Professional Documents
Culture Documents
FIELD OF ACTIVITIES
Building(Architectural) Steel Structures
- High-Rise Building
- Convention Center
- Airport Terminal
- Bus Terminal
- Sports Stadium
- Observation Tower
- Parking Tower
- Other Architectural Structures
Pre-Engineered Building Systems
Space Frame
- Sports Stadium
(Gymnasium, Velodrome, Sports Complex, etc.,)
- Passenger Terminal (Airport, Bus, Railway)
- Exhibition Hall, Pavillion & Museum
- Market & Department Store
- Factory & Warehouse
- Event Hall(In&Out-Door) & Model House
- Building Skylight & Interior Decoration, etc.,
Plant Steel Structures
- Oil & Gas Plant
- Petro-Chemical Plant
- Refinery Plant
- Ethylene Plant
- Power Station
- Fertilizer Plant
- Cement Plant
- Desalination Plant
- Steel Mill Plant
- Paper Mill
- Other Industrial Plants
- Flare Stack & Equipment Platform / Ladder
Hot Dip Galvanizing
Guard Road
HANMAEK,
For the past thirty years,
which has been recognized
as a professional steel structure
fabricator/erector is retaining
the firm position in various
industry fields.
Contents
Shop Area
Total Area
Roofed Area
- Indoor Fab. shop
- Galvanizing Shop
- Shop Blasting Booth(Auto)
- Shop Blasting Booth(Manual)
- Painting Shop(Fixed)
- Painting Shop(Movable)
- Others(Utility Shelter)
- Office
Un-Roofed Area
- Out-Door Fab. Yard
- Paint Drying Yard
- Sorting & Packing Yard
- Raw Material Stock Yard
- Other Service Yard
150,000
(35,000 )
16,800
2,100
50
500
810
1,750
2,340
650
(105,000 )
15,000
20,000
13,000
20,000
37,000
Aug.
2007
May.
2007
Feb.
2007
Nov.
2006
Oct.
2005
Completed New Factory (expanded) in Hwasung, KyungkiDo(100,000Tons Annual Capacity of Fabricated Structural Steel)
May.
1997
Jun.
1995
Nov.
1991
Oct.
1991
Oct.
1991
Completed New Factory at the Sihwa Industrial Estate, KyungkiDo.(36,000tons Annual Capacity Fabricated Structural Steel)
Jan.
1991
Jan.
1990
Oct.
1986
Feb.
1983
Feb.
1983
Sep.
1978
STRUCTURAL ANALYSIS
Receiving Inspection
Full-scale Drawing
Fab.Sequence/Instruction
(IF REQUIRED)
Inspection
Marking&Cutting
Inspection
Pre-Assembly
Inspection
Welding
NO
Inspection
OK
Trial Assembly
NDE Test
(Ultrasonic Test, etc.)
(IF REQUIRED)
Inspection
Painting or Galvanizing
Identification Marking
Inspection
Packing
Inspection
shipping
MAJOR EQUIPMENT
10
Project Name : Inchon International Airport Passenger Terminal & Traffic Center
Location
: Inchon, Korea
11
12
13
14
Hanmaek have also performed a lot of domestic and overseas steel structure work results in the
field of high-rise building for past 30 years.
By CAD, CAM System, Hanmaek do mass production process of H-Beam built-up line, CNC
sawing machine & 3-D drilling machine.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
SPACE FRAME
H.M SPACE FRAME SYSTEM, 3-dimensional frame structures, is a space innovation in building design and is recognized
for contributing functional beauty to
architectural design.
H.M SPACE FRAME SYSTEM is a remarkably versatile design medium and
architects are continually finding new and
unique ways to apply its numerous combinations of qualities.
Hanmaek offers H.M SPACE FRAME to
satisfy any requirements for span, geometry, aesthetics and structural support.
We also provide a full range of services for
design, engineering, fabrication, erection
and consultation.
Hanmaek has a worldwide organization
and distributor network, and our technical sales representatives in your area are
ready to assist in design of your pro-jects.
30
Space Innovation
Simple
Strong
Economic
Beautiful
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Hanmaek guide rail produced by accumulated know-how & complete N.C. automation line is
road safety system which confronts effectively in inducement and derailment prevention of
travelling vehicles. We supply various materials of guide rails in demand and specification of
customers.
46
Characters
Excellent sound-absorbing rate and sound
penetration loss.
Excellent durability Economical price
Easy construction and maintenance
Uses
Railway, expressway, freeway, periphery of
school and apartment complexes, and other
noisy areas.
47
Mark
A
B
35
40
45
50
ZHD A
ZHD B
ZHD 35
ZHD 40
ZHD 45
ZHD 50
55
35A
40A
40B
45B
50B
ZHD 55
ZHD 35A
ZHD 40A
ZHD 40B
ZHD 45B
ZHD 50B
ZHD 55C
55C
weight of zinc
coating( g/m2 )
350g/m2 over
400g/m2 over
450g/m2 over
500g/m2 over
550g/m2 over
350g/m2 over
400g/m2 over
400g/m2 over
450g/m over
500g/m2 over
500g/m2 over
Category
Time of
unigormity Test
4 time over
5 time over
4 time over
4 time over
5 time over
5 time over
5 time over
6 time over
Class of Material
Minimum weight of
zinc coating OZ/ft2
Design
Any
Average
of
-ation
specimens individual
specimen
tested
A123
2.00
2.30
1.80
2.00
A153
2.00
1.80
2.00
1.08
1.50
1.25
1.30
1.10
1.25
1.00
1.00
0.85
2.00
1.80
610
460
2.00
1.80
335
1.50
1.25
610
1.25
1.00
305
1.00
1.85
Steel which
are not
centrifuged
TANK SIZE
1. DEGREASING
48
2. PICKLING
3. FLUXING
4. DRYING
5. GALVANIZING
6. TESTING
7. FINISHING
8. PACKING&SHIPPING
49
HANMAEK FACTORY
50
CERTIFICATE
51