LCD Computer
CRT Computer
Plasma TV
Printer
Split AC
Exhaust Fan
Ceiling Fan
2
9
1
1
3
2
1
1
60
110
220
120
230
1.5
80
80
Total
circuit
watt in
room
120.00
990.00
220.00
120.00
690.00
3.00
80.00
80.00
Basement
Confrence
Room
18 W CFL
T5 Tubes
Ceiling AC Split
LCD Panels
24
10
2
2
18
30
2
110
432.00
300.00
4.00
220.00
Basement
Washroom
18 W CFL
36 W Tube
7
1
18
38
126.00
38.00
Basement
Canteen
40 W Tube (1*2)
10
84
840.00
Geyser
Fly Killer
Emergency Light
Water Boiler
Microwave Oven
Toaster
Griller
Hot Food Keeper
Electric Tava
Freezer
Water Cooler
Chiller Room
Mixer
40 W Tubes (1*2)
Geyser
T5 Tubes(1*2)
Ceiling Fan
Fly Killer
Emergency Light
1
1
1
1
1
1
1
1
1
1
1
1
1
13
4
2
1
2000
1200
2000
2000
2500
2000
2000
2000
2000.00
1200.00
2000.00
2000.00
2500.00
2000.00
2000.00
2000.00
2000
84
2000.00
84.00
60
80
780.00
320.00
Washroom
Sitting Part
58
Wattage/Tr
Centralised AC (8 openings)
Ground
Fl.
Library
T5 Tubes(1*2)
CRT Computer
Ceiling AC Split
Printer
Barcode Equip.
Scanner
8
1
1
1
1
1
60
220
2
230
480.00
220.00
2.00
230.00
Ground
Fl.
Room no. 2
T5 Mirror Optics(1*2)
CRT Computer
LCD Panel
Printer
Fax Mc
Shredder
Ceiling Fan
Split AC
4
2
2
4
1
1
1
2
60
220
120
230
240.00
440.00
240.00
920.00
80
1.5
80.00
3.00
Ground
Fl.
Driver Room
T5 Tubes
Ceiling Fan
Hot Case
2
1
1
30
80
1000
60.00
80.00
1000.00
Ground
Fl.
Washroom
40 W tube
Exhaust Fan
1
1
42
80
42.00
80.00
Ground
Fl.
Corridor
36 W Tube
9 W CFL
18 W CFL
40 W Tube
60 W GLS
Ceiling Fan
CRT
Printer
LCD Panel
2
3
4
6
1
1
1
1
1
38
9
18
42
60
80
220
230
120
76.00
27.00
72.00
252.00
60.00
80.00
220.00
230.00
120.00
10
Ground
Fl.
Room No. 3
36 W Tube(1*2)
Ceiling Fan
40 W Tube(1*2)
TV
25
3
2
1
76
80
42
220
1900.00
240.00
84.00
220.00
59
11
12
Ground
Fl.
Ground
Fl.
Room No. 4
4 (Cash Section)
Split Ac
Photocopier
Heater
CRT
Printer
Fax Mc
3
1
1
3
3
1
36 W (1*2)
36 W tube
Ceiling Fan
Window AC
Wall Fan
Photocopier
LCD
Printer
CRT
7
1
1
1
1
1
6
6
1
2*36 W Tube
1*36 W
Window AC
Split AC
LCD
Printer
Ceiling Fan
Electric Calculator
Hotcase
Heater
4
1
1
1
3
3
1
1
1
1
1.5
4.50
1000
220
230
1000.00
660.00
690.00
76
38
60
1.5
50
532.00
38.00
60.00
1.50
50.00
110
230
220
660.00
1380.00
220.00
76
38
1.5
1.5
110
230
80
304.00
38.00
1.50
1.50
330.00
690.00
80.00
1000
1000
1000.00
1000.00
13
Ground
Fl.
Room No. 5
2*36 W Tube
LCD
Printer
Ceiling Fan
Window AC
60 W GLS
2
2
2
1
1
1
76
110
230
80
1.5
60
152.00
220.00
460.00
80.00
1.50
60.00
14
Ground
Fl.
Room No. 6
2*36 W Tube
CRT
Printer
LCD
Ceiling Fan
4
3
4
1
1
76
220
230
110
80
304.00
660.00
920.00
110.00
80.00
60
Window AC
1.5
1.50
15
Ground
Fl.
Room No. 7
T5
1*36 W Tube
Ceiling Fan
Window AC
1
3
1
1
30
38
80
1.5
30.00
114.00
80.00
1.50
16
Ground
Fl.
Room No. 8
2*36 W Tube
Ceiling Fan
Window AC
CRT
Shredder
3
1
1
1
1
76
80
1.5
220
228.00
80.00
1.50
220.00
17
Ground
Fl.
Room No. 9
2
5
1
1
1
1
1
1
3
1
1
76
38
1.5
80
152.00
190.00
1.50
80.00
1000
110
220
230
1000.00
110.00
220.00
690.00
2*40 W Tube
Window AC
Photocopier
LCD
CRT
Printer
Shredder
Hotcase
Heater
Ceiling Fan
Wall Fan
Electric Kettle
4
1
2
1
1
2
1
1
1
1
1
1
84
1.5
336.00
1.50
110
220
230
110.00
220.00
460.00
1000
1000
80
50
1000.00
1000.00
80.00
50.00
40 W Tube
36 W Tube
Ceiling Fan
18
8
1
42
38
80
756.00
304.00
80.00
18
19
First
First
Room No.14A
Room No. 13
61
Split AC
TV
LCD
Printer
60 W Tube
2
1
2
1
1
1.5
220
110
230
60
3.00
220.00
220.00
230.00
60.00
20
First
2*36 W Tube
Split AC
Ceiling Fan
Printer
LCD
TV
Fly Killer
Shredder
Photocopier
3
1
1
2
1
1
1
1
1
76
1.5
80
230
110
220
228.00
1.50
80.00
460.00
110.00
220.00
21
First
Room No. 12
T5 Tubes
Ceiling Fan
Window AC
CRT
LCD
Printer
TV
Emergency
Electric Kettle
40
4
6
8
4
12
1
1
1
30
80
1.5
220
110
230
220
1200.00
320.00
9.00
1760.00
440.00
2760.00
220.00
22
First
Room No. 15
2*36 W Tubes
20 W
CFL 20 W
Split AC
Sony Full HD 46'
60 W complex
LCD
Decorative LED
Printer
Shredder
15 W GLS
CFL 27W
Geyser
Shower Cubicle
Handdrier
Fridge
14
2
8
2
1
3
2
4
2
1
2
1
1
1
1
1
102
20
20
1.5
140
60
110
1428.00
40.00
160.00
3.00
140.00
180.00
220.00
230
460.00
15
27
2
30.00
27.00
2.00
1.5
1.50
Washroom
62
23
24
25
26
First
First
First
First
Room No. 18
Room No. 17
2*36 W Tube
2*40 W Tube
Ceiling Fan
TV
CRT
LCD
Photocopier
Printer
Window AC
3
1
1
1
2
1
1
2
2
76
84
80
220
220
110
228.00
84.00
80.00
220.00
440.00
110.00
230
1.5
460.00
3.00
2*36 W Tube
40 W Tube
CRT
LCD
Ceiling Fan
Hotcase
Electric Kettle
Printer
Split AC
3
1
1
1
1
1
1
2
1
102
53
220
110
80
1000
306.00
53.00
220.00
110.00
80.00
1000.00
230
1.5
460.00
1.50
2*40 W Tube
2*36 W Tube
15 W Bulb
Split AC
LCD
Printer
Hotcase
Fax Mc
Ceiling Fan
Photocopier
1
1
2
1
2
1
1
1
1
1
106
102
15
1.5
110
230
1000
106.00
102.00
30.00
1.50
220.00
230.00
1000.00
80
80.00
40 W Tube
2*36 W Tube
Ceiling Fan
Split AC
LCD
Radiant Heater
Fly Killer
Shredder
Printer
Samsung LCD 26'
15 W Bulb
12
2
1
2
1
1
1
1
1
1
2
53
102
80
1.5
110
1200
636.00
204.00
80.00
3.00
110.00
1200.00
230
110
15
230.00
110.00
30.00
63
27
First
Visitor Room
28
First
Committee
Room
29
First
30
31
32
Ceiling AC Split
60 W Complex bulb
Metal Light 70 W
Blower
1
6
4
1
2
60
70
1200
2.00
360.00
280.00
1200.00
2*54 W Tube
2*36 W Tube
46' LCD
32
4
2
136
102
120
4352.00
408.00
240.00
COSA
2*36 W Tube
T5 Tubes
TV
LCD
Split AC
Wall Fan
3
2
1
4
1
1
102
30
220
110
1.5
50
306.00
60.00
220.00
440.00
1.50
50.00
First
Room No. 11
2*36 W Tube
Ceiling Fan
LCD
Printer
Window AC
Split AC
2
1
2
2
1
1
102
80
110
230
1.5
1.5
First
T5 Tube
2*36 W Tube
15 W bulb
Fax Mc
TV
Printer
LCD
Ceiling Fan
6
2
2
1
1
2
1
1
30
102
15
204.00
80.00
220.00
460.00
1.50
1.50
0.00
180.00
204.00
30.00
220
230
110
80
220.00
460.00
110.00
80.00
2*40 W Tube
T5 Tube
Ceiling Fan
Split AC
Wall Fan
CRT
LCD
Printer
Shredder
Hotcase
4
13
1
1
1
3
3
5
1
1
84
30
80
1.5
50
220
110
230
336.00
390.00
80.00
1.50
50.00
660.00
330.00
1150.00
1000
1000.00
First
14B - Staff
64
33
34
Second
Second
Room No. 19
2*36W Tube MO
2*36 W Tubes
15 W bulb
Ceiling fan
Window AC
TV
Shredder
Fax Mc
LCD
Printer
Hot Air
Photocopier
Radiant Heater
15 W bulb
2
12
2
1
2
1
1
1
1
1
1
1
1
2
2*36 W Tube
1*36 W Tube
15 W bulb
Window AC
TV
LCD
Printer
Fax Mc
Blower
2
1
2
1
1
1
1
1
1
102
102
15
80
1.5
220
204.00
1224.00
30.00
80.00
3.00
220.00
110
230
1000
110.00
230.00
1000.00
1200
15
1200.00
30.00
102
50
15
1.5
220
110
230
204.00
50.00
30.00
1.50
220.00
110.00
230.00
1200
1200.00
35
Second
1*36 W Tube
Ceiling Fan
Printer
CRT
LCD
Window AC
2
1
1
1
1
1
38
80
230
220
110
1.5
76.00
80.00
230.00
220.00
110.00
1.50
36
Second
36 W Tube
Ceiling Fan
Split AC
Heater
LCD
Printer
Photocopier
TV
Exhaust Fan
3
1
1
1
1
1
1
1
2
38
80
1.5
1000
110
230
114.00
80.00
1.50
1000.00
110.00
230.00
220
80
220.00
160.00
2*36 W Tube
15
76
1140.00
37
Second
Room No. 22
65
38
39
Second
Second
Room No. 23
Room NO. 24
Washroom
40
Second
Room No. 25
2*36 W Tube MO
1*36 W Tube
Ceiling Fan
Wall Fan
Split AC
Window Ac
LCD
CRT
Printer
Fax Mc
Shredder
2
2
3
2
2
1
4
8
12
1
1
76
38
80
50
1.5
1.5
110
220
230
152.00
76.00
240.00
100.00
3.00
1.50
440.00
1760.00
2760.00
1*36 W Tube
1*40 W Tube
2*40 W Tube
Window AC
Wall Fan
Ceiling Fan
Printer
LCD
Hotcase
Electric Kettle
CRT
Shredder
Fax Mc
6
4
2
3
4
1
9
3
1
2
5
2
1
38
42
84
1.5
50
80
230
110
1000
228.00
168.00
168.00
4.50
200.00
80.00
2070.00
330.00
1000.00
230
1150.00
2*36 W MO
2*36 W Tube
15 W bulb
Ceiling Fan
Split AC
TV
Fax Mc
LCD
Printer
Shredder
Blower
36 W Tube
Fridge
2
12
2
1
2
1
1
1
2
1
1
1
1
76
76
15
80
1.5
220
152.00
912.00
30.00
80.00
3.00
220.00
110
230
110.00
460.00
1200
38
2000
1200.00
38.00
2000.00
2*40 W Tube
2*36 W Tube
LCD
8
2
1
84
76
110
672.00
152.00
110.00
66
Printer
Heater
Split AC
40 W GLs
Blower
Photocopier
TV
Ceiling Fan
Fax Mc
1
1
1
1
1
1
1
1
1
230
1000
1.5
40
1200
230.00
1000.00
1.50
40.00
1200.00
220
80
220.00
80.00
41
Second
Room No. 26
2*36 W MO
2*36 W Tube
15 W Bulb
CFL 23 W
40 W GLS
Ceiling Fan
Window AC
Split AC
TV
Blower
LCD
Printer
Fax Mc
2
12
2
1
1
1
1
1
1
1
1
1
1
76
76
15
23
40
80
1.5
1.5
220
1200
110
230
152.00
912.00
30.00
23.00
40.00
80.00
1.50
1.50
220.00
1200.00
110.00
230.00
42
Second
Room No.26A
2*36 W Tube
1*36 W Tube
Electric Kettle
Ceiling Fan
Window AC
LCD
CRT
Printer
1
2
1
1
1
1
1
2
76
38
76.00
76.00
80
1.5
110
220
230
80.00
1.50
110.00
220.00
460.00
43
Second
Pantry
36 W Tube
Water Boiler
Water Cooler
Hotcase
1
1
1
1
38
2000
2000
1000
38.00
2000.00
2000.00
1000.00
44
Second
Corridor
36 W Tubes
CFL Bulbs 20 W
2*11 W CFL
Complex Bulb 60 W
50
5
5
2
38
20
22
60
1900.00
100.00
110.00
120.00
67
45
Second
Room No.21
2*36 W Tubes
2*36 W MO
Ceiling Fan
TV
Window AC
LCD
CRT
Shredder
Printer
Heater
68
16
2
1
1
1
4
2
1
4
1
76
76
80
220
1.5
110
220
1216.00
152.00
80.00
220.00
1.50
440.00
440.00
230
1000
920.00
1000.00
69
APPENDIX B
Basement
CCTV Room
5.37
5.17
27.76
2.5
1.05
243-280
257
T5 Mirror Optics(1*2)
No.
of
light
fittin
g
2
Basement
Confre-nce Room
7.16
4.7
33.65
3.19
0.89
700-780
710
18 W CFL
24
18
432.00
7.16
4.7
33.65
4.19
0.68
700-780
710
T5 Tubes
10
30
300.00
12.00
0.57
300-350
320
18 W CFL
18
126.00
12.00
0.57
300-350
320
36 W Tube
38
38.00
Canteen
25
4.7
117.50
1.32
257-500
354
40 W Tube (1*2)
10
84
840.00
Washr-oom
25
4.7
117.50
1.32
257-500
354
40 W Tubes (1*2)
84
84.00
S.
No.
3
4
Length
in m
Floor
Basement
Basement
Washr-oom
Width
in m
Area
in
sq.m.
Mounting
height in
m
Room
Index
Recorded
average Lux
Level
Range
Avg
Wattage
Total
circuit
watt in
room
W/
Sq.m
Lux/W/
Sq.m.
Target
Lux/W/
Sq.m
60
120.00
4.32
59.46
36
21.7
32.7
36
13.6
23.5
36
14.5
24.4
36
Sitting Part
25
4.7
117.50
1.32
257-500
354
T5 Tubes(1*2)
13
60
780.00
Ground Fl.
Library
6.48
5.4
34.99
2.76
1.07
169-369
232
T5 Tubes(1*2)
60
480.00
13.72
16.91
36
Ground Fl.
Room no. 2
7.24
5.78
41.85
1.82
1.77
89-187
167
T5 Mirror Optics(1*2)
60
240.00
5.74
29.12
36
Ground Fl.
Driver Room
6.00
2.5
0.48
67-140
94
T5 Tubes
30
60.00
10.00
9.40
36
Ground Fl.
Wash-room
4.5
3.5
15.75
3.5
0.56
48-80
69
40 W tube
42
42.00
2.67
25.88
36
Ground Fl.
Corridor
11
2.5
27.50
2.5
0.81
26-112
65
36 W Tube
38
76.00
17.7
3.6
36
11
2.5
27.50
2.5
0.81
26-112
65
9 W CFL
27.00
11
2.5
27.50
2.5
0.81
26-112
65
18 W CFL
18
72.00
11
2.5
27.50
2.5
0.81
26-112
65
40 W Tube
42
252.00
11
2.5
27.50
2.5
0.81
26-112
65
60 W GLS
60
60.00
9.26
6.55
60.65
1.92
82-256
135
36 W Tube(1*2)
25
76
1900.00
32.7
4.1
36
9.26
6.55
60.65
1.92
82-256
135
40 W Tube(1*2)
42
84.00
6.97
5.47
38.13
1.02
143-265
204
36 W (1*2)
76
532.00
14.9
13.6
36
6.97
5.47
38.13
1.02
143-265
204
36 W tube
38
38.00
4.31
4.06
17.50
3.5
0.60
65-249
177
2*36 W Tube
76
304.00
19.5
9.0
36
4.31
4.06
17.50
3.5
0.60
65-249
177
1*36 W
38
38.00
12.00
0.50
55-112
77
2*36 W Tube
76
152.00
17.6
4.3
36
12.00
0.50
55-112
77
60 W GLS
60
60.00
10
11
12
13
Ground Fl.
Ground Fl.
Ground Fl.
Ground Fl.
Room No. 3
Room No. 4
4 (Cash Section)
Room No. 5
14
Ground Fl.
Room No. 6
5.29
4.7
24.86
0.83
98-190
154
2*36 W Tube
76
304.00
12.23
12.60
36
15
Ground Fl.
Room No. 7
2.5
10.00
0.77
57-156
115
T5
30
30.00
14.4
7.9
36
2.5
10.00
0.77
57-156
115
1*36 W Tube
38
114.00
16
Ground Fl.
Room No. 8
2.69
10.76
2.5
0.64
143-255
184
2*36 W Tube
76
228.00
21.19
8.68
36
17
Ground Fl.
Room No. 9
5.71
4.44
25.35
3.5
0.71
40-278
169
76
152.00
13.5
12.5
36
5.71
4.44
25.35
3.5
0.71
40-278
169
36 W Tube
38
190.00
18
First
Room No.14A
4.44
17.76
2.71
0.78
221-418
263
2*40 W Tube
84
336.00
18.92
13.90
36
19
First
Room No. 13
6.63
5.81
38.52
2.5
1.24
122-269
201
40 W Tube
18
42
756.00
29
6.9
36
6.63
5.81
38.52
2.5
1.24
122-269
70
201
36 W Tube
38
304.00
6.63
5.81
38.52
2.5
1.24
122-269
201
60 W Tube
60
60.00
20
First
5.57
5.19
28.91
2.5
1.07
222-372
303
2*36 W Tube
76
228.00
7.89
38.42
36
21
First
Room No. 12
12.48
5.09
63.52
2.5
1.45
212-435
319
T5 Tubes
40
30
1200.00
18.89
16.89
36
71
component. The Harmonic filters connected suitably near the equipment generating
harmonics help to reduce Total Harmonic Distortion to acceptable limits
73
1/1.5 TR. Constant air volume (CAV) type & being old, most of them are inefficient and
drawing avg. power of around 1.68 KW/TR.
b) Daikin make VRV III outdoor type air conditioners with cooling capacity of 14.2 KW &
heating 12.9 KW have been installed to cater the requirements of conference room,
telephone exchange & one room in the basement.
c) Two units of outdoor Digital scroll type VRF air-conditioners (Voltas make, 25.2 KW
cooling & 27 KW heating) have also been installed for Lady Telephone Exchange feeding
to 6 nos. of wall mounted indoor evaporators.
d) For canteen having freezer chamber (maintaining 4 degree C & deep freezer (under
shutdown) for keeping eatable materials and most of the time run without material or
very few material in the basement, chiller a/c system is provided separately for human
comfort.
e) For the exclusive cooling & heating of the committee room on the first floor, AHU
type a/c of 2 X 8.5 TR (one standby) has been installed on the same floor.
In order to achieve energy saving on account of air-conditioning , it is proposed to
replace the existing window/split A/C with the equivalent VRV /VRF air-conditioning
system for the ground , first & second floor for an area of about 10127 Sq. ft.
Ground floor
: 2776 sq.ft
First Floor
: 4045 sq.ft.
Second floor
: 3306 sq.ft.
The total installed capacity of window/split CAV type a/cs on the ground, first & second
floor is about 80TR as per details below for a area of 10,127 sq. ft.
74
1.68KW/TR
80X1.68=134.4 KW
60X0.9 =54 KW
134.4 -54= 80.4KW
80.4X300X10=241000
76
77
78
7.2 MISCELLANEOUS
of these, computers are in use in very large numbers and hence, a comparative study
has been placed below for use of TFT v/s CRT monitors for the computers.
Use of TFT (LCD) Monitors in place of old CRT Monitors
These days, TFT (LCD) computer monitors are readily available in the market and they
offer a number of advantages as compared to old CRT monitors. These are as under:
a. They occupy lesser area
b. More warranty
c. Less heat dissipation and therefore lesser load on air conditioning system
d. Bigger screen size
e. Consume lesser energy
The energy savings by using TFT monitors in place CRT monitors can be calculated as
under :
(i) Difference between electricity consumption of the two monitors
= 40 watts 17 watts
= 23 watts
= 8 hrs/day X 250
days/year
= 2000 hrs/year
(iii) Average saving in electricity consumption
units
= 23 X 2000/1000
= 46 units
= 50 btu/hr
= 50 X 2000 btu
= 50 X 2000/3412
= 29.3 units
The investment required for each of the TFT monitor is app. Rs. 7,500/- and
accordingly, the payback period comes to around 17.8 years. However, based on
several other advantages of using TFT monitors as mentioned above, one may still take
the decision to replace CRT monitors with TFT monitors.
80
APPENDECIES
7.1 LIST OF INSTRUMENTS USED IN ENERGY AUDITING
S.
No.
Instrument
Features
Lux meter
Distance Meter
81
For Occupancy sensors, energy saver for air conditioners, LED products,
lighting luminaries, etc.
(i)
(ii)
Mr. VIKAS
M/S ALPINE TECHNOLOGIES,
108, Rishabh Vihar, Karkardooma,
Delhi 110092
Mobile : 09810160265
(ii)
(iii)
Mobile : 09837072082
Phone : 0121 - 2440611
83