Professional Documents
Culture Documents
Candidates Name
2.
Nationality
Indian
3.
QC Manager
4.
Candidates Employer
MGC Engineering
5.
6.
Very Good
7.
QC Supervisor Mechanical
8.
QC Manager
10.
Educational qualifications:
10.1 University degree
2002
Additional Qualification:
UT,PT,RT & MT
IRCA Certified Lead auditor course
as per ISO 9001:2000
Primavera Project planner 3.1
MS Office 2003
HVAC Course certificate
Page 2 of 5
11.
PROJECT
Name of Company
SINOPEC(SME)
Position
QC Supervisor Mechanical
Duration
PROJECT
Name of Company
TAACA (Earthtech ),
Position
QC Manager
Location
Marafiq , Al-Jubail ,
Duration
Dec
PROJECT
Name of Company
Arcelormittal Jubail
Position
QC Manager Mechanical/Piping
Location
Duration
Mar
PROJECT
Name of Company
:
:
Position
QC Manager Mechanical/Piping
Location
Duration
Feb
PROJECT
Name of Company
:
:
Position
QC Superintendent Mechanical/Piping
Location
Duration
Feb 2008 TO
PROJECT
Name of Company
:
:
Position
QC Superintendent Mechanical/Piping
Location
Duration
May 2006 TO
2011 TO
KSA
June 2012
Dec 2008.
Feb 2008.
Page 3 of 5
PROJECT
Name of Company
:
:
Position
Location
Duration
PROJECT
Name of Company
:
:
Position
Location
Duration
PROJECT
Name of Company
Position
:
:
:
Location
Hyderabad, India .
Duration
Ensuring that all Quality Programmes are operating effectively and that they are in
full compliance with ISO 9001: 2008.
Prepare and effectively maintain of Quality Management procedure (QMS) for the
corporate office.
Preparations of the Project Quality plan (PQP) and submit it for Client approval and
incorporation of the comments received.
Preparing Two weeks look ahead schedule for inspection and submitting to Contractor
and Client.
Effective maintain and implement of all the Quality management procedure in the
project and develop project specific Quality procedure.
Implement the Corpoarate Quality policies and objectives in the project and ensuring
all the Employees are well versed with it.
Page 4 of 5
Preparation of the ITP and QCP based on the Scope of work, Project and Client specific
requirements.
Prepare the index and Schedule for the submission of All Quality Manuals,
procedures, plans and Quality Documents for the project.
Identify and eliminate causes of non conformities, develop and implement plans and
programs to training employees in lean techniques and best practices. Analyze the
non conformities and establish prevention measures for all phases of construction
activities
Ensuring all Contractors' activities etc, comply with clients Standard and the General
Codes, Reviews Contractors Quality Documentation and project Quality plan.
Ensuring that all approved QC Inspection team were continuously checking and
monitoring all work activities.
Ensuring all QA/QC non-conformances and punch list items were actioned correctly,
signed off and close.
Monitors maintenance and distribution the latest revision of drawings making sure all
are signed and approved for field use
Final Preparation and review of Weld tracking/History sheet and getting signoff.
Involved in the PSSR(Pre start safety review) punch list and clearing them and getting
signed off from the client
Walk down the system and making sure it is ready for commissioning
Preparation of documents for pre and post inspection activities with consideration to
relevant drawing
Allotting the ownership for the punchlist and getting feedback day to day
Page 5 of 5
Execute the QA/QC program exercising professional judgment within the framework
of broad guidelines Quality Control Manual and Inspection and Test Plan
Knowledge in application of codes and standards of API-510, API-570, API-650, API653, API-1104, & ASME B16.5, B16.20, B31.1, B31.3 and AWS.
Witness welders and welding operator qualification test scrutinize WPS, PQR, and
WQT.The examination includes material identification, welding consumables, joint
preparation, fit-up, heat treatment, welding variables, parameter and techniques
Inspection of flanges, Bolts, Gasket, valves, Bolt Torqing & Tape wrap for
underground piping
Select best NDE method for final appearances of finish welds, PWHT, and hardness
test. Check and review it.
Examining and inspection of Raw materials, surveying site, site dimension and site
drawings.
Major Achievements:
Developed the weld tracking system for reworks with the help of an IT professional
Programmer in Microsoft Access which is first time in the history of Kentz as per the
project requirement.
Have done Material consolidation on site at the beginning stage of the project (JCP
Port Facilities) and validate the BOQ provided by the Engineering, and hence saves
the (Kentz) company from the over head materials cost which was roughly 2 million
Dollars.
Assist and Developed the Inspection, Testing and Preventive maintenance ITPM
Programme in Al-Bayroni, It involves predictive and preventive maintenance
programme at defined intervals for all the safety and critical equipment within the
facility.