You are on page 1of 2

18790 Federal Register / Vol. 73, No.

67 / Monday, April 7, 2008 / Notices

proposed facilities would disturb about your specific comments or concerns appropriate date range. For assistance,
12,000 acres of land. Of the 12,000 about Ruby’s planned project. Your please contact FERC Online Support at
acres, about 8,000 acres would be comments should focus on the potential FERCOnlineSupport@ferc.gov or toll
temporarily disturbed and about 4,000 environmental effects, reasonable free at 1–866–208–3676, or for TTY,
acres would be permanently maintained alternatives, and measures to avoid or contact (202) 502–8659. The eLibrary
for operation of the pipeline within a lessen environmental impacts. The more link on the FERC Internet Web site also
50-foot-wide permanent right-of-way specific your comments, the more useful provides access to the text of formal
and as aboveground facility sites. they will be. If you wish to mail documents issued by the Commission,
Following construction, all temporary comments, please carefully follow these such as orders, notices, and
workspaces would be restored and instructions: rulemakings.
allowed to revert to former use. About • Send an original and two copies of In addition, the FERC now offers a
60 percent of the proposed route would your letter to: free service called eSubscription that
cross federally administered land Kimberly D. Bose, Secretary, Federal allows you to keep track of all formal
managed by the BLM or USFS. Energy Regulatory Commission, 888 issuances and submittals in specific
First Street, NE.; Room 1A, Washington, dockets. This can reduce the amount of
The EIS Process DC 20426. time you spend researching proceedings
The FERC will be the lead federal • Label one copy of your comments by automatically providing you with
agency for the preparation of the EIS. As for the attention of Gas 1, DG2E; and notification of these filings, document
noted above, the BLM and USFS will be • Reference Docket No. PF08–9–000 summaries, and direct links to the
cooperating agencies. NEPA requires the on the original and both copies. documents. To register for this service,
FERC to take into account the • Mail your comments so that they go to the eSubscription link on the
environmental impacts that could result will be received in Washington, DC, on FERC Internet Web site (http://
from an action whenever it considers or before April 30, 2008. www.ferc.gov/docs-filing/
the issuance of a Certificate of Public The Commission encourages
esubscription.asp). Information
Convenience and Necessity under electronic filing of comments. See 18
concerning the involvement of the BLM
Section 7 of the Natural Gas Act. NEPA CFR 385.2001(a)(1)(iii) and the
in the EIS process may be obtained from
also requires us to identify and address instructions on the Commission’s
Mark Mackiewicz, PMP, National
concerns the public may have about Internet Web site at http://www.ferc.gov
Project Manager, at (435) 636–3616.
proposals. This is the ‘‘scoping’’ process under the link to ‘‘Documents and
Information concerning the involvement
referred to earlier. The main goal of the Filings’’ and ‘‘eFiling.’’ eFiling is a file
of the USFS may be obtained from
scoping process is to focus the analysis attachment process and requires that
Catherine Callaghan at the Fremont-
in the EIS on important environmental you prepare your submission in the
Winema National Forest at (541) 947–
issues and reasonable alternatives. By same manner as you would if filing on
2151, and David Ream (801) 236–3400
this Notice, we are requesting agency paper, and save it to a file on your
at the Wasatch-Cache National Forest.
and public comments on the scope on computer’s hard drive. New eFiling
the issues to be addressed in the EIS. All users must first create an account by Kimberly D. Bose,
comments received will be considered clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ Secretary.
during the preparation of the EIS. You will be asked to select the type of [FR Doc. E8–7104 Filed 4–4–08; 8:45 am]
We have already started to meet with filing you are making. This filing is BILLING CODE 6717–01–P
Ruby personnel, agencies, and other considered a ‘‘Comment on Filing.’’ In
interested stakeholders to discuss the addition, there is a ‘‘Quick Comment’’
project and identify issues/impacts and option available, which is an easy DEPARTMENT OF ENERGY
concerns. Between February 19 and method for interested persons to submit
March 18, 2008, representatives of FERC text only comments on a Project. The Federal Energy Regulatory
staff participated in public open houses Quick-Comment User Guide can be Commission
sponsored by Ruby in the project area. viewed at www.ferc.gov/docs-filing/ [Docket No. AD08–1–004]
FERC staff explained the NEPA efiling/quick-comment-guide.pdf. Quick
environmental review process to Comment does not require a FERC Review of Cost Submittals by Other
interested stakeholders and noted eRegistration account; however, you Federal Agencies for Administering
comments related to the project. will be asked to provide a valid e-mail Part I of the Federal Power Act; Notice
Our independent analysis of the address. All comments submitted under Requesting Questions and Comments
issues will be included in a draft EIS. either eFiling or the Quick Comment on Fiscal Year 2007 Other Federal
The draft EIS will be mailed to federal, option are placed in the public record Agency Cost Submissions
state, and local government agencies; for the specified docket or Project
elected officials; environmental and number(s). Comments submitted March 28, 2008.
public interest groups; Native American electronically must be submitted by In its Order On Rehearing
tribes; affected landowners; other April 30, 2008. Consolidating Administrative Annual
interested parties; local libraries and Charges Bill Appeals And Modifying
Availability of Additional Information Annual Charges Billing Procedures (109
newspapers; and the FERC’s official
service list for this proceeding. A Additional information about the FERC 61,040), the Commission set forth
comment period will be allotted for Project is available from the FERC’s an annual deadline for Other Federal
review of the draft EIS. We will consider Office of External Affairs at 1–866–208– Agencies (OFAs) to submit their costs
all timely comments on the draft EIS FERC or on the FERC Internet Web site related to Administering Part I of the
rfrederick on PROD1PC67 with NOTICES

and revise the document, as necessary, (http://www.ferc.gov) using the eLibrary Federal Power Act. The Commission
before issuing a final EIS. link. Click on the eLibrary link, click on required the OFAs to submit their costs
‘‘General Search,’’ and enter the docket by December 31st of each fiscal year
Public Participation number excluding the last three digits in (FY) using the OFA Cost Submission
You are encouraged to become the Docket Number field (i.e., PF08–9). Form. The order also announced that a
involved in this process and provide Be sure you have selected an technical conference would be held for

VerDate Aug<31>2005 15:24 Apr 04, 2008 Jkt 214001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1
Federal Register / Vol. 73, No. 67 / Monday, April 7, 2008 / Notices 18791

the purpose of reviewing the submitted preferred method), or by e-mail to Business Information (CBI), or other
cost forms and detailed supporting docket.oeca@epa.gov, or by mail to: EPA information whose public disclosure is
documentation. Docket Center (EPA/DC), Environmental restricted by statute. For further
On March 27, 2008, the Commission Protection Agency, Enforcement and information about the electronic docket,
held a technical conference to review Compliance Docket and Information go to http://www.regulations.gov.
the FY 2007 OFA cost submissions, Center, mail code 2201T, 1200 Title: NESHAP for Petroleum
which was attended by OFAs and Pennsylvania Avenue, NW., Refineries (Renewal).
licensees. As of the date of this notice, Washington, DC 20460; and (2) OMB at: ICR Numbers: EPA ICR Number
the Commission has not received any Office of Information and Regulatory 1692.06, OMB Control Number 2060–
further information that would change Affairs, Office of Management and 0340.
the analysis or figures discussed during Budget (OMB), Attention: Desk Officer ICR Status: This ICR is scheduled to
the Technical Conference. for EPA, 725 17th Street, NW., expire on April 30, 2008. Under OMB
Within three weeks of the date of this Washington, DC 20503. regulations, the Agency may continue to
notice, interested parties may file their FOR FURTHER INFORMATION CONTACT:
conduct or sponsor the collection of
specific questions and comments on the Marı́a Malavé, Compliance Assessment information while this submission is
FY 2007 OFA cost submissions with the and Media Programs Division (Mail pending at OMB. An Agency may not
Commission under Docket No. AD08–1– Code 2223A), Office of Compliance, conduct or sponsor, and a person is not
004. Once filed, the Commission will Environmental Protection Agency, 1200 required to respond to, a collection of
forward the questions and comments to Pennsylvania Avenue, NW., information unless it displays a
the OFAs for response. Washington, DC 20460; telephone currently valid OMB control number.
Anyone with questions pertaining to The OMB control numbers for EPA’s
number: (202) 564–7027; fax number:
the technical conference or this notice regulations in title 40 of the CFR, after
(202) 564–0050; e-mail address:
should contact Fannie Kingsberry at appearing in the Federal Register when
malave.maria@epa.gov.
(202) 502–6108 (via e-mail at approved, are listed in 40 CFR part 9,
SUPPLEMENTARY INFORMATION: EPA has and displayed either by publication in
fannie.kingsberry@ferc.gov), or Norman submitted the following ICR to OMB for the Federal Register or by other
Richardson at (202) 502–6219 (via e- review and approval according to the appropriate means, such as on the
mail at norman.richardson@ferc.gov). procedures prescribed in 5 CFR 1320.12. related collection instrument or form, if
Kimberly D. Bose, On March 9, 2007 (72 FR 10735), EPA applicable. The display of OMB control
Secretary. sought comments on this ICR pursuant numbers in certain EPA regulations is
[FR Doc. E8–7106 Filed 4–4–08; 8:45 am] to 5 CFR 1320.8(d). EPA received no consolidated in 40 CFR part 9.
BILLING CODE 6717–01–P
comments. Any additional comments on Abstract: The National Emission
this ICR should be submitted to EPA Standards for Hazardous Air Pollutants
and OMB within 30 days of this notice. (NESHAP) for Petroleum Refineries,
EPA has established a public docket published at 40 CFR part 63, subpart
ENVIRONMENTAL PROTECTION for this ICR under docket ID number CC, were proposed on July 15, 1994, and
AGENCY EPA–HQ–OECA–2007–0126, which is promulgated on August 18, 1995. These
[EPA–HQ–OECA–2007–0126; FRL–8551–7] available for public viewing online at regulations apply to the following
http://www.regulations.gov, in person existing and new petroleum refining
Agency Information Collection viewing at the Enforcement and process units and emission points
Activities; Submission to OMB for Compliance Docket in the EPA Docket located at refineries that are major
Review and Approval; Comment Center (EPA/DC), EPA West, Room sources of hazardous air pollutants
Request; NESHAP for Petroleum 3334, 1301 Constitution Avenue, NW., (HAPs): Miscellaneous process vents,
Refineries (Renewal), EPA ICR Number Washington, DC. The EPA Docket storage vessels, wastewater streams and
1692.06, OMB Control Number 2060– Center Public Reading Room is open treatment operations, equipment leaks,
0340 from 8:30 a.m. to 4:30 p.m., Monday gasoline loading racks, and marine
through Friday, excluding legal vessel loading operations. These
AGENCY: Environmental Protection holidays. The telephone number for the regulations also apply to storage vessels
Agency (EPA). Reading Room is (202) 566–1744, and and equipment leaks associated with
ACTION: Notice. the telephone number for the bulk gasoline terminals or pipeline
Enforcement and Compliance Docket is breakout stations that are related to an
SUMMARY: In compliance with the
(202) 566–1927. affected petroleum refinery. New
Paperwork Reduction Act (44 U.S.C. Use EPA’s electronic docket and facilities include those that commenced
3501 et seq.), this document announces comment system at http:// construction or reconstruction after the
that an Information Collection Request www.regulations.gov, to submit or view date of proposal. This information is
(ICR) has been forwarded to the Office public comments, access the index being collected to assure compliance
of Management and Budget (OMB) for listing of the contents of the docket, and with 40 CFR part 63, subpart CC.
review and approval. This is a request to access those documents in the docket In general, all NESHAP standards
to renew an existing approved that are available electronically. Once in require initial notifications,
collection. The ICR which is abstracted the system, select ‘‘docket search,’’ then performance tests, and periodic reports.
below describes the nature of the key in the docket ID number identified Owners or operators are also required to
collection and the estimated burden and above. Please note that EPA’s policy is maintain records of the occurrence and
cost. that public comments, whether duration of any startup, shutdown, or
DATES: Additional comments may be
rfrederick on PROD1PC67 with NOTICES

submitted electronically or in paper, malfunction in the operation of an


submitted on or before May 7, 2008. will be made available for public affected facility, or any period during
ADDRESSES: Submit your comments, viewing at http://www.regulations.gov, which the monitoring system is
referencing docket ID number EPA–HQ– as EPA receives them and without inoperative. These notifications, reports,
OECA–2007–0126, to: (1) EPA online change, unless the comment contains and records are essential in determining
using http://www.regulations.gov (our copyrighted material, Confidential compliance, and are required of all

VerDate Aug<31>2005 15:24 Apr 04, 2008 Jkt 214001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1