You are on page 1of 9

PT WIJAYA KARYA

REKAYASA KONSTRUKSI
Mechanical & Electrical Construction - Operation & Maintenance

METHOD STATEMENT FOR CABLE GROUNDING INSTALLATION

Erection and Installation of Civil, Mechanical and Electrical Works


for Inur Sakato Power Plant in Timor Leste

HEAD OFFICE :
Menara MTH, 17th Floor, Jl. M. T. Haryono, Kav 23, Jakarta Selatan 12820, Indonesia
Telephone : +62 (021) 83782491-93; Fax. : +62 (021) 83782494
Website : www. Wikarekon.co.id
Workshop: Komplek Industri Kembang Kuning. Jl. Raya Narogong, KM 26,5. Cileungsi - Bogor - Jawa Barat

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

Document No :

Page 1 of 8

METHOD STATEMENT FOR CABLE GROUNDING INSTALLATION

Revision

Name

Kind of Change

Date

Signature

Action

Name

Title

Date

Signature

Prepared By

Bayu dwi p

Reviewed By
Reviewed By
Reviewed By
Reviewed By
Reviewed By

1 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

Document No :

Page 2 of 8

CONTENTS
Page
1. TITLE 3 of 8
2. SCOPE . 3 of 8
3. OBJECTIVE 3 of 8
4. REFERENCE .. 3 of 8
5. RESPONSIBILITY .. 3 of 8
6. WORK PROSEDURE 4 of 8

2 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

1.0

Document No :

Page 3 of 8

TITLE
Underground Earthing Works

2.0

SCOPE
This method is to describe the minimum requirements for earthing conductor
installation in materials receiving, storing, and installation.

3.0

OBJECTIVE
This is to assure that the requirements of underground earthing installation works
are meets the codes requirements and contract specifications. To make sure, the
works are carried out in acceptable workmanship and follow the requirements of
project.

4.0

REFERENCE
4.1
4.2
4.3

5.0

Applicable Manufacturers Recommendation


Contract Specifications and approved Construction Drawing
Standards, codes and recommended practices

RESPONSIBILITY
5.1

The Site Engineer at site shall be responsible for the planning scheduling
and coordination, record and monitor progress of Underground earthing
works. To guide the supervisors in the field in terms of engineering and
technical problems.

3 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

6.0

Document No :

Page 4 of 8

WORK
6.1

GENERAL

1. The field installation, inspection and test of underground earthing shall be


executed under the responsibility of contractor according to the relevant
drawings and documents.
2. The work shall be done according to good workmanship and by using the
suitable tools and material as stated in the construction drawings,
approve documents, and procedures and it shall be studied before carry
out any electrical works.
3. Safety and Sanitation.
Full care and pre-caution shall be given by the field management for the
safety and sanitation of workman in the field to prevent accidents during
execution of the works.

4 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

6.2

Document No :

Page 5 of 8

GENERAL STEP OF CABLE GROUNDING INSTALLATION


1. Prepare the clamping tool :

To know C clamp already installed corectly, we must measure the difference end
of the C clamp before and after clamping proses.

5 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

Document No :

Page 6 of 8

2. Ensure excavation work in every building foundation already finish, and the
elevation of excavation appropriate with the design level
3. .Install Grounding cable in every building foundation, Installation start from
base excavation, and cable grounding must be touch with the soil.

6 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

Document No :

Page 7 of 8

4. Ensure every conection of grounding cable installed correctly.

7 of 8

Contractor:

Owner:

INUR SAKATO 4 X W9L34


POWER PLANT - PROJECT

PT WIKA REKAYASA KONSTRUKSI

Contract No

METHOD STATEMENT FOR CABLE


GROUNDING INSTALLATION.

Document No :

Page 8 of 8

5. For grounding cable rise up the installation must be installed correctly.

8 of 8

You might also like